{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"solar-pv-plants-in-permitting","question":"Where can I get a list of solar PV projects currently in permitting in Germany, with location, capacity (MW), developer, permitting stage and date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"partial","non_official_data":"partial","summary":"Germany has no complete national register of solar PV projects in permitting. Bundesnetzagentur's Marktstammdatenregister (MaStR) publishes 63,257 solar units in status 'In Planung' (1,094 ground-mounted), with kWp/kW capacity and WGS84 coordinates above 30 kW, but pre-commissioning registration is voluntary for solar PV under § 5(4) MaStRV and merges planning, permitting and construction into one status. Bundesnetzagentur's EEG tender XLSX files add awarded kW, bidder, parcel location and award date for subsidised projects. Binding zoning stages (Aufstellungsbeschluss, Auslegung, Satzungsbeschluss) sit as PDFs across 16 Länder Bauleitplanung portals and ~11,000 municipalities.","main_caveats":["Under § 5(4) MaStRV, pre-commissioning MaStR registration ('In Planung') is mandatory only for federal-law permits (e.g. BImSchG, WHG); standard solar PV is registered voluntarily until 1 month after commissioning.","MaStR has only one pre-commissioning status ('In Planung', code 31), lumping early concepts together with projects that already hold a Satzungsbeschluss, Baugenehmigung or are actively under construction ('Im Bau').","Large solar parks are often split across multiple MaStR units (e.g. PVA Schafhöfen Anlagenteil 1 at 17.6 MWp and Anlagenteil 2 at 200 MWp vs 268 MWp grid reservation in the municipal Bebauungsplan).","MaStR redacts coordinates, street and Flurstück for solar units <=30 kW (58,539 of 63,257 planned units) and masks natural-person operators under § 15(1) MaStRV.","BNetzA EEG tender lists cover only awarded subsidised bids (excluding subsidy-free PPA parks and pre-tender projects), omit coordinates, and split multi-Gemarkung bids across rows in Zuschläge_Detailliert.","Privileged ground-mounted PV within 200 m of motorways or double-track railways (§ 35(1) Nr. 8b BauGB) and rooftop PV skip Bebauungspläne; county Baugenehmigungen are not publicly listed."],"confidence":"high","confidence_reason":"Statutory inclusion/privacy rules (§§ 5, 15 MaStRV; §§ 35, 37 EEG; § 10a BauGB), live MaStR API/bulk exports, BNetzA tender XLSX files, all 16 Länder Bauleitplanung portals, UVP-Verbund, GEM and OSM were directly tested.","attributes":[{"attribute":"location","covered":"partial","source_ids":["mastr-units","bnetza-eeg-tenders","laender-bauleitplanung","uvp-verbund","osm-overpass","gem-gspt"],"note":"MaStR gives WGS84 coordinates and parcels for voluntary 'In Planung' units >30 kW (municipality/PLZ <=30 kW); BNetzA XLSX gives Gemarkung/Flurstück for EEG tender winners.","gap":"not_checked","gap_note":"Pre-commissioning MaStR registration is voluntary for solar PV (§ 5(4) MaStRV) and withholds coordinates/parcels at <=30 kW (§ 15(1) MaStRV). Privileged § 35(1) Nr. 8b BauGB building permits are not published; ~11,000 municipal Bauleitplanung portals behind the 16 tested Länder portals were only sampled."},{"attribute":"capacity_mw","covered":"partial","source_ids":["mastr-units","bnetza-eeg-tenders","gem-gspt","osm-overpass"],"note":"MaStR publishes DC Bruttoleistung (kWp), AC Nettonennleistung (kW) and inverter kW; BNetzA XLSX publishes awarded Gebotsmenge (kW) per winning EEG bid.","gap":"not_checked","gap_note":"Projects not yet voluntarily entered in MaStR or awarded an EEG tender have no national structured MW record. Municipal Bebauungspläne legally fix Sondergebiet area (ha) and height, stating MWp/grid reservation only variably in PDF Begründungen across ~11,000 municipalities (sampled)."},{"attribute":"developer","covered":"partial","source_ids":["bnetza-eeg-tenders","mastr-units","laender-bauleitplanung","uvp-verbund","gem-gspt"],"note":"BNetzA EEG award lists publish Name des Bieters; vorhabenbezogene Bebauungspläne (§ 12 BauGB) name the Vorhabenträger; MaStR publishes Anlagenbetreiber (non-natural persons).","gap":"not_checked","gap_note":"MaStR's Anlagenbetreiber field does not distinguish whether the registrant is the Projektierer (developer) or future operator, and masks natural persons (243 of 1,094 planned ground-mounted units). Non-project-specific Angebotsbebauungspläne often omit developers, and municipal portals were only sampled."},{"attribute":"permitting_stage","covered":"partial","source_ids":["laender-bauleitplanung","uvp-verbund","bnetza-eeg-tenders","mastr-units","gem-gspt","osm-overpass"],"note":"Länder/municipal Bauleitplanung PDFs distinguish Aufstellungsbeschluss, Auslegung and Satzungsbeschluss; BNetzA certifies EEG Zuschlag; MaStR only shows generic 'In Planung'.","gap":"not_checked","gap_note":"MaStR merges early planning, zoning, permitted and under-construction ('Im Bau') solar units into a single 'In Planung' status (1,014 of 1,094 ground-mounted units have no permit record). State/county Baugenehmigungen and construction start are not published online, and ~11,000 municipal portals were only sampled."},{"attribute":"stage_date","covered":"partial","source_ids":["bnetza-eeg-tenders","laender-bauleitplanung","uvp-verbund","mastr-units"],"note":"BNetzA XLSX gives legal award notice date (Bekanntgabe des Zuschlags); municipal B-Plan PDFs give council decision dates; MaStR gives registration and planned COD dates only.","gap":"not_checked","gap_note":"MaStR exposes EinheitRegistrierungsdatum and GeplantesInbetriebnahmedatum in JSON, while permit decision dates in EinheitenGenehmigung.xml are absent for 92.7% of planned ground-mounted units. Baugenehmigung dates are not published, and municipal Bauleitplanung notices across ~11,000 municipalities were only sampled."}]},"sources":[{"source_id":"mastr-units","name":"Marktstammdatenregister (MaStR) — Öffentliche Einheitenübersicht & Gesamtdatenexport","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","data_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung","access":"api","format":"JSON API, CSV export, and daily bulk XML (ZIP)","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0 (dl-de/by-2-0)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regulator","adds":"Primary national structured dataset of voluntarily registered pre-commissioning ('In Planung') solar PV units with kWp/kW capacities, operator/registrant, planned commissioning date, and WGS84 coordinates + Flurstücke above 30 kW.","first_seen_pass":1,"rank":1,"summary":"Official federal energy register exposing voluntarily registered 'In Planung' solar PV units via a filterable JSON API, CSV export and a daily 3.31 GB XML archive (Gesamtdatenexport).","coverage_note":"63,257 individual solar PV units in status 'In Planung' on 2026-11-25: 1,094 Freiflächensolaranlagen (across 1,053 park names), 45,008 Gebäudesolaranlagen, 17,135 Balkonkraftwerke and 20 Sonstige; 4,718 units exceed 30 kW (with coordinates) and 850 exceed 1 MWp.","data_date":"2026-11-25","caveats":["Voluntary pre-commissioning for standard solar PV (§ 5(4) MaStRV); omits un-registered permitting pipelines.","Single 'In Planung' status does not separate zoning, building permit or active construction; multi-unit parks split across rows.","Coordinates/parcels withheld at <=30 kW and natural-person operators masked (§ 15(1) MaStRV)."],"coverage":{"geographic":"Germany (all 16 Bundesländer)"},"fine_print":{"unit":{"value":"Bruttoleistung in kWp (DC module peak), Nettonennleistung in kW (AC), and ZugeordneteWirkleistungWechselrichter in kW (inverter active power); divide by 1,000 for MWp/MW.","quote":"Bruttoleistung: 200.000 kWp / Nettonennleistung (Wert wird vom System ausgefüllt): 200.000 kW / Zugeordnete Wechselrichterleistung: 200.000 kW","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Detail/IndexOeffentlich/11060374","attempts":[]},"inclusion_rule":{"value":"Mandatory within 1 month after commissioning for all grid-connected stationary solar PV units (§ 5(1), (5) MaStRV). Pre-commissioning registration in status 'In Planung' is mandatory only if a federal-law permit (BImSchG, WindSeeG, WHG or other Bundesrecht) is required and granted (§ 5(4) MaStRV); for standard BauGB/Landesbauordnung solar PV it is voluntary.","quote":"Betreiber müssen ihre Projekte im Marktstammdatenregister gemäß Absatz 5 registrieren, wenn die Errichtung oder der Betrieb der Stromerzeugungseinheit einer Zulassung nach dem Bundes-Immissionsschutzgesetz, dem Windenergie-auf-See-Gesetz oder sonstigem Bundesrecht bedarf und die Zulassung erteilt wurde.","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","attempts":[]},"reference_date":{"value":"Live JSON API queried on 2026-11-25; daily bulk XML archive Gesamtdatenexport_20261125_26.2.zip updated 2026-11-25 00:00:00 (with quarterly Stichtag snapshots retained since 2023-04-01).","quote":"Gesamtdatenauszug vom Vortag Download Daten [ZIP / 3.233.608 KB] Beschreibung des Exports [ZIP / 1.372 KB] Typ: XML Letzte Aktualisierung: 25.11.2026 00:00:00","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"update_frequency":{"value":"Continuous live updates in the web/JSON API; bulk XML Gesamtdatenexport regenerated daily around 05:00 CET.","quote":"Der Datendownload wird in der Regel um 5:00 Uhr auf den zu diesem Zeitpunkt gültigen Datenstand aktualisiert.","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"exclusions":{"value":"Off-grid units without direct/indirect grid connection and military national-defence units are exempt (§ 5(2) MaStRV). Under § 15(1) MaStRV, street, house number, Flurstück and coordinates are withheld for units <=30 kW, and personal data of natural-person operators are withheld.","quote":"Standortangaben zu Straße, Hausnummer, Flurstücksbezeichnungen und Geokoordinaten von Erzeugungseinheiten nach der Anlage Tabelle B bis E mit einer Leistung von höchstens 30 Kilowatt, wobei auf zu Solaranlagen gehörende Einheiten § 5 Absatz 1 Satz 2 anzuwenden ist","url":"https://www.gesetze-im-internet.de/mastrv/__15.html","attempts":[]}},"key_fields":[{"field":"MaStRNummer / EinheitMastrNummer","meaning":"Unique MaStR generator unit identifier (prefix SEE...); links to EegAnlageMastrNummer (EEG...) and SolarparkName."