{"schema_version":"1.0","country":"de","country_name":"Germany","topic":"wind-farms-in-permitting","question":"Where can I get a list of wind projects currently in permitting in Germany, with location, capacity (MW), developer, permitting stage and date?","territory":"de","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"partial","non_official_data":"partial","summary":"No single official dataset covers all wind permitting stages in Germany. The Bundesnetzagentur Marktstammdatenregister (MaStR) lists 8,808 pre-operational wind turbine units in status 'In Planung' (8,720 onshore, 88 offshore; 55.2 GW in total). Of these, 8,571 units have a permit identifier, with 4,843 distinct identifiers. Under § 5(4) MaStRV, registration is mandatory once a required federal permit is granted. Pending applications ('im Genehmigungsverfahren') are published as structured turbine data by 6 of 16 Länder (NRW, BB, SH, HE, northern RLP, SL; 3,249 pending turbines), mostly without developer names. EIA portals publish notices for larger cases.","main_caveats":["Under § 5(4)-(5) MaStRV, wind units enter MaStR as 'In Planung' only within 1 month after BImSchG/WindSeeG permit notification; unapproved applications ('im Genehmigungsverfahren') are absent unless registered voluntarily.","MaStR counts turbines. Of 8,808 units in 'In Planung', 8,571 have a GenehmigungsMastrNummer (4,843 distinct identifiers). The other 237 lack that field. WindparkName is free text (2,833 distinct state/name pairs).","Capacity units vary across official sources: MaStR, NRW, SH, TH, RLP and BNetzA report kW (e.g. 5700 = 5.7 MW), whereas Brandenburg, Hessen, Saarland, Baden-Württemberg and EMODnet report MW.","No official onshore register separates 'authorised' from 'under construction' ('im Bau'); refusals, withdrawals and § 16b BImSchG repowering are structured only in NRW GenMon, Hessen (gvs.csv/klagen.csv) and RLP SGD Nord.","UVP-Verbund and UVP-Portal cover only EIA-mandatory (>=20 WEA or offshore) and EIA-screened (>=3 WEA) cases as HTML/PDF notices, missing 1-2 turbine simplified § 19 BImSchG applications without UVP screening."],"confidence":"high","confidence_reason":"Verified against MaStRV statutory text, live queries fetching all 8,808 MaStR 'In Planung' wind units, bulk XML schemas, all 16 Länder portals/WFS, UVP portals, BSH/EMODnet offshore WFS, BNetzA awards and Overpass.","attributes":[{"attribute":"location","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-uvp-portals-wind","de-bnetza-wind-tenders","eu-emodnet-offshore-windfarms","de-bsh-offshore-fep","osm-overpass-wind-permitting"],"note":"Exact turbine coordinates in MaStR for all 8,699 permitted units >30 kW and in 8 Länder datasets; offshore polygons in EMODnet/BSH; parcel text in BNetzA awards and UVP PDFs.","gap":"not_checked","gap_note":"Pending BImSchG applications before permit grant have no statewide structured coordinate feed in 10 of 16 tested Länder (including Niedersachsen after Energieatlas shut down on 2026-10-31, and Sachsen iDA which returned HTTP 401), MaStR withholds coordinates for 109 planned units <=30 kW (§ 15(1) Nr. 1a MaStRV), and ~294 Landkreis-level portals were only sampled."