{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"environmental-assessment-decisions","question":"Where can I get the environmental assessment decisions on energy projects in Germany, with project, developer, location, date and outcome?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"none_found","summary":"German EIA assessments are generally embedded in consent decisions. Search the federal UVP portal for federal consents and the joint Länder portal for state and local consents; opened wind decisions identify the project, developer, place, date and outcome. Neither portal is a complete permanent historical archive, and an export of all decisions was not verified.","main_caveats":["A negative screening decision means no EIA is required; it is not the final consent decision.","Consultation notices and EIA reports are not final decisions; the environmental assessment often appears within the consent reasoning.","Portal publication is time-limited; the available historical series and completeness are not established.","A decision may be changed or challenged later; map markers and publication dates are not necessarily exact locations or decision dates.","No bulk export of decision outcomes was verified; portal and document reuse terms must be checked."],"confidence":"medium","confidence_reason":"Federal and state official decisions were opened and compared; temporal completeness and bulk extraction were not established.","attributes":[{"attribute":"project","covered":"partial","source_ids":["laender_uvp","federal_uvp"],"note":"Project titles occur in notices and decision texts.","gap":"not_checked","gap_note":"Completeness across authorities, time and projects was not verified."},{"attribute":"developer","covered":"partial","source_ids":["laender_uvp","federal_uvp"],"note":"Applicants are named in the opened decisions, but not checked in every record.","gap":"not_checked","gap_note":"Completeness across authorities, time and projects was not verified."},{"attribute":"location","covered":"partial","source_ids":["laender_uvp","federal_uvp"],"note":"Place descriptions occur in examples; map point precision varies.","gap":"not_checked","gap_note":"Completeness across authorities, time and projects was not verified."},{"attribute":"decision_date","covered":"partial","source_ids":["laender_uvp","federal_uvp"],"note":"Use the date of the decision, not the publication or modification date.","gap":"not_checked","gap_note":"Completeness across authorities, time and projects was not verified."},{"attribute":"outcome","covered":"partial","source_ids":["laender_uvp","federal_uvp"],"note":"The operative consent and its reasoning give the outcome in opened examples.","gap":"not_checked","gap_note":"Completeness across authorities, time and projects was not verified."},{"attribute":"latest_data","covered":"partial","source_ids":["laender_uvp","federal_uvp"],"note":"The Länder homepage displayed current energy notices on the check date.","gap":"not_checked","gap_note":"Completeness across authorities, time and projects was not verified."},{"attribute":"historical_series","covered":"partial","source_ids":["laender_uvp","federal_uvp"],"note":"Examples from 2022–2026 exist, but there is no verified continuous full historical series.","gap":"not_checked","gap_note":"Completeness across authorities, time and projects was not verified."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"Records are added by competent authorities; no quantified publication cadence was verified.","gap":"not_checked","gap_note":"A fixed national refresh schedule was not found in opened portal pages."}]},"sources":[{"source_id":"laender_uvp","name":"UVP-Verbundportal der deutschen Bundesländer","publisher":"Länderkooperation UVP-Verbund","official":true,"landing_url":"https://www.uvp-verbund.de/","data_url":null,"access":"web_viewer_only","format":"HTML, PDF","license":"unknown","language":"de","has_coordinates":null,"location_precision":"municipality","publisher_type":"regional_government","adds":"State and municipal decisions and notices; search jointly by Land and category.","first_seen_pass":1,"rank":1,"summary":"State and municipal decisions and notices; search jointly by Land and category.","coverage_note":"16 Länder, for state