{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"solar-pv-plants","question":"Where can I get a list of solar PV plants in operation in Germany, with location, capacity (MW), operator and commissioning date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"structured","non_official_data":"partial","summary":"The Bundesnetzagentur’s Marktstammdatenregister (MaStR) lists registered PV units with status, commissioning date, gross and net capacity in kW and operator identifiers. Filtering for solar energy and operating status yields 6,534,010 units on 2026-11-27, including 20,213 ground-mounted units. Use the extended overview or the daily XML export. Coordinates were found for 262,196 operating units over 30 kW net in the sample. Natural-person operator names are withheld. A park can span several registered units.","main_caveats":["In the export checked, precise coordinates were unavailable for operating PV units of up to 30 kW net. About 96% of registered operating PV units fell in this range.","Operator names are published only for organisations; natural persons appear as 'natürliche Person (ABR…)' – 86% of all operating units and about one in five ground-mounted units in the pages sampled.","The counting unit is the MaStR 'Einheit': one park can be several units (phases, operators); group with LokationMastrNr. Without filters the list also holds 1.56 million balcony units and planned or shut-down units.","Capacity is in kW on two bases: Bruttoleistung = module peak (DC, kWp), Nettonennleistung = lower of module and inverter rating. Divide by 1,000 for MW and do not mix with GEM's MWac.","Operators have one month to register after commissioning, so the latest month is incomplete; the web CSV export stops at 25,000 rows."],"confidence":"high","confidence_reason":"All four attributes were checked in MaStR with live counts and samples, and the publication limits are cited from § 15 MaStRV; regional and non-official sources were sampled, not exhausted.","attributes":[{"attribute":"location","covered":"partial","source_ids":["mastr-units-api","mastr-full-export","laender-energy-atlases","osm-solar-plants"],"note":"The export checked reported WGS84 points for 262,196 operating units above 30 kW net. The smaller units are located by postcode and municipality.","gap":"not_published","gap_note":"§ 15(1) Nr. 1a MaStRV withholds street, parcel and coordinates of units ≤30 kW; checked in the MaStR overview, the XML export, the TSO EEG files and the regulation."},{"attribute":"capacity_mw","covered":"yes","source_ids":["mastr-units-api","mastr-full-export","tso-eeg-master-data"],"note":"Per unit in kW: Bruttoleistung (module kWp, DC) and Nettonennleistung (lower of module and inverter rating); divide by 1,000 for MW.","gap":null,"gap_note":null},{"attribute":"operator","covered":"partial","source_ids":["mastr-units-api","mastr-full-export","gem-gspt"],"note":"Operator name for organisations; natural persons shown as 'natürliche Person (ABR…)' (19.5% of a sampled page of parks, 86% of all units).","gap":"not_published","gap_note":"§ 15(1) Nr. 2 MaStRV withholds data of natural-person operators; confirmed in MaStR JSON (AnlagenbetreiberPersonenArt 518) and the Marktakteure export; TSO files carry no operator."},{"attribute":"commissioning_date","covered":"yes","source_ids":["mastr-units-api","mastr-full-export","tso-eeg-master-data"],"note":"Inbetriebnahmedatum (first commissioning) present for every unit 'In Betrieb' in all samples checked.","gap":null,"gap_note":null}]},"sources":[{"source_id":"mastr-units-api","name":"Marktstammdatenregister (MaStR) – Erweiterte Einheitenübersicht, Stromerzeugungseinheiten (JSON behind the viewer, CSV export)","publisher":"Bundesnetzagentur","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","data_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung","access":"api","format":"JSON (Kendo grid endpoint used by the web viewer); CSV export button on the same page","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0 (BNetzA: applies to MaStR .xml/.csv data and the Webdienst unless marked otherwise)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regulator","adds":"The statutory national register of every generating unit, filterable by energy carrier (Solare Strahlungsenergie), operating status and type of solar installation; returns per unit the commissioning date, gross (module, kWp) and net (inverter) capacity in kW, coordinates for units above 30 kW, municipality/postcode for all, and the operator name already joined for organisations.","first_seen_pass":1,"rank":1,"summary":"Official register of every PV unit; filter Energieträger 2495 + Betriebs-Status 35 for units in operation, with commissioning date, kW capacities, operator and coordinates above 30 kW.","coverage_note":"6,534,010 solar units in operation on 2026-11-27: 20,213 ground-mounted, 4,953,666 on buildings, 1,559,990 balcony units, 141 other; 262,196 carry coordinates.","data_date":"2026-11-26 (previous-day state)","caveats":["Unit ≠ plant: group by LokationMastrNr.","Coordinates only above 30 kW net; natural-person operators masked."],"coverage":{"geographic":"Germany (all Länder; also units in the EEZ for wind). 6,534,010 solar units 'In Betrieb' on 2026-11-27."},"fine_print":{"unit":{"value":"kW for both capacity fields: Bruttoleistung = summed module rating (kWp, DC side); Nettonennleistung = net nominal rating – in all 1,627 export records checked it equals the lower of Bruttoleistung and the assigned inverter power (ZugeordneteWirkleistungWechselrichter). Divide by 1,000 for MW.","quote":"Bruttoleistung der gesamten Solaranlage: In einigen Fällen liegt nur eine Herstellerangabe zur Leistung pro Modul vor. In diesem Fall muss die Leistung der einzelnen Module zusammenaddiert werden. Achten Sie hierbei darauf, die Leistung in kWp umzurechnen.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/regHilfen/Registrierungshilfe_Solar.pdf","attempts":[]},"inclusion_rule":{"value":"Every grid-connected generating unit, with no size threshold and including self-consumption units, must be registered by its operator; modules of one operator commissioned together at the same site form one 'Einheit' (§ 5(1) MaStRV).","quote":"Die Vollständigkeit der Daten ist ein unverzichtbares Fundament dieser Transparenz. Sie ergibt sich daraus, dass das MaStR die Daten aller Anlagen enthält und dass für die Registrierung keine Abschneide-Grenze gilt.","url":"https://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/DatenaustauschUndMonitoring/MaStR/Bericht2023.pdf?__blob=publicationFile&v=2","attempts":[]},"reference_date":{"value":"Data as of the previous day (page showed 'Datenstand: 27.11.2026 00:00 Uhr' on 2026-11-27).","quote":"Diese „Erweiterte Einheitenübersicht“ enthält alle Daten, die bis zum Vortag im MaStR neu eingetragen oder geändert wurden.","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","attempts":[]},"update_frequency":{"value":"Daily (previous-day state); the 'Aktuelle Einheitenübersicht' is real-time but has fewer columns and no coordinates column.","quote":"Diese „Erweiterte Einheitenübersicht“ enthält alle Daten, die bis zum Vortag im MaStR neu eingetragen oder geändert wurden.","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","attempts":[]},"exclusions":{"value":"Not in the register: off-grid units and defence installations. Published without location detail (street, house number, Flurstück, coordinates): units of at most 30 kW. Operator data of natural persons are masked ('natürliche Person (ABR…)'); critical-infrastructure units can be withheld on request.","quote":"Nur Anlagen, die weder unmittelbar noch mittelbar ans Netz angeschlossen sind, und Anlagen, die der Landesverteidigung dienen, müssen nicht registriert werden.","url":"https://www.bundesnetzagentur.de/SharedDocs/Downloads/DE/Sachgebiete/Energie/Unternehmen_Institutionen/DatenaustauschUndMonitoring/MaStR/Bericht2023.pdf?