{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"curtailment-and-redispatch","question":"Where can I get renewable curtailment and redispatch volumes in Germany, by zone or node and by period?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"partial","summary":"SMARD publishes monthly renewable and conventional redispatch reductions by energy source and Bundesland from July 2022 in a downloadable CSV. The four TSOs publish event records; FfE maps some affected assets or clusters to daily events. Complete renewable volumes at electrical nodes remain unverified, and historical publication definitions changed.","main_caveats":["A Bundesland in SMARD locates affected generation, not necessarily the network bottleneck.","The shared SMARD CSV is headerless and includes many unrelated chart series; the chart HTML supplies field order.","Before October 2021, renewable feed-in management is absent from the TSO redispatch archive; the 2021–2023 TSO publication has a further balancing-related gap.","FfE points can represent clusters, not each generator or the bottleneck; its tested event table ended on 2025-11-01.","SMARD data are revised; chart display limits and raw CSV dates can differ."],"confidence":"medium","confidence_reason":"Official state-by-technology CSV, historic workbook and TSO event archive checked; complete nodal coverage and 2021–2023 operator gap remain unverified.","attributes":[{"attribute":"renewable_curtailment","covered":"partial","source_ids":["smard_reports","bnetza_2022"],"note":"SMARD provides monthly renewable technologies by state; complete node data remain unverified.","gap":"not_checked","gap_note":"Complete renewable curtailment volumes at network nodes were not verified."},{"attribute":"redispatch_volume","covered":"partial","source_ids":["smard_reports","bnetza_2022","tso_measures","ffe_arcgis"],"note":"National totals and individual TSO event energy are available.","gap":"not_checked","gap_note":"Complete DSO and nodal volumes were not verified."},{"attribute":"spatial_breakdown","covered":"partial","source_ids":["smard_reports","bnetza_2022","tso_measures","ffe_arcgis"],"note":"SMARD state/technology series; FfE maps some TSO assets and clusters with daily events.","gap":"not_checked","gap_note":"A complete nodal series was not verified."},{"attribute":"reference_period","covered":"yes","source_ids":["smard_reports","bnetza_2022","tso_measures","ffe_arcgis"],"note":"Quarter, annual and event date/time examples were checked.","gap":null,"gap_note":null},{"attribute":"latest_data","covered":"partial","source_ids":["smard_reports"],"note":"Raw state CSV includes July 2026; a Q2 2026 national report is available.","gap":"not_checked","gap_note":"Latest period across all series remains unchecked."},{"attribute":"historical_series","covered":"partial","source_ids":["bnetza_2022","tso_measures"],"note":"SMARD monthly state/technology since July 2022; 2020–2021 feed-in management by state and control zone.","gap":"not_checked","gap_note":"Earlier and 2022 interim renewable volumes by state/node and continuity not fully checked."},{"attribute":"update_frequency","covered":"partial","source_ids":["smard_reports","tso_measures"],"note":"SMARD announced monthly updates; TSO API lists event-driven updates.","gap":"not_checked","gap_note":"Actual current release lag and revisions have not been measured."}]},"sources":[{"source_id":"smard_reports","name":"Netzengpassmanagement nach Energieträgern und Bundesländern","publisher":"Bundesnetzagentur","official":true,"landing_url":"https://www.smard.de/page/home/topic-article/46/222004/netzengpassmanagement-nach-energietraegern-und-bundeslaendern","data_url":"https://www.smard.de/resource/blob/217306/-/data-csv-data.csv","access":"direct_download","format":"CSV; interactive charts and CSV/XLS table export","license":"unknown","language":"de","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"Monthly reductions and increases by energy source and Bundesland from July 2022; includes renewable technology series.","first_seen_pass":1,"rank":1,"summary":"Monthly state-by-technology renewable and conventional reductions and increases; machine-readable chart source checked.","coverage_note":"16 Länder, monthly from July 2022; no complete node-by-node layer established.","data_date":"2026-07-01","caveats":["Raw CSV has no header; chart HTML provides series identifiers and technology order.","Published values can be revised and chart display may limit dates."],"coverage":{"geographic":"16 German Länder; chart series for reductions and increases by technology. Offshore and cross-border treatment need further checking."