{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in Germany, with location, power (MW), developer, permitting stage and date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"No single German registry tracks BESS in permitting. Most stand-alone BESS are not BImSchG-listed and undergo confidential district Baugenehmigung (~400 authorities; >=4 MW within 200 m of substations privileged per § 35(1) Nr.12 BauGB since 23.12.2025) or municipal Bebauungsplan procedures. Closest official source is BNetzA's MaStR (753 planned >=1 MW units, 13.1 GW; 303 non-EEG/non-backup), but pre-grant filing is voluntary and only 65 hold post-grant permit data. Municipal consultations publish unstructured on UVP-Verbund and state DiPlanung/Bauleitplanung portals; EC JRC (WoodMac-backed) adds partial pipeline data.","main_caveats":["Pre-permit MaStR registration is voluntary for non-BImSchG projects; 753 planned >=1 MW BESS in MaStR vs 18,158 grid requests (573.5 GW) and 1,937 commitments (54.2 GW) in 2025.","Pending Baugenehmigungen (~400 district Bauaufsichtsbehörden) are non-public administrative files; MaStR's Genehmigung schema requires a mandatory grant date (Datum), so pending applications cannot appear there.","No explicit stand-alone boolean exists in MaStR: 443/753 planned >=1 MW units link to an EEG facility (many PV+BESS), while 303 non-EEG/non-backup units serve as an imperfect stand-alone proxy.","276/753 planned >=1 MW MaStR battery units already carry overdue planned commissioning dates (< 2026-11-15), inflating the apparent active pipeline.","MaStR list JSON returns GenehmigungRegistrierungsdatum (upload date), not actual Genehmigungsdatum / DatumDerAntragstellung (which require scraping unit detail HTML or parsing the 3.2 GB XML dump)."],"confidence":"high","confidence_reason":"Direct inspection of MaStR XSD/PDF schemas (rev 26.2), live API queries (753 records >=1 MW), MaStRV legal text (§§ 5, 15), BNetzA/SMARD reports, UVP portals, and state DiPlanung procedures confirms exact structural gaps.","attributes":[{"attribute":"location","covered":"yes","source_ids":["s001","s002"],"note":"MaStR provides municipality for 753/753 planned >=1 MW units, parcels for 539/753, and lat/lon in DE for 744/753 (9 masked). JRC adds coords.","gap":null,"gap_note":null},{"attribute":"power_mw","covered":"yes","source_ids":["s001","s002"],"note":"MaStR reports Bruttoleistung & Nettonennleistung in kW (divide by 1000 for MW) plus NutzbareSpeicherkapazitaet in kWh. JRC reports MW & MWh.","gap":null,"gap_note":null},{"attribute":"developer","covered":"partial","source_ids":["s001"],"note":"MaStR exposes AnlagenbetreiberName (operator/SPV) for 698/753 legal entities >=1 MW.","gap":"not_published","gap_note":"Natural-person owners are withheld per § 15(1) Nr.2 MaStRV (55/753 >=1 MW unshown); EC JRC publishes no developer column."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s002"],"note":"MaStR shows BetriebsStatus='In Planung' + linked SGE permits (65/753); JRC uses Announced (618), Permitted (8), Under construction (19).","gap":"not_published","gap_note":"Pending Baugenehmigung and § 3(1)/§ 3(2) BauGB consultation milestones are not tracked in MaStR or JRC, only in municipal/UVP notices."},{"attribute":"stage_date","covered":"partial","source_ids":["s001"],"note":"MaStR list API gives EinheitRegistrierungsdatum, GeplantesInbetriebsnahmeDatum, and GenehmigungRegistrierungsdatum (65/753).","gap":"not_published","gap_note":"List API omits Datum and DatumDerAntragstellung (found on detail HTML/XML for 65 granted permits only); JRC omits all permitting dates."