{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"data-centers-in-permitting","question":"Where can I get a list of data center projects currently in permitting in Germany, with location, power (MW), developer, permitting stage and date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"documents_only","non_official_data":"partial","summary":"The Länder UVP portal and regional participation sites provide selected dated files, especially for data-centre emergency power. Municipal planning and building approvals are separate and no complete current national list was verified. A party-hosted municipal reply gives an example electrical connection capacity; generator thermal MW must not be mistaken for data-centre demand.","main_caveats":["A public-display period ending does not establish that the permit was granted or remains pending.","Environmental notices frequently cover emergency generators; building permits may be separate.","Generator thermal input, data-centre IT load and electrical grid connection are different quantities.","The Maintal capacity and status example dates from February 2026 and needs current verification.","Coverage and bulk extraction beyond the opened examples remain unchecked."],"confidence":"medium","confidence_reason":"The cited case histories and units are directly checked, but national completeness and current status are not established.","attributes":[{"attribute":"location","covered":"partial","source_ids":["uvp_laender","nrw_participation"],"note":"Some files name an address or municipality.","gap":"not_checked","gap_note":"Nationwide project coverage not checked."},{"attribute":"power_mw","covered":"partial","source_ids":["maintal_reply"],"note":"A historical reply gives one maximum electrical connection; other files report generator thermal input.","gap":"not_checked","gap_note":"IT load, grid request and total demand are missing or unverified for most cases."},{"attribute":"developer","covered":"partial","source_ids":["uvp_laender","nrw_participation"],"note":"Some notices identify the applicant; it need not be the eventual operator.","gap":"not_checked","gap_note":"Applicant-to-developer identity and all regions not verified."},{"attribute":"permitting_stage","covered":"partial","source_ids":["uvp_laender","nrw_participation","hessen_decisions"],"note":"Individual consultations and decisions are dated; current pending status requires further checks.","gap":"not_checked","gap_note":"Files and subsequent decisions not checked nationally."},{"attribute":"stage_date","covered":"partial","source_ids":["uvp_laender","nrw_participation","hessen_decisions"],"note":"Notices provide display and decision dates when recorded.","gap":"not_checked","gap_note":"Timeliness and coverage across Länder and municipalities not established."}]},"sources":[{"source_id":"uvp_laender","name":"UVP-Portal der Länder","publisher":"Landesbetrieb Geoinformation und Vermessung","official":true,"landing_url":"https://www.uvp-verbund.de/","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"de","has_coordinates":false,"location_precision":"address","publisher_type":"regional_government","adds":"Finds selected UVP-linked permitting files and dated procedural milestones.","first_seen_pass":1,"rank":1,"summary":"Finds selected UVP-linked permitting files and dated procedural milestones.","coverage_note":"Federal Länder portal; selected UVP procedures, not all building applications.","data_date":null,"caveats":["The project is a backup-generator application, not necessarily an application for the building.","Redtec already has a decision; do not count it as currently pending. Its 230 MW is thermal fuel input."],"coverage":{"geographic":"Federal Länder portal; selected UVP procedures, not all building applications."},"fine_print":{"unit":{"value":"Project-specific: generator fuel input MW is not data centre IT or grid demand.","quote":"mit einer Gesamtfeuerungswärmeleistung von 230 MW","url":"https://www.uvp-verbund.de/trefferanzeige?docuuid=b066d6cb-374e-46fd-9645-ba6f080b60fb&modtime=last_year&provider=he&toggle_procedure=","attempts":[]},"inclusion_rule":{"value":"UVP-linked projects and procedures only, not all data centre building applications.","quote":"Im UVP-Portal dieser Internetseite können Sie sich über UVP-pflichtige Vorhaben","url":"https://www.uvp-verbund.de/","attempts":[]},"reference_date":{"value":"Procedural events have their own dates; the Redtec decision is 23.06.2026.","quote":"Datum der Entscheidung","url":"https://www.uvp-verbund.de/trefferanzeige?docuuid=b066d6cb-374e-46fd-9645-ba6f080b60fb&modtime=last_year&provider=he&toggle_procedure=","attempts":[]},"update_frequency":null,"exclusions":null},"key_fields":[{"field":"Allgemeine Vorhabenbeschreibung","meaning":"Project, applicant and sometimes address and power description."},{"field":"Verfahrensschritte","meaning":"Procedure milestones and dates, if recorded."