},{"field":"BetriebsStatusId / BetriebsStatusName","meaning":"Operational status: 31 = 'In Planung' (single pre-commissioning bucket covering planning, permitting and construction), 35 = 'In Betrieb'."},{"field":"ArtDerSolaranlageId / ArtDerSolaranlageBezeichnung","meaning":"Solar category: 852 = Freiflächensolaranlage, 853 = Gebäudesolaranlage, 2484 = Sonstige Solaranlage, 2961 = Steckerfertige Solaranlage."},{"field":"Bruttoleistung / Nettonennleistung / ZugeordneteWirkleistungWechselrichter","meaning":"DC module peak capacity in kWp, AC net nominal capacity in kW, and assigned inverter active power in kW (latter in detail view and EinheitenSolar.xml); grid connection capacity is not a separate MaStR field."},{"field":"AnlagenbetreiberName / AnlagenbetreiberMaStRNummer","meaning":"Registered operator or project developer ('vom künftigen Betreiber oder vom Projektierer'); masked as 'natürliche Person' for individuals."},{"field":"Breitengrad / Laengengrad / Gemarkung / Flurstueck","meaning":"WGS84 latitude/longitude and cadastral parcel text, published only when unit Bruttoleistung exceeds 30 kW and IsAnonymisiert is false."},{"field":"EinheitRegistrierungsdatum / GeplantesInbetriebsnahmeDatum","meaning":"MaStR registration date and self-reported target commissioning date (/Date(ms)/ in JSON); permit dates in EinheitenGenehmigung.xml exist only for 80 of 1,094 planned ground-mounted units."}],"how_to_use":{"example_request":"curl -sL 'https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung?sort=Bruttoleistung-desc&page=1&pageSize=2&filter=Betriebs-Status~eq~%2731%27~and~Energietr%C3%A4ger~eq~%272495%27~and~Art%20der%20Solaranlage~eq~%27852%27'","example_result":"{\"Total\":1094,\"Data\":[{\"MaStRNummer\":\"SEE963914434579\",\"EinheitName\":\"PVA Schafhöfen Anlagenteil 2\",\"AnlagenbetreiberName\":\"BEE Solarpark Schafhöfen GmbH ＆ Co. KG\",\"BetriebsStatusName\":\"In Planung\",\"Bundesland\":\"Bayern\",\"Gemeinde\":\"Mötzing\",\"Gemarkung\":\"Haimbuch\",\"Breitengrad\":48.887633,\"Laengengrad\":12.421482,\"Bruttoleistung\":200000.0,\"Nettonennleistung\":200000.0}]}","steps":["Query GetErweiterteOeffentlicheEinheitStromerzeugung with URL-encoded Kendo filter Betriebs-Status~eq~'31'~and~Energieträger~eq~'2495' (all 63,257 planned solar PV units) and add ~and~Art der Solaranlage~eq~'852' for ground-mounted parks (1,094 units) or ~and~Bruttoleistung der Einheit~gt~'30' for >30 kW units with coordinates (4,718 units; 850 >1,000 kW).","Paginate with page and pageSize (tested up to pageSize=1200 in a single JSON call), convert Bruttoleistung (kWp) and Nettonennleistung (kW) to MWp/MW by dividing by 1,000, and decode /Date(epoch_ms)/ timestamps.","For full offline analysis including inverter kW (ZugeordneteWirkleistungWechselrichter), land area (GroesseDerInAnspruchGenommenenFlaecheInHektar) and rare permit records, download https://download.marktstammdatenregister.de/Gesamtdatenexport_YYYYMMDD_26.2.zip (3.31 GB, 450 XML shards) and join EinheitenSolar_*.xml (EinheitBetriebsstatus=31) to AnlagenEegSolar_*.xml and EinheitenGenehmigung_*.xml."],"reading_traps":["Filter field names in GetErweiterteOeffentlicheEinheitStromerzeugung must match GetFilterColumnsErweiterteOeffentlicheEinheitStromerzeugung exactly (e.g. 'Bruttoleistung der Einheit', not 'Bruttoleistung'); unrecognized filter names are silently ignored and return the unfiltered 63,257 count.","Each record is a generator unit (Einheit), not necessarily a whole project: the 1,094 planned Freiflächensolaranlage units map to 1,053 distinct SolarparkName/unit entries (e.g. Solarpark Schafhöfen is split into SEE991008057236 at 17,600 kWp and SEE963914434579 at 200,000 kWp).","1,014 of 1,094 planned Freiflächensolaranlage units (92.7%) have no GenehmigungsMastrNummer/AktenzeichenGenehmigung, and only 134 list an EEG Zuschlagsnummer; 'In Planung' also retains projects already under construction until commissioning is reported.","Coordinate check across all 1,094 planned Freiflächensolaranlage units: 157 lack coordinates (154 <=30 kW under § 15 MaStRV plus 3 >30 kW with IsAnonymisiert=true: SEE921542231489, SEE931051684669, SEE998134823476); 0 of 937 geocoded units fall outside Germany, but 2 fall outside their declared Bundesland (SEE919089128768 declares Sachsen-Anhalt/Angern with placeholder lon 14.123456 in Brandenburg; SEE927229282546 declares Berlin HQ while coordinates 53.554356, 11.689993 lie in Mecklenburg-Vorpommern)."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":1824510,"records_total":63257,"records_for_country":63257,"problems":[]},"evidence":[{"claim":"Pre-commissioning registration in MaStR is possible in planning, design or construction phases by either the future operator or developer, but mandatory only when a federal-law permit (BImSchG, WindSeeG, WHG or other Bundesrecht) is required.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/subpages/registrierungVerpflichtendAnlagen.html","quote":"Die Registrierung der geplanten Einheit kann vom künftigen Betreiber oder vom Projektierer durchgeführt werden. ... Eine gesetzliche Pflicht zur Registrierung geplanter Einheiten besteht nur, wenn für diese eine der folgenden Zulassungen benötigt wird: Zulassung nach dem Bundes-Immissionsschutzgesetz / Zulassung nach dem Windenergie-auf-See-Gesetz / Zulassung nach dem Wasserhaushaltsgesetz / Zulassung nach sonstigem Bundesrecht"},{"claim":"Daily bulk XML Gesamtdatenexport (3,311,214,446 bytes via HTTP HEAD/Range 206 on 2026-11-25) is published under Datenlizenz Deutschland – Namensnennung – Version 2.0.","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","quote":"Hier können Sie die gesamten öffentlichen Daten des Marktstammdatenregisters herunterladen. Die Daten werden im XML Format bereitgestellt."}],"members":[],"members_summary":null},{"source_id":"bnetza-eeg-tenders","name":"EEG-Ausschreibungen — Zuschlagslisten (Solaranlagen 1. Segment, 2. Segment & Innovationsausschreibungen)","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/BeendeteAusschreibungen/start.html","data_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Solar1/Zuschlagslisten/ListeZuschlaegeJul2026.xlsx?__blob=publicationFile&v=2","access":"direct_download","format":"XLSX (one workbook per tender round per segment)","license":"Statutory publication under § 35(1) EEG 2023 (no explicit open-data license stated on page)","language":"de","has_coordinates":false,"location_precision":"municipality","publisher_type":"regulator","adds":"Publishes every subsidised solar PV bid awarded an EEG/InnAusV tariff per tender round, adding verified bidder name, awarded capacity in kW, cadastral parcel list (Gemarkung/Flurstück) and statutory award notice date, including projects not yet voluntarily registered in MaStR.","first_seen_pass":1,"rank":2,"summary":"Official Bundesnetzagentur Excel award lists for EEG Solar Segment 1 (ground-mounted), Segment 2 (rooftop >1 MW) and Innovationsausschreibungen (solar+storage), naming every winning bid, kW volume, cadastral parcels and award date.","coverage_note":"Latest single-round files tested: 261 awarded ground-mounted bids in Segment 1 (01.07.2026), 143 rooftop bids in Segment 2 (01.10.2026), and 32 solar+storage bids in InnAusV (01.09.2026); earlier rounds are archived per bid date.","data_date":"2026-11-10","caveats":["Covers only EEG/InnAusV tender winners; omits merchant/PPA solar parks and pre-tender projects.","Location is text Gemarkung/Flurstück without WGS84 coordinates (location_precision = municipality).","Static award-date snapshots; cross-check MaStR to exclude awards already commissioned."],"coverage":{"geographic":"Germany (all awarded bids in EEG Solar Segment 1, Segment 2 and InnAusV)"},"fine_print":{"unit":{"value":"Gebotsmenge in kW (DC installed capacity bid under § 3 Nr. 31 / § 37 EEG; divide by 1,000 for MWp).","quote":"Name des Bieters | Gebots-Nr | Zuschlags-Nr | Gebotsmenge | Angegebener Standort der Anlage | Bekanntgabe des Zuschlags","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Solar1/Zuschlagslisten/ListeZuschlaegeJul2026.xlsx?