__blob=publicationFile&v=2","attempts":[]}},"key_fields":[{"field":"MaStRNummer","meaning":"Unit ID (SEE…), one per registered solar 'Einheit'."},{"field":"LokationMastrNr","meaning":"Location ID (SEL…) shared by units at the same generation site; use it to group the phases of one park."},{"field":"EinheitName / SolarparkName","meaning":"Free display name chosen by the operator / optional park name."},{"field":"BetriebsStatusId / BetriebsStatusName","meaning":"31 In Planung, 35 In Betrieb, 37 Vorübergehend stillgelegt, 38 Endgültig stillgelegt."},{"field":"InbetriebnahmeDatum","meaning":"Date of first commissioning of the unit, as /Date(epoch-ms)/ (UTC midnight)."},{"field":"InbetriebnahmeDatumAmAktuellenOrt","meaning":"Commissioning date at the current site for relocated units (usually null)."},{"field":"Bruttoleistung","meaning":"Gross capacity in kW = summed module rating (kWp, DC)."},{"field":"Nettonennleistung","meaning":"Net nominal capacity in kW = lower of module and inverter rating in the records checked; the field the 30 kW publication threshold follows."},{"field":"ArtDerSolaranlageId / ArtDerSolaranlageBezeichnung","meaning":"852 Freiflächensolaranlage, 853 Gebäudesolaranlage, 2484 Sonstige Solaranlage, 2961 Steckerfertige Solaranlage (Balkonkraftwerk)."},{"field":"VollTeilEinspeisungBezeichnung","meaning":"Volleinspeisung vs Teileinspeisung (einschließlich Eigenverbrauch) – the self-consumption marker."},{"field":"Breitengrad / Laengengrad","meaning":"WGS84 point of the unit; null for units with Nettonennleistung ≤ 30 kW."},{"field":"Plz / Ort / Gemeinde / Gemeindeschluessel / Landkreis / Bundesland","meaning":"Administrative location, published for every unit."},{"field":"AnlagenbetreiberName / AnlagenbetreiberMaStRNummer / AnlagenbetreiberPersonenArt","meaning":"Operator name (organisations only), operator ID (ABR…), 517 organisation / 518 natural person (name masked)."},{"field":"SpannungsebenenNamen / NetzbetreiberNamen","meaning":"Grid connection voltage level and connecting DSO/TSO."},{"field":"IsNBPruefungAbgeschlossen","meaning":"Grid-operator check: 2954 Geprüft, 2955 In Prüfung, 3075 Nicht vorgesehen."}],"how_to_use":{"example_request":"curl -s -G 'https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung' --data-urlencode 'sort=Nettonennleistung-desc' --data-urlencode 'page=1' --data-urlencode 'pageSize=3' --data-urlencode 'group=' --data-urlencode \"filter=Energieträger~eq~'2495'~and~Betriebs-Status~eq~'35'~and~Art der Solaranlage~eq~'852'\"","example_result":"{\"Total\":20213,\"Data\":[{\"MaStRNummer\":\"SEE936162158023\",\"EinheitName\":\"Solarpark Gottesgabe\",\"BetriebsStatusName\":\"In Betrieb\",\"InbetriebnahmeDatum\":\"/Date(1644451200000)/\",\"Bruttoleistung\":153131.42,\"Nettonennleistung\":144000.0,\"AnlagenbetreiberName\":\"EnBW Solarpark Gottesgabe GmbH\",\"Breitengrad\":52.639405,\"Laengengrad\":14.189378,\"Gemeinde\":\"Neuhardenberg\"},…]}","steps":["Filter syntax (Kendo): filter=Energieträger~eq~'2495' (Solare Strahlungsenergie)~and~Betriebs-Status~eq~'35' (In Betrieb); add ~and~Art der Solaranlage~eq~'852' for ground-mounted parks or ~and~Nettonennleistung der Einheit~gt~'30' for the subset with coordinates. Filter names and code lists come from GetFilterColumnsErweiterteOeffentlicheEinheitStromerzeugung.","Paginate with page=1,2,… and pageSize up to 1000 (tested); 'Total' gives the row count of the filter.","Convert InbetriebnahmeDatum '/Date(ms)/' to a date (epoch milliseconds, UTC): /Date(1644451200000)/ = 2022-02-10.","Divide Bruttoleistung/Nettonennleistung by 1,000 for MW and keep both columns (DC vs AC).","Group units into plants with LokationMastrNr when a park was registered in several phases.","For a manual extract, the same filters can be set on the 'Erweiterte Einheitenübersicht' page and exported with 'Tabelle exportieren / CSV-Export' (25,000 rows per export).","An authenticated SOAP Webdienst (described at https://www.marktstammdatenregister.de/MaStRHilfe/subpages/webdienst.html) serves the same register; it needs a registered MaStR account with a Webdienst-Key and is limited to 100,000 calls per day."],"reading_traps":["Counting unit is the MaStR 'Einheit', not the plant: parks built in phases appear as several SEE units; in a 1,000-row page of Freiflächen units 217 shared their LokationMastrNr with another unit on the page.","Capacities are kW, not MW. Bruttoleistung (module kWp) exceeded Nettonennleistung in 722 of 1,000 sampled units >30 kW; in the 1,628-unit export file Nettonennleistung was never above Bruttoleistung or the inverter power.","Coordinates only for Nettonennleistung > 30 kW: 262,196 of 262,216 operating units above 30 kW have Breitengrad; units with Bruttoleistung > 30 but Nettonennleistung ≤ 30 have none. 96% of operating units (mostly rooftop and balcony) are located only by postcode/municipality.","3 of 1,000 sampled coordinates (>30 kW) fall outside their own Bundesland, e.g. SEE990564981245 'Nördlingen' (Bayern) at 52.88 N.","Operator: 'natürliche Person (ABR…)' replaces the name for natural-person operators – 86% of a 1,000-row page of all operating solar units, 47% of units >30 kW and 19.5% of Freiflächen units.","Self-consumption vs grid plants: 5,404,598 operating units are 'Teileinspeisung (einschließlich Eigenverbrauch)' (3,862,520 of them on buildings) and 1,112,487 'Volleinspeisung'; about 17,000 carry no value. Filter 'Volleinspeisung oder Teileinspeisung' to separate them.","Without the status filter the result includes 63,315 'In Planung', 8,417 'Vorübergehend stillgelegt' and 95,863 'Endgültig stillgelegt' solar units; without the type filter it includes 1,559,990 operating balcony units.","Grid-operator verification: of the operating solar units 4,378,535 are 'Geprüft', 595,483 still 'In Prüfung' and 1,559,990 (all balcony units) 'Nicht vorgesehen'; filter Netzbetreiberprüfung if only verified records are wanted.","The JSON endpoint is the undocumented backend of the viewer; its parameters may change without notice.","The page's CSV export holds only the first 25,000 rows of a selection; the 20,213 operating Freiflächen units fit, the 6.5 million operating units do not.","Operators have one month to register after commissioning, so the latest month is incomplete; the 'Aktuelle Einheitenübersicht' is real-time but has no coordinate columns.","The MaStR FAQ speaks of '30 kW(p)', but the data follow Nettonennleistung: filter on Nettonennleistung > 30 to select units with coordinates."]},"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":12614,"records_total":6701605,"records_for_country":6701605,"problems":[]},"evidence":[{"claim":"The extended overview carries previous-day data and offers CSV export with solar-specific columns and WGS84 coordinates.","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","quote":"Diese „Erweiterte Einheitenübersicht“ enthält alle Daten, die bis zum Vortag im MaStR neu eingetragen oder geändert wurden."