{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in Germany, with location, power (MW), developer, permitting stage and date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"No single German registry tracks BESS in permitting. Most stand-alone BESS are not BImSchG-listed and undergo confidential district Baugenehmigung (~400 authorities; >=4 MW within 200 m of substations privileged per § 35(1) Nr.12 BauGB since 23.12.2025) or municipal Bebauungsplan procedures. Closest official source is BNetzA's MaStR (753 planned >=1 MW units, 13.1 GW; 303 non-EEG/non-backup), but pre-grant filing is voluntary and only 65 hold post-grant permit data. Municipal consultations publish unstructured on UVP-Verbund and state DiPlanung/Bauleitplanung portals; EC JRC (WoodMac-backed) adds partial pipeline data.","main_caveats":["Pre-permit MaStR registration is voluntary for non-BImSchG projects; 753 planned >=1 MW BESS in MaStR vs 18,158 grid requests (573.5 GW) and 1,937 commitments (54.2 GW) in 2025.","Pending Baugenehmigungen (~400 district Bauaufsichtsbehörden) are non-public administrative files; MaStR's Genehmigung schema requires a mandatory grant date (Datum), so pending applications cannot appear there.","No explicit stand-alone boolean exists in MaStR: 443/753 planned >=1 MW units link to an EEG facility (many PV+BESS), while 303 non-EEG/non-backup units serve as an imperfect stand-alone proxy.","276/753 planned >=1 MW MaStR battery units already carry overdue planned commissioning dates (< 2026-11-15), inflating the apparent active pipeline.","MaStR list JSON returns GenehmigungRegistrierungsdatum (upload date), not actual Genehmigungsdatum / DatumDerAntragstellung (which require scraping unit detail HTML or parsing the 3.2 GB XML dump)."],"confidence":"high","confidence_reason":"Direct inspection of MaStR XSD/PDF schemas (rev 26.2), live API queries (753 records >=1 MW), MaStRV legal text (§§ 5, 15), BNetzA/SMARD reports, UVP portals, and state DiPlanung procedures confirms exact structural gaps.","attributes":[{"attribute":"location","covered":"yes","source_ids":["s001","s002"],"note":"MaStR provides municipality for 753/753 planned >=1 MW units, parcels for 539/753, and lat/lon in DE for 744/753 (9 masked). JRC adds coords.","gap":null,"gap_note":null},{"attribute":"power_mw","covered":"yes","source_ids":["s001","s002"],"note":"MaStR reports Bruttoleistung & Nettonennleistung in kW (divide by 1000 for MW) plus NutzbareSpeicherkapazitaet in kWh. JRC reports MW & MWh.","gap":null,"gap_note":null},{"attribute":"developer","covered":"partial","source_ids":["s001"],"note":"MaStR exposes AnlagenbetreiberName (operator/SPV) for 698/753 legal entities >=1 MW.","gap":"not_published","gap_note":"Natural-person owners are withheld per § 15(1) Nr.2 MaStRV (55/753 >=1 MW unshown); EC JRC publishes no developer column."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s002"],"note":"MaStR shows BetriebsStatus='In Planung' + linked SGE permits (65/753); JRC uses Announced (618), Permitted (8), Under construction (19).","gap":"not_published","gap_note":"Pending Baugenehmigung and § 3(1)/§ 3(2) BauGB consultation milestones are not tracked in MaStR or JRC, only in municipal/UVP notices."},{"attribute":"stage_date","covered":"partial","source_ids":["s001"],"note":"MaStR list API gives EinheitRegistrierungsdatum, GeplantesInbetriebsnahmeDatum, and GenehmigungRegistrierungsdatum (65/753).","gap":"not_published","gap_note":"List API omits Datum and DatumDerAntragstellung (found on detail HTML/XML for 65 granted permits only); JRC omits all permitting dates."