},"fine_print":{"unit":{"value":"GWh","quote":"yAxis: \"GWh\"","url":"https://www.smard.de/page/home/topic-article/46/222004/netzengpassmanagement-nach-energietraegern-und-bundeslaendern","attempts":[]},"inclusion_rule":{"value":"Market generation measures in the demonstrated figure; countertrading excluded","quote":"Die im Redispatch angepassten Einspeisungen der am Markt befindlichen Erzeugungsanlagen (exkl. Countertrading) betrugen im ersten Quartal 2026 rund 5.989 GWh","url":"https://www.smard.de/page/home/topic-article/444/221112/massnahmenvolumen-und-kosten-gesunken?trk=public_post_comment-text","attempts":[]},"reference_date":{"value":"For the checked Baden-Württemberg reduction series, July 2022–July 2026 in the raw CSV; site view limits can differ.","quote":"Erhöhungen und Reduzierungen seit Juli 2022","url":"https://www.smard.de/page/home/topic-article/46/222004/netzengpassmanagement-nach-energietraegern-und-bundeslaendern","attempts":[]},"update_frequency":{"value":"Monthly for SMARD congestion data","quote":"All the data will now be updated monthly","url":"https://www.bundesnetzagentur.de/SharedDocs/Pressemitteilungen/EN/2024/20240517_Redispatch.html","attempts":[]},"exclusions":{"value":"Increases used to balance distribution-grid measures are not included in the displayed increases","quote":"Die hierfür erforderlichen Mengen sind in den hier dargestellten Einspeisungserhöhungen nicht enthalten.","url":"https://www.smard.de/page/home/topic-article/444/221112/massnahmenvolumen-und-kosten-gesunken?trk=public_post_comment-text","attempts":[]}},"key_fields":[{"field":"s-nepm_baet-1-1","meaning":"Chart series identifier for Baden-Württemberg reductions"},{"field":"2022-08-01","meaning":"Example month in the second field"},{"field":"Wind Offshore, Wind Onshore, Braunkohle, Photovoltaik","meaning":"First four technology series labels, from chart configuration; numerical columns follow this order."}],"how_to_use":{"example_request":"https://www.smard.de/resource/blob/217306/-/data-csv-data.csv — semicolon CSV rows with first field s-nepm_baet-1-1; chart configuration at https://www.smard.de/page/home/topic-article/46/222004/netzengpassmanagement-nach-energietraegern-und-bundeslaendern","example_result":"s-nepm_baet-1-1;2022-08-01;;0.0;;0.01;;;1.28;0.0;0.06","steps":["Download the headerless semicolon-separated CSV and open the chart page HTML.","The chart page maps s-nepm_baet-1-1 to reductions in Baden-Württemberg and gives its ordered series labels: Wind Offshore, Wind Onshore, Braunkohle, Photovoltaik, Steinkohle, Erdgas, Kernenergie, Biomasse, Pumpspeicher, Wasserkraft, Sonstige Erneuerbare, Sonstige Konventionelle, Unbekannt (z.B Börse).","Each row starts with series identifier and month, then one field per technology in that order; 2022-08-01 has 0.01 GWh photovoltaic, 0.0 GWh wind onshore and 1.28 GWh nuclear.","The chart page lists 16 reduction and 16 increase chart IDs with a matching state title; obtain the mapping and category order from that page rather than treating identifiers as documented stable codes."],"reading_traps":["Rows have no header and can omit trailing empty fields; preserve positions and do not convert missing values automatically to zero.","The checked raw Baden-Württemberg reduction series has 47 rows from July 2022 to July 2026; the page configuration applies limit_until 2026-06-01, so raw and displayed date ranges can differ.","State refers to the affected generation, not necessarily the location of the underlying network bottleneck.","Renewable technology categories are separate from conventional types. Offshore, cross-border, and unknown values require source-specific interpretation.","SMARD can revise earlier periods after settlement.","The 2015–2021 historical reporting treated renewable Einspeisemanagement separately; the SMARD historical page states it was fully included in market-plant redispatch from 2022: https://www.smard.de/page/home/topic-article/46/217842/entwicklung-des-netzengpassmanagements","A later national Q2 2026 report, published 2026-10-12, reports 2,102 GWh renewable reductions: https://www.smard.de/page/en/topic-article/5892/221970/volume-down-costs-up-slightly"]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"text/csv","size_bytes":1703328,"records_total":41643,"records_for_country":null,"problems":[]},"evidence":[{"claim":"The national report gives a separate renewable quantity.","url":"https://www.smard.de/page/home/topic-article/444/221112/massnahmenvolumen-und-kosten-gesunken?trk=public_post_comment-text","quote":"Davon entfielen 4.043 GWh auf Einspeisereduktionen (Q1 2025: 4.182 GWh) wovon 2.215 GWh auf Redispatch mit Erneuerbaren Energien entfielen (Q1 2025: 2.153 GWh)."