},{"claim":"Location details are withheld for units of at most 30 kW.","url":"https://www.gesetze-im-internet.de/mastrv/__15.html","quote":"nach der Anlage Tabelle B bis E mit einer Leistung von höchstens 30 Kilowatt"},{"claim":"Solar modules of one operator commissioned together at the same site form one unit.","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","quote":"Einheiten von Solaranlagen, die von demselben Betreiber am selben Standort gleichzeitig in Betrieb genommen werden, sind summarisch als eine Einheit zu registrieren"},{"claim":"Definition of Freiflächensolaranlage in MaStR.","url":"https://www.marktstammdatenregister.de/mastrhilfe/files/regHilfen/Arten_der_Solaranlagen_im_Marktstammdatenregister_%E2%80%93_Uebersicht_und_Definitionen.pdf","quote":"Zu dieser Art der Solaranlage zählen Anlagen, die mittels einer ausschließlich für die PV-Anlage errichteten Unterkonstruktion mit der Erdoberfläche (Boden, Gewässer) verbunden sind."},{"claim":"CSV export limit.","url":"https://www.marktstammdatenregister.de/MaStR/Shared/_DownloadInfo?fileName=Stromerzeuger&gridId=grid-stromerzeugung-erweitert","quote":"Achtung: Der Tabellen-Export enthält nur die ersten 25.000 Datensätze Ihrer Auswahl."},{"claim":"Registration lag of up to one month.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/regHilfen/Anleitung_zur_Datenfilterung.pdf","quote":"Die Anlagenbetreiber haben für die Registrierung nach der Inbetriebnahme der Anlage einen Monat Zeit. Daher können die Daten des letzten Monats noch unvollständig sein."},{"claim":"Location of small plants and personal data are not published (FAQ wording uses kW(p)).","url":"https://www.marktstammdatenregister.de/MaStRHilfe/subpages/faq.html","quote":"Personenbezogene Daten und als nach der Marktstammdatenregisterverordnung (MaStRV) vertraulich eingestufte Daten, z.B. genaue Standortdaten von Anlagen kleiner oder gleich 30 kW(p), werden nicht veröffentlicht."},{"claim":"Webdienst daily quota.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/subpages/faq.html","quote":"Ein registrierter Webdienst-Benutzer kann pro Tag 100.000 Aufrufe an den Webdienst übermitteln."},{"claim":"Commissioning date is the first commissioning, not grid connection.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/regHilfen/Registrierungshilfe_Solar.pdf","quote":"Das Datum der erstmaligen Inbetriebnahme ist unabhängig vom Datum der ersten Netzeinspeisung, vom Datum des Netzanschlusses und vom Datum des Setzens eines Zählers."}],"members":[],"members_summary":null},{"source_id":"mastr-full-export","name":"MaStR Gesamtdatenauszug (Gesamtdatenexport) – EinheitenSolar_*.xml, Lokationen_*.xml, Marktakteure_*.xml","publisher":"Bundesnetzagentur","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","data_url":"https://download.marktstammdatenregister.de/Gesamtdatenexport_20261127_26.2.zip","access":"direct_download","format":"ZIP of XML files (UTF-16), 453 files; documentation with XSD","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regulator","adds":"Bulk copy of all public MaStR data in one ZIP (no paging of 6.7 million rows), with the Lokationen file that lists every unit linked to a site, the Marktakteure file for operator names, and dated snapshots (01.01/04/07/10) for reconstructing past stock.","first_seen_pass":1,"rank":2,"summary":"Daily 3.3 GB XML dump of the whole MaStR (solar units in EinheitenSolar_*.xml), with site and operator tables and quarterly snapshots.","coverage_note":"All public MaStR records; same 30 kW coordinate and natural-person limits as the web overview.","data_date":"2026-11-26 (Vortag)","caveats":["Codes need Katalogwerte.xml; operator names need a join to Marktakteure."],"coverage":{"geographic":"Germany, all public MaStR records (all energy carriers; solar units in EinheitenSolar_1…68.xml)."},"fine_print":{"unit":{"value":"kW (Bruttoleistung, Nettonennleistung, ZugeordneteWirkleistungWechselrichter).","quote":"Bruttoleistung in kW","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/gesamtdatenexport/Dokumentation%20MaStR%20Gesamtdatenexport.zip","attempts":[]},"inclusion_rule":{"value":"All public data of the register; same publication exclusions as the web overview (§ 15 MaStRV).","quote":"Hier können Sie die gesamten öffentlichen Daten des Marktstammdatenregisters herunterladen.","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"reference_date":{"value":"Previous day ('Gesamtdatenauszug vom Vortag', last update 27.11.2026 00:00:00 on the day tested); dated snapshots from 01.04.2023 onwards.","quote":"Der Datendownload wird in der Regel um 5:00 Uhr auf den zu diesem Zeitpunkt gültigen Datenstand aktualisiert.","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"update_frequency":{"value":"Daily, but not guaranteed: a missed day is not caught up.","quote":"aus technischen Gründen kann es vorkommen, dass nicht an jedem Tag ein Export ausgeführt wird. Dieser wird am Folgetag auch nicht nachgeholt.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/gesamtdatenexport/Dokumentation%20MaStR%20Gesamtdatenexport.zip","attempts":[]},"exclusions":{"value":"Same as § 15 MaStRV: no street/coordinates for units ≤ 30 kW; natural-person operators have no name fields in Marktakteure.","quote":"Daten zu Marktakteuren nach der Anlage Tabelle A werden nicht veröffentlicht, wenn der Marktakteur eine natürliche Person ist.","url":"https://www.gesetze-im-internet.de/mastrv/__15.html","attempts":[]}},"key_fields":[{"field":"EinheitMastrNummer","meaning":"Unit ID (SEE…)."},{"field":"LokationMaStRNummer","meaning":"Site ID (SEL…); Lokationen_*.xml lists VerknuepfteEinheitenMaStRNummern per site."},{"field":"EinheitBetriebsstatus","meaning":"Catalogue code: 35 In Betrieb, 31 In Planung, 37 Vorübergehend stillgelegt, 38 Endgültig stillgelegt (Katalogwerte.xml)."},{"field":"Inbetriebnahmedatum","meaning":"Commissioning date (YYYY-MM-DD)."},{"field":"Bruttoleistung / Nettonennleistung / ZugeordneteWirkleistungWechselrichter","meaning":"kW: module (DC) / net nominal / inverter active power."},{"field":"ArtDerSolaranlage / SolaranlagenKategorie","meaning":"852 Freifläche, 853 Gebäude, 2484 Sonstige, 2961 Balkonkraftwerk / 3176-3178."},{"field":"Einspeisungsart","meaning":"688 Volleinspeisung, 689 Teileinspeisung (einschließlich Eigenverbrauch)."},{"field":"Laengengrad / Breitengrad","meaning":"WGS84 decimal degrees, present only above 30 kW net."},{"field":"AnlagenbetreiberMastrNummer","meaning":"Operator ID (ABR…); join to Marktakteure_*.xml MastrNummer → Firmenname, Personenart (517 organisation, 518 natural person without name)."},{"field":"NameDesSolarparks / GroesseDerInAnspruchGenommenenFlaecheInHektar","meaning":"Optional park name and area used (ha) for ground-mounted units."}],"how_to_use":{"example_request":"curl -sIL 'https://download.marktstammdatenregister.de/Gesamtdatenexport_20261127_26.2.zip'  # then a Range read of the ZIP central directory and of member EinheitenSolar_68.xml: curl -s -r 1811490349-1811754378 -o es68.bin '<same URL>'","example_result":"HTTP 200, Content-Length 3315946246, Accept-Ranges bytes. EinheitenSolar_68.xml (1,628 units): <EinheitSolar><EinheitMastrNummer>SEE926618310853</EinheitMastrNummer><LokationMaStRNummer>SEL926746158228</LokationMaStRNummer>…<Laengengrad>9.189542</Laengengrad><Breitengrad>49.229366</Breitengrad><Inbetriebnahmedatum>2026-11-26</Inbetriebnahmedatum><EinheitBetriebsstatus>35</EinheitBetriebsstatus><Bruttoleistung>202.920</Bruttoleistung><Nettonennleistung>160.000</Nettonennleistung><ArtDerSolaranlage>853</ArtDerSolaranlage>","steps":["Download the 'Gesamtdatenauszug vom Vortag' (≈3.3 GB ZIP; file name carries date and export version, e.g. Gesamtdatenexport_20261127_26.2.zip) or a dated snapshot under /Stichtag/.","Read EinheitenSolar_1…68.xml as UTF-16 XML; one <EinheitSolar> element per unit.","Decode catalogue codes with Katalogwerte.xml (Id → Wert) and Katalogkategorien.xml.","Keep EinheitBetriebsstatus = 35 (In Betrieb) and, if wanted, ArtDerSolaranlage = 852 (Freiflächensolaranlage).","Join AnlagenbetreiberMastrNummer to Marktakteure_*.xml (MastrNummer) for Firmenname; Personenart 518 rows carry no name.","Group units into sites with LokationMaStRNummer (or Lokationen_*.xml VerknuepfteEinheitenMaStRNummern)."],"reading_traps":["UTF-16 encoding and numeric catalogue codes everywhere (e.g. Bundesland 1409 = Nordrhein-Westfalen, Energietraeger 2495 = Solare Strahlungsenergie).","In EinheitenSolar_68.xml only 39 of 1,628 units carry Laengengrad/Breitengrad; the smallest net capacity with coordinates was 35 kW and the largest without was 30 kW.","The documentation's example values swap the axes (Laengengrad 51.254, Breitengrad 12.597); the data themselves are correct (e.g. Laengengrad 9.189542, Breitengrad 49.229366 in Bad Wimpfen).","Export versions change structure (new format since 01.10.2025) and are not backward compatible; check the documentation for the version in the file name.","Operator names are not in the unit file: a unit-only parse shows only ABR numbers."]