}]},"sources":[{"source_id":"s001","name":"Marktstammdatenregister (MaStR) — Planned Battery Storage Units","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","data_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung?sort=Bruttoleistung-desc&page=1&pageSize=250&group=&filter=Betriebs-Status~eq~'31'~and~Energietr%C3%A4ger~eq~'2496'~and~Speichertechnologie~eq~'524'~and~Land~eq~'84'~and~Bruttoleistung+der+Einheit~gt~999","access":"direct_download","format":"JSON","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regulator","adds":null,"first_seen_pass":1,"rank":1,"summary":"Marktstammdatenregister (MaStR) — Planned Battery Storage Units","coverage_note":"national (Germany)","data_date":"2026-11-15 (daily snapshot at 00:00:00 CET; latest Einheit record update 2026-11-14)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"national (Germany)"},"fine_print":{"unit":{"value":"kW (Bruttoleistung & Nettonennleistung) and kWh (NutzbareSpeicherkapazitaet); divide kW by 1000 for MW","quote":"Bruttoleistung | Bruttoleistung in kW | decimal | Ja | 150.112","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"inclusion_rule":{"value":"Grid-connected stationary storage units; mandatory pre-commissioning filing only after permit grant for BImSchG/WindSeeG/WHG/federal permits, voluntary for others","quote":"Eine gesetzliche Pflicht zur Registrierung geplanter Einheiten besteht nur, wenn für diese eine der folgenden Zulassungen benötigt wird: Zulassung nach dem Bundes-Immissionsschutzgesetz Zulassung nach dem Windenergie-auf-See-Gesetz Zulassung nach dem Wasserhaushaltsgesetz Zulassung nach sonstigem Bundesrecht","url":"https://www.marktstammdatenregister.de/MaStRHilfe/subpages/registrierungVerpflichtendAnlagen.html","attempts":[]},"reference_date":{"value":"2026-11-15 (daily snapshot at 00:00:00 CET; latest Einheit record update 2026-11-14)","quote":"Letzte Aktualisierung: 15.11.2026 00:00:00","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"update_frequency":{"value":"Daily (prior-day snapshot generated ~05:00 CET; live portal updates continuously)","quote":"Der Datendownload wird in der Regel um 5:00 Uhr auf den zu diesem Zeitpunkt gültigen Datenstand aktualisiert.","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"exclusions":{"value":"Off-grid island storage exempt; natural-person owners masked; coords/streets hidden <=30 kW; pending permits excluded from SGE (grant date mandatory)","quote":"Daten zu Marktakteuren nach der Anlage Tabelle A werden nicht veröffentlicht, wenn der Marktakteur eine natürliche Person ist","url":"https://www.gesetze-im-internet.de/mastrv/__15.html","attempts":[]}},"key_fields":[{"field":"MaStRNummer","meaning":"Unique unit identifier (SEE...); Id maps to public HTML detail page /MaStR/Einheit/Detail/IndexOeffentlich/{Id}"},{"field":"EinheitName","meaning":"Operator-chosen project/unit name"},{"field":"Bruttoleistung","meaning":"Gross electrical power in kW (divide by 1000 for MW)"},{"field":"NutzbareSpeicherkapazitaet","meaning":"Usable energy storage capacity in kWh"},{"field":"BetriebsStatusId","meaning":"Operational status: 31 = In Planung, 35 = In Betrieb, 37 = Vorübergehend stillgelegt, 38 = Endgültig stillgelegt"},{"field":"AnlagenbetreiberName","meaning":"Legal-entity operator/SPV name (withheld for natural persons)"},{"field":"Breitengrad","meaning":"WGS84 latitude (plus Laengengrad longitude, Gemeinde, Flurstueck)"},{"field":"EegAnlageMastrNummer","meaning":"Linked EEG installation ID (presence indicates co-located/EEG-coupled system; absent for 303 non-backup planned units >=1 MW)"},{"field":"GenehmigungsMastrNummer","meaning":"Linked SGE permit ID (present on only 65/753 >=1 MW planned BESS, alongside Genehmigungbehoerde, AktenzeichenGenehmigung, GenehmigungRegistrierungsdatum)"},{"field":"GeplantesInbetriebsnahmeDatum","meaning":"Planned commissioning date (epoch-ms JSON format /Date(...)