__blob=publicationFile&v=2","attempts":[]},"inclusion_rule":{"value":"Covers bids winning an EEG/InnAusV award: Segment 1 covers ground-mounted and non-building PV up to 20 MW (up to 50 MW in special cases) that hold at least a published Bebauungsplan draft/Aufstellungsbeschluss + Offenlage or § 35 BauGB/plan-approval eligibility (§ 37 EEG); Segment 2 covers building/noise-barrier PV >1,000 kW; InnAusV covers solar-plus-storage combinations.","quote":"Die Bundesnetzagentur gibt die Zuschläge mit den folgenden Angaben auf ihrer Internetseite bekannt: ... den Namen der Bieter, die einen Zuschlag erhalten haben, mit a) dem jeweils in dem Gebot angegebenen Standort der Anlage ... e) der jeweils bezuschlagten Gebotsmenge","url":"https://www.gesetze-im-internet.de/eeg_2014/__35.html","attempts":[]},"reference_date":{"value":"Latest tested rounds: Segment 1 bid date 2026-07-01 (award notice date 2026-08-25), Segment 2 bid date 2026-10-01 (award notice date 2026-11-10), and InnAusV bid date 2026-09-01 (award notice date 2026-10-06).","quote":"Zuschläge des Ausschreibungsverfahrens EEG Solar für den Gebotstermin 01.07.2026","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/BeendeteAusschreibungen/2026/01072026/artikel.html","attempts":[]},"update_frequency":{"value":"Three tender rounds per year each for Segment 1 (1 March, 1 July, 1 December) and Segment 2 (1 February, 1 June, 1 October), plus two rounds per year for Innovationsausschreibungen (1 May, 1 September).","quote":"Kompakte Darstellung: Pro Zeile wird ein Zuschlag dargestellt.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Solar1/Zuschlagslisten/ListeZuschlaegeJul2026.xlsx?__blob=publicationFile&v=2","attempts":[]},"exclusions":{"value":"Excludes subsidy-free (merchant/PPA) solar parks, installations <=1,000 kW outside tenders, unsuccessful/excluded bids, and individual bid prices (ct/kWh). Round award lists are eventually removed after statutory realisation deadlines expire.","quote":"Der Zuschlag ist eine Woche nach der öffentlichen Bekanntgabe nach Absatz 1 als bekanntgegeben anzusehen.","url":"https://www.gesetze-im-internet.de/eeg_2014/__35.html","attempts":[]}},"key_fields":[{"field":"Name des Bieters","meaning":"Awarded bidder/project SPV or developer entity."},{"field":"Zuschlags-Nr","meaning":"Unique award identifier (e.g. SOL26-2/235, SDA26-3/073, Inn26-2/002)."},{"field":"Gebotsmenge","meaning":"Awarded bid capacity in kW (present in sheet Zuschläge_Kompakt; omitted in sheet Zuschläge_Detailliert)."},{"field":"Bundesland / Landkreis / Postleitzahl / Gemeinde / Gemarkung / Flur / Flurstück","meaning":"Structured administrative and cadastral parcel siting in sheet Zuschläge_Detailliert (no WGS84 coordinates)."},{"field":"Bekanntgabe des Zuschlags","meaning":"Statutory effective date of award notice (Excel serial date, 1 week after web publication per § 35(2) EEG)."}],"how_to_use":{"example_request":"curl -sL 'https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Solar1/Zuschlagslisten/ListeZuschlaegeJul2026.xlsx?__blob=publicationFile&v=2' -o /tmp/georutter/de-solar-pv-plants-in-permitting/seg1_jul2026.xlsx  # Sheet 'Zuschläge_Kompakt', data starts row 5","example_result":"Row 5: Name des Bieters='1. Grünstrom PV UG (haftungsbeschränkt) & Co. KG', Zuschlags-Nr='SOL26-2/235', Gebotsmenge=2000 (kW), Angegebener Standort='Schleswig-Holstein, Landkreis Segeberg, PLZ 24649, Gemeinde Wiemersdorf, Gemarkung Wiemersdorf: Flur 6: 38; 40; 44; 46; 52; 55', Bekanntgabe=2026-08-25 (46259)","steps":["Download the per-round Zuschlagsliste XLSX from BeendeteAusschreibungen under Solaranlagen1 (ground-mounted), Solaranlagen2 (rooftop >1 MW, e.g. ZuschlagslisteOkt2026.xlsx) and Innovation (solar+storage, e.g. ZuschlagslisteSep26.xlsx).","Read sheet Zuschläge_Kompakt (header row 4, data from row 5) for 1-row-per-award capacity (Gebotsmenge in kW; divide by 1,000 for MW) and convert the Excel serial integer in Bekanntgabe des Zuschlags from base date 1899-12-30.","Join on Zuschlags-Nr to sheet Zuschläge_Detailliert for split columns Bundesland, Landkreis, Postleitzahl, Gemeinde, Gemarkung and Flur / Flurstück, and (in InnAusV) to Zuschläge_Registernummern for MaStR EEG... IDs."],"reading_traps":["Sheet Zuschläge_Detailliert repeats multi-Gemarkung awards across multiple rows (296 rows for 261 awards in July 2026 Segment 1) and omits Gebotsmenge; always aggregate capacity from Zuschläge_Kompakt.","Bekanntgabe des Zuschlags is stored as an unformatted Excel serial integer (e.g. 46259 = 2026-08-25, 46336 = 2026-11-10, 46301 = 2026-10-06) representing the legal deemed-notice date 7 days after website publication under § 35(2) EEG.","Each round is a separate static XLSX snapshot that is not updated when a project later receives its Baugenehmigung, enters construction, is commissioned (check MaStR Zuschlagsnummern to filter out already-commissioned awards), or forfeits its bid bond."]},"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet;charset=UTF-8","size_bytes":59363,"records_total":261,"records_for_country":261,"problems":[]},"evidence":[{"claim":"Segment 1 July 2026 XLSX contains 261 compact award rows (and 296 detailed parcel rows) with bidder, Zuschlags-Nr, Gebotsmenge in kW, parcel list and award date.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Solar1/Zuschlagslisten/ListeZuschlaegeJul2026.xlsx?__blob=publicationFile&v=2","quote":"Zuschläge des Ausschreibungsverfahrens EEG Solar für den Gebotstermin 01.07.2026 | Kompakte Darstellung: Pro Zeile wird ein Zuschlag dargestellt."},{"claim":"Segment 2 October 2026 XLSX (ZuschlagslisteOkt2026.xlsx, 32,331 bytes) adds 143 building/noise-barrier solar awards, and InnAusV September 2026 XLSX (ZuschlagslisteSep26.xlsx, 19,245 bytes) adds 32 solar+storage awards linked to 64 MaStR EEG IDs.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen2/Okt2026/artikel.html","quote":"Zuschläge des Ausschreibungsverfahrens EEG Aufdach Solar für den Gebotstermin 01.10.2026"}],"members":[],"members_summary":null},{"source_id":"laender-bauleitplanung","name":"Zentrale Landesportale der Bauleitplanung (16 Bundesländer & DiPlanung-Portal)","publisher":"Bundesländer (State planning/interior ministries and GDI portals, partly federated via DiPlanung)","official":true,"landing_url":"https://portal.diplanung.de/","data_url":null,"access":"web_viewer_only","format":"Web map/search portals linking to municipal HTML pages, PDF plan documents and partial XPlanung WMS/WFS layers","license":"Varies by Land/municipality (mostly public inspection only; open geodata subsets under dl-de/by-2-0 or dl-de/zero-2-0)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regional_government","adds":"Provides statutory access under §§ 3(2), 4a and 10a BauGB to municipal Bebauungspläne for non-privileged ground-mounted solar PV parks ('Sondergebiet Photovoltaik'), exposing exact planning stages (Aufstellungsbeschluss, Auslegung, Satzungsbeschluss), decision dates and PDF Begründungen.","first_seen_pass":1,"rank":3,"summary":"Statutory state urban land-use planning portals (§§ 3(2), 10a BauGB) across all 16 Bundesländer (partly federated at portal.diplanung.de), providing access to municipal Bebauungspläne for ground-mounted solar parks.","coverage_note":"16 of 16 state portals checked on 2026-11-25; records are general municipal planning procedures (no solar-only structured count) linking to ~11,000 municipalities' draft and adopted PDF plan packages.","data_date":"2026-11-25","caveats":["Web viewers and municipal link directories only; no downloadable structured list of solar PV projects or MW capacities.","Covers non-privileged ground-mounted PV requiring a Bebauungsplan; excludes § 35(1) Nr. 8b BauGB corridor permits and rooftop PV.","Tracks zoning up to Satzungsbeschluss, not subsequent county Baugenehmigung or construction start."],"coverage":{"geographic":"Germany (all 16 Bundesländer via state portals, indexing participating municipalities among ~11,000 Gemeinden)"},"fine_print":{"unit":{"value":"Plan documents state Geltungsbereich / Sondergebiet area in ha; electrical capacity (MWp DC, inverter MW AC, grid connection MW) appears only in narrative PDF Begründungen when reported by the developer.","quote":"Das Plangebiet weist eine Größe von ca. 223 ha auf. Eine Netzreservierung von 268 MWp wurde gesichert.","url":"https://www.gemeinde-moetzing.de/media/105409/bplan_d01-solarpark-schafh_gesamt.pdf","attempts":[]},"inclusion_rule":{"value":"Non-privileged outdoor ground-mounted PV parks require a municipal Bebauungsplan (often vorhabenbezogener Bebauungsplan under § 12 BauGB); drafts in public consultation (§ 3(2) BauGB) and adopted plans (§ 10a(2) BauGB) are published online and made accessible via each Land's central portal.","quote":"Der in Kraft getretene Bebauungsplan mit der Begründung und der zusammenfassenden Erklärung soll ergänzend auch in das Internet eingestellt und über ein zentrales Internetportal des Landes zugänglich gemacht werden.","url":"https://www.gesetze-im-internet.de/bbaug/__10a.html","attempts":[]},"reference_date":{"value":"Continuously updated by municipalities during statutory participation windows and upon plan adoption (checked across all 16 Länder portals on 2026-11-25).","quote":"Das Zentrale Landesportal für Raumordnungs- und Bauleitplanung Sachsen bietet einen Überblick über alle aktuellen Planverfahren im Freistaat Sachsen.","url":"https://buergerbeteiligung.sachsen.de/portal/bplan/startseite","attempts":[]},"update_frequency":{"value":"Event-driven per municipal procedure (upon Aufstellungsbeschluss, § 3(1) early participation, § 3(2) public display, and § 10(3) Satzungsbeschluss notice).","quote":"Unter „Pläne in Aufstellung“ finden Sie die noch nicht beschlossenen Entwürfe von Bauleitplänen, die sich noch im laufenden Aufstellungsverfahren befinden.","url":"https://bplan.geodaten-mv.de/bauportal/","attempts":[]},"exclusions":{"value":"Excludes rooftop PV and privileged outdoor PV (e.g. within 200 m of motorways or double-track railways under § 35(1) Nr. 8b BauGB) that proceed directly to county Baugenehmigung without a Bebauungsplan; does not track subsequent Baugenehmigung or construction status; many portals remove draft PDFs once the participation deadline closes.","quote":"Der Zeitraum für das Beteiligungsverfahren liegt in der Vergangenheit. Es ist nicht mehr möglich, sich daran zu beteiligen.","url":"https://portal.diplanung.de/","attempts":[]}},"key_fields":[{"field":"Planname / Bezeichnung","meaning":"Title of the Bebauungsplan or FNP amendment (search 'Photovoltaik', 'Solarpark', 'Freiflächen-PV', 'Sondergebiet Solar')."