{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"grid-hosting-capacity","question":"Where can I get the available grid connection capacity per substation or node in Germany, for generation and for demand, with the latest value and its history?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"partial","non_official_data":"partial","summary":"Germany has no unified official substation hosting-capacity dataset across its 4 TSOs and ~865 electricity DSOs (inferred by subtracting 4 TSOs from 869 active Stromnetzbetreiber in BNetzA's MaStR). At TSO level, 50Hertz exposes a JSON API for 75 substations with available, reserved and requested MW for generation and demand (and an undocumented-unit constructionCostContribution field); TransnetBW embeds 52 substations in HTML with MW bands; Amprion and TenneT list 10 substations each without available MW. At DSO level, Geoportal Saarland maps renewable feed-in MW for 6 DSOs and E.ON DSOs publish qualitative maps (HTTP 403). Only paid aggregator GridChecker (844 sites) keeps history.","main_caveats":["No single national official portal exists: publication is split across 4 TSOs and ~865 electricity DSOs, and VNBdigital (814 DSOs) only hosts territories, Netzausbaupläne and portal links.","Since 1 April 2026 all 4 TSOs allocate large load and battery connections via cyclic Reifegradverfahren (first-ready, first-served); published MW values are non-binding maximum indications.","Only 50Hertz (exact MW) and TransnetBW (MW bands for 2032/2035) publish node-level generation and demand MW at TSO level; Amprion and TenneT publish bay/site availability without MW.","Saarland Geoportal and Netze BW's Mittelspannungsauskunft cover generation feed-in only; urban DSO Repartition/Fair-Grid notices (Hamburg, Düsseldorf, Berlin) give only grid-wide MVA totals.","50Hertz's JSON API sets available*CapacityMw to null (not 0) on 60/75 unavailable nodes and duplicates Eulenberg (EUB) and Eulenberg (EUB) Neubau with identical 1,800/2,000 MW values.","Official portals overwrite snapshots in place with no history; TenneT and E.ON DSO portals (Bayernwerk, E.DIS, SH Netz, Westnetz) block non-browser HTTP clients via Cloudflare HTTP 403."],"confidence":"high","confidence_reason":"All 4 TSOs, BNetzA, SMARD, VNBdigital (814 DSOs), EnWG/BMWE's 2026 Netzanschlusspaket bill, Capacitypedia, Saarland Geoportal, 18 major DSOs and GridChecker were directly inspected.","attributes":[{"attribute":"node","covered":"partial","source_ids":["de-uenb-netzanschlusskapazitaet","de-saarland-geoportal-umspannanlagen","de-vnb-netzanschlusskapazitaet","gridchecker-de"],"note":"50Hertz (75 EHV nodes), TransnetBW (52), Amprion (10), TenneT (10) and ~25 DSOs publish substation entries; 8 of 18 directly tested DSOs publish none or only grid-wide totals.","gap":"not_checked","gap_note":"Among tested operators, 8 of 18 DSOs publish no per-substation capacity (BMWE's August 2026 § 17c EnWG-E bill remains in parliament; VNBdigital's 814 DSO profiles expose only territories, Netzausbaupläne and portal links), Amprion and TenneT omit unavailable substations from their tables, TenneT and 7 regional DSO portals return HTTP 403, GridChecker's full 844-site table is paid, and ~841 smaller DSOs were not individually opened."},{"attribute":"generation_capacity","covered":"partial","source_ids":["de-uenb-netzanschlusskapazitaet","de-saarland-geoportal-umspannanlagen","de-vnb-netzanschlusskapazitaet","gridchecker-de"],"note":"50Hertz gives exact firm MW per EHV node (13/75 >0 MW); TransnetBW gives MW bands (2032/2035); Saarland Geoportal gives HV/MV renewable MW; Netze BW/N-ERGIE check <=10 MW.","gap":"not_checked","gap_note":"Among tested operators, Amprion and TenneT publish no numerical generation MW per substation, E.ON regional DSO maps (Bayernwerk, E.DIS, SH Netz) use qualitative classes behind Cloudflare HTTP 403, tested urban/regional DSOs (8 of 18) publish only network-wide MVA or none, GridChecker's consolidated export is paid, and ~841 smaller electricity DSOs were not individually checked."