{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"wind-farms-in-permitting","question":"Where can I get a list of wind projects currently in permitting in Germany, with location, capacity (MW), developer, permitting stage and date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"partial","non_official_data":"partial","summary":"No single official dataset covers all wind permitting stages in Germany. The Bundesnetzagentur Marktstammdatenregister (MaStR) lists 8,808 pre-operational wind turbine units in status 'In Planung' (8,720 onshore, 88 offshore; 55.2 GW in total). Of these, 8,571 units have a permit identifier, with 4,843 distinct identifiers. Under § 5(4) MaStRV, registration is mandatory once a required federal permit is granted. Pending applications ('im Genehmigungsverfahren') are published as structured turbine data by 6 of 16 Länder (NRW, BB, SH, HE, northern RLP, SL; 3,249 pending turbines), mostly without developer names. EIA portals publish notices for larger cases.","main_caveats":["Under § 5(4)-(5) MaStRV, wind units enter MaStR as 'In Planung' only within 1 month after BImSchG/WindSeeG permit notification; unapproved applications ('im Genehmigungsverfahren') are absent unless registered voluntarily.","MaStR counts turbines. Of 8,808 units in 'In Planung', 8,571 have a GenehmigungsMastrNummer (4,843 distinct identifiers). The other 237 lack that field. WindparkName is free text (2,833 distinct state/name pairs).","Capacity units vary across official sources: MaStR, NRW, SH, TH, RLP and BNetzA report kW (e.g. 5700 = 5.7 MW), whereas Brandenburg, Hessen, Saarland, Baden-Württemberg and EMODnet report MW.","No official onshore register separates 'authorised' from 'under construction' ('im Bau'); refusals, withdrawals and § 16b BImSchG repowering are structured only in NRW GenMon, Hessen (gvs.csv/klagen.csv) and RLP SGD Nord.","UVP-Verbund and UVP-Portal cover only EIA-mandatory (>=20 WEA or offshore) and EIA-screened (>=3 WEA) cases as HTML/PDF notices, missing 1-2 turbine simplified § 19 BImSchG applications without UVP screening."],"confidence":"high","confidence_reason":"Verified against MaStRV statutory text, live queries fetching all 8,808 MaStR 'In Planung' wind units, bulk XML schemas, all 16 Länder portals/WFS, UVP portals, BSH/EMODnet offshore WFS, BNetzA awards and Overpass.","attributes":[{"attribute":"location","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-uvp-portals-wind","de-bnetza-wind-tenders","eu-emodnet-offshore-windfarms","de-bsh-offshore-fep","osm-overpass-wind-permitting"],"note":"Exact turbine coordinates in MaStR for all 8,699 permitted units >30 kW and in 8 Länder datasets; offshore polygons in EMODnet/BSH; parcel text in BNetzA awards and UVP PDFs.","gap":"not_checked","gap_note":"Pending BImSchG applications before permit grant have no statewide structured coordinate feed in 10 of 16 tested Länder (including Niedersachsen after Energieatlas shut down on 2026-10-31, and Sachsen iDA which returned HTTP 401), MaStR withholds coordinates for 109 planned units <=30 kW (§ 15(1) Nr. 1a MaStRV), and ~294 Landkreis-level portals were only sampled."},{"attribute":"capacity_mw","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-bnetza-wind-tenders","eu-emodnet-offshore-windfarms","osm-overpass-wind-permitting","global-energy-monitor-gwpt"],"note":"MaStR reports gross/net kW per permitted turbine (55,210 MW total); 8 Länder give turbine kW or MW; BNetzA XLSX gives awarded bid kW; EMODnet gives offshore project MW.","gap":"not_checked","gap_note":"Proposed MW for pending onshore BImSchG applications is unpublished at state level in 10 of 16 tested Länder (Sachsen iDA returned HTTP 401), requiring manual extraction from UVP-Verbund notices (which omit 1–2 turbine simplified § 19 BImSchG cases without UVP screening), and ~294 Landkreis-level portals were only sampled."},{"attribute":"developer","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-bnetza-wind-tenders","osm-overpass-wind-permitting","global-energy-monitor-gwpt"],"note":"MaStR names legal-entity operators for 8,672 permitted units and BNetzA names tender bidders; among Länder datasets, only Brandenburg (BETREIBER) and NRW BürgEnG name developers.","gap":"not_checked","gap_note":"7 of 8 open Länder permitting datasets (NRW GenMon, SH, HE, RLP, SL, TH, BW) and EMODnet omit applicant/developer names, MaStR masks 136 planned units registered by natural persons (§ 15(1) Nr. 2 MaStRV), Sachsen iDA returned HTTP 401, and ~294 Landkreis portals were only sampled."