},{"attribute":"capacity_mw","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-bnetza-wind-tenders","eu-emodnet-offshore-windfarms","osm-overpass-wind-permitting","global-energy-monitor-gwpt"],"note":"MaStR reports gross/net kW per permitted turbine (55,210 MW total); 8 Länder give turbine kW or MW; BNetzA XLSX gives awarded bid kW; EMODnet gives offshore project MW.","gap":"not_checked","gap_note":"Proposed MW for pending onshore BImSchG applications is unpublished at state level in 10 of 16 tested Länder (Sachsen iDA returned HTTP 401), requiring manual extraction from UVP-Verbund notices (which omit 1–2 turbine simplified § 19 BImSchG cases without UVP screening), and ~294 Landkreis-level portals were only sampled."},{"attribute":"developer","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-bnetza-wind-tenders","osm-overpass-wind-permitting","global-energy-monitor-gwpt"],"note":"MaStR names legal-entity operators for 8,672 permitted units and BNetzA names tender bidders; among Länder datasets, only Brandenburg (BETREIBER) and NRW BürgEnG name developers.","gap":"not_checked","gap_note":"7 of 8 open Länder permitting datasets (NRW GenMon, SH, HE, RLP, SL, TH, BW) and EMODnet omit applicant/developer names, MaStR masks 136 planned units registered by natural persons (§ 15(1) Nr. 2 MaStRV), Sachsen iDA returned HTTP 401, and ~294 Landkreis portals were only sampled."},{"attribute":"permitting_stage","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-uvp-portals-wind","de-bnetza-wind-tenders","eu-emodnet-offshore-windfarms","osm-overpass-wind-permitting","global-energy-monitor-gwpt"],"note":"6 Länder separate pending vs approved turbines (NRW, HE, RLP also log refusals/withdrawals); MaStR flags permitted 'In Planung'; EMODnet, OSM and GEM separate 'construction'.","gap":"not_checked","gap_note":"MaStR merges authorised and under-construction turbines into 'In Planung', omits pending applications, and drops refused/withdrawn projects; 10 tested Länder publish no open statewide pending-application dataset (Sachsen iDA returned HTTP 401), none of the 8 Länder datasets separates 'im Bau', and ~294 Landkreis portals were only sampled."},{"attribute":"stage_date","covered":"partial","source_ids":["de-mastr-wind-units","de-laender-bimschg-wind","de-uvp-portals-wind","de-bnetza-wind-tenders"],"note":"MaStR bulk XML and detail pages give permit and application dates; NRW GenMon and HE gvs.csv give filing, permit, refusal and withdrawal dates; BB, SH and BW give permit dates.","gap":"not_checked","gap_note":"MaStR's JSON overview omits the permit grant date (available in EinheitenGenehmigung.xml); BB and SH leave pending 'im Gen.Verf.' rows undated; TH, SL and RLP SGD Nord WFS omit individual permit/application dates; Sachsen iDA returned HTTP 401 and ~294 Landkreis portals were only sampled."}]},"sources":[{"source_id":"de-mastr-wind-units","name":"Marktstammdatenregister (MaStR) — Öffentliche Einheitenübersicht & Gesamtdatenexport (EinheitenWind / EinheitenGenehmigung)","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","data_url":"https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung","access":"api","format":"JSON API, CSV web export, and daily bulk XML ZIP (Gesamtdatenexport ~3.31 GB)","license":"Datenlizenz Deutschland – Namensnennung – Version 2.0 (dl-de/by-2-0)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regulator","adds":"Single nationwide official register of permitted onshore and offshore wind turbine units ('In Planung') with exact WGS84 coordinates (>30 kW), kW capacity, legal-entity operator, wind farm name, permit ID/authority/reference, and (in bulk XML/detail view) permit grant and application dates.","first_seen_pass":1,"rank":1,"summary":"Official federal register of all permitted pre-operational wind turbine units ('In Planung') in