/)"}],"how_to_use":{"example_request":"curl -sS \"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung?sort=Bruttoleistung-desc&page=1&pageSize=250&group=&filter=Betriebs-Status~eq~'31'~and~Energietr%C3%A4ger~eq~'2496'~and~Speichertechnologie~eq~'524'~and~Land~eq~'84'~and~Bruttoleistung+der+Einheit~gt~999\"","example_result":"{\"Total\":753,\"Data\":[{\"Id\":11137142,\"MaStRNummer\":\"SEE976701215879\",\"EinheitName\":\"GigaBattery Jänschwalde 1000\",\"Bruttoleistung\":1000000.0,\"NutzbareSpeicherkapazitaet\":4000000.0,\"BetriebsStatusName\":\"In Planung\",\"Bundesland\":\"Brandenburg\",\"Gemeinde\":\"Teichland\",\"Breitengrad\":51.833902,\"Laengengrad\":14.46658,\"AnlagenbetreiberName\":\"LEAG Clean Power GmbH\",\"GeplantesInbetriebsnahmeDatum\":\"/Date(1830211200000)/\",\"GenehmigungsMastrNummer\":null}]}","steps":["Paginate page=1..ceil(Total/250) on GetErweiterteOeffentlicheEinheitStromerzeugung with filter Betriebs-Status='31', Energieträger='2496', Speichertechnologie='524', Land='84', Bruttoleistung>999 for >=1 MW planned BESS.","Convert Bruttoleistung (kW) / 1000 -> MW and parse /Date(ms)/ timestamps to ISO dates.","Optionally filter out EegAnlageMastrNummer != null and IsEinheitNotstromaggregat == true to approximate stand-alone grid BESS (303 of 753 units; 10,915.5 MW).","To retrieve permit grant date (Genehmigungsdatum), application date (DatumDerAntragstellung), permit type (Art der Genehmigung), and AC/DC coupling, fetch /MaStR/Einheit/Detail/IndexOeffentlich/{Id} or download EinheitenGenehmigung.xml & EinheitenStromSpeicher.xml inside the daily 3.2 GB Gesamtdatenexport ZIP at /MaStR/Datendownload."],"reading_traps":["GenehmigungRegistrierungsdatum in the JSON list API is when the operator registered the permit in MaStR, NOT when the authority issued it or when the application was filed.","276 of 753 planned >=1 MW units already have GeplantesInbetriebsnahmeDatum < 2026-11-15 (stale/delayed entries never updated or cancelled).","Voluntary pre-grant filing means most active municipal Bebauungsplan and district Baugenehmigung pipelines are absent here; BNetzA counted 1,937 grid connection commitments (54.2 GW) in 2025 vs 753 units >=1 MW (13.1 GW) in MaStR.","BESS units <=1 MW or behind-the-meter industrial storage can appear if Bruttoleistung threshold is lowered (30,952 planned battery units exist across all sizes, mostly residential)."]},"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":983105,"records_total":2948611,"records_for_country":753,"problems":["Unfiltered queries return Total=0; technology and country filters are required.","records_total=2,948,611 represents all German battery storage units (all statuses/sizes); 30,952 are In Planung across all sizes; 753 are In Planung >=1 MW."]},"evidence":[{"claim":"Project registration duty in MaStR triggers only within 1 month AFTER permit grant for BImSchG/WindSeeG/federal approvals","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","quote":"Betreiber müssen ihre Projekte im Marktstammdatenregister gemäß Absatz 5 registrieren, wenn die Errichtung oder der Betrieb der Stromerzeugungseinheit einer Zulassung nach dem Bundes-Immissionsschutzgesetz, dem Windenergie-auf-See-Gesetz oder sonstigem Bundesrecht bedarf und die Zulassung erteilt wurde."},{"claim":"EinheitenGenehmigung schema requires Datum (permit grant date) as mandatory field (Pflicht: Ja), precluding pending permits without a grant date","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","quote":"Datum | Datum, ab dem die Genehmigung für Bau oder Betrieb der Stromerzeugungseinheit erteilt ist | date | Ja"}],"members":[],"members_summary":null},{"source_id":"s002","name":"European Energy Storage Inventory","publisher":"European Commission Joint Research Centre (EC JRC) / Wood Mackenzie","official":false,"landing_url":"https://ses.jrc.ec.europa.eu/european-energy-storage-inventory","data_url":"https://ses.jrc.ec.europa.eu/storage-inventory-tool/api/projects","access":"api","format":"JSON","license":"Commercial underlying data (Wood Mackenzie Limited) displayed under EC JRC