},{"attribute":"permitting_stage","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-uvp-portals-wind","de-bnetza-wind-tenders","eu-emodnet-offshore-windfarms","osm-overpass-wind-permitting","global-energy-monitor-gwpt"],"note":"6 Länder separate pending vs approved turbines (NRW, HE, RLP also log refusals/withdrawals); MaStR flags permitted 'In Planung'; EMODnet, OSM and GEM separate 'construction'.","gap":"not_checked","gap_note":"MaStR merges authorised and under-construction turbines into 'In Planung', omits pending applications, and drops refused/withdrawn projects; 10 tested Länder publish no open statewide pending-application dataset (Sachsen iDA returned HTTP 401), none of the 8 Länder datasets separates 'im Bau', and ~294 Landkreis portals were only sampled."},{"attribute":"stage_date","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-uvp-portals-wind","de-bnetza-wind-tenders"],"note":"MaStR bulk XML and detail pages give permit and application dates; NRW GenMon and HE gvs.csv give filing, permit, refusal and withdrawal dates; BB, SH and BW give permit dates.","gap":"not_checked","gap_note":"MaStR's JSON overview omits the permit grant date (available in EinheitenGenehmigung.xml); BB and SH leave pending 'im Gen.Verf.' rows undated; TH, SL and RLP SGD Nord WFS omit individual permit/application dates; Sachsen iDA returned HTTP 401 and ~294 Landkreis portals were only sampled."}]},"sources":[{"source_id":"de-mastr-wind-units","name":"Marktstammdatenregister (MaStR) — Öffentliche Einheitenübersicht & Gesamtdatenexport (EinheitenWind / EinheitenGenehmigung)","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","data_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung","access":"api","format":"JSON API, CSV web export, and daily bulk XML ZIP (Gesamtdatenexport ~3.31 GB)","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0 (dl-de/by-2-0)","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Official federal register of all permitted pre-operational wind turbine units ('In Planung') in Germany via JSON API, CSV export and daily 3.31 GB XML dump.","coverage_note":"8,808 'In Planung' wind turbine units (8,720 onshore, 88 offshore; 55,210 MW in total). Of those, 8,571 have a permit identifier (4,843 distinct identifiers).","data_date":"2026-11-25","caveats":["Counts individual turbines (WEA) in kW, not wind farms in MW; group via GenehmigungsMastrNummer or WindparkName.","JSON API omits permit grant date (available in EinheitenGenehmigung.xml or unit detail pages); 'In Planung' does not separate 'im Bau'."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":[]},"example":{"example_request":"curl -sG 'https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung' --data-urlencode 'page=1' --data-urlencode 'pageSize=2' --data-urlencode \"filter=Energieträger~eq~'2497'~and~Betriebs-Status~eq~'31'\"","example_result":"{\"Total\":8808,\"Data\":[{\"Id\":1800275,\"MaStRNummer\":\"SEE950179793688\",\"EinheitName\":\"WEA 3\",\"WindparkName\":\"Windpark Länge\",\"BetriebsStatusName\":\"In Planung\",\"Bruttoleistung\":5700.0,\"AnlagenbetreiberName\":\"solarcomplex GmbH ＆ Co. KG Windpark Länge\",\"Breitengrad\":47.880898,\"Laengengrad\":8.597642,\"GenehmigungsMastrNummer\":\"SGE969844675464\"}]}"},"members_summary":null},{"source_id":"de-laender-bimschg-wind","name":"Länder BImSchG Wind Permitting Datasets and WFS Services (LIS-A / Genehmigungsmonitoring / Energie-WFS)","publisher":"Landesumweltämter, Bezirksregierungen und Geoportale der Bundesländer","official":true,"landing_url":null,"data_url":null,"access":"direct_download","format":"XLSX, CSV, Shapefile ZIP, and OGC WFS 1.1.0/2.0.0 (varies by Land)","license":"dl-de/by-2-0 (NRW, SH, TH, RLP, HH, BE) and CC BY 4.0 (BB, HE, SL, BW)","language":"de","has_coordinates":true,"location_precision":"exact","summary":"State-level BImSchG immissions-control exports and WFS services (XLSX, CSV, Shapefile, GML) across 8 of 16 Bundesländer, capturing pending wind applications before MaStR.","coverage_note":"6 Länder publish pending applications (3,249 turbines: NRW 1,108, BB 899, SH 513, RLP-North 371, HE 328, SL 36) plus permitted units; TH (314) and BW (239) publish permitted/Vorbescheid turbines only.","data_date":"2026-11-24","caveats":["Only Brandenburg (BETREIBER) and NRW's BürgEnG file name developers; other 7 Länder omit applicant names.","8 Länder (including Niedersachsen and Bayern) have no open structured pending-turbine dataset; check kW vs MW per Land."],"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"problems":["Sachsen iDA portal (umwelt.sachsen.de/umwelt/infosysteme/ida/) returned HTTP 401 Unauthorized to unauthenticated requests; RLP OGC API Features endpoint returned HTTP 401 (use classic MapServer WFS URL instead); Hamburg WFS de.hh.up:wka returned 0 features."]