Germany via JSON API, CSV export and daily 3.31 GB XML dump.","coverage_note":"8,808 'In Planung' wind turbine units (8,720 onshore, 88 offshore; 55,210 MW in total). Of those, 8,571 have a permit identifier (4,843 distinct identifiers).","data_date":"2026-11-25","caveats":["Counts individual turbines (WEA) in kW, not wind farms in MW; group via GenehmigungsMastrNummer or WindparkName.","JSON API omits permit grant date (available in EinheitenGenehmigung.xml or unit detail pages); 'In Planung' does not separate 'im Bau'."],"coverage":{"geographic":"Germany nationwide (all 16 Länder onshore plus Exclusive Economic Zone / AWZ and territorial waters in North Sea and Baltic Sea)"},"fine_print":{"unit":{"value":"Individual electricity generation unit / wind turbine (Stromerzeugungseinheit / Windenergieanlage, SEE...); capacities Bruttoleistung and Nettonennleistung are in kilowatts (kW), hub height and rotor diameter in metres (m).","quote":"Bruttoleistung: Bruttoleistung in kW | Nettonennleistung: Nettonennleistung in kW","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/gesamtdatenexport/Dokumentation%20MaStR%20Gesamtdatenexport.zip","attempts":[]},"inclusion_rule":{"value":"Grid-connected wind units requiring a permit under BImSchG (onshore >50 m total height per 4. BImSchV Nr. 1.6) or WindSeeG (offshore) must register as 'In Planung' within one month after notification of the granted permit; pre-permit registration is voluntary.","quote":"Betreiber müssen ihre Projekte im Marktstammdatenregister gemäß Absatz 5 registrieren, wenn die Errichtung oder der Betrieb der Stromerzeugungseinheit einer Zulassung nach dem Bundes-Immissionsschutzgesetz, dem Windenergie-auf-See-Gesetz oder sonstigem Bundesrecht bedarf und die Zulassung erteilt wurde.","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","attempts":[]},"reference_date":{"value":"Live JSON API queried on 2026-11-25; daily bulk XML archive Gesamtdatenexport_20261125_26.2.zip timestamped 2026-11-25 00:00:00.","quote":"Gesamtdatenauszug vom Vortag Download Daten [ZIP / 3.233.608 KB] Beschreibung des Exports [ZIP / 1.372 KB] Typ: XML Letzte Aktualisierung: 25.11.2026 00:00:00","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"update_frequency":{"value":"Continuous live updates in the JSON/web portal; bulk XML Gesamtdatenexport regenerated nightly (typically around 05:00 CET) plus quarterly Stichtag snapshots.","quote":"Der Datendownload wird in der Regel um 5:00 Uhr auf den zu diesem Zeitpunkt gültigen Datenstand aktualisiert.","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","attempts":[]},"exclusions":{"value":"Does not systematically cover pending BImSchG/WindSeeG applications. Withholds street, parcel and coordinates for units <=30 kW (109 of 8,808 'In Planung' wind units) and masks natural-person operator names (136 units). Off-grid and military units are exempt. No § 16b BImSchG repowering flag exists in the schema.","quote":"Standortangaben zu Straße, Hausnummer, Flurstücksbezeichnungen und Geokoordinaten von Erzeugungseinheiten nach der Anlage Tabelle B bis E mit einer Leistung von höchstens 30 Kilowatt [...] Daten zu Marktakteuren nach der Anlage Tabelle A werden nicht veröffentlicht, wenn der Marktakteur eine natürliche Person ist","url":"https://www.gesetze-im-internet.de/mastrv/__15.html","attempts":[]}},"key_fields":[{"field":"MaStRNummer / EinheitMastrNummer","meaning":"Unique wind turbine unit ID (SEE...)"