},{"claim":"The interactive series begins July 2022.","url":"https://www.smard.de/page/home/topic-article/211816/213328/netzengpassmanagement","quote":"Mengen und Kosten des Netzengpassmanagements seit Juli 2022"},{"claim":"SMARD states that the charts show monthly energy sources per state.","url":"https://www.smard.de/page/home/topic-article/46/222004/netzengpassmanagement-nach-energietraegern-und-bundeslaendern","quote":"Die folgenden Abbildungen zeigen die monatlichen Erhöhungen und Reduzierungen der Einspeisung, aufgeschlüsselt nach Energieträgern je Bundesland."},{"claim":"Older national history is additionally available from 2015.","url":"https://www.smard.de/home/jetzt-neu-historische-entwicklung-des-netzengpassmanagements-217874","quote":"Die Daten zu Mengen und Kosten des Netzengpassmanagements unter „Energiedaten kompakt“ werden jetzt auch für Zeiträume seit 2015 bereitgestellt."},{"claim":"Q2 2026 renewable reduction figure is published.","url":"https://www.smard.de/page/en/topic-article/5892/221970/volume-down-costs-up-slightly","quote":"redispatching measures involving renewable power plants contributing 2,102 GWh of that"}],"members":[],"members_summary":null},{"source_id":"bnetza_2022","name":"Berichte zum Netzengpassmanagement und Tabellendokumente","publisher":"Bundesnetzagentur","official":true,"landing_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/artikel.html","data_url":"https://data.bundesnetzagentur.de/Bundesnetzagentur/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/tabellen2022.xlsx","access":"direct_download","format":"XLSX","license":"unknown","language":"de","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"Historical state and TSO control-zone feed-in-management lost energy (renewables and certain CHP/gas) in 2020–2021 and annual 2022 state/technology totals.","first_seen_pass":1,"rank":2,"summary":"Annual 2020–2021 feed-in-management volumes by state and control zone, and 2022 annual state and technology totals.","coverage_note":"Germany; 2020–2022 examples from report and workbook; not state-by-technology cross-tab.","data_date":"2022-12-31","caveats":["Not a nodal dataset."],"coverage":{"geographic":"Germany; historic feed-in-management lost energy by state and control zone, and 2022 generation reductions by state."},"fine_print":{"unit":{"value":"GWh, see workbook Tabelle 7 row 8","quote":"Kraftwerkseinsätze im deutschen Stromnetz zum Redispatch nach Energieträgern\nim Gesamtjahr 2022 in GWh","url":"https://data.bundesnetzagentur.de/Bundesnetzagentur/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/tabellen2022.xlsx","attempts":[]},"inclusion_rule":{"value":"Annual measures in 2022","quote":"Tabelle 7: Verteilung der Kraftwerkseinsätze im Redispatch nach Energieträgern\nim Gesamtjahr 2022","url":"https://data.bundesnetzagentur.de/Bundesnetzagentur/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/tabellen2022.xlsx","attempts":[]},"reference_date":{"value":"2022 calendar year","quote":"Tabelle 8: Verteilung der Kraftwerkseinsätze nach Bundesländern im Gesamtjahr 2022","url":"https://data.bundesnetzagentur.de/Bundesnetzagentur/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/tabellen2022.xlsx","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/artikel.html","note":"Not confirmed in the opened source."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/artikel.html","note":"Not confirmed in the opened source."}]}},"key_fields":[{"field":"Tabelle 7!E9:I11","meaning":"Technology and 2022 downward/upward redispatch in GWh"},{"field":"Tabelle 8!E9:I11","meaning":"State and 2022 downward/upward redispatch in GWh"}],"how_to_use":{"example_request":"https://data.bundesnetzagentur.de/Bundesnetzagentur/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/tabellen2022.xlsx — sheet Tabelle 7, cells E9:I11; sheet Tabelle 8, cells E9:I11","example_result":"Tabelle 7: Wind (offshore); Absenkung 4152.8077489999969; Erhöhung 0 (GWh). Tabelle 8: Baden-Württemberg; Absenkung 3.7954192199999999; Erhöhung 4059.2262499999997 (GWh).","steps":["Download XLSX and open Tabelle 7 for annual technology totals or Tabelle 8 for annual state totals.","Read column E as category, G as reduction and I as increase, with units GWh in each table title.","Use Tabelle 2 for the historical reporting break; preserve its quarter and measure definitions.","For historical feed-in-management lost energy (including certain CHP and gas installations), open https://bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/Zahlen%20Ganzes%20Jahr2021.pdf?