disclaimer","language":"en","has_coordinates":true,"location_precision":"municipality","publisher_type":"supranational","adds":"Cross-checks non-MaStR utility pipeline: 645 pre-operational German battery entries (618 Announced, 8 Permitted, 19 Under construction) including early-stage developer announcements missing from MaStR.","first_seen_pass":1,"rank":2,"summary":"European Energy Storage Inventory","coverage_note":"Europe (1,191 records in Germany)","data_date":"No dataset snapshot date published on portal or API response","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Europe (1,191 records in Germany)"},"fine_print":{"unit":{"value":"MW (power) and MWh (capacity, estimated if estimated_capacity == 1)","quote":"Power (MW): ... Capacity (MWh): ... Estimated Capacity (MWh):","url":"https://ses.jrc.ec.europa.eu/modules/custom/storage_inventory_tool/js/map.js?v=0.1","attempts":[]},"inclusion_rule":{"value":"Utility-scale and commercial European storage projects sourced primarily from Wood Mackenzie plus public/EC inputs","quote":"The European Energy Inventory Storage dataset is mainly based on public data and data from Wood Mackenzie. Wood Mackenzie Limited, subject to any additional data modifications and/or input provided by the EC or any of its authorised 3rd party contributor.","url":"https://ses.jrc.ec.europa.eu/european-energy-storage-inventory","attempts":[]},"reference_date":{"value":"No dataset snapshot date published on portal or API response","quote":"Explore the map of Energy Storage Projects using interactive tools and filter options by status, technology, subtechnology, and more.","url":"https://ses.jrc.ec.europa.eu/european-energy-storage-inventory","attempts":["Inspected landing page HTML, interactive map HTML, map.js, and decoded API JSON; no reference timestamp is included."]},"update_frequency":{"value":"Not disclosed on portal","quote":"The European Energy Inventory Storage dataset is mainly based on public data and data from Wood Mackenzie.","url":"https://ses.jrc.ec.europa.eu/european-energy-storage-inventory","attempts":["Inspected storage inventory pages and JS endpoints; no update cadence stated."]},"exclusions":{"value":"Omits developer names, permitting filing/grant dates, and stand-alone vs co-located classification; /storage-inventory-export download URL returns 404","quote":"STATUS: Permitted Power: 8 MW Capacity: 16 MWh Duration: 2 hours Units: 1 Technology and subtechnology ELECTROCHEMICAL | Lithium-ion batteries","url":"https://ses.jrc.ec.europa.eu/storage-inventory-maps/project/total-arnsberg-bess","attempts":[]}},"key_fields":[{"field":"title","meaning":"Project name (often embeds developer/location, e.g. 'Total Arnsberg BESS', 'Kyon Diesdorfer Wuhne')"},{"field":"status.name","meaning":"Project status: Announced, Permitted, Under construction, Operational, Inactive"},{"field":"power","meaning":"Rated power in MW"},{"field":"capacity","meaning":"Energy capacity in MWh (check estimated_capacity == '1')"},{"field":"facility.region","meaning":"Federal state (Bundesland) name in English"},{"field":"facility.latitude","meaning":"Point latitude (plus facility.longitude; frequently rounded to ~0.01 deg)"},{"field":"technology.name","meaning":"Storage technology (filter out PHS, CAES, Hydrogen/P2G, Thermal to keep batteries)"}],"how_to_use":{"example_request":"curl -sS -H \"X-App-Request: map-widget\" \"https://ses.jrc.ec.europa.eu/storage-inventory-tool/api/projects\"","example_result":"Base64+XOR payload; decoded object sample: {\"id\":\"167950\",\"title\":\"Total Arnsberg BESS\",\"status\":{\"id\":\"379\",\"name\":\"Permitted\"},\"power\":\"8\",\"capacity\":\"16\",\"facility\":{\"region\":\"North Rhine-Westphalia\",\"country\":{\"name\":\"Germany\"},\"latitude\":\"51.410000\",\"longitude\":\"8.050000\"},\"technology\":{\"name\":\"Lithium-ion batteries\"}}","steps":["Request /storage-inventory-tool/api/projects with header X-App-Request: map-widget.","Base64-decode the text response and XOR bytewise with key string 'X7k#mP2vL9qR4wZ8nT1s' (from map.js?v=0.1) to parse JSON.","Filter projects where facility.country.name == 'Germany', status.name in ('Announced','Permitted','Under construction'), and technology excludes Hydrogen/Power to Gas/PHS/CAES/Thermal."],"reading_traps":["3 of the 11 German 'Permitted' entries are hydrogen electrolysis plants (GreenHydroChem, Lingen, Jänschwalde), leaving 8 permitted battery projects.","Payload is XOR-obfuscated rather than raw JSON; standard REST GET without X-App-Request or XOR decoding cannot parse it directly.","Coordinates are frequently rounded to municipality centroids (e.g. 51.410000, 8.050000) and commissioningYear is null on all 662 German pre-operational records."]},"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"content_type":"text/plain; charset=utf-8","size_bytes":2729756,"records_total":3949,"records_for_country":1191,"problems":["Of 1,191 DE projects, 645 are pre-operational battery projects (618 Announced, 8 Permitted, 19 Under construction); lacks developer, permitting date, and stand-alone fields.","Dataset mixes commercial Wood Mackenzie intelligence (redistribution constraints apply) and lacks publication date metadata."]},"evidence":[{"claim":"JRC storage inventory is primarily sourced from Wood Mackenzie plus public/EC inputs","url":"https://ses.jrc.ec.europa.eu/european-energy-storage-inventory","quote":"Disclaimer: The European Energy Inventory Storage dataset is mainly based on public data and data from Wood Mackenzie."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Bundesnetzagentur (BNetzA) for energy register/grid; BMWSB (federal building code BauGB) and state/district building authorities for permitting","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/artikel.html"},"operators":{"structure":"many","note":"Permitting authority is split across ~400 Landkreise/kreisfreie Städte (untere Bauaufsichtsbehörden issuing confidential Baugenehmigungen under state LBO & § 35(1) Nr.12 BauGB), ~10,700 municipalities (Bebauungspläne), and regional authorities for rare BImSchG/UVP triggers. Stand-alone BESS lack an independent 4. BImSchV category; grid queues sit separately with 4 TSOs and >800 DSOs.","census_url":"https://www.uvp-portal.de/de/laenderportale"},"publication_obligation":{"exists":"yes","norm":"§ 5 Abs. 4–5 & § 15 MaStRV; § 35 Abs. 1 Nr. 11–12 & §§ 3, 4a BauGB (BGBl. 2025 I Nr. 348); § 5 UVPG","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","what_must_be_published":"MaStRV § 5(4)-(5) mandates project registration in MaStR within 1 month AFTER permit grant for BImSchG, WindSeeG, WHG, or federal-law permits, not before. State Baugenehmigungen are exempt from pre-grant MaStR obligation and are not published while pending; municipal Bebauungspläne require public consultation notices (§§ 3, 4a BauGB).","frequency":"MaStR updates live in UI and exports daily at ~05:00 CET; Bauleitplanung & UVP notices publish per procedural milestone."},"consolidated_republication":{"found":"no_evidence_found","note":"Third-party portals (bess-market.com, bess-check.com, battery-charts.de, energiewende-dashboard.org) republish MaStR rather than permitting portals; JRC republishes proprietary Wood Mackenzie project records.","checked_pages":[{"organization":"GovData (FITKO / IT-Planungsrat)","url":"https://www.govdata.de/","saw":"Federal open data portal (165,423 datasets); CKAN package_search?q=Batteriespeicher returned 9 installed-capacity/GDI-DE datasets and 0 permitting lists."},{"organization":"UVP-Verbund (Länder cooperation)","url":"https://www.uvp-verbund.de/freitextsuche?q=Batteriespeicher","saw":"Aggregates EIA and select land-use notices across all 16 Länder, but query 'Batteriespeicher' returns only 22 items (mostly forest conversion or co-located biogas § 16 BImSchG notices)."