{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"battery-storage","question":"Where can I get a list of battery storage (BESS) installations in operation in Germany, with location, power (MW), energy (MWh), operator and commissioning date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"structured","non_official_data":"partial","summary":"The Bundesnetzagentur's Marktstammdatenregister (MaStR) is the official unit-level register of reported grid-connected battery units in Germany: status, gross/net kW, usable kWh, PLZ/Gemeinde (coordinates only above 30 kW), operator and commissioning date. Query it without login through the public viewer's JSON service or the daily XML export. On 2026-11-26, 2,929,627 battery units were In Betrieb, 556 of them above 1 MW (4.75 GW, 8.37 GWh). Rows are units: group sites by LokationMastrNr. Natural-person operators are masked.","main_caveats":["MaStR rows are units (SEE), not installations: one site can be many units (SWM Uppenborn: 10 × 2,610 kW). Group by LokationMastrNr (SEL) and sum storage rows only.","Over 99.8% of the 2.93 million operating battery units are connected at Niederspannung; there is no official grid-scale flag, so state the size or voltage filter used.","Coordinates are withheld for units ≤30 kW and for a few large anonymised units (e.g. RWE Werne, LEAG Big Battery Lausitz), which show only PLZ and place.","Natural-person operators are masked; data are self-declared and registered up to a month (sometimes more) after commissioning, so the latest weeks are incomplete.","The viewer's CSV export stops at 25,000 rows; use the JSON paging or the daily XML export."],"confidence":"high","confidence_reason":"All counts and field meanings come from live MaStR queries, the official export documentation and the MaStRV text opened on 2026-11-26; only the non-official sources stayed untested.","attributes":[{"attribute":"location","covered":"yes","source_ids":["mastr-units-api","mastr-bulk-export"],"note":"Every unit has PLZ/Ort/Gemeinde; WGS84 coordinates only for units >30 kW (§15 MaStRV): 6,646 operating units, 550 of 556 >1 MW.","gap":null,"gap_note":null},{"attribute":"power_mw","covered":"yes","source_ids":["mastr-units-api","mastr-bulk-export","bnetza-kraftwerksliste"],"note":"Bruttoleistung and Nettonennleistung in kW, discharge (Ausspeicher) side; no charging-power field for batteries. Kraftwerksliste in MW.","gap":null,"gap_note":null},{"attribute":"energy_mwh","covered":"yes","source_ids":["mastr-units-api","mastr-bulk-export"],"note":"NutzbareSpeicherkapazitaet in kWh on the linked storage object (SSE); empty for 57 operating units, filled for all 556 >1 MW.","gap":null,"gap_note":null},{"attribute":"operator","covered":"partial","source_ids":["mastr-units-api","mastr-bulk-export","bnetza-kraftwerksliste"],"note":"Operator name and ABR number for organisations; 'natürliche Person (ABR…)' for 2,851,374 operating units, incl. 19 of 556 >1 MW.","gap":"restricted","gap_note":"§15 Abs. 1 Nr. 2 MaStRV: data of natural-person operators are not published; only the masked ABR number is visible."},{"attribute":"commissioning_date","covered":"yes","source_ids":["mastr-units-api","mastr-bulk-export"],"note":"Inbetriebnahmedatum (first technical commissioning) for all operating units; registration date and date at current site are separate fields.","gap":null,"gap_note":null}]},"sources":[{"source_id":"mastr-units-api","name":"Marktstammdatenregister (MaStR) – Erweiterte öffentliche Einheitenübersicht, Stromerzeugungseinheiten (JSON grid service and CSV table export)","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","data_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung","access":"api","format":"JSON (Kendo grid service, GET with filter string); CSV via the page's table export","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0 (stated on the MaStR Datendownload page for the public MaStR data)","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Official, unit-level register of reported grid-connected battery units in Germany with status, kW, usable kWh, location, operator and commissioning date; queryable without login via the viewer's JSON grid service.","coverage_note":"2,929,627 battery units In Betrieb on 2026-11-26 (2,979,782 all statuses); 556 operating units >1 MW totalling 4,751 MW gross / 8,373 MWh. Coordinates only for units >30 kW.","data_date":"2026-11-26 (Datenstand 00:00 Uhr)","caveats":["Rows are units, not sites: group by LokationMastrNr.","Natural-person operators and ≤30 kW locations are masked.","CSV export capped at 25,000 rows; use JSON paging or the bulk XML."],"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"problems":["The page's CSV table export is capped: 'Der Tabellen-Export enthält nur die ersten 25.000 Datensätze Ihrer Auswahl.'","Operator identity withheld for natural persons; location reduced to PLZ/Ort for units ≤30 kW and for some large units flagged as anonymised.","The JSON service is the viewer's internal grid endpoint; it is not documented as an API (the documented interfaces are the XML download and a registered SOAP Webdienst)."]