__blob=publicationFile&v=1 at printed page 20, Tabelle 12 for states, and page 25, Tabelle 17 for the four control zones; TenneT 2021 is 4.545 GWh and 50Hertz is 1.168 GWh.","For Q1 2022 feed-in-management lost energy, open https://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/QuartalszahlenQ1in2022.pdf?__blob=publicationFile&v=3 printed page 20 Tabelle 12: Niedersachsen 1.668 GWh; page 25 gives control-zone distribution.","For Q2 2022, https://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/QuartalszahlenQ2in2022.pdf?__blob=publicationFile&v=3 Tabelle 17, p. 25 reports TenneT 1.568 GWh and 50Hertz 548 GWh; Tabelle 12 breaks the quarter down by state."],"reading_traps":["Tabelle 7 separates technologies nationally and Tabelle 8 separates states; these are not a state-by-technology joint table.","Table 2 says EinsMan is integrated into Redispatch from Q3 2022 in this reporting series; this is different from the 2021 legal transition.","The file contains formulas and raw floating point figures; display rounding can differ.","The 2021 report labels control zones by the location of curtailed generation, not necessarily the requesting TSO. The 2021 and 2022 reporting regimes differ.","Historical Einspeisemanagement totals can include CHP and mine/sewage gas, not only renewables; technology-specific figures are in separate tables."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":6690587,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"The official workbook is published with the 2022 report.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/artikel.html","quote":"Tabellendokument für das Jahr 2022"},{"claim":"Earlier data and reports are indexed by the regulator.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/artikel.html","quote":"Ältere Daten und Quartalsbericht bis zum vierten Quartal 2023 finden Sie"},{"claim":"The 2021 annual report gives historical renewable lost energy by TSO control zone.","url":"https://bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/Zahlen%20Ganzes%20Jahr2021.pdf?__blob=publicationFile&v=1","quote":"Verteilung der EinsMan-Maßnahmen nach Regelzonen im Gesamtjahr 2021 und Gesamtjahr 2020"}],"members":[],"members_summary":null},{"source_id":"tso_measures","name":"Redispatch","publisher":"Netztransparenz.de / German transmission system operators","official":true,"landing_url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","data_url":"https://www.netztransparenz.de/xspproxy/api/staticfiles/ntp-relaunch/dokumente/systemdienstleistungen/betriebsf%C3%BChrung/redispatch/archiv/2025-09-17%20redispatch%20export%202013-2020.zip","access":"direct_download","format":"ZIP containing semicolon-delimited CSV; current service API","license":"unknown","language":"de","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"TSO event records with operator, asset name, energy and period.","first_seen_pass":1,"rank":3,"summary":"TSO event records with operator, asset name, energy and period.","coverage_note":"Germany; archive 2013–2020 tested, current API requires registration.","data_date":"2020-12-31","caveats":["Before 2021 renewable cuts are excluded; later coverage also changes."],"coverage":{"geographic":"Four German transmission-system operators; measures affecting assets connected in Germany"},"fine_print":{"unit":{"value":"MW for power, MWh for energy","quote":"⇒ GESAMTE_ARBEIT_MWH (TOTAL_WORK_MWH)= 37,5 MWh","url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","attempts":[]},"inclusion_rule":{"value":"Daily measures initiated by the four German TSOs that affect plants connected in Germany","quote":"Below you will find the redispatch measures initiated by the four German transmission system operators on a daily basis that affect adjustments to plants connected in Germany","url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","attempts":[]},"reference_date":{"value":"2013–2020 archive tested","quote":"Here you can download redispatch measures from 2013-2020.","url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","attempts":[]},"update_frequency":{"value":"Event-driven in the current API documentation","quote":"Redispatch | https://www.netztransparenz.de/de-de/Systemdienstleistungen/Betriebsfuehrung/Redispatch | Ereignisgesteuert | Ereignisgesteuert","url":"https://www.netztransparenz.de/cdn/files/21370286-9832-472d-5388-08dedb4f1fc1/dokumentation-webserviceapi-netztransparenz_v1.25.pdf","attempts":[]},"exclusions":{"value":"Cross-border trades and foreign generation adjustments excluded","quote":"Cross-border trading transactions and power plant feed-in adjustments abroad are not published.","url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","attempts":[]}},"key_fields":[{"field":"BEGINN_DATUM / BEGINN_UHRZEIT","meaning":"Start date and time"},{"field":"ENDE_DATUM / ENDE_UHRZEIT","meaning":"End