}]},"sources":[{"source_id":"s001","name":"Marktstammdatenregister (MaStR) — Planned Battery Storage Units","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","data_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung?sort=Bruttoleistung-desc&page=1&pageSize=250&group=&filter=Betriebs-Status~eq~'31'~and~Energietr%C3%A4ger~eq~'2496'~and~Speichertechnologie~eq~'524'~and~Land~eq~'84'~and~Bruttoleistung+der+Einheit~gt~999","access":"direct_download","format":"JSON","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Marktstammdatenregister (MaStR) — Planned Battery Storage Units","coverage_note":"national (Germany)","data_date":"2026-11-15 (daily snapshot at 00:00:00 CET; latest Einheit record update 2026-11-14)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"problems":["Unfiltered queries return Total=0; technology and country filters are required.","records_total=2,948,611 represents all German battery storage units (all statuses/sizes); 30,952 are In Planung across all sizes; 753 are In Planung >=1 MW."]},"example":null,"members_summary":null},{"source_id":"s002","name":"European Energy Storage Inventory","publisher":"European Commission Joint Research Centre (EC JRC) / Wood Mackenzie","official":false,"landing_url":"https://ses.jrc.ec.europa.eu/european-energy-storage-inventory","data_url":"https://ses.jrc.ec.europa.eu/storage-inventory-tool/api/projects","access":"api","format":"JSON","license":"Commercial underlying data (Wood Mackenzie Limited) displayed under EC JRC disclaimer","language":"en","has_coordinates":true,"location_precision":"municipality","summary":"European Energy Storage Inventory","coverage_note":"Europe (1,191 records in Germany)","data_date":"No dataset snapshot date published on portal or API response","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"problems":["Of 1,191 DE projects, 645 are pre-operational battery projects (618 Announced, 8 Permitted, 19 Under construction); lacks developer, permitting date, and stand-alone fields.","Dataset mixes commercial Wood Mackenzie intelligence (redistribution constraints apply) and lacks publication date metadata."]},"example":{"example_request":"curl -sS -H \"X-App-Request: map-widget\" \"https://ses.jrc.ec.europa.eu/storage-inventory-tool/api/projects\"","example_result":"Base64+XOR payload; decoded object sample: {\"id\":\"167950\",\"title\":\"Total Arnsberg BESS\",\"status\":{\"id\":\"379\",\"name\":\"Permitted\"},\"power\":\"8\",\"capacity\":\"16\",\"facility\":{\"region\":\"North Rhine-Westphalia\",\"country\":{\"name\":\"Germany\"},\"latitude\":\"51.410000\",\"longitude\":\"8.050000\"},\"technology\":{\"name\":\"Lithium-ion batteries\"}}"},"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":null},"local_terms":[{"term":"Marktstammdatenregister (MaStR)","language":"de","meaning":"Federal core energy market data register operated by BNetzA"},{"term":"Vorhabenbezogener Bebauungsplan","language":"de","meaning":"Project-specific municipal zoning plan required when BESS lacks § 35 BauGB privilege"},{"term":"Baugenehmigung","language":"de","meaning":"State building permit issued by district untere Bauaufsichtsbehörde (unpublished while pending)"},{"term":"Untere Bauaufsichtsbehörde","language":"de","meaning":"District/city building authority (~400 nationwide) handling § 35(1) Nr. 12 BauGB BESS permits"},{"term":"Bauleitplanung","language":"de","meaning":"Municipal urban land-use planning (Flächennutzungsplan + Bebauungsplan public consultations)"},{"term":"UVP-Vorprüfung","language":"de","meaning":"Environmental impact screening; triggered for BESS mainly by ancillary forest clearing (Waldumwandlung)"},{"term":"Netzanschlussbegehren","language":"de","meaning":"Grid connection request submitted to TSO/DSO (18,158 in 2025; distinct from permitting)"},{"term":"Stromspeicher","language":"de","meaning":"Electricity storage unit/installation in MaStR (Energieträger ID 2496, Technologie 524 = Batterie)"}],"provenance":{"pass_count":1,"models":["Gemini 4 Hydrogen"],"minutes_estimate":22,"pages_opened":88,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/de/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/de/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/de.json"}