}],"how_to_use":{"example_request":"https://www.uvp-verbund.de/trefferanzeige?docuuid=b066d6cb-374e-46fd-9645-ba6f080b60fb&modtime=last_year&provider=he&toggle_procedure=","example_result":"Redtec Computing GmbH; Assar-Gabrielsson-Straße 18, Dietzenbach; public display 15.12.2025–14.01.2026; decision 23.06.2026.","steps":["Search for Rechenzentrum and Notstrom by Land and open each project record.","Read Verfahrensschritte, dates, and any decision; cross-check the current stage against the responsible authority."],"reading_traps":["The project is a backup-generator application, not necessarily an application for the building.","Redtec already has a decision; do not count it as currently pending. Its 230 MW is thermal fuel input.","A displayed consultation is a dated milestone, not proof the file remains pending today."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Portal content","url":"https://www.uvp-verbund.de/","quote":"Im UVP-Portal dieser Internetseite können Sie sich über UVP-pflichtige Vorhaben, deren Verfahrensstand, Auslegungs- und Erörterungstermine, eingestellte Unterlagen, Berichte und Empfehlungen sowie die anschließende Entscheidung informieren."}],"members":[],"members_summary":null},{"source_id":"nrw_participation","name":"Beteiligung NRW Bezirksregierung Köln","publisher":"Bezirksregierung Köln","official":true,"landing_url":"https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062","data_url":"https://beteiligung.nrw.de/portal/download/resources/beteiligung/1030062/information/1086830/datei/2327008_1/%C3%96ffentliche%2BBekanntmachung%2BNEA%2BNRW08_09.pdf","access":"web_viewer_only","format":"HTML and PDF","license":"unknown","language":"de","has_coordinates":false,"location_precision":"address","publisher_type":"regional_government","adds":"A detailed NRW consultation record and notice for a Bedburg data-centre campus backup system.","first_seen_pass":1,"rank":2,"summary":"A detailed NRW consultation record and notice for a Bedburg data-centre campus backup system.","coverage_note":"Cologne government district, North Rhine-Westphalia.","data_date":null,"caveats":["Kürzlich beendet labels the participation period, not the overall permit decision.","545,3 MW is the thermal input of emergency generators, not IT load or the electricity connection."],"coverage":{"geographic":"Cologne government district, North Rhine-Westphalia."},"fine_print":{"unit":{"value":"MW of fuel thermal input for the backup plant.","quote":"einer Netzersatzanlage mit einer Feuerungswärmeleistung von insgesamt 545,3 MW","url":"https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062","attempts":[]},"inclusion_rule":null,"reference_date":null,"update_frequency":null,"exclusions":null},"key_fields":[{"field":"Kürzlich beendet","meaning":"Participation period ended, not necessarily permit granted."}],"how_to_use":{"example_request":"https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062","example_result":"Microsoft Deutschland MCIO GmbH; Netzersatzanlage Bedburg; 17.08.2026 bis 16.10.2026; Kürzlich beendet.","steps":["Open the detailed participation record and the linked notice.","Read the notice, pp. 1–3, for the applicant, address and public-display dates; check the authority for a subsequent decision."],"reading_traps":["Kürzlich beendet labels the participation period, not the overall permit decision.","545,3 MW is the thermal input of emergency generators, not IT load or the electricity connection.","The authority website labels the Bedburg procedure laufend in an entry dated 29.07.2026; an updated decision was not established."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Application and thermal input","url":"https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062","quote":"einer Netzersatzanlage mit einer Feuerungswärmeleistung von insgesamt 545,3 MW"},{"claim":"Authority describes an ongoing procedure in its dated notice","url":"https://www.bezreg-koeln.nrw.de/bekanntmachungen/microsoft-deutschland-mcio-gmbh-walter-gropius-strasse-5-80807-muenchen-0","quote":"Laufende immissionsschutzrechtliche Genehmigungsverfahren (BImSchG)"}],"members":[],"members_summary":null},{"source_id":"hessen_decisions","name":"Industrieemissionen","publisher":"Regierungspräsidium Darmstadt","official":true,"landing_url":"https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen","data_url":null,"access":"web_viewer_only","format":"HTML and PDF","license":"unknown","language":"de","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Checks later decisions for Hessian industrial-emissions cases.","first_seen_pass":1,"rank":3,"summary":"Checks later decisions for Hessian industrial-emissions cases.","coverage_note":"Darmstadt administrative district, Hessen.","data_date":null,"caveats":["This is a decision list, not a live list of pending applications.","Publication date differs from decision date; a generator approval may differ from the building permit."],"coverage":{"geographic":"Darmstadt administrative district, Hessen."