and municipal competent authorities","data_date":"Records inspected 2022–2026; completeness not established","caveats":["Decision documents may be removed after publication periods."],"coverage":{"geographic":"16 Länder, for state and municipal competent authorities"},"fine_print":{"unit":{"value":"One entry concerns a procedure; an individual project can have multiple entries.","quote":null,"attempts":[]},"inclusion_rule":{"value":"Public EIA procedures and negative screening notices under the competent authority.","quote":"„Informationen und insbesondere Unterlagen für die Öffentlichkeit zu allen aktuellen Zulassungsverfahren mit UVP sind in Deutschland über die UVP-Portale des Bundes und der Länder im Internet zugänglich.“ https://www.umweltbundesamt.de/themen/nachhaltigkeit-strategien-internationales/umweltpruefungen","attempts":[]},"reference_date":{"value":null,"attempts":["Individual decisions have dates; no uniform portal snapshot date found."]},"update_frequency":{"value":null,"attempts":["The homepage displays recent notices; fixed refresh frequency not established."]},"exclusions":{"value":"Archived decisions may disappear after statutory access period; environmental assessments are integrated into permits.","quote":"„bis zum Ablauf der jeweiligen Rechtsbehelfsfrist“ https://www.gesetze-im-internet.de/uvpportv/BJNR242810020.html","attempts":[]}},"key_fields":[{},{},{},{}],"how_to_use":{"example_request":"https://www.uvp-verbund.de/documents-ige-ng/igc_sh/75e310ac-3db4-4e05-845e-dfa470b421ea/2026-03-27_G40-2024-083_G_Endf_digAusf.pdf (cover and pp. 43–44)","example_result":"G40/2024/083; Windpark Rosacker Au GmbH & Co. KG; Silberstedt; 27. März 2026; Genehmigungsbescheid.","steps":["Open the portal list and filter by the appropriate energy or line category and authority.","Open a project detail and distinguish the decision from the participation notice and negative screening.","Read the operative decision and the environmental assessment reasoning; extract fields and cite each document."],"reading_traps":["Not every entry is an issued decision, nor does a negative EIA screening approve the project.","Publication date, modification date, application date and decision date differ.","Availability and geographical precision vary across procedures; published points are not assumed exact."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"The portal contains information on proceedings and the subsequent decision.","url":"https://www.uvp-verbund.de/","quote":"„Im UVP-Portal dieser Internetseite können Sie sich über UVP-pflichtige Vorhaben, deren Verfahrensstand, Auslegungs- und Erörterungstermine, eingestellte Unterlagen, Berichte und Empfehlungen sowie die anschließende Entscheidung informieren.“"},{"claim":"One actual decision identifies date, developer and location.","url":"https://www.uvp-verbund.de/documents-ige-ng/igc_sh/75e310ac-3db4-4e05-845e-dfa470b421ea/2026-03-27_G40-2024-083_G_Endf_digAusf.pdf","quote":"Genehmigungsbescheid"}],"members":[{"name":"Schleswig-Holstein","landing_url":"https://www.uvp-verbund.de/documents-ige-ng/igc_sh/75e310ac-3db4-4e05-845e-dfa470b421ea/2026-03-27_G40-2024-083_G_Endf_digAusf.pdf","data_url":"https://www.uvp-verbund.de/documents-ige-ng/igc_sh/75e310ac-3db4-4e05-845e-dfa470b421ea/2026-03-27_G40-2024-083_G_Endf_digAusf.pdf","access":"pdf","tested":true,"data_found":true,"note":"Rosacker Au consent and UVP reasoning at p. 43."},{"name":"Baden-Württemberg","landing_url":"https://www.uvp-verbund.de/documents-ige-ng/igc_bw/335283a7-b56b-4db8-8190-b64cfd5ae78b/2024-04-03_Genehmigung%20Windpark%20Altheim%20III_Geschw%C3%A4rzt.pdf","data_url":"https://www.uvp-verbund.de/documents-ige-ng/igc_bw/335283a7-b56b-4db8-8190-b64cfd5ae78b/2024-04-03_Genehmigung%20Windpark%20Altheim%20III_Geschw%C3%A4rzt.pdf","access":"pdf","tested":true,"data_found":true,"note":"Altheim III consent contains EIA analysis."},{"name":"Sachsen-Anhalt","landing_url":"https://www.uvp-verbund.de/freitextsuche?category=chemie%3Bverarbeitung%3Bbauvorhaben%3Bholzzellstoff%3Benergie%3Bflurbereinigung%3Bforstlandvorhaben&page=6&procedure=obj_class_zv&provider=be%3Bbb%3Bth%3Bhe%3Brp%3Bst","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"Jerichow/Mangelsdorf notice states decision date 17 December 2025; search page is shared."