},{"field":"BetriebsStatusName / EinheitBetriebsstatus","meaning":"Lifecycle state: filter '31' = 'In Planung' (permitted, pre-commissioning)"},{"field":"WindAnLandOderSeeBezeichnung","meaning":"'Windenergie an Land' (888, onshore) vs 'Windenergie auf See' (889, offshore)"},{"field":"WindparkName / NameWindpark","meaning":"Operator-chosen wind farm name (populated on 8,706/8,808 planned units; 2,833 distinct Bundesland+name pairs)"},{"field":"GenehmigungsMastrNummer / GenMastrNummer","meaning":"Permit object ID (SGE.../GEN...) grouping co-permitted turbines (populated on 8,571/8,808 units; 4,843 distinct permits)"},{"field":"Bruttoleistung / Nettonennleistung","meaning":"Gross and net rated electrical capacity in kW (divide by 1,000 for MW)"},{"field":"AnlagenbetreiberName / AnlagenbetreiberMaStRNummer","meaning":"Registered project operator/SPV name and actor ID (ABR...; masked for natural persons)"},{"field":"Breitengrad / Laengengrad / Flurstueck","meaning":"WGS84 decimal latitude/longitude and cadastral parcel (populated for all 8,699 units >30 kW)"},{"field":"Genehmigungbehoerde / AktenzeichenGenehmigung","meaning":"Permitting authority and permit docket number"},{"field":"Datum / DatumDerAntragstellung / Frist (EinheitenGenehmigung.xml)","meaning":"Permit grant date, application filing date, and statutory construction/operation deadline in bulk XML"},{"field":"GeplantesInbetriebsnahmeDatum","meaning":"Expected commissioning date (note spelling 'Inbetriebsnahme' with extra 's' in JSON API)"}],"how_to_use":{"example_request":"curl -sG 'https://www.marktstammdatenregister.de/MaStR/Einheit/EinheitJson/GetErweiterteOeffentlicheEinheitStromerzeugung' --data-urlencode 'page=1' --data-urlencode 'pageSize=2' --data-urlencode \"filter=Energieträger~eq~'2497'~and~Betriebs-Status~eq~'31'\"","example_result":"{\"Total\":8808,\"Data\":[{\"Id\":1800275,\"MaStRNummer\":\"SEE950179793688\",\"EinheitName\":\"WEA 3\",\"WindparkName\":\"Windpark Länge\",\"BetriebsStatusName\":\"In Planung\",\"Bruttoleistung\":5700.0,\"AnlagenbetreiberName\":\"solarcomplex GmbH ＆ Co. KG Windpark Länge\",\"Breitengrad\":47.880898,\"Laengengrad\":8.597642,\"GenehmigungsMastrNummer\":\"SGE969844675464\"}]}","steps":["For fast paginated JSON retrieval without downloading 3.31 GB, GET GetErweiterteOeffentlicheEinheitStromerzeugung with filter=Energieträger~eq~'2497'~and~Betriebs-Status~eq~'31' and pageSize=2500 across pages 1..4 (8,808 rows total; add ~and~Wind an Land oder auf See~eq~'888' for onshore or '889' for offshore).","Divide Bruttoleistung and Nettonennleistung by 1,000 to convert kW to MW, and parse Microsoft JSON timestamps '/Date(ms)/' as UTC epoch milliseconds.","To obtain exact permit grant dates (Datum), application dates (DatumDerAntragstellung) and permit-expiration deadlines (Frist) in bulk, scrape today's dynamically named Gesamtdatenexport_YYYYMMDD_*.zip URL from https://www.marktstammdatenregister.de/MaStR/Datendownload and join EinheitenWind.xml (EinheitBetriebsstatus='31') to EinheitenGenehmigung.xml on GenMastrNummer (and Marktakteure_*.xml on AnlagenbetreiberMastrNummer).","To aggregate individual wind turbines (SEE...) into wind farm projects, group primarily by GenehmigungsMastrNummer (4,843 permits; also inspect VerknuepfteEinheitenMaStRNummern in EinheitenGenehmigung.xml) and cross-check free-text WindparkName within the same Gemeinde/Landkreis."],"reading_traps":["Each row is one turbine. Of 8,808 'In Planung' rows, 8,571 have a GenehmigungsMastrNummer (4,843 distinct identifiers). WindparkName is unvalidated free text (2,833 