},"example":{"example_request":"curl -sL 'https://opendata.schleswig-holstein.de/dataset/9b0eade8-81a3-478b-829e-7c7d47667c2f/resource/28911585-47ae-4f77-8672-c13f3a346adc/download/windkraftanlagen-2026-10-12.csv' | grep 'G30/2026/021' | head -n 1","example_result":"Stormarn,Rehhorst,\"Vorbescheid: G30/2026/021 (genehmigt); Typ Nordex N163-6.8, 6,8 MW, NH 164 m, RD 163 m zzgl. 1,80 Fundamenterhöhung\",Nordex,164,163,,6800,kW,Nennleist. Rotor.,32595620,595620,5968996,015101-Rehhorst,8,15,21.01.2026,,,im Gen.Verf.,62059399289,0007,G30/2026/021,12.10.2026,\"LfU, Abt. 2, FIS LIS-A\""},"members_summary":{"total":16,"listed":16,"tested":16,"data_found":8,"scope_note":"All 16 German Bundesländer were checked via GDI-DE CSW, GovData and state portals/WFS: 8 publish structured pre-operational wind turbine data (6 including pending 'im Verfahren' applications; 2 only granted/Vorbescheid) and 8 do not expose open structured permitting lists.","pattern":"Search GDI-DE (gdk.gdi-de.org) or each Land's Geoportal/OpenData portal for 'Windenergieanlagen' or 'Windkraftanlagen' + 'LIS-A' / '4. BImSchV' / 'Genehmigungsverfahren'."}},{"source_id":"de-uvp-portals-wind","name":"UVP-Verbund der Länder & UVP-Portal des Bundes (Statutory EIA and BImSchG Permitting Portals)","publisher":"Länder-UVP-Verbund (Landesbetrieb Geoinformation und Vermessung Hamburg) & Umweltbundesamt (UBA)","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"HTML procedure pages with attached PDFs (and embedded Leaflet JSON on uvp-portal.de/de/vorhaben/karte)","license":"Official statutory public notices under § 20 UVPG / § 10 BImSchG (no open bulk license stated)","language":"de","has_coordinates":true,"location_precision":"exact","summary":"Statutory Länder (uvp-verbund.de) and federal/offshore (uvp-portal.de) EIA portals publishing public-display notices, screenings and permit PDFs.","coverage_note":"1,270 energy Zulassungsverfahren (4,441 total wind hits) on uvp-verbund.de plus 2,080 federal/Espoo 'Windpark' entries on uvp-portal.de; procedure records, not turbine rows.","data_date":"2026-11-25","caveats":["HTML/PDF notices only (no bulk CSV/WFS); omits 1-2 turbine simplified § 19 BImSchG applications without UVP screening.","Portal 'Zuletzt geändert' date reflects upload time, not the underlying permit or filing date inside the PDF."],"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"problems":["No structured CSV, JSON API or WFS download; legacy map endpoint /getSearchMarkers returned HTTP 404."]},"example":null,"members_summary":{"total":2,"listed":2,"tested":2,"data_found":2,"scope_note":"Covers both statutory German EIA portals: the joint Länder portal (uvp-verbund.de) and the federal portal (uvp-portal.de).","pattern":"Use uvp-verbund.de for onshore state BImSchG procedures and uvp-portal.de for federal/EEZ BSH offshore procedures."}},{"source_id":"de-bnetza-wind-tenders","name":"Bundesnetzagentur — Zuschläge der Ausschreibungen für Windenergie an Land (EEG) und auf See (WindSeeG)","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/BeendeteAusschreibungen/start.html","data_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Onshore/Zuschlagslisten/ListeZuschlaegeAugust2026.xlsx?