},{"attribute":"demand_capacity","covered":"partial","source_ids":["de-uenb-netzanschlusskapazitaet","de-vnb-netzanschlusskapazitaet","gridchecker-de"],"note":"50Hertz gives availableLoadCapacityMw (15/75 >0 MW) and TransnetBW gives load MW bands; N-ERGIE Netz offers single-site LV/MV pre-checks <=10 MW; GridChecker tracks 844 sites.","gap":"not_checked","gap_note":"Amprion and TenneT publish qualitative bay/site availability without numerical demand MW; Geoportal Saarland and Netze BW's Mittelspannungsauskunft cover generation feed-in only; tested urban DSOs (Hamburger Energienetze 0 MVA, Düsseldorf 0 MVA, ENERVIE ~100 MVA, Stromnetz Berlin suspended) publish only grid-wide totals; 7 regional DSO portals returned HTTP 403, GridChecker is paid, and ~841 smaller DSOs were not individually checked."},{"attribute":"latest_data","covered":"partial","source_ids":["de-uenb-netzanschlusskapazitaet","de-saarland-geoportal-umspannanlagen","de-vnb-netzanschlusskapazitaet","gridchecker-de"],"note":"Latest snapshots: 50Hertz knowledge 2026-03-31 (API updatedAt 2026-05-18), TransnetBW 2026-04-01 (map 05/2026), Amprion 04/2026, Saarland WMS 2026-11-24, GridChecker 2026-11-25.","gap":"not_checked","gap_note":"Among tested sources, current node-level generation and demand MW exist only at 50Hertz and TransnetBW (with 6–8 month assessment lag), Saarland (feed-in only), single-site MV pre-check tools, and paid GridChecker; Westnetz's 110 kV grid-group PDF dates from 2022-07-01, 7 DSO portals returned HTTP 403, 8 tested DSOs publish no node snapshot, and ~841 smaller DSOs were not individually checked."},{"attribute":"historical_series","covered":"partial","source_ids":["gridchecker-de"],"note":"No tested official German TSO or DSO portal archives past hosting-capacity snapshots; commercial aggregator GridChecker archives daily snapshots for 29 operators since Oct 2024.","gap":"not_checked","gap_note":"All tested official TSO and DSO portals overwrite their current map or PDF snapshot in place without historical archives. GridChecker retains versioned daily snapshots since October 2024 (e.g. 22 snapshots for TenneT DE since 2026-06-09, 1 for Bayernwerk since 2026-11-16), but requires a paid commercial plan and covers 29 operators; 7 regional DSO portals returned HTTP 403 and ~841 smaller DSOs were not individually checked."},{"attribute":"update_frequency","covered":"partial","source_ids":["de-uenb-netzanschlusskapazitaet","de-saarland-geoportal-umspannanlagen","de-vnb-netzanschlusskapazitaet","gridchecker-de"],"note":"50Hertz and TransnetBW update ad hoc/cyclically; TenneT every ~10 months; Netze BW weekly; urban DSO Repartition portals annually; GridChecker polls daily at 05:15 UTC.","gap":"not_checked","gap_note":"Although Art. 50(4a) of Regulation (EU) 2019/943 requires monthly TSO updates and Art. 31(3) of Directive (EU) 2019/944 requires at least quarterly DSO updates (transposed as monthly in pending § 17c(1) EnWG-E), tested German operators mostly state ad-hoc or 10-to-12-month cycle updates (Saarland WMS states no schedule), 7 DSO portals returned HTTP 403, and ~841 smaller DSOs were not individually checked."