distinct state/name pairs).","Bruttoleistung and Nettonennleistung are in kW, not MW (e.g., 5700.0 = 5.7 MW; total planned pipeline is 55,209.79 MW).","The JSON API returns GenehmigungRegistrierungsdatum (date the permit was entered in MaStR) and GeplantesInbetriebsnahmeDatum (note the extra 's' typo in the field name), but omits the actual permit grant date ('Datum der Erstgenehmigung'), which is only in EinheitenGenehmigung.xml (<Datum>) or on /MaStR/Einheit/Detail/IndexOeffentlich/{Id}.","'In Planung' mixes newly authorised turbines, projects awaiting EEG auction awards, turbines under active construction ('im Bau'), and stale/litigated permits not yet deactivated by operators.","2 of the 8,699 georeferenced 'In Planung' wind units have erroneous longitudes ~17.0-17.49°E in Poland instead of Germany (SEE999005545480 declared in Brandenburg at 52.659028, 17.492802; SEE970142364196 declared in Niedersachsen at 52.934261, 17.00854); validate coordinates against Bundesland polygons.","MaStR has no Repowering boolean or permit category: § 16b BImSchG repowering turbines appear indistinguishable from greenfield BImSchG permits."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":14189210,"records_total":8808,"records_for_country":8808,"problems":[]},"evidence":[{"claim":"Mandatory MaStR registration for planned wind units applies only once the BImSchG or WindSeeG permit has been granted, within one month of permit notification.","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","quote":"Die Registrierungen nach den Absätzen 3 und 4 müssen innerhalb eines Monats nach dem Eintreten des jeweiligen Ereignisses erfolgen. Für Registrierungen nach Absatz 4 Satz 1 ist das Ereignis die Bekanntgabe der Zulassung."},{"claim":"Bulk XML export includes a dedicated EinheitenGenehmigung.xml file with permit type, grant date, authority, file reference, deadline, linked SEE unit IDs, and application date.","url":"https://www.marktstammdatenregister.de/MaStRHilfe/files/gesamtdatenexport/Dokumentation%20MaStR%20Gesamtdatenexport.zip","quote":"5.5.13 EinheitenGenehmigung Alle öffentlichen Daten der Genehmigungen. Rootelement: EinheitenGenehmigung Element: EinheitGenehmigung Dateiname: EinheitenGenehmigung.xml"}],"members":[],"members_summary":null},{"source_id":"de-laender-bimschg-wind","name":"Länder BImSchG Wind Permitting Datasets and WFS Services (LIS-A / Genehmigungsmonitoring / Energie-WFS)","publisher":"Landesumweltämter, Bezirksregierungen und Geoportale der Bundesländer","official":true,"landing_url":null,"data_url":null,"access":"direct_download","format":"XLSX, CSV, Shapefile ZIP, and OGC WFS 1.1.0/2.0.0 (varies by Land)","license":"dl-de/by-2-0 (NRW, SH, TH, RLP, HH, BE) and CC BY 4.0 (BB, HE, SL, BW)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"regional_government","adds":"Only official structured source for pending onshore BImSchG wind permit applications ('im Genehmigungsverfahren' / 'beantragt' — 3,249 pending turbines across 6 Länder), plus refused/withdrawn applications, litigation status ('beklagte Anlage') and § 16b BImSchG repowering flags in NRW and Hessen.","first_seen_pass":1,"rank":2,"summary":"State-level BImSchG immissions-control exports and WFS services (XLSX, CSV, Shapefile, GML) across 8 of 16 Bundesländer, capturing pending wind applications before MaStR.","coverage_note":"6 Länder publish pending applications (3,249 turbines: NRW 1,108, BB 899, SH 513, RLP-North 371, HE 328, SL 36) plus permitted units; TH (314) and BW (239) publish