{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"data-centers-in-permitting","question":"Where can I get a list of data center projects currently in permitting in Germany, with location, power (MW), developer, permitting stage and date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"documents_only","non_official_data":"partial","summary":"The Länder UVP portal and regional participation sites provide selected dated files, especially for data-centre emergency power. Municipal planning and building approvals are separate and no complete current national list was verified. A party-hosted municipal reply gives an example electrical connection capacity; generator thermal MW must not be mistaken for data-centre demand.","main_caveats":["A public-display period ending does not establish that the permit was granted or remains pending.","Environmental notices frequently cover emergency generators; building permits may be separate.","Generator thermal input, data-centre IT load and electrical grid connection are different quantities.","The Maintal capacity and status example dates from February 2026 and needs current verification.","Coverage and bulk extraction beyond the opened examples remain unchecked."],"confidence":"medium","confidence_reason":"The cited case histories and units are directly checked, but national completeness and current status are not established.","attributes":[{"attribute":"location","covered":"partial","source_ids":["uvp_laender","nrw_participation"],"note":"Some files name an address or municipality.","gap":"not_checked","gap_note":"Nationwide project coverage not checked."},{"attribute":"power_mw","covered":"partial","source_ids":["maintal_reply"],"note":"A historical reply gives one maximum electrical connection; other files report generator thermal input.","gap":"not_checked","gap_note":"IT load, grid request and total demand are missing or unverified for most cases."},{"attribute":"developer","covered":"partial","source_ids":["uvp_laender","nrw_participation"],"note":"Some notices identify the applicant; it need not be the eventual operator.","gap":"not_checked","gap_note":"Applicant-to-developer identity and all regions not verified."},{"attribute":"permitting_stage","covered":"partial","source_ids":["uvp_laender","nrw_participation","hessen_decisions"],"note":"Individual consultations and decisions are dated; current pending status requires further checks.","gap":"not_checked","gap_note":"Files and subsequent decisions not checked nationally."},{"attribute":"stage_date","covered":"partial","source_ids":["uvp_laender","nrw_participation","hessen_decisions"],"note":"Notices provide display and decision dates when recorded.","gap":"not_checked","gap_note":"Timeliness and coverage across Länder and municipalities not established."}]},"sources":[{"source_id":"uvp_laender","name":"UVP-Portal der Länder","publisher":"Landesbetrieb Geoinformation und Vermessung","official":true,"landing_url":"https://www.uvp-verbund.de/","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"de","has_coordinates":false,"location_precision":"address","summary":"Finds selected UVP-linked permitting files and dated procedural milestones.","coverage_note":"Federal Länder portal; selected UVP procedures, not all building applications.","data_date":null,"caveats":["The project is a backup-generator application, not necessarily an application for the building.","Redtec already has a decision; do not count it as currently pending. Its 230 MW is thermal fuel input."],"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"nrw_participation","name":"Beteiligung NRW Bezirksregierung Köln","publisher":"Bezirksregierung Köln","official":true,"landing_url":"https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062","data_url":"https://beteiligung.nrw.de/portal/download/resources/beteiligung/1030062/information/1086830/datei/2327008_1/%C3%96ffentliche%2BBekanntmachung%2BNEA%2BNRW08_09.pdf","access":"web_viewer_only","format":"HTML and PDF","license":"unknown","language":"de","has_coordinates":false,"location_precision":"address","summary":"A detailed NRW consultation record and notice for a Bedburg data-centre campus backup system.","coverage_note":"Cologne government district, North Rhine-Westphalia.","data_date":null,"caveats":["Kürzlich beendet labels the participation period, not the overall permit decision.","545,3 MW is the thermal input of emergency generators, not IT load or the electricity connection."],"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"hessen_decisions","name":"Industrieemissionen","publisher":"Regierungspräsidium Darmstadt","official":true,"landing_url":"https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen","data_url":null,"access":"web_viewer_only","format":"HTML and PDF","license":"unknown","language":"de","has_coordinates":false,"location_precision":"municipality","summary":"Checks later decisions for Hessian industrial-emissions cases.","coverage_note":"Darmstadt administrative district, Hessen.","data_date":null,"caveats":["This is a decision list, not a live list of pending applications.","Publication date differs from decision date; a generator approval may differ from the building permit."],"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"maintal_reply","name":"Anfrage Nr. 260/2026 – Rechenzentren","publisher":"FDP-Fraktion Maintal (copy of municipal response)","official":false,"landing_url":"https://fdp-maintal.de/wp-content/uploads/sites/52/2026/02/260209_Grosse_Anfrage_Rechenzentren.pdf","data_url":null,"access":"pdf","format":"PDF","license":"unknown","language":"de","has_coordinates":false,"location_precision":"municipality","summary":"A dated municipal response, available in a party-hosted copy, states a project electrical connection capacity.","coverage_note":"Maintal, Hessen; one response dated 09.02.2026.","data_date":null,"caveats":["A party-hosted copy is not the live municipal permit register.","The February reply does not establish that either application remains pending in November; 168 MW is not IT load."],"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"problems":[]},"example":null,"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":"Public notices and decisions are project-specific and need manual reconciliation; missing data cannot necessarily be recovered from them."},"local_terms":[{"term":"Rechenzentrum","language":"de","meaning":"data centre"},{"term":"Genehmigungsverfahren","language":"de","meaning":"permitting procedure"},{"term":"Öffentliche Auslegung","language":"de","meaning":"public display of application documents"},{"term":"Netzersatzanlage","language":"de","meaning":"backup power system"},{"term":"Feuerungswärmeleistung","language":"de","meaning":"thermal fuel input"},{"term":"Baugenehmigung","language":"de","meaning":"building permit"},{"term":"Aktenzeichen","language":"de","meaning":"authority file number"}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":8,"pages_opened":41,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/data-centers-in-permitting.json","detail_url":"https://georutter.org/v1/de/data-centers-in-permitting/detail.json","html_url":"https://georutter.org/de/data-centers-in-permitting/","country_url":"https://georutter.org/v1/countries/de.json"}