date and time"},{"field":"RICHTUNG","meaning":"Increase or decrease"},{"field":"GESAMTE_ARBEIT_MWH","meaning":"Event energy in MWh"},{"field":"MITTLERE_LEISTUNG_MW","meaning":"Mean active-interval power in MW"},{"field":"ANWEISENDER_UENB","meaning":"Instructing connecting TSO"},{"field":"ANFORDERNDER_UENB","meaning":"Requesting TSO"},{"field":"BETROFFENE_ANLAGE","meaning":"Named asset or aggregated pool"},{"field":"PRIMAERENERGIEART","meaning":"Energy type"}],"how_to_use":{"example_request":"https://www.netztransparenz.de/xspproxy/api/staticfiles/ntp-relaunch/dokumente/systemdienstleistungen/betriebsf%C3%BChrung/redispatch/archiv/2025-09-17%20redispatch%20export%202013-2020.zip — CSV first data row","example_result":"02.04.2013;11:00;UTC;02.04.2013;14:00;UTC;Strombedingter Redispatch;Wirkleistungseinspeisung reduzieren;267;300;800;50Hertz;PSE;Jänschwalde, Schkopau;Konventionell","steps":["Download and unzip the historical 2013–2020 archive; parse the CSV as UTF-8 with BOM and semicolon separator.","Use RICHTUNG, GESAMTE_ARBEIT_MWH, ANWEISENDER_UENB, ANFORDERNDER_UENB, BETROFFENE_ANLAGE, PRIMAERENERGIEART and timestamps for event aggregation.","For current measures the same website shows daily data; its documented WebAPI needs registration and client credentials, so it was not queried."],"reading_traps":["The archive is conventional redispatch, not a complete renewable-curtailment series before October 2021.","Some assets are pools or clusters: the named asset is not necessarily a single node or coordinate.","Anweisender ÜNB and anfordernder ÜNB can differ; neither is necessarily the congestion location.","Mean power is averaged over active intervals only; multiplying it by elapsed start–end time can overestimate energy.","Renewable measures without TSO balancing are missing from this central publication from October 2021 through September 2023."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/x-zip-compressed","size_bytes":605544,"records_total":40118,"records_for_country":40118,"problems":[]},"evidence":[{"claim":"Operators specify the coverage break.","url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","quote":"Reduction instructions for renewable energy plants before 01.10.2021 (so-called feed-in management) are not included in the redispatch publication."},{"claim":"A second coverage break applies to measures without balancing.","url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","quote":"Redispatch measures with RES plants without balancing by the grid operator are only included in this publication from October 1, 2023."},{"claim":"Current automated access needs credentials.","url":"https://www.netztransparenz.de/en/FAQ/FAQ-WebAPI","quote":"If you have registered for API use and have created at least one client in the WebAPI-Portal, you can test all WebAPIs"}],"members":[],"members_summary":null},{"source_id":"ffe_arcgis","name":"Redispatch-Maßnahmen der Übertragungsnetzbetreiber seit 2024","publisher":"Forschungsstelle für Energiewirtschaft e. V. (FfE)","official":false,"landing_url":"https://www.ffe.de/redispatch-dashboard/","data_url":"https://services-eu1.arcgis.com/hRoipVjpIokHzAKF/arcgis/rest/services/nt_redispatch_zuordnung_ergebnis/FeatureServer/0?f=json","access":"api","format":"ArcGIS FeatureServer JSON","license":"unknown","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"academic","adds":"Independent map layer locates some affected installations and links them to an independently hosted TSO event table.","first_seen_pass":1,"rank":4,"summary":"Independent map and event table give some affected assets or clusters and their daily measures.","coverage_note":"TSO measures from 2024; queried table ended at 2025-11-01, and point accuracy and join completeness are not verified.","data_date":"2025-11-01","caveats":["Three of 418 records lack point geometry; a mapped cluster need not locate each generator or the network bottleneck."],"coverage":{"geographic":"Germany and offshore/foreign exceptions; TSO events only, since 2024 in dashboard description."},"fine_print":{"unit":{"value":"MWh in event field gesamtearbeitmwh","quote":"\"valueSuffix\":\" MWh\"","url":"https://ffemunich.maps.arcgis.com/sharing/rest/content/items/397f61f3f3fe486b9d6852f94d331452/data?f=json","attempts":[]},"inclusion_rule":{"value":"Dashboard says TSO measures since 2024; event and point completeness not verified.","quote":"Redispatch-Maßnahmen der Übertragungsnetzbetreiber seit 2024","url":"https://www.ffe.de/redispatch-dashboard/","attempts":[]},"reference_date":{"value":"In the tested table latest start date was 2025-11-01.","quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.ffe.de/redispatch-dashboard/","note":"Not confirmed on the opened description."