permitted/Vorbescheid turbines only.","data_date":"2026-11-24","caveats":["Only Brandenburg (BETREIBER) and NRW's BürgEnG file name developers; other 7 Länder omit applicant names.","8 Länder (including Niedersachsen and Bayern) have no open structured pending-turbine dataset; check kW vs MW per Land."],"coverage":{"geographic":"8 of 16 German Länder publish structured pre-operational wind turbine records: 6 include pending BImSchG applications (NRW, BB, SH, HE, northern RLP/SGD Nord, SL) and 2 include granted/preliminary-decision turbines only (TH, BW); the other 8 Länder publish operational-only, zone-only, restricted, or MaStR-delegated views."},"fine_print":{"unit":{"value":"Individual wind turbine (WEA) per row (plus procedure/litigation tables in NRW and Hessen); capacity is in kW in NRW, SH, TH and RLP, and in MW in BB, HE, SL and BW.","quote":"Die einzelnen Windenergieanlagen aus dem Genehmigungsmonitoring Windenergie finden sich in dem Tabellensheet \"Anlagendaten im GenMon\".","url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/Anlagen-Genehmigungsmonitoring-NRW_EPSG25832_Excel.xlsx","attempts":[]},"inclusion_rule":{"value":"BImSchG-regulated wind turbines (>50 m total height under 4. BImSchV Nr. 1.6) tracked in state immissions-control databases (typically LIS-A); NRW GenMon covers turbines permitted or in proceedings from 2023-01-01 onward.","quote":"Das Genehmigungsmonitoring Windenergie beinhaltet Daten genehmigter oder sich im Verfahren befindlicher Windenergieanlagen ab dem 01.01.2023.","url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/Anlagen-Genehmigungsmonitoring-NRW_EPSG25832_Excel.xlsx","attempts":[]},"reference_date":{"value":"Varies by Land: NRW 2026-11-24, BW 2026-11-23, HE 2026-11-15, SH 2026-10-12, BB 2026-10-05, SL 2026-09-28, RLP SGD Nord 2026-06-29, TH 2025-12-31.","quote":"Anlagen-Genehmigungsmonitoring-NRW_EPSG25832_Excel.xlsx, size: 1266014, timestamp: 2026-11-24T14:39:04.952185","url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/index.json","attempts":[]},"update_frequency":{"value":"Monthly in Hessen and NRW; quarterly in Brandenburg and Schleswig-Holstein; annual or ad-hoc in Thüringen, Saarland and Rheinland-Pfalz.","quote":"Der Datensatz wird in der Regel monatlich aktualisiert.","url":"https://zenodo.org/records/23557186","attempts":[]},"exclusions":{"value":"7 of the 8 structured Land datasets omit developer/applicant names (only BB wka.zip/WFS and NRW's separate BürgEnG file name operators); 8 Länder (NI, BY, MV, SN, ST, BE, HB, HH) plus southern RLP (SGD Süd) provide no open structured list of pending/permitted pre-operational turbines.","quote":"Im Genehmigungsverfahren: Der Genehmigungsbehörde liegt ein Antrag für die Errichtung der Anlage vor.","url":"https://zenodo.org/records/23557186","attempts":[]}},"key_fields":[{"field":"STATUS / ANLAGENSTATUS / SACHSTAND / planstd","meaning":"Permitting stage (e.g. 'im Gen.Verf.' / 'im Genehmigungsverfahren' / 'beantragt' vs 'vor Inbetriebnahme' / 'genehmigt')"},{"field":"Datum_Antragseingang / Datum_Genehmigungsbescheid / Datum_Ablehnung / Datum_Ruecknahme (NRW)","meaning":"Application, permit, refusal and withdrawal dates (stored as Excel serial days in NRW XLSX)"},{"field":"Antragsart (NRW) / verfahrenstyp (HE gvs.csv)","meaning":"Distinguishes 'Neugenehmigung', 'Repowering' (§ 16b BImSchG), 'Vorbescheid' (§ 9 BImSchG), and 'Änderung vor Errichtung'"},{"field":"BETREIBER (BB) / Firmenname Betreiber (NRW BürgEnG)","meaning":"Developer or project