},"fine_print":{"unit":null,"inclusion_rule":null,"reference_date":null,"update_frequency":null,"exclusions":null},"key_fields":[{"field":"Datum des Bescheides","meaning":"Decision date."},{"field":"Datum der Bekanntmachung","meaning":"Publication date."},{"field":"Aktenzeichen","meaning":"Authority file identifier."}],"how_to_use":{"example_request":"https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen","example_result":"Redtec Computing GmbH, Dietzenbach: Datum des Bescheides 23.06.2026; Datum der Bekanntmachung 15.07.2026.","steps":["Find the operator or file number in the annual section.","Read the decision date and link the published decision to the earlier consultation."],"reading_traps":["This is a decision list, not a live list of pending applications.","Publication date differs from decision date; a generator approval may differ from the building permit."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Decision date","url":"https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen","quote":"Datum des Bescheides: 23.06.2026"}],"members":[],"members_summary":null},{"source_id":"maintal_reply","name":"Anfrage Nr. 260/2026 – Rechenzentren","publisher":"FDP-Fraktion Maintal (copy of municipal response)","official":false,"landing_url":"https://fdp-maintal.de/wp-content/uploads/sites/52/2026/02/260209_Grosse_Anfrage_Rechenzentren.pdf","data_url":null,"access":"pdf","format":"PDF","license":"unknown","language":"de","has_coordinates":false,"location_precision":"municipality","publisher_type":"community","adds":"A dated municipal response, available in a party-hosted copy, states a project electrical connection capacity.","first_seen_pass":1,"rank":4,"summary":"A dated municipal response, available in a party-hosted copy, states a project electrical connection capacity.","coverage_note":"Maintal, Hessen; one response dated 09.02.2026.","data_date":null,"caveats":["A party-hosted copy is not the live municipal permit register.","The February reply does not establish that either application remains pending in November; 168 MW is not IT load."],"coverage":{"geographic":"Maintal, Hessen; one response dated 09.02.2026."},"fine_print":{"unit":{"value":"MW electrical connection at maximum load.","quote":"Elektrischer Anschlussleistung von max. 168 Megawatt (MW)","url":"https://fdp-maintal.de/wp-content/uploads/sites/52/2026/02/260209_Grosse_Anfrage_Rechenzentren.pdf","attempts":[]},"inclusion_rule":null,"reference_date":null,"update_frequency":null,"exclusions":null},"key_fields":[],"how_to_use":{"example_request":"https://fdp-maintal.de/wp-content/uploads/sites/52/2026/02/260209_Grosse_Anfrage_Rechenzentren.pdf pages 1–2 of response","example_result":"Edge Connex Maintal: Elektrischer Anschlussleistung von max. 168 Megawatt (MW); Baugenehmigungsverfahren and BImSchG-Verfahren.","steps":["Read the municipal reply following the party request; retain the reply date.","Transcribe the stated electrical connection capacity and verify any later permit status independently."],"reading_traps":["A party-hosted copy is not the live municipal permit register.","The February reply does not establish that either application remains pending in November; 168 MW is not IT load."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"application/pdf","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Electrical connection capacity","url":"https://fdp-maintal.de/wp-content/uploads/sites/52/2026/02/260209_Grosse_Anfrage_Rechenzentren.pdf","quote":"Elektrischer Anschlussleistung von max. 168 Megawatt (MW)"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Länder building authorities and competent environmental permitting authorities","url":"https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062"},"operators":{"structure":"many","note":"Private applicants and operators; no operator census checked.","census_url":null},"publication_obligation":{"exists":"yes","url":"https://beteiligung.nrw.de/portal/download/resources/beteiligung/1030062/information/1086830/datei/2327008_1/%C3%96ffentliche%2BBekanntmachung%2BNEA%2BNRW08_09.pdf"},"consolidated_republication":{"found":"partial","note":"Länder UVP portal aggregates selected UVP-relevant procedures.","checked_pages":[{"organization":"UVP-Portal der Länder","url":"https://www.uvp-verbund.de/","saw":"Search, Länder filters and procedural milestones."},{"organization":"Umweltbundesamt","url":"https://www.umweltbundesamt.de/themen/rechenzentrumsregister-daten-widerlegen-hohe","saw":"National energy register concerns reported operational information, not a permitting queue."}]}},"national_registry":{"exists":"partial","note":"The Länder UVP portal aggregates selected UVP proceedings but is not an exhaustive list of building-permit applications; no complete national live queue was verified.","checked_pages":[{"organization":"UVP-Portal der Länder","url":"https://www.uvp-verbund.de/","saw":"UVP project portal with search and procedures."