},{"organization":"DiPlanung (VDiPB multi-state planning platform)","url":"https://diplanung.de/","saw":"Open-source digital planning suite adopted by 7 Länder (HH, BE, BY, BB, HB, NI, SH), not a national single database; each state hosts its own portal (e.g. by.beteiligung.diplanung.de)."},{"organization":"Netztransparenz.de (4 German TSOs)","url":"https://www.netztransparenz.de/de-de/Systemdienstleistungen/Betriebsfuehrung/Batteriespeichersysteme","saw":"Regulatory/ancillary-service rules for BESS; publishes no project permitting queue or list."}]}},"national_registry":{"exists":"no_evidence_found","note":"No national permitting registry tracks BESS currently in permitting. BNetzA's Marktstammdatenregister (MaStR) is the mandatory national electricity unit register and contains voluntary 'In Planung' units plus post-grant federal permits (65/753 >=1 MW), not active permit applications.","checked_pages":[{"organization":"Bundesnetzagentur (MaStR)","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","saw":"Unit registry covering 753 planned >=1 MW BESS (30,952 all sizes), but pre-grant registration is voluntary for BauGB/LBO projects and SGE requires a mandatory grant date."},{"organization":"Bundesnetzagentur (SMARD Electricity Market Data)","url":"https://www.smard.de/page/home/topic-article/444/221208/entwicklung-bei-uenb-und-vnb","saw":"Publishes only aggregate counts/GW of grid requests (18,158 requests / 573.5 GW in 2025) and commitments (1,937 / 54.2 GW), with no project list or stand-alone split."},{"organization":"Umweltbundesamt / UVP-Portal des Bundes","url":"https://www.uvp-portal.de/de/vorhaben?search_api_fulltext=Batteriespeicher","saw":"Federal EIA portal search for 'Batteriespeicher' returned 0 matches ('Die Suche mit den aktuellen Filtereinstellungen führte zu keinem Treffer.')."},{"organization":"Bundesministerium für Wohnen, Stadtentwicklung und Bauwesen (BMWSB)","url":"https://www.bmwsb.bund.de/DE/bauen/baurecht/baurecht_node.html","saw":"Federal building code (BauGB) hub; confirms planning/permitting execution rests with states and municipalities with no federal permit registry."},{"organization":"GovData (FITKO)","url":"https://www.govdata.de/","saw":"CKAN search for 'Batteriespeicher' found 9 statistical/GDI-DE layers and 0 permitting project datasets."}]},"if_unstructured":{"summary":null,"recipe":["Pull MaStR Betriebs-Status=31, Energieträger=2496, Speichertechnologie=524, Bruttoleistung>999 and cross-match against EC JRC Germany pre-operational battery projects to establish a baseline pipeline.","Scrape UVP-Verbund (/freitextsuche?q=Batteriespeicher and /freitextsuche?q=Batteriespeicheranlage) across Bauleitplanung and Negative Vorprüfungen to capture EIA-screened BESS and forest-conversion triggers.","Crawl state Bauleitplanung portals—DiPlanBeteiligung portals (HH, BE, BY, BB, HB, NI, SH via diplanung.de) plus non-DiPlanung portals (bauleitplanung.nrw.de, beteiligung.nrw.de, BW/HE/SN portals)—filtering titles for 'Batteriespeicher', 'BESS', 'Energiespeicher', and 'Sondergebiet Speicher'.","For non-privileged projects not in state portals and for § 35(1) Nr. 12 BauGB privileged Baugenehmigungen, monitor municipal council RIS agendas for § 36 BauGB consent ('Einvernehmen' + 'Batteriespeicher') and download attached PDFs (Begründung) to extract developer name and MW."],"location_method":"Extract Gemarkung and Flurstück parcel numbers from Bebauungsplan/UVP notices and geocode via state ALKIS/Geoportal WFS services; for MaStR records, validate Breitengrad/Laengengrad directly against parcel boundaries and substations.","cross_with":["ALKIS cadastral parcel layers (via state surveying authorities / Geoportal.de) to turn Gemarkung + Flurstück into exact polygons.","High/extra-high-voltage substation locations (OSMap/TSO network maps) because § 35(1) Nr. 12 BauGB limits stand-alone