SPV name (absent in SH, HE, TH, BW, SL, RLP and NRW GenMon)"},{"field":"BST_NR / Standort_ID / NAME_WINDPARK / NAMEN","meaning":"Facility or wind farm grouping identifier linking turbines of the same project"},{"field":"Leistung_kW / LEISTUNG / ELEKTR_LEISTUNG_MW","meaning":"Rated turbine capacity (kW in NRW/SH/TH/RLP; MW in BB/HE/SL/BW)"},{"field":"UTM_32_Ost/Nord (EPSG:25832) / OSTWERT/NORDWERT (EPSG:25833 in BB) / RW/HW (GK in SL)","meaning":"Projected turbine coordinates"}],"how_to_use":{"example_request":"curl -sL 'https://opendata.schleswig-holstein.de/dataset/9b0eade8-81a3-478b-829e-7c7d47667c2f/resource/28911585-47ae-4f77-8672-c13f3a346adc/download/windkraftanlagen-2026-10-12.csv' | grep 'G30/2026/021' | head -n 1","example_result":"Stormarn,Rehhorst,\"Vorbescheid: G30/2026/021 (genehmigt); Typ Nordex N163-6.8, 6,8 MW, NH 164 m, RD 163 m zzgl. 1,80 Fundamenterhöhung\",Nordex,164,163,,6800,kW,Nennleist. Rotor.,32595620,595620,5968996,015101-Rehhorst,8,15,21.01.2026,,,im Gen.Verf.,62059399289,0007,G30/2026/021,12.10.2026,\"LfU, Abt. 2, FIS LIS-A\"","steps":["Fetch each Land's current export or WFS: NRW XLSX files from opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/; BB wka.zip (both georeferenced wka.dbf and un-georeferenced dok/wka_og.dbf) from data.geobasis-bb.de; SH latest CSV via opendata.schleswig-holstein.de CKAN API; HE latest CSVs via DOI 10.5281/zenodo.20589039 (records 23557186 & 23596067); and WFS GetFeature for RLP SGD Nord, SL, TH and BW.","Harmonize CRS to WGS84 (EPSG:25832 in NRW/SH/HE/TH/BW/RLP, EPSG:25833 in BB, EPSG:31466 Gauß-Krüger in SL) and harmonize capacity units to MW (divide kW by 1,000 in NRW, SH, TH, RLP; keep MW as-is in BB, HE, SL, BW).","Group individual turbines into wind farms using BST_NR/BST_NAME (BB, SH), Standort_ID (NRW GenMon), ID prefix/NAME_WINDPARK (HE), or VERFAHRENS/NAMEN (SL).","In NRW, join or cross-check Anlagen-Genehmigungsmonitoring-NRW (which has pending/refused/withdrawn dates) spatially with NW-Vorhaben-nach-Buergerenergiegesetz (446 projects with Firmenname Betreiber) and MaStR."],"reading_traps":["Mixed capacity units across Länder: Brandenburg ('5.560'), Hessen, Saarland and Baden-Württemberg report MW, whereas NRW ('5700'), Schleswig-Holstein ('3200'), Thüringen ('6800.0') and RLP ('7200') report kW.","NRW XLSX stores dates as Excel 1900 serial integers (e.g. 46267) and in NW-Vorhaben-nach-Buergerenergiegesetz some hub heights lack decimals ('1666' for 166.6 m).","Brandenburg's wka.shp omits un-georeferenced planned turbines; read dok/wka_og.dbf inside wka.zip as well (8 additional turbines: 6 'im Gen.Verf.', 2 'vor Inbetriebnahme').","Rheinland-Pfalz WFS (ms:windenergieanlagen_an) covers only northern RLP (SGD Nord), leaves datum_antr and datum_gen empty on all 2,661 rows, and its OGC API Features path returns HTTP 401 while classic WFS GetFeature is open.","Hessen separates 191 'beklagte Anlage' (litigated decisions) from 'vor Inbetriebnahme': per metadaten.txt, 'beklagte Anlage' includes both third-party lawsuits against granted permits and applicant lawsuits against refusals; join gvs.csv and klagen.csv to separate them.","Baden-Württemberg's WFS is named Windkraft_Bestand ('existing stock') yet contains 239 'Anlagen genehmigt, nicht in Betrieb' turbines alongside 864 operational ones; conversely, Mecklenburg-Vorpommern's LUNG WFS (wea) contains only operational turbines (all 1,829 rows carry INBETR_DAT or ALTANLAN_D)."