},{"organization":"Bundeswirtschaftsministerium","url":"https://www.bundeswirtschaftsministerium.de/Redaktion/DE/Publikationen/Technologie/stand-und-entwicklung-des-rechenzentrumsstandorts-deutschland.pdf?__blob=publicationFile&amp=&v=10","saw":"Section 4.2.6 describes separate building and emissions licensing."},{"organization":"Umweltbundesamt","url":"https://www.umweltbundesamt.de/themen/rechenzentrumsregister-daten-widerlegen-hohe","saw":"National energy register records energy information for operating centres."}]},"if_unstructured":{"summary":"Public notices and decisions are project-specific and need manual reconciliation; missing data cannot necessarily be recovered from them.","recipe":["For Bedburg, open the notice and transcribe applicant, address and file number from page 1; record 545,3 MW as thermal input, not demand.","From pages 2–3 record the 17.08.2026–16.09.2026 public display separately from the 16.10.2026 objection deadline.","The Cologne authority listed this under Laufende immissionsschutzrechtliche Genehmigungsverfahren on a page dated 29.07.2026; check for a later decision before assigning a current stage.","For the Redtec example, match the applicant and location to the Darmstadt list and record its 23.06.2026 decision; do not retain it as a pending file."],"location_method":"Copy an address or parcel number only where stated; municipal-level location is not an exact site.","cross_with":["The responsible authority decision list and the separate building application or decision, where publicly available."],"where_published":[{"name":"Beteiligung NRW – Bezirksregierung Köln","url":"https://beteiligung.nrw.de/portal/brk/beteiligung/themen/1030062","what":"Public notices, procedural milestones and decisions.","how_to_search_inside":"Use the portal search by title or place, including Rechenzentrum, Netzersatzanlage and the operator name.","example_document":{"url":"https://beteiligung.nrw.de/portal/download/resources/beteiligung/1030062/information/1086830/datei/2327008_1/%C3%96ffentliche%2BBekanntmachung%2BNEA%2BNRW08_09.pdf","what_it_gives":"Notice p. 1: Microsoft Deutschland MCIO GmbH; 50181 Bedburg, Lipper Straße; 545,3 MW Feuerungswärmeleistung. Pages 2–3: 17.08.2026 bis einschließlich 16.09.2026 display."}},{"name":"Industrieemissionen – Regierungspräsidium Darmstadt","url":"https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen","what":"Public notices, procedural milestones and decisions.","how_to_search_inside":"Search the page for the applicant or Aktenzeichen in the year of a possible decision.","example_document":{"url":"https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/industrieemissionen","what_it_gives":"Redtec Computing GmbH, Dietzenbach: Datum des Bescheides 23.06.2026; Datum der Bekanntmachung 15.07.2026."}}]},"related_not_answering":[{"name":"Energieeffizienzregister für Rechenzentren","url":"https://www.umweltbundesamt.de/themen/rechenzentrumsregister-daten-widerlegen-hohe","why":"An energy reporting register for data centres, not a register of pending permit applications."},{"name":"Microsoft Rechenzentrum Grevenbroich","url":"https://www.grevenbroich.de/wirtschaft/rechenzentrum","why":"Municipal announcement and planned land-use process, not evidence that a building application has been filed."},{"name":"Megawattlas Data Center Projects","url":"https://megawattlas.com/projects/","why":"Combines announced and under-construction projects, without a verified pending-permit stage."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"GPT-6","rules_version":"6.12","note":"Selected consultation and decision examples; nationwide completeness and current permit stages require further checks.","headline":{"official_data":"documents_only","non_official_data":"partial","national_registry":"partial"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":41,"minutes":8}}],"local_terms":[{"term":"Rechenzentrum","language":"de","meaning":"data centre"},{"term":"Genehmigungsverfahren","language":"de","meaning":"permitting procedure"},{"term":"Öffentliche Auslegung","language":"de","meaning":"public display of application documents"},{"term":"Netzersatzanlage","language":"de","meaning":"backup power system"},{"term":"Feuerungswärmeleistung","language":"de","meaning":"thermal fuel input"},{"term":"Baugenehmigung","language":"de","meaning":"building permit"},{"term":"Aktenzeichen","language":"de","meaning":"authority file number"}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":8,"pages_opened":41,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/data-centers-in-permitting.json","detail_url":"https://georutter.org/v1/de/data-centers-in-permitting/detail.json","html_url":"https://georutter.org/de/data-centers-in-permitting/","country_url":"https://georutter.org/v1/countries/de.json"}