privilege to <=200 m of eligible substations/power plants.","SMARD / BNetzA grid request statistics and TSO milestone guidance (Reifegradverfahren) to calibrate attrition and unbuilt speculative queues."],"where_published":[{"name":"UVP-Verbund (16 Länder Environmental Impact Assessment Portal)","url":"https://www.uvp-verbund.de/","what":"Screening notices (Negative Vorprüfungen) and land-use notices (Bauleitplanung) when a BESS triggers EIA screening (e.g. Waldumwandlung) or voluntary state upload.","how_to_search_inside":"GET /freitextsuche?q=Batteriespeicher (returns 22 hits; filter by Bauleitplanung or Negative Vorprüfungen; note q=Stromspeicher returned 0).","example_document":{"url":"https://www.uvp-verbund.de/trefferanzeige?docuuid=c61afee1-9390-499e-9ee2-8dad2e9a1636","what_it_gives":"Developer (SZ Solarpark Schleife GmbH), site & parcels (Gemarkung Rohne, Flurstücke 1/18 & 1/19, 20,187 m²), stage (Negative Vorprüfung for forest conversion to build BESS + substation), updated date (16.02.2026); omits MW."}},{"name":"DiPlanung / DiPlanBeteiligung State Portals (7 VDiPB Länder, e.g. Bayern)","url":"https://by.beteiligung.diplanung.de/","what":"Public consultations (§ 3(1) early & § 3(2) formal BauGB) for municipal Bebauungspläne including project-specific BESS zoning plans across VDiPB member states (HH, BE, BY, BB, HB, NI, SH).","how_to_search_inside":"Fetch state DiPlanBeteiligung root or search portal for 'Batteriespeicher', 'Speicher', 'BESS', and inspect /verfahren/{slug}/public/detail.","example_document":{"url":"https://by.beteiligung.diplanung.de/verfahren/batteriespeicherpark-neuried/public/detail","what_it_gives":"Municipality (Markt Indersdorf), parcel IDs (Fl.-Nr. 2098 & 2099 Gemarkung Ainhofen), stage (Beteiligung Öffentlichkeit § 3(2) BauGB), council approval date (22.04.2026), consultation window (05.05.2026–15.06.2026)."}},{"name":"Non-DiPlanung State Planning Portals (e.g. NRW Beteiligung & Bauleitplanung)","url":"https://bauleitplanung.nrw.de","what":"State-level municipal planning participation & adopted/draft Bebauungsplan portals in states outside DiPlanung (NRW, BW, HE, RP, SL, ST, SN, TH, MV).","how_to_search_inside":"Query state Beteiligungsportal (e.g. https://beteiligung.nrw.de/portal/rpv/beteiligung/themen) and municipal planning portals by keyword 'Batteriespeicher'.","example_document":{"url":"https://beteiligung.nrw.de/portal/rpv/startseite","what_it_gives":"Municipal public-consultation index exposing active local zoning notices and statutory display periods in NRW."}},{"name":"District Building Authorities (Untere Bauaufsichtsbehörden, ~400 districts)","url":"https://www.bmwsb.bund.de/DE/bauen/baurecht/baurecht_node.html","what":"Direct § 35(1) Nr. 12 BauGB / LBO Baugenehmigung proceedings for privileged stand-alone BESS (>=4 MW within 200 m of eligible substations).","how_to_search_inside":"Pending building permits are non-public; monitor local municipal council minutes (Ratsinformationssysteme) for § 36 BauGB municipal-consent agenda items ('Einvernehmen').","example_document":{"url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/11501234","what_it_gives":"After grant, voluntary MaStR filings expose Stadt Horstedt Untere Bauaufsichtsbehörde, filing date (16.08.2024), grant date (10.10.2024), permit ref (600112212024) for 146.5 MW Kyon-53."}}]},"related_not_answering":[{"name":"BNetzA Kraftwerksliste","url":"https://www.bundesnetzagentur.de/EN/Areas/Energy/SecurityOfSupply/GeneratingCapacity/PowerPlantList/start.html","why":"Covers only operational, reserve, and decommissioned plants >=10 MW (Datenstand 26.06.2026); excludes projects in permitting."},{"name":"BNetzA Zu- und Rückbauliste (Planned Construction >=10 MW)","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/artikel.html","why":"ZuUndRueckbau.xlsx (26.06.2026) tracks only projects >=10 MW already 'in Bau oder Probebetrieb' under § 35 EnWG (21 BESS rows), not permitting-stage projects."