}]},"sources":[{"source_id":"de-uenb-netzanschlusskapazitaet","name":"Netzanschlusskarten und Umspannwerk-Kapazitätsübersichten der vier deutschen Übertragungsnetzbetreiber (50Hertz, TransnetBW, Amprion, TenneT)","publisher":"50Hertz Transmission GmbH, TransnetBW GmbH, Amprion GmbH, TenneT TSO GmbH","official":true,"landing_url":null,"data_url":null,"access":"api","format":"JSON (50Hertz API), HTML/SVG (TransnetBW), PDF (Amprion), Web viewer/table (TenneT)","license":"Proprietary informational publication (no legal entitlement; standard statutory copyright)","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Official substation connection capacity publications of all 4 German 220/380 kV TSOs: 50Hertz exposes a 75-substation JSON API with exact generation and demand MW, TransnetBW embeds 52 substations in HTML with MW classes, Amprion provides a 10-substation PDF table without MW, and TenneT's 10-site page is gated by Cloudflare.","coverage_note":"Test record count (75) represents EHV substations in 50Hertz's JSON API (3 coordinate pairs overlap). Across all 4 TSOs, TransnetBW adds 52 EHV substations, Amprion lists 10 available substations, and TenneT lists 10 future sites.","data_date":"2026-03-31 to 2026-05-18 (by TSO)","caveats":["50Hertz sets available*CapacityMw to null on 60/75 unavailable nodes and duplicates Eulenberg (EUB) and Eulenberg (EUB) Neubau.","TransnetBW values apply only from 2032/2035 and hide 37 red unavailable substations via JS; Amprion and TenneT omit numerical MW.","TenneT's webpage returns HTTP 403 to non-browser clients; no TSO provides historical snapshots."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":["TenneT Germany's page (https://www.tennet.eu/de/strommarkt/kunden-deutschland/netzanschlussanfragen) rejects automated HTTP clients with HTTP 403 (Cloudflare anti-bot challenge).","No historical snapshots are exposed by any of the four TSO portals."]},"example":{"example_request":"curl -sSL \"https://www.50hertz.com/DesktopModules/Lotes/FrequentModules/API/DigitalMap/GetDnbInfo?path=GridLoadMapVersion/map/type/gridcapacity\"","example_result":"{\"id\":\"1b58832e-bd03-48fe-b71f-08de8b31ead3\",\"locations\":[{\"name\":\"Altentreptow Süd (ATS)\",\"coordinate\":{\"x\":\"13.174416\",\"y\":\"53.62405\"},\"voltageLevel\":\"380\",\"availableSwitchgearBay\":1,\"availableLoadCapacityMw\":1300.0,\"availableGenerationCapacityMw\":650.0,\"reservedLoadCapacityMw\":250.0,\"reservedGenerationCapacityMw\":850.0,\"requestedLoadCapacityMw\":5193.0,\"requestedGenerationCapacityMw\":5193.0}]}"},"members_summary":{"total":4,"listed":4,"tested":4,"data_found":3,"scope_note":"Covers all 4 balancing-responsible German electricity transmission system operators (Übertragungsnetzbetreiber, ÜNB). All 4 were tested.","pattern":"Published on each ÜNB's Netzanschluss / Netzzugang page alongside joint Reifegradverfahren documentation on netztransparenz.de."}},{"source_id":"de-saarland-geoportal-umspannanlagen","name":"Geoportal Saarland – Kapazitäten der Umspannanlagen","publisher":"Landesamt für Vermessung, Geoinformation und Landentwicklung Saarland (Zentrale Stelle GDI-SL) / Ministerium für Wirtschaft, Innovation, Digitales und Energie Saarland","official":true,"landing_url":"https://geoportal.saarland.de/article/Umspannanlagen_Kapazitaeten/","data_url":"https://geoportal.saarland.de/mapbender/php/wms.php?layer_id=50468&REQUEST=GetCapabilities&VERSION=1.1.1&SERVICE=WMS&withChilds=1","access":"web_viewer_only","format":"Mapbender web viewer / OGC WMS (linked per-substation graphics)","license":"Viewing free within Geoportal Saarland; any other use or embedding in external applications is expressly prohibited","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Official Saarland state geoportal mapping HV/MV substations across 6 regional DSOs (VSE Verteilnetz, Creos Deutschland, Pfalzwerke Netz, Stadtwerke Saarbrücken Netz, SSW Netz, KEW) with linked graphics showing installed transformer MW, existing/committed EEG MW, arithmetic available feed-in MW, and queued MW.","coverage_note":"Covers Saarland and adjacent Pfalzwerke/Creos HV/MV substations (WMS Capabilities returns layer metadata without a feature count; 1 state out of 16 Länder).","data_date":"2026-11-24","caveats":["Covers renewable generation feed-in only; no demand capacity is published.","'Verfügbar' is an arithmetic residual (Trafoleistung minus Bestand and Geplant), not a power-flow limit.","Terms forbid any use or embedding outside viewing in Geoportal Saarland."