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.ffe.de/redispatch-dashboard/","note":"Not confirmed on the opened description."}]}},"key_fields":[{"field":"betroffeneanlage","meaning":"Asset or cluster name; common field in both map and event layers."},{"field":"primaerenergieart","meaning":"Energy type, including Erneuerbar."},{"field":"beginndatum / endedatum","meaning":"Event dates."},{"field":"gesamtearbeitmwh","meaning":"Event energy in MWh."},{"field":"anweisenderuenb / anfordernderuenb","meaning":"Instructing and requesting TSOs."},{"field":"bl / lk","meaning":"Bundesland and district in point layer, sometimes missing."}],"how_to_use":{"example_request":"https://services-eu1.arcgis.com/hRoipVjpIokHzAKF/arcgis/rest/services/nt_redispatch_zuordnung_ergebnis/FeatureServer/0/query?where=1%3D1&outFields=*&resultRecordCount=3&outSR=4326&f=json AND https://services-eu1.arcgis.com/hRoipVjpIokHzAKF/arcgis/rest/services/rem_marketdata_nt_redispatch/FeatureServer/0/query?where=betroffeneanlage%3D%2750H_AVA_CR_FOE%27&outFields=*&resultRecordCount=3&returnGeometry=false&f=json","example_result":"Point: 50H_AVA_CR_FOE; Erneuerbar; Sachsen-Anhalt; 11.625000000000057, 51.90900000000005. Event: 2024-01-25 09:45:00–16:45:00 UTC; 1662 MWh; 50Hertz; TenneT DE.","steps":["Query the map layer for points and the event layer for records; both use betroffeneanlage.","The demonstrated filter 50H_AVA_CR_FOE returns the example event; join on betroffeneanlage and verify operator or duplicate identifiers as needed.","Filter primaerenergieart for Erneuerbar and richtung for reductions; use beginndatum, endedatum, time zones, and gesamtearbeitmwh.","The map layer metadata reports maximum 2,000 features per request and the event layer 1,000; paginate larger event results."],"reading_traps":["The point represents an affected asset or cluster, not necessarily the physical bottleneck or each individual generator. Location assignment method and positional accuracy have not been independently verified.","Three of 418 point-layer records have no geometry: Börse (Amprion, twice) and EGM_DTS (Amprion).","Of 415 points, three lie outside a coarse Germany bounding box: Kühtai 2 (Uniper) and two OWP Deutsche Bucht records; offshore and foreign locations make a bounding box an imperfect country test.","Only a single name join was checked; ambiguous names, missing geometry and event-to-point completeness require further verification.","Latest event start returned by descending query was 2025-11-01, although the check was in November 2026.","Of 390 geocoded records declaring a state, all 390 fall within that state polygon from the same FfE web map; this is not independent confirmation of point accuracy."]},"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":418,"records_for_country":null,"problems":[]},"evidence":[{"claim":"FfE describes its dashboard as locating affected assets or network nodes.","url":"https://www.ffe.de/redispatch-dashboard/","quote":"Das interaktive Dashboard zeigt die standortgenaue Verortung von Anlagen bzw. Netzknoten, die historisch von Redispatch-Maßnahmen betroffen waren."},{"claim":"The dashboard identifies its temporal scope.","url":"https://www.ffe.de/redispatch-dashboard/","quote":"Redispatch-Maßnahmen der Übertragungsnetzbetreiber seit 2024"}],"members":[],"members_summary":null},{"source_id":"entsoe_redispatch","name":"Redispatching [13.1.A] – Transparency Platform","publisher":"ENTSO-E","official":false,"landing_url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","data_url":"https://transparency.entsoe.eu/","access":"registration_required","format":"XML, XLSX, ZIP, CSV; REST API","license":"unknown","language":"en","has_coordinates":null,"location_precision":null,"publisher_type":"supranational","adds":"Pan-European publication of TSO measures by control area; documentation specifies network element identification and energy by market time unit.","first_seen_pass":1,"rank":5,"summary":"TSO-supplied redispatch publication with documented network element and MWh fields; actual German records untested.","coverage_note":"ENTSO-E control areas; API requires account and token.","data_date":null,"caveats":["Documentation was read, but access and completeness of German node values were not verified."],"coverage":{"geographic":"ENTSO-E control areas, including the German TSOs; actual completeness of German records was not tested."