},"test":{"tested_on":"2026-11-27","method":"headers_only","http_status":200,"content_type":"application/x-zip-compressed","size_bytes":3315946246,"records_total":null,"records_for_country":null,"problems":["Full ZIP is 3.3 GB; tested by headers and Range reads of the central directory and of EinheitenSolar_68.xml, Katalogwerte.xml, Lokationen_71.xml and the start of EinheitenSolar_1.xml and Marktakteure_1.xml."]},"evidence":[{"claim":"Full public data in XML, updated daily, licensed DL-DE-BY-2.0.","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","quote":"Hier können Sie die gesamten öffentlichen Daten des Marktstammdatenregisters herunterladen. Die Daten werden im XML Format bereitgestellt."},{"claim":"No registration needed for the export.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/gesamtdatenexport/Dokumentation%20MaStR%20Gesamtdatenexport.zip","quote":"Eine Registrierung ist nicht erforderlich."},{"claim":"Encoding.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/gesamtdatenexport/Dokumentation%20MaStR%20Gesamtdatenexport.zip","quote":"Die Zeichensatzcodierung erfolgt in UTF-16."}],"members":[],"members_summary":null},{"source_id":"tso-eeg-master-data","name":"EEG-Anlagenstammdaten (EEG system master data) for the annual statement – files of the four transmission system operators","publisher":"50Hertz, Amprion, TenneT TSO, TransnetBW (published on netztransparenz.de)","official":true,"landing_url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","data_url":null,"access":"direct_download","format":"ZIP with one CSV per TSO (semicolon, cp1252, decimal comma) + legend XLSX","license":"unknown","language":"de","has_coordinates":false,"location_precision":"address","publisher_type":"operator","adds":"An independent official list compiled from grid-operator reports for EEG payments: per EEG installation the commissioning date, installed capacity (kW), postcode/place and – above 30 kW – street or parcel, plus the decommissioning date during the year; useful to cross-check MaStR capacity and commissioning dates.","first_seen_pass":1,"rank":3,"summary":"Annual EEG settlement master data from the four TSOs: per EEG installation commissioning date, installed kW, postcode/place (street above 30 kW) and decommissioning date.","coverage_note":"All EEG installations reported for 2025 (status 31.12.2025); TransnetBW file alone: 711,131 solar rows.","data_date":"2025-12-31","caveats":["No operator and no coordinates.","50Hertz area reports only installations missing from MaStR."],"coverage":{"geographic":"Germany, split by control area (one file per TSO); status 31.12.2025 for the 2025 annual statement."},"fine_print":{"unit":{"value":"installierte_Leistung in kW with decimal comma (e.g. '48401,86').","quote":null,"url":null,"attempts":[{"url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","note":"Landing page does not state the unit. Cross-check with MaStR: EEG953217273524 = 48401,86 here and EegInstallierteLeistung 48401.86 kW in MaStR, so the values are kW."},{"url":"https://www.netztransparenz.de/cdn/files/5631dc19-4e68-4f6e-29ce-08defc51206b/anlagenstammdaten_legende.xlsx","note":"Legend XLSX lists code values (Bundesland, Energietraeger, Einspeisespannungsebene) and operator IDs, but no unit."}]},"inclusion_rule":{"value":"All EEG installations reported by the DSOs to the TSOs for the annual statement; in the 50Hertz area only installations not yet recorded in MaStR were reported by grid operators, the rest are taken from MaStR.","quote":"For the 50Hertz control area , the grid operators only reported the installations for the 2025 calendar year if installations were or are not yet recorded in the Market Master Data Register (MaStR).","url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","attempts":[]},"reference_date":{"value":"31.12.2025 or the day of decommissioning/grid transfer (2025 annual statement, files dated 4 Sept 2026).","quote":"In general, the master data reflects the status as at 31.12.2025 or the day of decommissioning or grid transfer.","url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","attempts":[]},"update_frequency":{"value":"Annual (one set per EEG annual statement).","quote":"The system master data reported to the transmission system operators for the 2025 annual statement is available for download as a file.","url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","attempts":[]},"exclusions":{"value":"Street and house number withheld for installations up to 30 kW; installations not paid under the EEG are outside the EEG settlement.","quote":"For data protection reasons, the exact address (street and house number) is not given for systems with an installed capacity of up to 30 kW.","url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","attempts":[]}},"key_fields":[{"field":"EEG_Mastr_Nr","meaning":"MaStR number of the EEG installation (EEG…), join key to MaStR."},{"field":"EEG-Anlagenschluessel","meaning":"EEG installation key used in settlement."},{"field":"Strasse_Flurstueck / PLZ / Ort_Gemarkung / Bundesland","meaning":"Address or parcel (only >30 kW), postcode, place, Land code (legend)."},{"field":"installierte_Leistung","meaning":"Installed capacity (kW, decimal comma)."},{"field":"Energietraeger","meaning":"Code; 9 = Solar (legend XLSX)."},{"field":"Inbetriebnahme / Ausserbetriebnahme","meaning":"Commissioning and decommissioning date (DD.MM.YYYY)."},{"field":"NB_Mastr_Nr / UENB_Mastr_Nr","meaning":"Connecting DSO and TSO (grid operators, not plant operators)."}],"how_to_use":{"example_request":"curl -sL -o tbw.zip 'https://www.netztransparenz.de/cdn/files/96fbf4b0-1763-4a48-29cd-08defc51206b/transnetbw%20gmbh%20eeg-zahlungen%20anlagenstammdaten%202025.zip'  # then read TransnetBW_2025_EEGZahlungen_Stammdaten.csv (cp1252, ';')","example_result":"714,835 rows; Energietraeger 9 (Solar) = 711,131, of which 710,327 without Ausserbetriebnahme. Row: EEG966734369304;E1084301ABLO019618500000000000001;SNB948311994307;SNB984944755380;Stumpenäcker, Gewann  9999;88512;Mengen;1;74800;9;3;27.05.2025;;;","steps":["Download the four ZIPs (50Hertz, Amprion, TenneT, TransnetBW) from the landing page; each holds one CSV.","Read with encoding cp1252 and delimiter ';'; convert decimal commas.","Keep Energietraeger = 9 (Solar); treat rows with empty Ausserbetriebnahme as connected to that grid operator at 31.12.2025 and check filled rows against Netzabgang and MaStR.","Decode Bundesland, Energietraeger and Einspeisespannungsebene with anlagenstammdaten_legende.xlsx.","Join EEG_Mastr_Nr to MaStR (EegMaStRNummer) to add coordinates and operator."],"reading_traps":["No plant operator and no coordinates: NB_Mastr_Nr/UENB_Mastr_Nr are grid operators.","Counting unit is the EEG installation, not the MaStR unit; installations that changed grid operator during the year can appear twice (stated on the landing page).","Strasse_Flurstueck is empty for every TransnetBW solar row up to 30 kW (smallest with street: 30.01 kW).","The CSV exceeds spreadsheet row limits (TransnetBW alone has 714,835 rows); the landing page warns that Excel silently drops excess lines.","A year-end snapshot: plants commissioned in 2026 are missing.","installierte_Leistung usually equals MaStR EegInstallierteLeistung (EEG953217273524: 48401,86 in both) but not always: EEG966734369304 shows 74800, which is the MaStR Nettonennleistung (Bruttoleistung 80308.8 kW), and its Ort 'Mengen' differs from the MaStR Gemeinde 'Langenenslingen'.","Ausserbetriebnahme is also filled when an installation leaves the grid operator: EEG970935572432 has Ausserbetriebnahme and Netzabgang 15.01.2025 but is 'In Betrieb' in MaStR; dropping filled Ausserbetriebnahme rows removes some operating installations."