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":["Terms of use prohibit any utilization beyond free viewing inside Geoportal Saarland.","Underlying ArcGIS REST MapServer endpoint is not publicly exposed (returns HTML 404), so substation count is not returned by WMS Capabilities (GridChecker indexes ~70+ Saarland/Pfalz substations from these operators)."]},"example":null,"members_summary":null},{"source_id":"de-vnb-netzanschlusskapazitaet","name":"Kapazitätskarten, Online-Netzauskünfte und Zuteilungsportale deutscher Verteilernetzbetreiber (VNB)","publisher":"Individual German electricity distribution system operators (Verteilernetzbetreiber, e.g. Netze BW, N-ERGIE Netz, EWE NETZ, MITNETZ STROM, Bayernwerk Netz, E.DIS Netz, Schleswig-Holstein Netz)","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"Interactive web portals and PDFs (varies by DSO)","license":"Proprietary informational self-service tools (non-binding)","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Individual portals of Germany's ~865 electricity DSOs: Netze BW, N-ERGIE Netz and MITNETZ STROM provide interactive single-site MV connection pre-check tools (typically <= 10 MW); E.ON regional DSOs host qualitative HV/MV substation maps behind Cloudflare (HTTP 403); urban DSOs publish only grid-wide Repartition MVA totals.","coverage_note":"Universe of 865 represents German electricity DSOs (869 MaStR Stromnetzbetreiber minus 4 TSOs); 18 major DSOs tested directly (3 with single-site MV pre-check tools, 7 HTTP 403, 8 without node capacity data; 6 further Saarland DSOs are in Geoportal Saarland).","data_date":"2026-08 to 2026-11-25 (varies by DSO)","caveats":["Open MV self-service tools return single-coordinate feasibility up to 10 MW, not bulk substation tables.","E.ON DSO portals (*.zuteilungsverfahren.de) and Westnetz reject non-browser HTTP requests with HTTP 403.","Urban Repartition/Fair-Grid portals (Hamburg, Düsseldorf, ENERVIE, Berlin) give only grid-wide MVA totals or suspended publication."],"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"problems":["No bulk substation download or public REST/WFS endpoint found on tested open DSO pages; interactive MV tools require per-coordinate queries.","Bayernwerk Netz, E.DIS Netz, Schleswig-Holstein Netz, Avacon Netz, Westnetz, Syna and Westfalen Weser Netz reject automated HTTP clients with HTTP 403 (Cloudflare/WAF)."]},"example":null,"members_summary":{"total":865,"listed":18,"tested":18,"data_found":3,"scope_note":"Universe of 865 German electricity DSOs is inferred by subtracting the 4 balancing-zone TSOs from the 869 active Stromnetzbetreiber returned live by BNetzA's MaStR (consistent with BMWE's Aug 2026 Netzanschlusspaket draft bill citing 866 DSOs on p. 41 / 851 on p. 25, and VNBdigital's 814 DSO profiles). 18 major regional and urban DSOs were tested directly here (plus 6 Saarland/Pfalz DSOs covered in de-saarland-geoportal-umspannanlagen).","pattern":"Look up the local DSO on https://www.vnbdigital.de, then search its website for 'Kapazitätskarte', 'Online-Netzauskunft', 'Mittelspannungsauskunft', 'SNAP', 'Zuteilungsverfahren' or 'Repartierungsverfahren'."