},"example":{"example_request":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung?sort=Bruttoleistung-desc&page=1&pageSize=5&group=&filter=Energietr%C3%A4ger~eq~%272496%27~and~Speichertechnologie~eq~%27524%27~and~Betriebs-Status~eq~%2735%27~and~Bruttoleistung%20der%20Einheit~gt~%271000%27","example_result":"{\"Data\":[{\"MaStRNummer\":\"SEE916532936024\",\"EinheitName\":\"Batteriespeicher Westfalen 1\",\"AnlagenbetreiberName\":\"RWE Generation SE\",\"BetriebsStatusName\":\"In Betrieb\",\"Bruttoleistung\":174240.0,\"Nettonennleistung\":140000.0,\"NutzbareSpeicherkapazitaet\":150801.0,\"Plz\":\"59071\",\"Ort\":\"Hamm\",\"Breitengrad\":51.682563,\"Laengengrad\":7.970723,\"InbetriebnahmeDatum\":\"/Date(1735344000000)/\",…}],\"Total\":556}"},"members_summary":null},{"source_id":"mastr-bulk-export","name":"MaStR Gesamtdatenexport (daily full public XML export, with quarterly Stichtag snapshots)","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","data_url":"https://download.marktstammdatenregister.de/Gesamtdatenexport_20261126_26.2.zip","access":"direct_download","format":"ZIP (3.3 GB) of 450 XML files in UTF-16 (68 GB uncompressed); XSD and PDF documentation in a separate ZIP","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Same official register as a daily full XML dump; needed for complete joins (unit–storage object–location–operator), AC/DC coupling and history.","coverage_note":"All public MaStR data; 30 unit files + 30 storage-object files for storage; 3.3 GB ZIP.","data_date":"2026-11-26","caveats":["3.3 GB ZIP, UTF-16 XML, 68 GB uncompressed.","Format changed on 2025-10-01."],"test":{"tested_on":"2026-11-26","method":"headers_only","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"bnetza-kraftwerksliste","name":"Kraftwerksliste der Bundesnetzagentur (power plant list, Energieträger 'Batteriespeicher')","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/start.htm","data_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/_DL/Kraftwerksliste_CSV.csv?__blob=publicationFile&v=11","access":"direct_download","format":"CSV (';', cp1252 despite the UTF-8 header) and XLSX","license":"unknown (not stated on the page; data drawn from the MaStR)","language":"de","has_coordinates":false,"location_precision":"none","summary":"Official BNetzA power-plant list; names battery units on sites ≥10 MW net with operator, status, commissioning year and MW, Bundesland only.","coverage_note":"Datenstand 05.11.2026: 214 named battery units (208 In Betrieb, 3,444.8 MW net) plus 33 Land aggregates.","data_date":"2026-11-05","caveats":["No MWh, no coordinates, commissioning year only.","cp1252 CSV with 10 preamble lines."],"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"problems":["Declared charset UTF-8 but content is cp1252.","No storage energy (MWh) and no location below Bundesland."]},"example":{"example_request":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/_DL/Kraftwerksliste_CSV.csv?__blob=publicationFile&v=11  → decode cp1252, header on line 11, keep Energietraeger == 'Batteriespeicher' and EinheitMastrNummer starting with 'SEE'.","example_result":"SEE999790559914;EnspireME;BESS Jardelund;SchleswigHolstein;Deutschland;2018;;InBetrieb;Batteriespeicher;;Nein;Nein;48;48;Batterie;Volleinspeisung;Hochspannung;TenneT TSO GmbH (SNB970033313272);Nein;"},"members_summary":null},{"source_id":"battery-charts","name":"Battery Charts (ISEA / PGS, RWTH Aachen University)","publisher":"RWTH Aachen University – ISEA and PGS","official":false,"landing_url":"https://battery-charts.de/battery-charts/","data_url":null,"access":"web_viewer_only","format":"Charts and Leaflet maps fed by the site's own JSON endpoint (wp-json/isea/v1/data); ranking CSV generated in the browser","license":"CC BY 4.0 (graphics and data on the page)","language":"en","has_coordinates":true,"location_precision":null,"summary":"Academic MaStR evaluation with size classes (home <30 kWh and <30 kW; large ≥1000 kWh or ≥1000 kW), a large-storage map and operator ranking.","coverage_note":"Germany; viewer only, installation rows not downloaded in this test.","data_date":null,"caveats":["Derived from MaStR; not independent.","No tested download of installation rows."],"test":{"tested_on":"2026-11-26","method":"page_only","http_status":200,"problems":["Installation rows are served only through the page's JSON endpoint called with a key embedded in the page script; no published download of installation rows was found."]},"example":null,"members_summary":null}],"other_sources_count":2,"if_unstructured":{"summary":"Not needed for most units: MaStR is structured. Operator documents only help for the few large units whose location MaStR anonymises, and to cross-check MWh."},"local_terms":[{"term":"Marktstammdatenregister (MaStR)","language":"de","meaning":"Federal register of all generation and storage units, run by the Bundesnetzagentur; the official source for this question."},{"term":"Stromspeicher / Batteriespeicher","language":"de","meaning":"Electricity storage / battery storage; MaStR Energieträger 'Speicher', Speichertechnologie 'Batterie'."},{"term":"Großbatteriespeicher","language":"de","meaning":"Grid-scale battery; BNetzA usage: Bruttoleistung greater than 999 kW."},{"term":"Nutzbare Speicherkapazität","language":"de","meaning":"Usable storage capacity in kWh (MaStR field on the storage object SSE)."},{"term":"Inbetriebnahmedatum","language":"de","meaning":"Commissioning date of the unit (first technical commissioning)."},{"term":"Betriebs-Status: In Betrieb","language":"de","meaning":"Operating status filter value meaning 'in operation' (others: In Planung, vorübergehend / endgültig stillgelegt)."},{"term":"technische Lokation (SEL)","language":"de","meaning":"Technical location grouping all units behind common grid connection points; use it to build sites."},{"term":"Anlagenbetreiber","language":"de","meaning":"Operator of the unit; masked when a natural person."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":45,"pages_opened":53,"passes":[{"pass":1,"date":"2026-11-26","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/battery-storage.json","detail_url":"https://georutter.org/v1/de/battery-storage/detail.json","html_url":"https://georutter.org/de/battery-storage/","country_url":"https://georutter.org/v1/countries/de.json"}