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/x-zip-compressed","size_bytes":17370587,"records_total":714835,"records_for_country":711131,"problems":["The file server answers HEAD requests with 405 Method Not Allowed; GET works.","Range requests are ignored (full file returned)."]},"evidence":[{"claim":"Master data of all EEG installations reported by DSOs for the annual statement.","url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","quote":"The file contains the master data of all EEG installations that were reported by the DSOs to the TSOs as part of the 2025 EEG annual report."},{"claim":"Address withheld up to 30 kW.","url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","quote":"For data protection reasons, the exact address (street and house number) is not given for systems with an installed capacity of up to 30 kW."}],"members":[{"name":"TransnetBW GmbH","landing_url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","data_url":"https://www.netztransparenz.de/cdn/files/96fbf4b0-1763-4a48-29cd-08defc51206b/transnetbw%20gmbh%20eeg-zahlungen%20anlagenstammdaten%202025.zip","access":"direct_download","tested":true,"data_found":true,"note":"17,370,587 B ZIP; 714,835 rows, 711,131 solar."},{"name":"50Hertz Transmission GmbH","landing_url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","data_url":"https://www.netztransparenz.de/cdn/files/22b1ed13-39ab-43c0-29ca-08defc51206b/50hertz%20transmission%20gmbh%20eeg-zahlungen%20anlagenstammdaten%202025.zip","access":"direct_download","tested":false,"data_found":null,"note":"GET headers 200, 15,178,260 B; only installations not yet in MaStR were reported by grid operators."},{"name":"TenneT TSO GmbH","landing_url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","data_url":"https://www.netztransparenz.de/cdn/files/5356665b-8b4e-4181-29cc-08defc51206b/tennet%20tso%20gmbh%20eeg-zahlungen%20stammdaten%202025.zip","access":"direct_download","tested":false,"data_found":null,"note":"GET headers 200, 45,508,409 B; file name 'eeg-zahlungen stammdaten 2025'."},{"name":"Amprion GmbH","landing_url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","data_url":"https://www.netztransparenz.de/cdn/files/61f62098-ff56-4ce7-29fe-08defc51206b/amprion%20gmbh%20eeg-zahlungen%20anlagenstammdaten%202025.zip","access":"direct_download","tested":false,"data_found":null,"note":"GET headers 200, 31,764,874 B."}],"members_summary":{"total":4,"listed":4,"tested":1,"data_found":1,"scope_note":"One file per German transmission system operator (control area); TransnetBW downloaded and parsed, the other three checked by GET headers only.","pattern":"netztransparenz.de › EEG › EEG-Abrechnungen › EEG-Jahresabrechnungen › EEG-Anlagenstammdaten, one ZIP per TSO and year."},"member_scope":{"total":4,"note":"One file per German transmission system operator (control area); TransnetBW downloaded and parsed, the other three checked by GET headers only.","pattern":"netztransparenz.de › EEG › EEG-Abrechnungen › EEG-Jahresabrechnungen › EEG-Anlagenstammdaten, one ZIP per TSO and year."}},{"source_id":"laender-energy-atlases","name":"Länder energy atlases – plant layers derived from MaStR (e.g. Energieatlas NRW 'Photovoltaik Freifläche' / 'Photovoltaik Bauliche')","publisher":"Landesämter / Länder ministries (LANUK NRW; Bayerisches Staatsministerium für Wirtschaft, Landesentwicklung und Energie; Senatsverwaltung Berlin)","official":true,"landing_url":null,"data_url":null,"access":"direct_download","format":"GeoPackage (EPSG:25832) in ZIP; also XLSX","license":"unknown","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regional_government","adds":"State-validated plant layers: in NRW a free GeoPackage with ground-mounted and building PV points above 30 kW, status and a source flag (MaStR, LANUK) that marks 12 operating ground-mounted plants added by LANUK beyond MaStR.","first_seen_pass":1,"rank":4,"summary":"Some Länder republish MaStR plant points; NRW offers a free GeoPackage of PV units above 30 kW with status and commissioning date.","coverage_note":"Regional only; NRW tested (767 ground-mounted, 45,407 building units).","data_date":"2026-08-03","caveats":["No operator; gross kW only."],"coverage":{"geographic":"Per Land; tested for Nordrhein-Westfalen only."},"fine_print":{"unit":{"value":"'Bruttoleistung el. [kW]' (gross, kW).","quote":null,"url":null,"attempts":[{"url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/","note":"Unit taken from the column name 'Bruttoleistung el. [kW]' in the GeoPackage; no separate documentation opened."}]},"inclusion_rule":{"value":"NRW layer holds units above 30 kW (smallest 30.34 kW in 'Photovoltaik Freifläche', 30.008 kW in 'Photovoltaik Bauliche'); built from MaStR and validated by LANUK.","quote":"Die Statistiken der Erneuerbaren-Energien-Anlagen werden monatlich mit Hilfe der Daten des Marktstammdatenregisters (MaStR) der Bundesnetzagentur (BNetzA) aktualisiert.","url":"https://wirtschaft.nrw/system/files/media/document/file/26-05-29_monitoringbericht_ffpv_2025.pdf","attempts":[]},"reference_date":{"value":"Column 'Stand' 2026-08-03 for MaStR rows (file timestamp 2026-09-02).","quote":null,"url":null,"attempts":[{"url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/","note":"Directory listing gives file timestamp 2026-09-02T11:24:06; 'Stand' column in data 2026-08-03 or 2026-02-01 (LANUK-only rows)."}]},"update_frequency":{"value":"Monthly statistics update from MaStR (NRW); the GeoPackage file itself is refreshed irregularly.","quote":"Die Statistiken der Erneuerbaren-Energien-Anlagen werden monatlich mit Hilfe der Daten des Marktstammdatenregisters (MaStR) der Bundesnetzagentur (BNetzA) aktualisiert.","url":"https://wirtschaft.nrw/system/files/media/document/file/26-05-29_monitoringbericht_ffpv_2025.pdf","attempts":[]},"exclusions":{"value":"No operator field in the PV layers; units ≤30 kW absent.","quote":null,"url":null,"attempts":[{"url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/Standorte-Strom-EE-NRW_EPSG25832_GeoPackage.zip","note":"Column list of both PV layers checked: 'Anlagenbetreiber' exists only in the wind layer."}]}},"key_fields":[{"field":"Einheitennummer","meaning":"MaStR unit number (SEE…)."},{"field":"Inbetriebnahmedatum / Stilllegungsdatum / Status","meaning":"Commissioning date, decommissioning date, 'In Betrieb' / 'Genehmigt' / 'Stillgelegt'."},{"field":"Bruttoleistung el. [kW]","meaning":"Gross capacity in kW."},{"field":"UTM32 E / UTM32 N, geom","meaning":"Point in EPSG:25832."},{"field":"Quelle / Stand","meaning":"'MaStR', 'MaStR, LANUK' or 'LANUK' and data date."