},{"field":"Verfahrensstand / Status","meaning":"Planning phase: Aufstellungsbeschluss, Frühzeitige Beteiligung (§ 3(1) BauGB), Öffentliche Auslegung (§ 3(2) BauGB), or Satzungsbeschluss / Rechtskraft (§ 10 BauGB)."},{"field":"Beteiligungszeitraum / Beschlussdatum","meaning":"Consultation window dates on the portal and exact council decision dates inside the Bekanntmachung and Begründung PDFs."}],"how_to_use":{"example_request":"Open https://portal.diplanung.de/ (BY, BE, BB, HB, HH, NI, SH federated search) or state portals such as https://buergerbeteiligung.sachsen.de/portal/bplan/startseite and filter plan titles by 'Photovoltaik' or 'Solarpark'.","example_result":"Portal lists general urban land-use plans (no solar-only structured table) and links out to municipal pages and PDF plan packages (Bekanntmachung, Planzeichnung, Begründung, Umweltbericht, Zusammenfassende Erklärung).","steps":["Query the target Land's central Bauleitplanungsportal (or https://portal.diplanung.de/ for connected Länder) for keywords 'Photovoltaik', 'Solarpark' or 'Sondergebiet' and filter to active participation ('im Verfahren' / 'Pläne in Aufstellung').","Follow the link to the municipal procedure page and download the Bekanntmachung and Begründung PDFs.","Extract the council decision date (Aufstellungsbeschluss, Auslegungsbeschluss or Satzungsbeschluss), Vorhabenträger, Gemarkung/Flurstücke and any stated MWp/MW/grid-connection figures from the Begründung."],"reading_traps":["None of the 16 Länder portals provides a downloadable state-wide structured table filtered to solar PV projects; solar parks are mixed with housing and commercial Bebauungspläne and cannot be filtered by MW.","Several Länder portals (e.g. Brandenburg and Niedersachsen on UVP-Verbund, Sachsen-Anhalt LVwA) act only as link directories to municipal websites, where past participation documents often disappear between § 3(2) Auslegung and § 10a Rechtskraft.","A rechtskräftiger Bebauungsplan (Satzungsbeschluss) creates municipal zoning right, not the building permit (Baugenehmigung) itself."]},"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":837,"records_total":null,"records_for_country":null,"problems":["No unified national/state structured download of solar PV permitting records; portals serve interactive SPA maps or municipal link directories."]},"evidence":[{"claim":"Mecklenburg-Vorpommern's central portal separates adopted plans from plans currently in preparation ('Pläne in Aufstellung').","url":"https://bplan.geodaten-mv.de/bauportal/","quote":"Unter „Pläne in Aufstellung“ finden Sie die noch nicht beschlossenen Entwürfe von Bauleitplänen, die sich noch im laufenden Aufstellungsverfahren befinden."},{"claim":"Sachsen's central Bauleitplanung portal aggregates ongoing municipal planning procedures with status and participation dates.","url":"https://buergerbeteiligung.sachsen.de/portal/bplan/startseite","quote":"Das Zentrale Landesportal für Raumordnungs- und Bauleitplanung Sachsen bietet einen Überblick über alle aktuellen Planverfahren im Freistaat Sachsen."}],"members":[{"name":"Bayern — Zentrales Landesportal für die Bauleitplanung (via DiPlanung)","landing_url":"https://www.geoportal.bayern.de/bauleitplanungsportal/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"Redirects to DiPlanung Portal (HTTP 200); links to municipal B-Plan procedures (cross-checked with Gemeinde Mötzing Solarpark Schafhöfen)."},{"name":"Brandenburg — Planungsportal / UVP & Bauleitplanung Brandenburg","landing_url":"https://bauleitplanung.brandenburg.de/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"Redirects to https://www.uvp-verbund.de/bb (HTTP 200); 45 'Solarpark' Bauleitplanung entries indexed."},{"name":"Baden-Württemberg — Geoportal BW & UVP-Verbund Bauleitplanung","landing_url":"https://www.geoportal-bw.de/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200; municipal Bauleitplanung links also federated in UVP-Verbund (140 'Solarpark' entries in BW)."},{"name":"Niedersachsen — Bauleitplanung im UVP-Verbund","landing_url":"https://www.uvp-verbund.de/freitextsuche?provider=ni&procedure=obj_class_blp&q=Photovoltaik","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200; indexes municipal Bauleitplanung link pages (28 'Solarpark' entries in NI)."},{"name":"Nordrhein-Westfalen — Bauleitplanung.NRW","landing_url":"https://www.bauleitplanung.nrw.de/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 map.apps viewer (complemented by https://beteiligung.nrw.de/ for active consultations)."},{"name":"Sachsen-Anhalt — Landesverwaltungsamt Bauleitplanung & Sachsen-Anhalt-Viewer","landing_url":"https://lvwa.sachsen-anhalt.de/das-lvwa/wirtschaft-bauwesen-verkehr/bauwesen/bauleitplanung","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 directory/viewer linking to municipal Bauleitplanung pages."},{"name":"Mecklenburg-Vorpommern — Bau- und Planungsportal M-V","landing_url":"https://bplan.geodaten-mv.de/bauportal/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200; dedicated section 'Pläne in Aufstellung' for draft Bebauungspläne."},{"name":"Sachsen — Zentrales Landesportal Raumordnungs- und Bauleitplanung","landing_url":"https://buergerbeteiligung.sachsen.de/portal/bplan/startseite","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200; searchable list of active and completed municipal Planverfahren with consultation dates."},{"name":"Schleswig-Holstein — Digitaler Atlas Nord (Bauleitpläne SH)","landing_url":"https://danord.gdi-sh.de/viewer/resources/apps/BuFPlaene/index.html","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 map viewer for draft and adopted B-Pläne and FNP."},{"name":"Hessen — Zentrales Bauleitplanungsportal Hessen","landing_url":"https://bauleitplanung.hessen.de/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 central portal linking to municipal consultations and adopted plans."},{"name":"Rheinland-Pfalz — GeoPortal.rlp","landing_url":"https://www.geoportal.rlp.de/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 state geoportal indexing municipal B-Plan WMS/metadata (e.g. Solarpark Krastel, Solarpark Niederkail)."},{"name":"Thüringen — ThüringenViewer Planung","landing_url":"https://thueringenviewer.thueringen.de/thviewer3/planung.html","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 spatial viewer for state/municipal planning layers."},{"name":"Saarland — Geoportal Saarland Bebauungspläne","landing_url":"https://geoportal.saarland.de/article/Bebauungsplaene/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 portal (6 'Solarpark' Bauleitplanung entries also federated in UVP-Verbund)."},{"name":"Berlin — Geoportal Berlin (GDI Berlin)","landing_url":"https://gdi.berlin.de/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 GDI portal hosting Berlin XPlanung / B-Plan layers (minimal ground-mounted PV relevance in city-state)."},{"name":"Hamburg — Planportal Hamburg","landing_url":"https://geoportal-hamburg.de/planportal/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 urban planning viewer backed by Hamburg GDI XPlanung services."},{"name":"Bremen — Bauleitplanportal Bremen","landing_url":"https://www.bauleitplan.bremen.de/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"HTTP 200 portal listing draft and adopted Bebauungspläne in Bremen."}],"members_summary":{"total":16,"listed":16,"tested":16,"data_found":16,"scope_note":"All 16 German Bundesländer central Bauleitplanung / GDI portals were opened and verified on 2026-11-25; none publishes a standalone structured solar-PV-in-permitting table (all expose map viewers, XPlanung/WMS plan boundaries or links to municipal procedure pages).","pattern":"Search '<Bundesland> zentrales Internetportal Bauleitplanung' or query https://portal.diplanung.de/, then follow municipal links to 'Bauleitpläne im Verfahren' / 'Öffentliche Auslegung' for 'Sondergebiet Photovoltaik'."