},"fine_print":{"unit":{"value":"MWh","quote":"ENTSO-E has decided to publish redispatched energy for generation and/or for load in MWh","url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","attempts":[]},"inclusion_rule":{"value":"TSO measures for control areas, per market time unit; actual German data not sampled.","quote":"Information relating to redispatching per market time unit","url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","note":"No sampled German values."}]},"update_frequency":{"value":"Publication deadline no later than one hour after operating period; actual latency untested.","quote":"no later than 1 hour after the operating period","url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","note":"German record exclusions not verified."}]}},"key_fields":[],"how_to_use":{"example_request":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","example_result":"Documentation: generation increase or decrease, network element identification, requesting and connecting control areas, and redispatched energy in MWh. No actual German record was retrieved.","steps":["The publicly opened documentation describes article 13.1.A; the platform lists internal and cross-border reports.","API access requires a registered account and security token; registration and API query were not attempted.","Export formats shown in the registered-user guide include XML, XLSX, ZIP and CSV; actual German values and field availability were not tested."],"reading_traps":["Network-element identifiers and their availability depend on submitted TSO data; do not assume complete nodal detail or renewable-only identification.","Cross-check scope and periods before comparing ENTSO-E results with SMARD or the TSO site."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Documented content includes energy and network elements.","url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/16676134651796-Redispatching-13-1-A","quote":"Redispatched energy (MWh) resulting from changes of affected generation/load capacity."},{"claim":"API requires token.","url":"https://transparencyplatform.zendesk.com/hc/en-us/articles/12845911031188-How-to-get-security-token","quote":"Security token is required to use web API."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Bundesnetzagentur","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/Engpassmanagement/Redispatch/artikel.html?nn=686258"},"operators":{"structure":"many","note":"Four TSOs publish common event records; distribution operators also undertake and report measures.","census_url":null},"publication_obligation":{"exists":"yes","norm":"EnWG §§ 13, 13a and 14; BNetzA reporting arrangements","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/Engpassmanagement/Redispatch/artikel.html?nn=686258","what_must_be_published":"Network operators report requesting and instructing measures separately to the regulator; this is a reporting obligation, not proof that each submission is publicly released.","frequency":null},"consolidated_republication":{"found":"partial","note":"BNetzA republishes national and state summaries; the TSO platform publishes their event records. Complete public node-by-node DSO data were not verified.","checked_pages":[{"organization":"Bundesnetzagentur","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/artikel.html","saw":"Current SMARD and historic annual workbooks."}]}},"national_registry":{"exists":"partial","note":"SMARD and the joint TSO site consolidate different subsets, not a verified complete national nodal list.","checked_pages":[{"organization":"Bundesnetzagentur","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Netzengpassmanagement/artikel.html","saw":"Links to SMARD and old workbooks."},{"organization":"Netztransparenz / four TSOs","url":"https://www.netztransparenz.de/en/Ancillary-Services/System-operations/Redispatch","saw":"Daily TSO-initiated measures and an archive; gaps described."},{"organization":"SMARD / BNetzA","url":"https://www.smard.de/page/home/topic-article/211816/213328/netzengpassmanagement","saw":"National congestion totals and charts; source is the regulator."},{"organization":"50Hertz","url":"https://www.50hertz.com/de/Transparenz/Kennzahlen/Engpassmanagement","saw":"Its page identifies the common TSO daily event platform."},{"organization":"TenneT","url":"https://netztransparenz.tennet.eu/de/strommarkt/transparenz/transparenz-deutschland/berichte-marktrelevante-informationen/einspeisemanagement-einsaetze-nach-14-eeg","saw":"Historic regional feed-in management archive; event details but not a complete national nodal energy dataset."