}],"how_to_use":{"example_request":"curl -sL -o openee.zip 'https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/Standorte-Strom-EE-NRW_EPSG25832_GeoPackage.zip'  # open NW-Standorte-Strom-EE-NRW_EPSG25832_Geom.gpkg with sqlite3, layer 'Photovoltaik Freifläche'","example_result":"Layer 'Photovoltaik Freifläche' 767 points (In Betrieb: 710 'MaStR, LANUK', 31 'MaStR', 12 'LANUK'). Row: SEE903308338953 | Hürth | 2025-11-26 | 23673.6 kW | 'Randstreifen längs von Autobahnen oder Schienenwegen' | In Betrieb | 345825.215, 5639207.645","steps":["Unzip and open the GeoPackage (SQLite); PV layers are 'Photovoltaik Freifläche' and 'Photovoltaik Bauliche'.","Filter Status = 'In Betrieb'.","Reproject from EPSG:25832 if WGS84 is needed.","Join Einheitennummer to MaStR for net capacity and operator."],"reading_traps":["Status 'Genehmigt' rows (approved, not built) sit in the same layer.","Only gross capacity; no net/AC value and no operator.","Coverage is one Land per file; other Länder publish different products (Bayern: viewer-based 'Daten-Recherche'; Berlin: MaStR-based maps)."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"application/zip","size_bytes":5970420,"records_total":46174,"records_for_country":null,"problems":["www.energieatlas.bayern.de answers 'Request Rejected' to curl; the page opened with another client."]},"evidence":[{"claim":"LANUK validates MaStR data for its monitoring.","url":"https://wirtschaft.nrw/system/files/media/document/file/26-05-29_monitoringbericht_ffpv_2025.pdf","quote":"werden validierte LANUK-Daten basierend auf Daten des MaStR der BNetzA herangezogen."},{"claim":"Parks can be split into several MaStR units.","url":"https://wirtschaft.nrw/system/files/media/document/file/26-05-29_monitoringbericht_ffpv_2025.pdf","quote":"Es ist zu beachten, dass in einigen Fällen die Anlagen zwar als zusammenhängende Anlagen gebaut werden, diese im Marktstammdatenregister allerdings als zwei oder mehrere Teilanlagen gemeldet werden."},{"claim":"Bayern offers a filterable data search with download.","url":"https://www.bayernportal.de/dokumente/leistung/267088708483","quote":"Daten-Recherche und Download: individuell konfigurierbare Suche mit Filtermöglichkeit und Downloadoption (CSV-, KML-, XLSX-Format)"},{"claim":"Berlin's PV locations come from MaStR.","url":"https://www.berlin.de/umweltatlas/energie/solaranlagen/fortlaufend-aktualisiert/datengrundlage/","quote":"Standorte PV: Angaben der Bundesnetzagentur entsprechend des Marktstammdatenregisters (MaStR), Stand 31.12.2025"}],"members":[{"name":"Nordrhein-Westfalen – Energieatlas NRW (LANUK)","landing_url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/","data_url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/Standorte-Strom-EE-NRW_EPSG25832_GeoPackage.zip","access":"direct_download","tested":true,"data_found":true,"note":"GeoPackage 2026-09-02: 'Photovoltaik Freifläche' 767 points, 'Photovoltaik Bauliche' 45,407; >30 kW; no operator. A 421 MB FileGDB 'Karte-Strom-Bestand-NRW' (2025-12-19) was checked by headers only."},{"name":"Bayern – Energie-Atlas Bayern","landing_url":"https://www.energieatlas.bayern.de/","data_url":"https://www.karten.energieatlas.bayern.de/?comp=recherche","access":"web_viewer_only","tested":false,"data_found":null,"note":"Daten-Recherche with CSV/KML/XLSX export inside a JavaScript viewer; site rejects curl; export not tested."},{"name":"Berlin – Umweltatlas / Energieatlas Berlin","landing_url":"https://www.berlin.de/umweltatlas/energie/solaranlagen/fortlaufend-aktualisiert/datengrundlage/","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"PV locations from MaStR (Stand 31.12.2025); maps aggregated per district/postcode."}],"members_summary":{"total":16,"listed":3,"tested":1,"data_found":1,"scope_note":"16 Länder; 3 checked (NRW downloaded; Bayern and Berlin pages opened). All three build on MaStR. The rest were not checked because the national register already covers every Land.","pattern":"Search '<Land> Energieatlas' or the Land open-geodata portal for 'Erneuerbare-Energien-Anlagen' / 'Anlagenstandorte'; expect MaStR-derived points above 30 kW."},"member_scope":{"total":16,"note":"16 Länder; 3 checked (NRW downloaded; Bayern and Berlin pages opened). All three build on MaStR. The rest were not checked because the national register already covers every Land.","pattern":"Search '<Land> Energieatlas' or the Land open-geodata portal for 'Erneuerbare-Energien-Anlagen' / 'Anlagenstandorte'; expect MaStR-derived points above 30 kW."}},{"source_id":"gem-gspt","name":"Global Solar Power Tracker (GSPT), February 2026 release","publisher":"Global Energy Monitor","official":false,"landing_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","data_url":"https://publicgemdata.nyc3.cdn.digitaloceanspaces.com/interim_maps/gspt_map_2026-02.geojson","access":"direct_download","format":"GeoJSON (map data file); summary tables as Google Sheets","license":"CC BY 4.0 (records with a TZ ID: CC BY-NC 4.0)","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Project/phase view of utility-scale parks (≥1 MW) with owner (including ownership shares), operator, start year, capacity in MWac and a location-accuracy flag – a park-level grouping that MaStR units do not provide.","first_seen_pass":1,"rank":5,"summary":"Non-official park/phase list ≥1 MW with owner, operator, start year and MWac; Germany: 7,825 operating phases.","coverage_note":"Worldwide, utility-scale only; February 2026 release.","data_date":"2026-02","caveats":["Start year only; MWac vs MaStR DC kWp."],"coverage":{"geographic":"Worldwide; Germany 7,825 operating utility-scale phases (≥1 MW) in the summary table."},"fine_print":{"unit":{"value":"MW (alternating current) per phase ('units-of-m': 'MW').","quote":"2,093 gigawatts alternating current of operating capacity","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]},"inclusion_rule":{"value":"Utility-scale solar farm phases of 1 MW and more; distributed solar only as national aggregates.","quote":"The Global Solar Power Tracker’s utility-scale data (1 megawatt (MW)+) catalog over 100,000 operating and prospective projects worldwide.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]},"reference_date":{"value":"February 2026 release (GeoJSON last modified 2026-03-24).","quote":"The most recent release of this data was in February 2026.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","note":"Project page gives the latest release date only, no schedule."},{"url":"https://globalenergymonitor.github.io/interim-maps/trackers/gspt/","note":"Map config points to a dated file (gspt_map_2026-02.geojson); no update cadence stated."}]},"exclusions":{"value":"Phases below 1 MW are not listed individually.","quote":"Summary data includes utility-scale solar farm phases 1 MW and greater.","url":"https://docs.google.com/spreadsheets/d/1cxeu_WZ4GaKWET0RMvm6ERdd9RrJTEWt7IJzb0_66n8/export?format=csv&gid=1763744319","attempts":[]}},"key_fields":[{"field":"name / unit-name","meaning":"Project and phase name."},{"field":"capacity","meaning":"Capacity in MW (AC)."},{"field":"status","meaning":"operating, construction, pre-construction, announced, shelved, mothballed, retired, cancelled."},{"field":"start-year","meaning":"Year of start of operation (text, may be empty)."},{"field":"owner / operator","meaning":"Owner(s) with % shares; operator."},{"field":"Latitude / Longitude / location-accuracy","meaning":"Point and 'exact'/'approximate' flag."},{"field":"country-area1 / subnational","meaning":"Country and state."