},"member_scope":{"total":16,"note":"All 16 German Bundesländer central Bauleitplanung / GDI portals were opened and verified on 2026-11-25; none publishes a standalone structured solar-PV-in-permitting table (all expose map viewers, XPlanung/WMS plan boundaries or links to municipal procedure pages).","pattern":"Search '<Bundesland> zentrales Internetportal Bauleitplanung' or query https://portal.diplanung.de/, then follow municipal links to 'Bauleitpläne im Verfahren' / 'Öffentliche Auslegung' for 'Sondergebiet Photovoltaik'."}},{"source_id":"uvp-verbund","name":"UVP-Verbund — Zentrales Internetportal für Umweltverträglichkeitsprüfungen und Bauleitplanung","publisher":"Länder der Bundesrepublik Deutschland (operated by LGV Hamburg)","official":true,"landing_url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Photovoltaik","data_url":null,"access":"web_viewer_only","format":"HTML search results and detail pages with attached PDF/ZIP notices","license":"All rights reserved (© 2026 Landesbetrieb Geoinformation und Vermessung)","language":"de","has_coordinates":true,"location_precision":"municipality","publisher_type":"regional_government","adds":"Cross-state search engine capturing solar PV environmental impact screenings (UVP-Vorprüfungen, e.g. forest conversion or landfill PV) with decision dates and PDF notices, plus municipal Bauleitplanung links for participating Länder.","first_seen_pass":1,"rank":4,"summary":"Joint Länder environmental assessment portal indexing project-level UVP screenings/approvals for solar PV alongside municipal Bauleitplanung portal links from participating Länder.","coverage_note":"127 German entries for 'Photovoltaik' (1 Zulassungsverfahren, 11 Negative Vorprüfungen, 115 municipal Bauleitplanung link cards; plus 1 foreign hit) and 222 for 'Solarpark' (3 Negative Vorprüfungen, 219 Bauleitplanung link cards) on 2026-11-25.","data_date":"2026-11-25","caveats":["Over 90% of hits are municipality Bauleitplanung link cards, not individual project records.","Project-level entries cover only UVP-relevant cases (e.g. forest conversion or landfills) and rarely state MW capacity.","HTML viewer and PDF attachments only; no structured bulk download."],"coverage":{"geographic":"Participating German Bundesländer (solar hits concentrated in Baden-Württemberg, Brandenburg, Niedersachsen, Saarland, Hessen and Sachsen)"},"fine_print":{"unit":{"value":"No structured electrical capacity field; attached UVP screening PDFs typically state conversion/site area in ha or m² and only occasionally MWp.","quote":"Die SZ Solarpark Schleife GmbH beantragte die Genehmigung für die Umwandlung einer Waldfläche in der Größe von 20.187 m²","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Solarpark","attempts":[]},"inclusion_rule":{"value":"Lists projects subject to UVPG environmental impact assessment or screening (for solar PV mainly forest conversion under state forest acts, landfill/industrial sites, or urban development projects) plus municipal Bauleitplanung directory entries from participating Länder (BW, BB, NI, SL).","quote":"Negative Vorprüfungen (3) / Bauleitplanung (219) ... 222 Ergebnisse zu \"Solarpark\"","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Solarpark","attempts":[]},"reference_date":{"value":"Live portal queried on 2026-11-25 (recent solar screening decisions dated up to 2026-06-30 / updated 2026-07-01).","quote":"Zuletzt geändert 01.07.2026 ... Datum der Entscheidung 30.06.2026","url":"https://www.uvp-verbund.de/trefferanzeige?docuuid=86a8a7cd-7770-40a6-a84b-f06208512f24&rstart=0&currentSelectorPage=1&q=Photovoltaik","attempts":[]},"update_frequency":{"value":"Continuous per competent authority notification.","quote":"Bauleitpläne können im Filter \"Aktualität\" leider nicht berücksichtigt werden.","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Solarpark","attempts":[]},"exclusions":{"value":"Standard solar PV parks without forest conversion or special UVPG triggers undergo environmental review inside municipal Bauleitplanung (§ 2(4) BauGB) rather than project-level UVPG Zulassungsverfahren, and non-participating Länder host Bauleitplanung on separate state portals.","quote":"(1) Zulassungsverfahren / (11) Negative Vorprüfungen / (1) Ausländische Vorhaben / (115) Bauleitplanung","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Photovoltaik","attempts":[]}},"key_fields":[{"field":"Verfahrenstyp","meaning":"Procedure category: Zulassungsverfahren, Negative Vorprüfungen, or Bauleitplanung."},{"field":"Verfahrensführende Stelle","meaning":"Competent permitting or planning authority (e.g. Regierungspräsidium, Untere Forstbehörde, Gemeinde)."},{"field":"Datum der Entscheidung / Zuletzt geändert","meaning":"Official UVP screening/approval decision date (distinguished from portal last-modified date)."}],"how_to_use":{"example_request":"curl -sL 'https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Photovoltaik'","example_result":"128 hits for 'Photovoltaik' (1 Zulassungsverfahren, 11 Negative Vorprüfungen, 1 Ausländische Vorhaben, 115 Bauleitplanung); 222 hits for 'Solarpark' (3 Negative Vorprüfungen, 219 Bauleitplanung).","steps":["Query /freitextsuche with q=Photovoltaik or q=Solarpark and inspect facet counts under Verfahrenstypen.","Open individual /trefferanzeige?docuuid=... pages under Zulassungsverfahren and Negative Vorprüfungen to obtain applicant name, authority, Datum der Entscheidung and attached PDF screening notices.","Treat hits under Verfahrenstyp=Bauleitplanung as municipality-level portal links ('Bauleitpläne im Beteiligungsverfahren') rather than 1-to-1 project records."],"reading_traps":["219 of 222 'Solarpark' hits and 115 of 128 'Photovoltaik' hits are Bauleitplanung municipality directory cards (e.g. 'Bauleitplanung: Liebenburg'), NOT individual project records, and cannot be filtered by recency ('Aktualität').","Most project-level UVP entries for solar PV are 'Negative Vorprüfungen' for ancillary permits such as forest conversion (Waldumwandlung) or landfill expansion, stating area in m²/ha without electrical MW."]},"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"content_type":"text/html;charset=UTF-8","size_bytes":178433,"records_total":128,"records_for_country":127,"problems":["HTML search only (no CSV/API export); Bauleitplanung hits represent municipal link cards rather than individual solar projects."]},"evidence":[{"claim":"Search for 'Solarpark' returns 222 entries split into 3 Negative Vorprüfungen and 219 Bauleitplanung records across 7 Länder.","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Solarpark","quote":"(3) Negative Vorprüfungen / (219) Bauleitplanung ... 222 Ergebnisse zu \"Solarpark\""},{"claim":"Project-level screening pages publish both the portal modification date and the distinct administrative decision date (Datum der Entscheidung).","url":"https://www.uvp-verbund.de/trefferanzeige?docuuid=86a8a7cd-7770-40a6-a84b-f06208512f24&rstart=0&currentSelectorPage=1&q=Photovoltaik","quote":"Main-Kinzig-Kreis, Eigenbetrieb Abfallwirtschaft: \"Solarpark Hohenzell II\" - Erweiterung von Photovoltaik-Freiflächenanlagen auf dem Gelände der Deponie in Schlüchtern-Hohenzell | Zuletzt geändert 01.07.2026 ... Datum der Entscheidung 30.06.2026"}],"members":[],"members_summary":null},{"source_id":"osm-overpass","name":"OpenStreetMap — Solar PV Plants in Construction or Proposed (via Overpass API)","publisher":"OpenStreetMap contributors","official":false,"landing_url":"https://www.openstreetmap.org/","data_url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","access":"api","format":"JSON / XML (Overpass API)","license":"Open Database License (ODbL 1.0)","language":"de, en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Provides open site-polygon geometry without registration for a small set of mapped solar parks under construction or proposed, occasionally linking municipal Bebauungsplan resolutions.","first_seen_pass":1,"rank":5,"summary":"Crowd-sourced OpenStreetMap polygons for solar PV plants tagged as under construction or proposed, queryable without registration via Overpass API.","coverage_note":"13 OSM ways/relations in Germany on 2026-11-25 (9 under construction, 4 proposed); only 2 records include numeric MW/MWp capacity and 3 include an operator tag.","data_date":"2026-11-25","caveats":["Very low completeness (<2% of planned ground-mounted solar parks in MaStR).","9 of 13 records put 'yes' instead of a MW figure in output:electricity, and several construction tags are stale.","overpass-api.de returned HTTP 406 to default curl; use an Overpass mirror."],"coverage":{"geographic":"Germany (sparse volunteer coverage of pre-operational solar plants)"},"fine_print":{"unit":{"value":"Tag construction:plant:output:electricity / proposed:plant:output:electricity mixes MW and MWp strings when numeric (e.g. '5 MW', '7.6 MWp') and is set to 'yes' in 9 of 13 German records.","quote":"\"proposed:plant:output:electricity\": \"7.6 MWp\"","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","attempts":[]},"inclusion_rule":{"value":"Volunteer-mapped ways/relations tagged with lifecycle prefixes construction:power=plant or proposed:power=plant (or power=construction/proposed) and plant:source=solar inside ISO3166-1=DE.","quote":"\"proposed:power\": \"plant\", \"proposed:source\": \"Bebauungsplan VK-27 aus Beschlussvorlage 25-25880\"","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","attempts":[]},"reference_date":{"value":"OSM database timestamp 2026-11-25T22:35:48Z.","quote":"\"timestamp_osm_base\": \"2026-11-25T22:35:48Z\"","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","attempts":[]},"update_frequency":{"value":"Continuous crowd-sourced edits (several construction polygons carry stale 2024 fixme notes).","quote":"\"fixme\": \"Nach Fertigstellung 2024-06 alle\\\"construction:\\\" entfernen.