},{"name":"BNetzA / SMARD Grid Connection Requests & Commitments Statistics","url":"https://www.smard.de/page/home/topic-article/444/221208/entwicklung-bei-uenb-und-vnb","why":"Reports only aggregate totals (18,158 requests / 573.5 GW in 2025; 1,937 commitments / 54.2 GW in 2025; 64 TSO commitments / 24.7 GW by 01.04.2026) with no project list or stand-alone split."},{"name":"TransnetBW Netzanschlusskarte & Reifegradverfahren","url":"https://www.transnetbw.de/de/transparenz/netzzugang-und-entgelt/netzanschlusskarte","why":"Shows substation hosting-capacity status and connection maturity guidelines, not a public list of applicant BESS projects."},{"name":"BESS-Market Project Database / Battery-Charts / Energiewende-Dashboard / BESS-Check","url":"https://bess-market.com/de/intelligence/project-database/","why":"Pure downstream MaStR aggregators adding no independent permitting data; bess-market.com/de/projects/find/ lists 0 developer-submitted projects."},{"name":"OpenStreetMap (Taginfo / Overpass)","url":"https://taginfo.openstreetmap.org/api/4/tag/overview?key=proposed%3Aplant%3Asource&value=battery","why":"Effectively empty for permitting BESS: only 6 proposed and 2 under-construction plant:source=battery ways mapped worldwide."}],"open_questions":["Which share of the 443 planned >=1 MW MaStR battery units with an EegAnlageMastrNummer are stand-alone storage facilities registered under EEG frameworks versus true co-located PV/wind+BESS plants (requires joining AnlagenEegSpeicher.xml & AnlagenStromErzeugung in the 3.2 GB XML dump)?","What exact percentage of Germany's post-23.12.2025 § 35(1) Nr. 12 BauGB applications sit inside confidential district Baugenehmigungen versus municipal Bebauungspläne on state portals outside DiPlanung (BW, HE, RP, SN, etc.)?"],"history":[{"pass":1,"date":"2026-11-15","role":"research","model":"Gemini 4 Hydrogen","rules_version":"6.5","note":"Initial research pass. No dedicated permitting registry exists; MaStR covers voluntary planned BESS (753 units >=1 MW) plus 65 post-grant SGE records; pending permits scatter across LBO districts and municipal Bauleitplanung portals.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"no_evidence_found"},"sources":{"total":2,"new":2,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":88,"minutes":22}}],"local_terms":[{"term":"Marktstammdatenregister (MaStR)","language":"de","meaning":"Federal core energy market data register operated by BNetzA"},{"term":"Vorhabenbezogener Bebauungsplan","language":"de","meaning":"Project-specific municipal zoning plan required when BESS lacks § 35 BauGB privilege"},{"term":"Baugenehmigung","language":"de","meaning":"State building permit issued by district untere Bauaufsichtsbehörde (unpublished while pending)"},{"term":"Untere Bauaufsichtsbehörde","language":"de","meaning":"District/city building authority (~400 nationwide) handling § 35(1) Nr. 12 BauGB BESS permits"},{"term":"Bauleitplanung","language":"de","meaning":"Municipal urban land-use planning (Flächennutzungsplan + Bebauungsplan public consultations)"},{"term":"UVP-Vorprüfung","language":"de","meaning":"Environmental impact screening; triggered for BESS mainly by ancillary forest clearing (Waldumwandlung)"},{"term":"Netzanschlussbegehren","language":"de","meaning":"Grid connection request submitted to TSO/DSO (18,158 in 2025; distinct from permitting)"},{"term":"Stromspeicher","language":"de","meaning":"Electricity storage unit/installation in MaStR (Energieträger ID 2496, Technologie 524 = Batterie)"}],"provenance":{"pass_count":1,"models":["Gemini 4 Hydrogen"],"minutes_estimate":22,"pages_opened":88,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/de/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/de/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/de.json"}