}],"how_to_use":{"example_request":"curl -s -r 0-6000 'https://publicgemdata.nyc3.cdn.digitaloceanspaces.com/interim_maps/gspt_map_2026-02.geojson'","example_result":"{\"type\":\"Feature\",\"properties\":{\"country-area1\":\"Australia\",\"name\":\"Western Green Energy Hub solar farm\",\"unit-name\":\"Future phases\",\"capacity\":32000.0,\"status\":\"announced\",\"start-year\":\"\",\"owner\":\"CWP Global [44%]; …\",\"Latitude\":-30.7568,\"Longitude\":121.4658,\"location-accuracy\":\"approximate\",…}}","steps":["Download the GeoJSON (154 MB) or request the Excel file through GEM's 'Download data' section.","Filter country-area1 = 'Germany' and status = 'operating'.","Use location-accuracy to separate exact from approximate points.","Compare with MaStR via name/municipality; no MaStR IDs are carried in the map file fields seen."],"reading_traps":["Status mixes operating and prospective phases in one file.","Capacity is MWac; MaStR Bruttoleistung is module kWp (DC), so GEM values are usually lower than MaStR gross.","start-year is a year, not a date, and may be empty."]},"test":{"tested_on":"2026-11-27","method":"headers_only","http_status":200,"content_type":"binary/octet-stream","size_bytes":154053548,"records_total":null,"records_for_country":7825,"problems":[]},"evidence":[{"claim":"Facility-level utility-scale data.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","quote":"The Global Solar Power Tracker consists of worldwide facility-level data on utility-scale solar power facilities, as well as country-aggregated distributed solar data."},{"claim":"License.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","quote":"When the data set is being shared or adapted and our Creative Commons CC BY 4.0 International license applies, please read the license for attribution requirements."}],"members":[],"members_summary":null},{"source_id":"osm-solar-plants","name":"OpenStreetMap – power=plant + plant:source=solar","publisher":"OpenStreetMap contributors","official":false,"landing_url":"https://taginfo.geofabrik.de/europe:germany","data_url":"https://overpass-api.de/api/interpreter","access":"api","format":"OSM JSON/XML via Overpass API","license":"ODbL 1.0","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Mapped footprints (polygons) of solar parks, often with a ref:mastr link back to the MaStR unit.","first_seen_pass":1,"rank":6,"summary":"Volunteer-mapped park polygons (7,021 objects) with sparse operator/start_date/capacity tags; 478 carry a ref:mastr link.","coverage_note":"Germany-wide, ground-mounted parks; rooftop units are separate generator objects.","data_date":"2026-11-24","caveats":["Tags sparse and free-text."],"coverage":{"geographic":"Germany: 7,021 objects tagged plant:source=solar (6,455 ways, 561 relations, 5 nodes) on 2026-11-24."},"fine_print":{"unit":{"value":"Free text in plant:output:electricity (e.g. '153 MWp', '145 MW'); 4,082 of 5,805 values are just 'yes'.","quote":null,"url":null,"attempts":[{"url":"https://taginfo.geofabrik.de/europe:germany/api/4/tag/stats?key=plant:source&value=solar","note":"Tag statistics for Germany; no unit convention enforced."}]},"inclusion_rule":{"value":"Whatever volunteers mapped; no threshold.","quote":null,"url":null,"attempts":[{"url":"https://taginfo.geofabrik.de/europe:germany/api/4/tag/stats?key=plant:source&value=solar","note":"Counts only; OSM has no inclusion rule."}]},"reference_date":{"value":"Taginfo data until 2026-11-24T21:21:21Z; Overpass is live.","quote":null,"url":null,"attempts":[{"url":"https://taginfo.geofabrik.de/europe:germany/api/4/tag/stats?key=plant:source&value=solar","note":"'data_until' field of the taginfo response."}]},"update_frequency":{"value":"Continuous (live database).","quote":null,"url":null,"attempts":[]},"exclusions":{"value":"Rooftop systems are mapped as generator:source=solar (297,049 objects), not as plants.","quote":null,"url":null,"attempts":[{"url":"https://taginfo.geofabrik.de/europe:germany/api/4/tag/stats?key=generator:source&value=solar","note":"297,049 generator:source=solar objects in Germany."}]}},"key_fields":[{"field":"name","meaning":"Park name (on 23% of plant:source=solar objects)."},{"field":"operator","meaning":"Operator (18.9%)."},{"field":"start_date","meaning":"Commissioning date in mixed formats (15.5%)."},{"field":"plant:output:electricity","meaning":"Capacity text, often 'yes'."},{"field":"ref:mastr","meaning":"MaStR unit number (6.8%)."}],"how_to_use":{"example_request":"https://overpass-api.de/api/interpreter?data=[out:json][timeout:60];nwr[\"plant:source\"=\"solar\"](52.60,14.12,52.72,14.30);out tags center;","example_result":"9 elements; way 882369693: name 'Solarpark Gottesgabe', operator 'EnBW Solarpark Gottesgabe GmbH', plant:output:electricity '153 MWp', ref:mastr 'SEE936162158023', start_date '2022/03', center 52.6432809, 14.1929628","steps":["Query power=plant + plant:source=solar for an area or bounding box; use 'out geom' for polygons.","Parse plant:output:electricity text into MW and start_date into dates (formats vary).","Join ref:mastr to MaStR for authoritative capacity, date and operator."],"reading_traps":["Attributes are sparse: operator on 1,324 and start_date on 1,090 of 7,021 objects; in the sample bbox 4 of 9 parks had no name, operator or capacity.","start_date formats differ ('2022/03', '30-09-2012', '2024-07').","Capacity mixes MWp (DC) and MW in free text.","One OSM polygon can hold several MaStR units (e.g. 'PVA Bliesdorf An der Bahn' lists three SEE numbers)."]},"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"content_type":null,"size_bytes":null,"records_total":7021,"records_for_country":7021,"problems":["overpass-api.de and overpass.private.coffee answered 406 Not Acceptable to curl with its default client identification; the same query through another HTTP client returned data."]},"evidence":[{"claim":"Germany counts for plant:source=solar.","url":"https://taginfo.geofabrik.de/europe:germany/api/4/tag/stats?key=plant:source&value=solar","quote":"{\"type\":\"all\",\"count\":7021,\"count_fraction\":0.0}"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Bundesnetzagentur (BNetzA), registry authority of the Marktstammdatenregister","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/start.html"},"operators":{"structure":"many","note":"Millions of plant operators: 5,812,122 market actors with Marktfunktion 'Anlagenbetreiber' in MaStR on 2026-11-27 (all energy carriers). Grid operators (DSOs, 4 TSOs) verify registrations and settle EEG payments.","census_url":"https://www.marktstammdatenregister.de/MaStR/Akteur/Marktakteur/IndexOeffentlich"},"publication_obligation":{"exists":"yes","norm":"Marktstammdatenregisterverordnung (MaStRV) § 5 (registration duty) and § 15 (public accessibility)","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","what_must_be_published":"Operators register every unit with location, capacity, commissioning date and operator; the Bundesnetzagentur publishes the register except location details of units ≤30 kW and data of natural-person operators.","frequency":"Registration within one month of commissioning; real-time web overview, previous-day extended overview and daily XML export."},"consolidated_republication":{"found":"yes","note":"The Bundesnetzagentur republishes all operator registrations in MaStR (web overviews, JSON behind the viewer, daily XML export). The four TSOs additionally republish DSO-reported EEG master data once a year on netztransparenz.de.","checked_pages":[{"organization":"Bundesnetzagentur","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","saw":"Daily 'Gesamtdatenauszug vom Vortag' (ZIP 3,238,229 KB, XML, DL-DE-BY-2.0) and dated snapshots."},{"organization":"Bundesnetzagentur","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","saw":"Extended unit overview with solar columns, WGS84 coordinates, operator (organisations only), CSV export."