\"","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","attempts":[]},"exclusions":{"value":"Covers <2% of Germany's utility-scale permitting/construction pipeline; omits nearly all early permitting projects.","quote":null,"url":null,"attempts":[{"url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","note":"Live Overpass count across all of Germany returned only 13 ways/relations (9 construction, 4 proposed) versus 1,094 planned ground-mounted units in MaStR."},{"url":"https://overpass-api.de/api/interpreter","note":"Primary overpass-api.de instance returned HTTP 406 Not Acceptable to default curl/urllib requests; verified via public Overpass mirror maps.mail.ru."}]}},"key_fields":[{"field":"power / construction:power / proposed:power","meaning":"Lifecycle stage distinguishing under-construction (9 records) from proposed (4 records) solar plants."},{"field":"construction:plant:output:electricity / proposed:plant:output:electricity","meaning":"Capacity string (numeric MW/MWp in only 2 of 13 German records; 'yes' in 9; absent in 2)."},{"field":"operator / proposed:operator / description","meaning":"Operator or developer name (present in 3 structured tags plus free-text description fields)."}],"how_to_use":{"example_request":"curl -sL -G --data-urlencode 'data=[out:json][timeout:45];area[\"ISO3166-1\"=\"DE\"][admin_level=2]->.de;(nwr[\"power\"=\"construction\"][\"construction:power\"=\"plant\"][\"plant:source\"=\"solar\"](area.de);nwr[\"power\"=\"proposed\"][\"proposed:power\"=\"plant\"][\"plant:source\"=\"solar\"](area.de);nwr[\"construction:power\"=\"plant\"][\"construction:plant:source\"=\"solar\"](area.de);nwr[\"proposed:power\"=\"plant\"][\"proposed:plant:source\"=\"solar\"](area.de););out center tags;' 'https://maps.mail.ru/osm/tools/overpass/api/interpreter'","example_result":"13 elements (9 construction, 4 proposed), e.g. relation/20015666 center=(52.3130603, 10.4351465), proposed:operator='SESP II Solar Projects GmbH & Co. KG', proposed:plant:output:electricity='7.6 MWp', proposed:source='Bebauungsplan VK-27 aus Beschlussvorlage 25-25880'.","steps":["Run the Overpass QL query covering both power=construction/proposed + plant:source=solar and lifecycle-prefixed construction:plant:source=solar / proposed:plant:source=solar.","Parse numeric values + units (MW vs MWp) from *:plant:output:electricity while discarding literal 'yes' placeholders.","Inspect check_date, opening_date and fixme tags against recent orthophotos or MaStR to remove already-commissioned parks."],"reading_traps":["overpass-api.de rejected default non-browser HTTP clients with HTTP 406 Not Acceptable on 2026-11-25; use a public Overpass mirror such as https://maps.mail.ru/osm/tools/overpass/api/interpreter.","Only 2 of 13 German records contain numeric capacity ('5 MW' and '7.6 MWp'), 3 carry structured operator tags, and 3 carry start/opening/check dates; all 13 fall inside Germany's bounding box, but several retain outdated construction tags past their planned 2024 completion."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":6383,"records_total":13,"records_for_country":13,"problems":["Primary endpoint overpass-api.de returned HTTP 406 Not Acceptable to default automated clients; mirror maps.mail.ru served HTTP 200."]},"evidence":[{"claim":"Live Overpass query returned 13 German ways/relations (9 construction, 4 proposed) as of 2026-11-25T22:35:48Z, with 2 carrying numeric capacity.","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","quote":"\"proposed:operator\": \"SESP II Solar Projects GmbH & Co. KG\", \"proposed:plant:method\": \"photovoltaic\", \"proposed:plant:output:electricity\": \"7.6 MWp\""}],"members":[],"members_summary":null},{"source_id":"gem-gspt","name":"Global Solar Power Tracker (GSPT)","publisher":"Global Energy Monitor (GEM)","official":false,"landing_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","data_url":"https://globalenergymonitor.org/download-data/","access":"registration_required","format":"XLSX / CSV (via registration form; country summary tables in Google Sheets)","license":"CC BY 4.0 (records with a 'TZ ID' from TransitionZero Solar Asset Mapper under CC BY-NC 4.0)","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Curates utility-scale prospective solar PV farm phases (>=1 MW, manual research >20 MW) into explicit Announced, Pre-construction (permitting) and Construction stages in MWac, separating phases that MaStR lumps into 'In Planung'.","first_seen_pass":1,"rank":6,"summary":"Global NGO tracker of utility-scale solar phases (>=1 MW; manual permitting research >20 MW) with Announced, Pre-construction and Construction statuses.","coverage_note":"103,940 global solar farm phases in the February 2026 release; German facility-level prospective count requires registration download.","data_date":"2026-02","caveats":["Facility-level download requires registration; 1–20 MW relies mainly on MaStR.","Capacities standardized to MWac; TZ ID rows carry CC BY-NC 4.0."],"coverage":{"geographic":"Global (103,940 solar farm phases tracked worldwide, including Germany)"},"fine_print":{"unit":{"value":"Megawatts alternating current (MWac) for utility-scale phases >=1 MW.","quote":"2,093 gigawatts alternating current of operating capacity / 2,247 gigawatts alternating current of prospective capacity","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]},"inclusion_rule":{"value":"Tracks utility-scale solar PV phases >=1 MW worldwide: comprehensive manual permitting/corporate research above 20 MW, and automated government/TransitionZero ingestion for 1–20 MW.","quote":"The Global Solar Power Tracker’s utility-scale data (1 megawatt (MW)+) catalog over 100,000 operating and prospective projects worldwide.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]},"reference_date":{"value":"February 2026 release.","quote":"The most recent release of this data was in February 2026.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]},"update_frequency":{"value":"Periodic global releases (typically semi-annual/annual).","quote":"The most recent release of this data was in February 2026.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]},"exclusions":{"value":"Installations <1 MW are only tracked as country-level distributed aggregates; 1–20 MW prospective coverage depends on automated government sources; facility-level download requires submitting an email registration form.","quote":"Projects in this category are mainly captured from government databases, and the coverage of projects between 1-20 MW is subject to the availability of these sources.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]}},"key_fields":[{"field":"Status","meaning":"Distinguishes Announced, Pre-construction ('actively moving forward in seeking governmental approvals, land rights, or financing'), Construction, Shelved and Operating."},{"field":"Capacity (MW)","meaning":"Phase capacity standardized to MWac."},{"field":"Owner / Parent / Other IDs","meaning":"Project owner/developer and cross-references to national IDs (e.g. MaStR) or TransitionZero TZ IDs."}],"how_to_use":{"example_request":"Open https://globalenergymonitor.org/download-data/ and request the Global Solar Power Tracker workbook (registration required; not submitted in this session).","example_result":"Public landing page and February 2026 summary tables report 103,940 global phases tracked (33,213 MWac operating utility-scale solar in Germany); facility-level German prospective rows require form registration.","steps":["Request the GSPT XLSX via GEM's download form and filter Country/Area = 'Germany' and Status in ('Announced', 'Pre-construction', 'Construction').","Check Capacity Rating / MWac conversion notes before comparing with German DC MWp figures from MaStR or municipal Bebauungspläne.","Check the 'Other IDs (unit/phase)' column to exclude or re-verify CC BY-NC 4.0 TransitionZero rows if commercial reuse is required."],"reading_traps":["Prospective projects between 1 and 20 MW are ingested primarily from government databases (i.e. MaStR), inheriting MaStR's voluntary pre-commissioning limitation below 20 MW.","GEM standardizes capacities to MWac, whereas German developers, EEG tenders and MaStR Bruttoleistung quote DC MWp/kWp."]},"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":137223,"records_total":103940,"records_for_country":null,"problems":["Facility-level workbook is gated behind a JavaScript registration form (gem-download-form.bundle.js); gem.wiki methodology page returned HTTP 403 to non-browser requests."]},"evidence":[{"claim":"GSPT distinguishes Announced, Pre-construction (seeking governmental approvals) and Construction stages.