__blob=publicationFile&v=3","access":"direct_download","format":"XLSX per onshore bidding round (4 rounds/year) and PDF/HTML BK6 award notices for offshore WindSeeG rounds","license":"Public statutory disclosure under § 35 Abs. 1 EEG / WindSeeG (no open-data license stated)","language":"de","has_coordinates":false,"location_precision":"municipality","summary":"Official BNetzA EEG onshore wind (quarterly XLSX) and WindSeeG offshore wind (BK6 PDF) auction award lists naming winning bidders, capacities and sites.","coverage_note":"235 awarded onshore wind bids in the 2026-08-01 round XLSX (plus quarterly archives since 2017 and BK6 offshore site awards); bid awards, not full permit inventory.","data_date":"2026-09-24","caveats":["Onshore awards require an existing BImSchG permit, while offshore WindSeeG awards precede BSH Planfeststellung.","No coordinates in onshore XLSX (join Zuschlags-Nr or EEG9... IDs to MaStR); Gebotsmenge is in kW."],"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"eu-emodnet-offshore-windfarms","name":"EMODnet Human Activities — Offshore Wind Farms (WFS emodnet:windfarmspoly)","publisher":"European Marine Observation and Data Network (EMODnet, European Commission / CINEA)","official":true,"landing_url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetCapabilities","data_url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=emodnet:windfarmspoly&CQL_FILTER=country='Germany'&outputFormat=application/json","access":"api","format":"OGC WFS 2.0.0 (GeoJSON, GML, Shapefile)","license":"CC BY 4.0 / EMODnet open reuse with attribution","language":"en","has_coordinates":true,"location_precision":"exact","summary":"EU EMODnet WFS polygon layer of German offshore wind farms and FEP zones separating Planned, Approved and Construction stages.","coverage_note":"62 pre-operational German offshore polygons (55 Planned, 5 Approved, 2 Construction; out of 93 total); wind farm/zone polygons, offshore only.","data_date":"2026","caveats":["Offshore only; omits developer names and exact permit dates, and mixes named projects with unauctioned FEP zones (e.g. N-12.4).","Use emodnet:windfarmspoly (polygons), not emodnet:windfarms (incomplete point layer)."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":[]},"example":{"example_request":"curl -sG 'https://ows.emodnet-humanactivities.eu/wfs' --data-urlencode 'service=WFS' --data-urlencode 'version=2.0.0' --data-urlencode 'request=GetFeature' --data-urlencode 'typeNames=emodnet:windfarmspoly' --data-urlencode \"CQL_FILTER=country='Germany' AND status IN ('Planned','Approved','Construction')\" --data-urlencode 'outputFormat=application/json'","example_result":"{\"type\":\"FeatureCollection\",\"features\":[{\"id\":\"windfarmspoly.1\",\"properties\":{\"country\":\"Germany\",\"name\":\"EnBW He Dreiht\",\"n_turbines\":64,\"power_mw\":960.0,\"status\":\"Approved\",\"updateyear\":\"2026\"}}]}"},"members_summary":null}],"other_sources_count":4,"if_unstructured":{"summary":"To capture pending onshore BImSchG applications in the 10 Länder without open 'im Verfahren' tables, exact permit/application dates, and offshore AWZ Planfeststellung details, extract fields from official BImSchG public-display/permit PDFs (Bekanntmachungen and redacted Genehmigungsbescheide) and BSH Öffentliche Bekanntmachungen."},"local_terms":[{"term":"In Planung","language":"de","meaning":"MaStR Betriebs-Status (code 31) for permitted pre-operational wind units"},{"term":"im Genehmigungsverfahren","language":"de","meaning":"Pending BImSchG permit application status in Länder LIS-A datasets ('im Gen.Verf.')"},{"term":"vor Inbetriebnahme","language":"de","meaning":"BImSchG permit granted but turbine not yet commissioned (BB, SH, HE status)"},{"term":"Genehmigungsmonitoring Windenergie","language":"de","meaning":"NRW LANUK open dataset tracking pending, approved, refused and withdrawn WEA"},{"term":"Windenergieanlage (WEA) / Windkraftanlage (WKA)","language":"de","meaning":"Individual wind turbine unit (standard record unit in MaStR and Länder WFS)"},{"term":"Bundes-Immissionsschutzgesetz (BImSchG)","language":"de","meaning":"Federal Immissions Control Act governing onshore wind permits (>50 m height)"},{"term":"Repowering (§ 16b BImSchG)","language":"de","meaning":"Replacement of existing wind turbines by modern units under § 16b BImSchG"},{"term":"Planfeststellungsbeschluss (WindSeeG)","language":"de","meaning":"BSH offshore wind farm approval decision in the Exclusive Economic Zone (AWZ)"}],"provenance":{"pass_count":2,"models":["Gemini 4 Carbon","GPT-6 (Codex)"],"minutes_estimate":null,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-26","model":"Gemini 4 Carbon"},{"pass":2,"date":"2026-11-26","model":"GPT-6 (Codex)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/wind-farms-in-permitting.json","detail_url":"https://georutter.org/v1/de/wind-farms-in-permitting/detail.json","html_url":"https://georutter.org/de/wind-farms-in-permitting/","country_url":"https://georutter.org/v1/countries/de.json"}