}]},"if_unstructured":{"summary":"Quarterly reports supply national quantities but do not establish a complete nodal series. Do not infer nodes or missing zone-by-technology cells from national totals.","recipe":["Open the quarterly report and locate the generation-adjustment paragraph.","Record the quarter, units, renewable reductions and the separately stated overall reductions; retain the report date and revision context.","Repeat for each report; this yields national totals only and cannot reconstruct a complete nodal series.","For 2020–2021 feed-in-management lost energy (including certain CHP/gas) by control zone, extract Tabelle 17 from the 2021 annual report; the example gives 4.545 GWh in the TenneT zone in 2021. Record these as plant connection areas, not requesting-operator volumes.","For the first quarter of 2022, extract Tabelle 12, p. 20 of https://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/QuartalszahlenQ1in2022.pdf?__blob=publicationFile&v=3: Niedersachsen has 1.668 GWh. The report describes transitional balancing changes, so the series is not automatically comparable to earlier or later redispatch totals."],"location_method":"The tested quarterly paragraph gives national values, not coordinates.","cross_with":["Compare national aggregates against SMARD tables, preserving distinctions among measures and revisions."],"where_published":[{"name":"SMARD quarterly congestion management reports","url":"https://www.smard.de/page/home/topic-article/444/221112/massnahmenvolumen-und-kosten-gesunken?trk=public_post_comment-text","what":"Narrative quarterly national totals and technology-specific renewable cuts.","how_to_search_inside":"Open the quarterly report and search the page for GWh or Erneuerbaren Energien.","example_document":{"url":"https://www.smard.de/page/home/topic-article/444/221112/massnahmenvolumen-und-kosten-gesunken?trk=public_post_comment-text","what_it_gives":"The Q1 2026 report states: 5.989 GWh adjusted market generation; 4.043 GWh reductions; 2.215 GWh renewable redispatch."}},{"name":"Bundesnetzagentur annual congestion-management report 2021","url":"https://bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/Zahlen%20Ganzes%20Jahr2021.pdf?__blob=publicationFile&v=1","what":"Annual tables of feed-in management by state and TSO control zone.","how_to_search_inside":"Search PDF for Tabelle 12 or Tabelle 17.","example_document":{"url":"https://bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/Versorgungssicherheit/Engpassmanagement/Zahlen%20Ganzes%20Jahr2021.pdf?__blob=publicationFile&v=1","what_it_gives":"Tabelle 12, p. 20: Niedersachsen 2021 2.643 GWh; Tabelle 17, p. 25: TenneT 2021 4.545 GWh; 50Hertz 1.168 GWh."}}]},"related_not_answering":[{"name":"Modeling Curtailment in Germany","url":"https://arxiv.org/abs/2009.03801","why":"Modelled nodal congestion is not a measured national curtailment series."},{"name":"TenneT Einspeisemanagement-Einsätze 2021 archive","url":"https://netztransparenz.tennet.eu/fileadmin/user_upload/The_Electricity_Market/Transparency/feed-in-management/archive/einspeisemanagement_eeg_archiv_2021_bis_Sept.pdf","why":"Page 1 names substation, offshore plant and start/end, but does not establish lost energy in MWh; repeated updates must not be counted as independent events."},{"name":"Schleswig-Holstein Netz: redispatch April 2022","url":"https://ptrabe-transparenz-ew.azurewebsites.net/EinsMan/EinsManHistoricalMap/shn/2022/04","why":"The verified JSON gives 254 municipality bottleneck-minute entries and plant counts, not curtailed energy in MWh."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"GPT-6","rules_version":"6.12","note":"State/technology CSV, historical TSO archive and independent mapped event join checked; complete nodal coverage remains unverified.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"partial"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":61,"minutes":25}}],"local_terms":[{"term":"Netzengpassmanagement","language":"de","meaning":"grid congestion management"},{"term":"Redispatch","language":"de","meaning":"grid-directed change of power generation"},{"term":"Einspeisemanagement","language":"de","meaning":"earlier feed-in management for renewables"},{"term":"Ausfallarbeit","language":"de","meaning":"lost energy due to curtailment"},{"term":"Absenkung","language":"de","meaning":"reduction"},{"term":"Regelzone","language":"de","meaning":"TSO control area"},{"term":"anweisender ÜNB","language":"de","meaning":"instructing transmission operator"},{"term":"anfordernder ÜNB","language":"de","meaning":"requesting transmission operator"}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":25,"pages_opened":61,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/curtailment-and-redispatch.json","detail_url":"https://georutter.org/v1/de/curtailment-and-redispatch/detail.json","html_url":"https://georutter.org/de/curtailment-and-redispatch/","country_url":"https://georutter.org/v1/countries/de.json"}