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","quote":"Pre-construction: Projects are actively moving forward in seeking governmental approvals, land rights, or financing. Construction: Site preparation or equipment installation are underway."},{"claim":"Licensed under CC BY 4.0, except TZ ID records under CC BY-NC 4.0.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","quote":"Creative Commons CC BY 4.0 International license applies, please read the license for attribution requirements. ... Distributed under a Creative Commons Attribution-Non-Commercial 4.0 International License (CC BY-NC 4.0)."}],"members":[],"members_summary":null},{"source_id":"commercial-trackers","name":"Commercial Renewable Project Pipeline Databases (Rystad Energy, Wood Mackenzie, BloombergNEF)","publisher":"Rystad Energy / Wood Mackenzie / BloombergNEF","official":false,"landing_url":null,"data_url":null,"access":"paid","format":"Proprietary web platforms, APIs and Excel exports","license":"Commercial subscription","language":"en","has_coordinates":null,"location_precision":null,"publisher_type":"commercial","adds":"Proprietary analyst-curated asset pipelines tracking German utility-scale solar PV projects across permitting, EEG auction, PPA and construction milestones with developer ownership and expected COD.","first_seen_pass":1,"rank":7,"summary":"Subscription-only commercial renewable asset trackers covering German solar PV pipelines.","coverage_note":"3 major commercial providers verified at landing-page level.","data_date":null,"caveats":["Paid enterprise license required; underlying coverage not independently auditable."],"coverage":{"geographic":"Europe / Global including Germany"},"fine_print":{"unit":null,"inclusion_rule":null,"reference_date":null,"update_frequency":null,"exclusions":null},"key_fields":[],"how_to_use":{"example_request":"","example_result":"","steps":["Requires paid enterprise subscription; named only for completeness per catalogue rules."],"reading_traps":[]},"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":143033,"records_total":null,"records_for_country":null,"problems":["Paid commercial subscription required."]},"evidence":[{"claim":"Commercial intelligence providers maintain subscription-only European renewable power asset databases.","url":"https://www.rystadenergy.com/services/europe-renewables-and-power-solution","quote":"Europe Renewables & Power Solution"}],"members":[{"name":"Rystad Energy — Europe Renewables & Power Solution","landing_url":"https://www.rystadenergy.com/services/europe-renewables-and-power-solution","data_url":null,"access":"paid","tested":true,"data_found":null,"note":"Product landing page verified (HTTP 200); subscription required."},{"name":"Wood Mackenzie — Power & Renewables (Lens)","landing_url":"https://www.woodmac.com/industry/power-and-renewables/","data_url":null,"access":"paid","tested":true,"data_found":null,"note":"Product landing page verified (HTTP 200); subscription required."},{"name":"BloombergNEF (BNEF)","landing_url":"https://about.bnef.com/","data_url":null,"access":"paid","tested":true,"data_found":null,"note":"Product landing page verified (HTTP 200); subscription required."}],"members_summary":{"total":null,"listed":3,"tested":3,"data_found":0,"scope_note":"Three major commercial energy intelligence providers opened to verify landing pages only (no paid access tested).","pattern":"Commercial renewable power asset trackers covering European solar PV pipelines."},"member_scope":{"total":null,"note":"Three major commercial energy intelligence providers opened to verify landing pages only (no paid access tested).","pattern":"Commercial renewable power asset trackers covering European solar PV pipelines."}}],"sector":{"regulator":{"name":"Bundesnetzagentur (BNetzA) — federal energy registry & EEG tenders; ~11,000 Gemeinden (Bauleitplanung) and ~400 untere Bauaufsichtsbehörden (Baugenehmigung)","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/artikel.html"},"operators":{"structure":"many","note":"Thousands of project SPVs (GmbH & Co. KG), utilities, energy cooperatives and commercial/private rooftop owners develop solar PV plants; registered market actors (Marktakteure, prefix ABR...) are listed in MaStR except natural persons.","census_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht"},"publication_obligation":{"exists":"yes","norm":"§ 5 & § 15 MaStRV (post-commissioning solar registration; federal-law permits only pre-commissioning); § 35 EEG 2023 (BNetzA tender awards); §§ 3(2), 4a & 10a BauGB (online municipal Bauleitplanung via central Länder portals)","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","what_must_be_published":"BNetzA must publish EEG tender winners, bid kW, parcel siting and award dates (§ 35 EEG), and public MaStR unit data (>30 kW with coordinates; voluntary pre-commissioning for solar PV under § 5(4) MaStRV). Municipalities must publish draft Bebauungspläne during consultation (§ 3(2) BauGB) and adopted plans (§ 10a BauGB) online and via central state portals; county Baugenehmigungen have no public publication obligation.","frequency":"Continuous in MaStR (daily XML export at 05:00); after each of 3+3+2 annual EEG/InnAusV tender rounds; event-driven per municipal Bauleitplan step."},"consolidated_republication":{"found":"partial","note":"BNetzA consolidates voluntary pre-commissioning MaStR registrations and EEG tender winners nationwide, while DiPlanung (7+ Länder) and UVP-Verbund (7 Länder for solar) partially federate municipal Bauleitplanung links; no authority consolidates all municipal PV Bebauungspläne or county Baugenehmigungen into one structured dataset.","checked_pages":[{"organization":"Bundesnetzagentur — Marktstammdatenregister (MaStR)","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","saw":"Daily nationwide XML Gesamtdatenexport and live JSON API include 63,257 'In Planung' solar units, but pre-commissioning solar registration is voluntary under § 5(4) MaStRV and lacks permitting sub-stages."},{"organization":"Bundesnetzagentur — EEG-Ausschreibungen Solaranlagen","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/BeendeteAusschreibungen/start.html","saw":"Publishes per-round XLSX Zuschlagslisten for awarded EEG bids only, without coordinates or post-award permitting/construction updates."},{"organization":"Bund-Länder-Projekt DiPlanung (DiPlanPortal)","url":"https://portal.diplanung.de/","saw":"Cross-state SPA viewer federating spatial plans/consultations for participating Länder, without a solar-specific filter or bulk project table."},{"organization":"Bundesministerium für Wirtschaft und Klimaschutz (BMWK)","url":"https://www.bundeswirtschaftsministerium.de/Redaktion/DE/Dossier/erneuerbare-energien.html","saw":"Policy dossier and aggregate expansion monitoring; no project-level solar PV permitting inventory."}]}},"national_registry":{"exists":"partial","note":"Marktstammdatenregister (MaStR) is the official single national energy register and includes an 'In Planung' status (63,257 solar PV units on 2026-11-25), but under § 5(4) MaStRV pre-commissioning registration is legally mandatory only for units requiring a federal-law permit (not state-law Baugenehmigungen or municipal Bebauungspläne), and MaStR does not distinguish planning, permitting, authorised or construction stages.","checked_pages":[{"organization":"Bundesnetzagentur — MaStR Webhilfe (Registrierungspflicht)","url":"https://www.marktstammdatenregister.de/MaStRHilfe/subpages/registrierungVerpflichtendAnlagen.html","saw":"Confirms planned units must be registered only when requiring a permit under BImSchG, WindSeeG, WHG or other federal law; standard solar PV registration in 'In Planung' is voluntary until commissioning."},{"organization":"Bundesnetzagentur — Kraftwerksliste","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/artikel.html","saw":"Explicitly states that wind and PV installations are included only aggregated by Bundesland and operational status, not as individual plants."},{"organization":"Bundesministerium für Wirtschaft und Klimaschutz (BMWK)","url":"https://www.bundeswirtschaftsministerium.de/Redaktion/DE/Dossier/erneuerbare-energien.html","saw":"Covers EEG policy and aggregate renewable targets; no national solar permitting register."},{"organization":"UVP-Verbund (Länder & Bund)","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Photovoltaik","saw":"Contains 127 German 'Photovoltaik' entries (115 municipal Bauleitplanung link cards and 12 UVP/screening cases), confirming standard solar parks are not centrally tracked in a federal EIA permit database."