}],"members_summary":{"total":16,"listed":3,"tested":3,"data_found":3,"scope_note":"All 16 Länder are listed by the national portal; actual decision documents and search pages were selectively inspected. Other state searches encountered HTTP 429.","pattern":null},"member_scope":{"total":16,"note":"All 16 Länder are listed by the national portal; actual decision documents and search pages were selectively inspected. Other state searches encountered HTTP 429."}},{"source_id":"federal_uvp","name":"Umweltprüfungsportal des Bundes","publisher":"Umweltbundesamt and competent federal authorities","official":true,"landing_url":"https://www.uvp-portal.de/de","data_url":null,"access":"web_viewer_only","format":"HTML, PDF","license":"unknown","language":"de","has_coordinates":null,"location_precision":"municipality","publisher_type":"national_government","adds":"Federal-authority consents and their environmental reasoning, including offshore energy projects.","first_seen_pass":1,"rank":2,"summary":"Federal-authority consents and their environmental reasoning, including offshore energy projects.","coverage_note":"Germany including EEZ, for federal competent authorities","data_date":"Records inspected 2022–2026; completeness not established","caveats":["Decision documents may be removed after publication periods."],"coverage":{"geographic":"Germany including EEZ, for federal competent authorities"},"fine_print":{"unit":{"value":"One entry concerns a procedure; an individual project can have multiple entries.","quote":null,"attempts":[]},"inclusion_rule":{"value":"Public EIA procedures and negative screening notices under the competent authority.","quote":"„Informationen und insbesondere Unterlagen für die Öffentlichkeit zu allen aktuellen Zulassungsverfahren mit UVP sind in Deutschland über die UVP-Portale des Bundes und der Länder im Internet zugänglich.“ https://www.umweltbundesamt.de/themen/nachhaltigkeit-strategien-internationales/umweltpruefungen","attempts":[]},"reference_date":{"value":null,"attempts":["Individual decisions have dates; no uniform portal snapshot date found."]},"update_frequency":{"value":null,"attempts":["The homepage displays recent notices; fixed refresh frequency not established."]},"exclusions":{"value":"Archived decisions may disappear after statutory access period; environmental assessments are integrated into permits.","quote":"„bis zum Ablauf der jeweiligen Rechtsbehelfsfrist“ https://www.gesetze-im-internet.de/uvpportv/BJNR242810020.html","attempts":[]}},"key_fields":[{},{},{},{}],"how_to_use":{"example_request":"https://www.uvp-portal.de/de/node/3347","example_result":"NC 1; Nordseecluster A GmbH; German North Sea EEZ; 14.06.2024; plan approved for 15 turbines.","steps":["Open the portal list and filter by the appropriate energy or line category and authority.","Open a project detail and distinguish the decision from the participation notice and negative screening.","Read the operative decision and the environmental assessment reasoning; extract fields and cite each document."],"reading_traps":["Not every entry is an issued decision, nor does a negative EIA screening approve the project.","Publication date, modification date, application date and decision date differ.","Availability and geographical precision vary across procedures; published points are not assumed exact."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"The federal portal covers procedures where a federal agency makes the final consent decision.","url":"https://www.uvp-portal.de/de/laenderportale","quote":"„Hier stellen Bundesbehörden und Anhörungsbehörden der Länder UVP-Unterlagen aus solchen Verfahren bereit, in denen eine Bundesbehörde als Zulassungsbehörde die abschließende Entscheidung im Zulassungsverfahren trifft.“"},{"claim":"The record announces the decision and project.","url":"https://www.uvp-portal.de/de/node/3347","quote":"„Am 14.06.2024 ist der Planfeststellungsbeschluss für den Offshore-Windpark „NC 1“ (ehemals OWP N-3.7) erlassen worden.