},{"organization":"Bundesnetzagentur","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/start.html","saw":"Register contains energy carrier, capacity, location and operator of all generating units; open licence DL-DE-BY-2.0."},{"organization":"Übertragungsnetzbetreiber (netztransparenz.de)","url":"https://www.netztransparenz.de/en/Renewable-energies-and-levies/EEG/EEG-billing/EEG-annual-statements/EEG-system-master-data","saw":"EEG system master data 2025, one ZIP per TSO, status 31.12.2025."}]}},"national_registry":{"exists":"yes","note":"The Marktstammdatenregister is the official national register; every PV unit must be registered regardless of size or age, and its public part is open (DL-DE-BY-2.0).","checked_pages":[{"organization":"Bundesnetzagentur","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Monitoringberichte/Marktstammdatenregister/start.html","saw":"\"Das Register enthält – insbesondere zu allen Stromerzeugungsanlagen – Angaben zum Energieträger, zur Anlagenleistung, zum Standort und zum Anlagenbetreiber.\""},{"organization":"Bundesnetzagentur (MaStR)","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","saw":"6,534,010 solar units 'In Betrieb' via the JSON endpoint on 2026-11-27."},{"organization":"Bundesnetzagentur (MaStR)","url":"https://www.marktstammdatenregister.de/MaStRHilfe/subpages/faq.html","saw":"\"Alle Anlagen, die noch genutzt werden, müssen unabhängig von ihrem Inbetriebnahmedatum im MaStR registriert werden.\""},{"organization":"Bundesamt für Justiz (gesetze-im-internet.de)","url":"https://www.gesetze-im-internet.de/mastrv/__15.html","saw":"§ 15 MaStRV publication rules and exclusions."}]},"if_unstructured":{"summary":"No document route is needed for the published attributes: MaStR is structured. The two gaps – exact location of units ≤30 kW and names of natural-person operators – are withheld under § 15 MaStRV; no official document source publishing them was found, and the TSO EEG files apply the same 30 kW address cut.","recipe":[],"location_method":"Units ≤30 kW carry only Postleitzahl, Ort, Gemeinde and Gemeindeschluessel: usable for municipal or postcode maps, not for distances.","cross_with":["TSO EEG-Anlagenstammdaten via EEG_Mastr_Nr = MaStR EegMaStRNummer (capacity/date cross-check).","OSM ref:mastr for park footprints.","GEM GSPT for project/phase grouping and owners of parks ≥1 MW."],"where_published":[]},"related_not_answering":[{"name":"Bundesnetzagentur EE-Statistik (EEStatistikMaStR, EEG in Zahlen)","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/ErneuerbareEnergien/EE-Statistik/start.html","why":"Monthly and yearly aggregates by energy carrier and Land, not a list of plants."},{"name":"Bundesnetzagentur – Beendete Ausschreibungen Solaranlagen (award lists)","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Solaranlagen1/BeendeteAusschreibungen/start.html","why":"Tender awards are projects before construction; an award is neither commissioning nor operation."},{"name":"NRW Solarkataster / LEP Freiflächen-PV layers (Förderkulisse, Vorrang-, Ausschlussflächen)","url":"https://www.energieatlas.nrw.de/energiekarten-nrw?admin=nrw&map=solarkataster","why":"Potential and eligible areas, not existing plants."},{"name":"NRW Monitoringbericht Freiflächen-PV 2025","url":"https://wirtschaft.nrw/system/files/media/document/file/26-05-29_monitoringbericht_ffpv_2025.pdf","why":"Statewide statistics built from MaStR; no plant list."},{"name":"TransitionZero Solar Asset Mapper (Zenodo, Q1 2024)","url":"https://zenodo.org/records/11368204","why":"Satellite footprints with modelled capacity and construction-date windows, no operator; 4,932 German assets in the Q1 2024 CSV, whose date columns are garbled."},{"name":"open-MaStR dataset on Zenodo","url":"https://zenodo.org/records/14783581","why":"Third-party copy of the MaStR export dated 2025-02-09, older than the daily official file."},{"name":"Open Power System Data – renewable_power_plants","url":"https://data.open-power-system-data.org/renewable_power_plants/latest/","why":"Latest package 2020-08-25; superseded by MaStR."},{"name":"Bundesnetzagentur Kraftwerksliste","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Versorgungssicherheit/Erzeugungskapazitaeten/Kraftwerksliste/start.html","why":"Lists units ≥10 MW per site individually, but 'Wind- und PV-Anlagen aggregiert nach Bundesland und Betriebsstatus'."},{"name":"SMARD – Download power plant data","url":"https://www.smard.de/en/downloadcenter/download-power-plant-data","why":"Generation time series only for units of at least 100 MW, core data taken from the Kraftwerksliste; no PV plant list."},{"name":"ENTSO-E Transparency Platform – Installed Capacity per Production Unit","url":"https://transparency.entsoe.eu/generation/r2/installedCapacityPerProductionUnit/show","why":"Reporting threshold is 100 MW per generator (netztransparenz.de disclosure page), so at most the few largest PV parks; JavaScript application, not tested."},{"name":"JRC Open Power Plants Database (JRC-PPDB-OPEN) v1.0","url":"https://data.jrc.ec.europa.eu/dataset/9810feeb-f062-49cd-8e76-8d8cfd488a05","why":"No German solar units (solar only for Spain 239 and Italy 39 in JRC_OPEN_UNITS.csv)."}],"open_questions":["The MaStR FAQ withholds exact location for plants 'kleiner oder gleich 30 kW(p)', but in the published data the cut follows Nettonennleistung (units with Bruttoleistung >30 kWp and Nettonennleistung ≤30 kW have no coordinates); only the Bundesnetzagentur can say which value governs.","The TransnetBW EEG file gives installierte_Leistung 74800 and Ort 'Mengen' for EEG966734369304, while MaStR shows Bruttoleistung 80308.8 kW, Nettonennleistung 74800 kW and Gemeinde 'Langenenslingen'; the TSO would have to explain the basis used."],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-27-de-red-generacion-mineria","note":"First pass: MaStR tested as the structured national register; 30 kW coordinate cut, operator masking and unit-vs-plant counting quantified; TSO EEG files, NRW layer, GEM and OSM added.","headline":{"official_data":"structured","non_official_data":"partial","national_registry":"yes"},"sources":{"total":6,"new":6,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":52,"minutes":38}}],"local_terms":[{"term":"Marktstammdatenregister (MaStR)","language":"de","meaning":"National register of all electricity and gas generating units run by the Bundesnetzagentur; the official list of PV units."},{"term":"Erweiterte Einheitenübersicht","language":"de","meaning":"MaStR public filter view (previous-day data) with CSV export and the JSON endpoint used in this record."},{"term":"Gesamtdatenauszug / Gesamtdatenexport","language":"de","meaning":"Daily full XML dump of public MaStR data."},{"term":"Solare Strahlungsenergie","language":"de","meaning":"MaStR energy-carrier value for solar PV (code 2495)."},{"term":"Freiflächensolaranlage","language":"de","meaning":"Ground-mounted PV (MaStR 'Art der Solaranlage' 852); Gebäudesolaranlage = on buildings (853)."},{"term":"Steckerfertige Solaranlage (Balkonkraftwerk)","language":"de","meaning":"Plug-in balcony PV (code 2961), ≤2,000 W modules / 800 VA inverter."},{"term":"Inbetriebnahmedatum","language":"de","meaning":"Commissioning date (first commissioning)."},{"term":"Bruttoleistung / Nettonennleistung","language":"de","meaning":"Gross capacity (module kWp) / net nominal capacity (inverter side), both in kW."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":38,"pages_opened":52,"passes":[{"pass":1,"date":"2026-11-27","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/solar-pv-plants.json","detail_url":"https://georutter.org/v1/de/solar-pv-plants/detail.json","html_url":"https://georutter.org/de/solar-pv-plants/","country_url":"https://georutter.org/v1/countries/de.json"}