}},{"source_id":"gridchecker-de","name":"GridChecker – Germany Grid Connection Capacity and Connection Queue","publisher":"GridChecker","official":false,"landing_url":"https://gridchecker.com/countries/de","data_url":"https://gridchecker.com/de/netzanschluss-kapazitaet","access":"paid","format":"HTML preview table (public), CSV and API / map export (paid subscription)","license":"Commercial proprietary (figures non-binding as published by grid operators)","language":"en, de","has_coordinates":true,"location_precision":"exact","summary":"Commercial aggregator harmonising public capacity maps and tables from 29 German operators (all 4 TSOs and 25 DSOs, 844 sites total), offering free HTML previews and paid CSV/API access with daily archived snapshots since October 2024.","coverage_note":"844 records represent published substations and 17 Westnetz 110 kV grid groups across 29 operators (~3.3% of Germany's 869 active electricity grid operators); 815 have map coordinates.","data_date":"2026-11-25","caveats":["Full CSV export and historical snapshots since Oct 2024 require a paid subscription.","Inherits upstream gaps (no numeric MW for Bayernwerk, Amprion or TenneT; includes 50Hertz Eulenberg duplicate and 2022 Westnetz PDF)."],"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"problems":["Public HTML exposes only ~32 preview rows on the country page; bulk CSV export and historical time series require a paid subscription."]},"example":null,"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":"Where a tested DSO publishes no substation capacity map or a TSO omits numerical MW (Amprion, TenneT), look up the responsible DSO via VNBdigital and extract substation expansion deltas (+/- MVA) and bottleneck flags from its biennial § 14d EnWG Netzausbauplan PDF and annual Repartition/Fair-Grid capacity notices, or submit a formal Netzanschlussbegehren."},"local_terms":[{"term":"Kapazitätskarte / Netzanschlusskarte","language":"de","meaning":"Geographic hosting-capacity or grid-connection map published by a TSO or DSO per substation or grid area."},{"term":"Verfügbare Einspeisekapazität / Verfügbare Lastkapazität","language":"de","meaning":"Available connection capacity for generation feed-in (Einspeisung) versus demand/offtake (Last / Bezug)."},{"term":"Umspannwerk (UW) / Schaltanlage","language":"de","meaning":"Transformer substation or switchgear station serving as a grid connection node."},{"term":"Schaltfeldverfügbarkeit","language":"de","meaning":"Availability of physical switchgear bays at an EHV/HV substation, published by 50Hertz and Amprion."},{"term":"Online-Netzauskunft / Mittelspannungsauskunft / SNAP","language":"de","meaning":"Interactive DSO self-service pre-check portals returning an indicative MV connection point for a queried coordinate and MW."},{"term":"Reifegradverfahren","language":"de","meaning":"Joint maturity-based ('first ready, first served') allocation procedure introduced on 1 April 2026 by all 4 German TSOs for large loads and battery storage."},{"term":"Zuteilungsverfahren / Repartierungsverfahren","language":"de","meaning":"Criteria-based or pro-rata capacity allocation procedures used by congested German DSOs for large connection requests."},{"term":"Übertragungsnetzbetreiber (ÜNB) / Verteilernetzbetreiber (VNB)","language":"de","meaning":"Transmission system operators (4 in Germany) and distribution system operators (~865 in electricity)."}],"provenance":{"pass_count":1,"models":["Gemini 4 Carbon"],"minutes_estimate":40,"pages_opened":86,"passes":[{"pass":1,"date":"2026-11-26","model":"Gemini 4 Carbon"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/grid-hosting-capacity.json","detail_url":"https://georutter.org/v1/de/grid-hosting-capacity/detail.json","html_url":"https://georutter.org/de/grid-hosting-capacity/","country_url":"https://georutter.org/v1/countries/de.json"}