“"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Bundesministerium für Umwelt and competent federal, Länder or municipal authorities","url":"https://www.bundesumweltministerium.de/gesetz/verordnung-ueber-zentrale-internetportale-des-bundes-und-der-laender-im-rahmen-der-umweltvertraeglichkeitspruefung"},"operators":{"structure":"many","note":"Each competent consent authority runs its own procedure; the federal agency or Land/municipality portal depends on who decides.","census_url":"https://www.uvp-portal.de/de/laenderportale"},"publication_obligation":{"exists":"yes","url":"https://www.gesetze-im-internet.de/uvpg/__27.html"},"consolidated_republication":{"found":"partial","checked_pages":[{"url":"https://www.umweltbundesamt.de/themen/nachhaltigkeit-strategien-internationales/umweltpruefungen"},{"url":"https://lfu.brandenburg.de/lfu/de/aktuelles/oeffentliche-bekanntmachungen/obere-wasserbehoerde-bekanntmachungen/"}]}},"national_registry":{"exists":"partial","note":"Two connected national-scope public portals split federal and state/local competences, with temporary publication; no verified complete historical register.","checked_pages":[{"url":"https://www.umweltbundesamt.de/themen/nachhaltigkeit-strategien-internationales/umweltpruefungen"},{"url":"https://www.bundesumweltministerium.de/gesetz/verordnung-ueber-zentrale-internetportale-des-bundes-und-der-laender-im-rahmen-der-umweltvertraeglichkeitspruefung"},{"url":"https://rp-darmstadt.hessen.de/veroeffentlichungen-und-digitales/oeffentliche-bekanntmachungen/umweltinformationen"}]},"if_unstructured":{"summary":"The assessment and the approval outcome are often embedded in long individual decisions; search and extract individual documents.","recipe":["For NC 1 open the detail page and the Planfeststellungsbeschluss PDF, and read section A.I for developer, date, project and consent.","Read section B.III.2 at pp. 67–68 for EIA reasoning; retain the distinction between that analysis and the operative consent.","Extract the actual text and compare the decision date with the notice, along with any later amendments and conditions."],"location_method":"Use the project location in the detail page or the referenced maps and coordinates in the consent; the developer address is not the project location.","cross_with":["Check the issuing authority for amendments or documents no longer accessible on the portal."],"where_published":[{"name":"UVP-Verbundportal der Länder","url":"https://www.uvp-verbund.de/","example_document":{}},{"name":"Umweltprüfungsportal des Bundes","url":"https://www.uvp-portal.de/de/vorhaben","example_document":{}}]},"related_not_answering":[{"name":"Rare Context UVP-Portal catalogue","url":"https://rarecontext.com/sources/uvp-portal","why":"Names an aggregate, but its public claims omit underlying values and do not provide a complete decision outcome table."},{"name":"UVP screening of Windpark Hollenstedt","url":"https://www.uvp-verbund.de/documents-ige-ng/igc_ni/d69e885c-c016-4595-81f2-ebbfff99f471/Vermerk%20UVP-%20Vorpr%C3%BCfung%20Windpark.pdf","why":"A screening notice determines whether an EIA is required; it is not the subsequent final EIA-based consent."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"GPT-6","rules_version":"6.12","note":"Federal and Länder decisions checked; historical completeness and bulk extraction remain uncertain.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"partial"},"sources":{"total":2,"new":2,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":40,"minutes":10}}],"local_terms":[{"term":"Umweltverträglichkeitsprüfung","language":"de","meaning":"Environmental impact assessment (UVP)."},{"term":"Zulassungsentscheidung","language":"de","meaning":"Consent or refusal decision."},{"term":"negative Vorprüfung","language":"de","meaning":"Screening outcome that no EIA is required."},{"term":"Genehmigungsbescheid","language":"de","meaning":"Permit decision document."},{"term":"Vorhabenträger","language":"de","meaning":"Project proponent."},{"term":"Planfeststellungsbeschluss","language":"de","meaning":"Planning approval decision."}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":10,"pages_opened":40,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/environmental-assessment-decisions.json","detail_url":"https://georutter.org/v1/de/environmental-assessment-decisions/detail.json","html_url":"https://georutter.org/de/environmental-assessment-decisions/","country_url":"https://georutter.org/v1/countries/de.json"}