}]},"if_unstructured":{"summary":"Because MaStR 'In Planung' is voluntary and merges all pre-commissioning phases while BNetzA lists only EEG tender winners, exact permitting stages (Aufstellungsbeschluss, § 3(2) Auslegung, § 10 Satzungsbeschluss), council decision dates, Vorhabenträger and grid-reservation MWp for non-privileged ground-mounted solar parks must be extracted from municipal Bebauungsplan PDFs via the 16 Länder Bauleitplanung portals and municipal websites.","recipe":["Start from MaStR (Betriebs-Status = 'In Planung', Art der Solaranlage = 'Freiflächensolaranlage', 1,094 units) and BNetzA EEG Segment 1/InnAusV Zuschlagslisten XLSX files, deduplicating on MaStR EEG numbers, Zuschlags-Nr, or Municipality + Gemarkung + Flurstück.","For target Länder or municipalities, query the Land's central Bauleitplanungsportal (and portal.diplanung.de / uvp-verbund.de) for 'Photovoltaik' or 'Solarpark' to capture projects in Aufstellungsbeschluss or § 3(2) Auslegung that have not yet bid in EEG tenders or registered in MaStR.","Download the Bekanntmachung, Begründung and (if already adopted) Zusammenfassende Erklärung PDFs; extract text with pdftotext (converting scanned Bekanntmachungen such as Mötzing's 09-bekanntmachung-satzung.pdf via pdftoppm/OCR if needed).","Record from Section 'Verfahren / Rechtsverhältnisse' the latest procedural milestone (Aufstellungsbeschluss, Frühzeitige Beteiligung, Öffentliche Auslegung, or Satzungsbeschluss) and its council session date — never the website upload date.","Record from Section 'Lage und Größe / Technische Planung' the Geltungsbereich/Sondergebiet area (ha) and, where stated, DC module peak (MWp), inverter AC power (MW) and grid reservation/connection capacity, plus the Vorhabenträger from the cover sheet or Vorhaben- und Erschließungsplan."],"location_method":"Bebauungsplan Begründungen, Bekanntmachungen and BNetzA EEG award tables list Gemeinde, Gemarkung, Flur and Flurstück numbers; intersect those parcel identifiers with official state ALKIS cadastral WFS/WMS services (via Geoportal.de or state geoportals) or digitize the Geltungsbereich boundary from the Planzeichnung PDF.","cross_with":"Cross-check municipal Bebauungspläne with MaStR ('In Betrieb' status = 35 as well as 'In Planung' = 31) to remove solar parks that have already been commissioned, and with BNetzA EEG Segment 1 / InnAusV Zuschlagslisten on Gemarkung + Flurstück to attach awarded kW capacities and bidder SPVs.","where_published":[{"name":"Municipal Bauleitplanung & Amtsblatt pages (reached via the 16 Länder Bauleitplanungsportale and portal.diplanung.de)","url":"https://www.gemeinde-moetzing.de/aktuelles/aktuelle-meldungen/bebauungsplan-solarpark-schafhoefen-rechtskraeftig/","what":"Publishes Bekanntmachungen, Planzeichnungen, Begründungen, Umweltberichte and Zusammenfassende Erklärungen for 'Sondergebiet Photovoltaik' Bebauungspläne.","how_to_search_inside":"Filter the Land's Bauleitplanungsportal or municipal 'Bebauungspläne im Verfahren / Rechtskräftige Bauleitpläne' section by 'Photovoltaik', 'Solarpark' or 'SO Solar'; note that many municipal Ratsinformationssysteme (e.g. ALLRIS in Braunschweig) place an interactive anti-bot click gate in front of automated requests.","example_document":{"url":"https://www.gemeinde-moetzing.de/media/99858/08-b-plan-so-solarpark-schafhoefen_zusammenferklaerung.pdf","what_it_gives":"Zusammenfassende Erklärung (p. 2–3) for 'Solarpark und Batteriespeicher Mötzing / Schafhöfen' gives the complete dated permitting chain: Aufstellungsbeschluss 'am 13.11.2023', frühzeitige Beteiligung '13.09.2024 bis 14.10.2024', Raumordnungsverfahren 'am 06.03.2025', Auslegung '29.04.2025 bis 30.05.2025', erneute Beteiligung '17.09.2025 bis 08.10.2025', and 'Der Satzungsbeschluss gem. § 10 Abs. 1 BauGB i.V.m. Art. 81 Abs. 2 BayBO erfolgte am 08.12.2025' (Inkrafttreten notice 12.02.2026; 1. Änderung Begründung p. 7 & 18 adds 'Größe von ca. 223 ha', 'Eine Netzreservierung von 268 MWp wurde gesichert', Satzungsbeschluss 14.09.2026, Inkrafttreten 10.11.2026) — whereas MaStR on 2026-11-25 still lists BEE Solarpark Schafhöfen GmbH & Co. KG only as two generic 'In Planung' units (SEE991008057236 at 17,600 kWp + SEE963914434579 at 200,000 kWp = 217.6 MWp) with no permit record attached."}},{"name":"UVP-Verbund — Project-level UVP-Vorprüfungen & Zulassungsverfahren","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&q=Solarpark","what":"Publishes UVP screening decisions and permit notices when a solar park triggers forest conversion (Waldumwandlung), landfill/industrial modification or mandatory EIA.","how_to_search_inside":"Query q=Photovoltaik or q=Solarpark and restrict Verfahrenstypen to 'Zulassungsverfahren' and 'Negative Vorprüfungen' (ignoring 'Bauleitplanung' link cards).","example_document":{"url":"https://www.uvp-verbund.de/trefferanzeige?docuuid=86a8a7cd-7770-40a6-a84b-f06208512f24&rstart=0&currentSelectorPage=1&q=Photovoltaik","what_it_gives":"Lists applicant and project 'Main-Kinzig-Kreis, Eigenbetrieb Abfallwirtschaft: \"Solarpark Hohenzell II\" - Erweiterung von Photovoltaik-Freiflächenanlagen auf dem Gelände der Deponie in Schlüchtern-Hohenzell', authority 'Regierungspräsidium Darmstadt', stage 'Negative Vorprüfungen', and decision date 'Datum der Entscheidung 30.06.2026' separately from portal update 'Zuletzt geändert 01.07.2026'."}}]},"related_not_answering":[{"name":"Bundesnetzagentur — Kraftwerksliste & Zu- und Rückbau von Kraftwerken","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/artikel.html","why":"Lists individual power plants >=10 MW for conventional/storage technologies, but aggregates wind and solar PV only as totals by Bundesland and operational status."},{"name":"SMARD.de — Strommarktdaten (Bundesnetzagentur)","url":"https://www.smard.de/home/217776-217776","why":"Publishes operational generation capacity and market time series derived from MaStR and the Kraftwerksliste, not a project-level permitting list."},{"name":"Energie-Atlas Bayern — WMS Photovoltaikanlagen & Freiflächen-Potenzial (LfU Bayern)","url":"https://www.lfu.bayern.de/gdi/wms/energieatlas/photovoltaikanlagen?SERVICE=WMS&REQUEST=GetCapabilities","why":"Maps commissioned solar PV installations (from MaStR) and suitability/potential zones rather than concrete solar PV projects currently in permitting."},{"name":"GovData.de & data.europa.eu — Photovoltaik / Freiflächen metadata","url":"https://www.govdata.de/ckan/api/3/action/package_search?q=Freifl%C3%A4chen-Photovoltaik&rows=5","why":"Returns 426 GovData (and 2,914 data.europa.eu) datasets consisting of solar suitability/potential maps, commissioned stock layers and isolated single-municipality XPlanung B-Plan WMS links, with no consolidated permitting inventory."}],"open_questions":["No public source quantifies what share of Germany's uncommissioned ground-mounted PV pipeline is voluntarily registered early in MaStR ('In Planung') versus first appearing after commissioning under § 5(1) MaStRV.","Privileged ground-mounted solar PV projects within 200 m of motorways or double-track railways (§ 35(1) Nr. 8b BauGB) require only a county-level Baugenehmigung without a municipal Bebauungsplan; unless they win an EEG tender or voluntarily register in MaStR, whether any Land plans to publish county Baugenehmigung statistics/lists remains undocumented."],"history":[{"pass":1,"date":"2026-11-26","role":"research","model":"Gemini 4 Carbon","rules_version":"2026-11-25-de-red-y-tramitacion","note":"Initial research in session f843b96e-b516-44f8-8831-ee71816fec53: verified MaStRV § 5(4) voluntary rule, MaStR API (63,257 planned units), BNetzA EEG XLSX awards, 16 Länder Bauleitplanung portals, Mötzing B-Plan PDFs, GEM and OSM.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"partial"},"sources":{"total":7,"new":7,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":66,"minutes":22}}],"local_terms":[{"term":"Freiflächensolaranlage / Freiflächen-Photovoltaikanlage","language":"de","meaning":"Ground-mounted solar PV installation (MaStR Art der Solaranlage code 852)."},{"term":"In Planung","language":"de","meaning":"MaStR pre-commissioning unit status (code 31), covering voluntary entries from early planning through active construction."},{"term":"Vorhabenbezogener Bebauungsplan (Sondergebiet Photovoltaik)","language":"de","meaning":"Project-specific municipal binding land-use plan (§ 12 BauGB, § 11 BauNVO) creating zoning right for non-privileged solar parks."},{"term":"Aufstellungsbeschluss / Öffentliche Auslegung / Satzungsbeschluss","language":"de","meaning":"Sequential municipal Bauleitplanung milestones: initiation (§ 2(1) BauGB), draft public consultation (§ 3(2) BauGB) and statutory adoption (§ 10 BauGB)."},{"term":"Baugenehmigung","language":"de","meaning":"State-law construction permit issued by the county/city Bauaufsichtsbehörde (required after Satzungsbeschluss or directly for privileged § 35 BauGB corridor PV)."},{"term":"Ausschreibungen für Solaranlagen des ersten / zweiten Segments","language":"de","meaning":"BNetzA EEG competitive tenders for ground-mounted/non-building PV (1st segment) and rooftop/noise-barrier PV >1 MW (2nd segment)."},{"term":"Bruttoleistung (kWp) / Nettonennleistung (kW)","language":"de","meaning":"DC module peak capacity under STC versus AC nominal capacity limited by generator/inverter in MaStR."},{"term":"Vorhabenträger","language":"de","meaning":"Project developer/applicant named in urban land-use plans and UVP screenings."}],"provenance":{"pass_count":1,"models":["Gemini 4 Carbon"],"minutes_estimate":22,"pages_opened":66,"passes":[{"pass":1,"date":"2026-11-26","model":"Gemini 4 Carbon"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/solar-pv-plants-in-permitting.json","detail_url":"https://georutter.org/v1/de/solar-pv-plants-in-permitting/detail.json","html_url":"https://georutter.org/de/solar-pv-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/de.json"}