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":1266014,"records_total":4081,"records_for_country":4081,"problems":["Sachsen iDA portal (umwelt.sachsen.de/umwelt/infosysteme/ida/) returned HTTP 401 Unauthorized to unauthenticated requests; RLP OGC API Features endpoint returned HTTP 401 (use classic MapServer WFS URL instead); Hamburg WFS de.hh.up:wka returned 0 features."]},"evidence":[{"claim":"Hessen's monthly LIS-A dataset explicitly distinguishes operational, permitted pre-commissioning, pending application, and litigated turbines.","url":"https://zenodo.org/api/records/23557186/files/metadaten.txt/content","quote":"Vor Inbetriebnahme: Für die Anlage ist eine Genehmigung erteilt worden, sie ist aber noch nicht in Betrieb gegangen. [...] Im Genehmigungsverfahren: Der Genehmigungsbehörde liegt ein Antrag für die Errichtung der Anlage vor."},{"claim":"Brandenburg's quarterly LIS-A shapefile ZIP includes operational, permitted, and pending-application turbines with operator names and a separate dBase table for non-georeferenced planned units.","url":"https://data.geobasis-bb.de/geofachdaten/Energie-_und_Klimaschutz/wka.zip","quote":"wka.shp ein Punktshape; wka_og.dbf Tabelle mit Anlagen ohne Georeferenzierung (v.a. geplante WKA)"}],"members":[{"name":"Nordrhein-Westfalen (LANUK Genehmigungsmonitoring & BürgEnG Transparenzplattform)","landing_url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/","data_url":"https://www.opengeodata.nrw.de/produkte/umwelt_klima/energie/ee/Anlagen-Genehmigungsmonitoring-NRW_EPSG25832_Excel.xlsx","access":"direct_download","tested":true,"data_found":true,"note":"4,081 turbines since 2023-01-01 (2,518 genehmigt, 1,108 pending im Verfahren, 147 abgelehnt, 308 zurückgenommen; 397 Repowering) with UTM32, kW and all stage dates, no developer; companion NW-Vorhaben-nach-Buergerenergiegesetz XLSX adds Firmenname Betreiber for 446 projects (1,111 turbines)."},{"name":"Brandenburg (LfU / Geobasis-BB Windkraftanlagen LIS-A)","landing_url":"https://inspire.brandenburg.de/services/lfu_wka_wfs?SERVICE=WFS&REQUEST=GetCapabilities","data_url":"https://data.geobasis-bb.de/geofachdaten/Energie-_und_Klimaschutz/wka.zip","access":"direct_download","tested":true,"data_found":true,"note":"5,826 georeferenced turbines in wka.dbf (893 im Gen.Verf., 807 vor Inbetriebnahme, 4,126 in Betrieb) + 8 un-georeferenced in wka_og.dbf; includes BETREIBER (developer), BST_NAME, UTM33, MW, and GENEHMIGT date (Stand 2026-10-05)."},{"name":"Schleswig-Holstein (LfU Open Data Windkraftanlagen LIS-A)","landing_url":"https://opendata.schleswig-holstein.de/api/3/action/package_search?q=Windkraftanlagen","data_url":"https://opendata.schleswig-holstein.de/dataset/9b0eade8-81a3-478b-829e-7c7d47667c2f/resource/28911585-47ae-4f77-8672-c13f3a346adc/download/windkraftanlagen-2026-10-12.csv","access":"direct_download","tested":true,"data_found":true,"note":"4,365 turbines (513 im Gen.Verf., 565 vor Inbetriebnahme, 3,287 in Betrieb; Stand 2026-10-12) in CSV/XLSX/JSON/WFS with UTM32, kW, BST_NR, AKTENZEICHEN and GENEHMIGT_AM; omits developer and filing date."},{"name":"Hessen (HLNUG Windenergieanlagen & Genehmigungsverfahren LIS-A on Zenodo)","landing_url":"https://www.hlnug.de/themen/luft/windenergie-in-hessen.html","data_url":"https://zenodo.org/api/records/23557186/files/HLNUG_WEA_2026-11-15.csv/content","access":"direct_download","tested":true,"data_found":true,"note":"2,134 turbines (328 im Genehmigungsverfahren, 403 vor Inbetriebnahme, 191 beklagte Anlage, 1,212 in Betrieb; Stand 2026-11-15) with UTM32, MW, NAME_WINDPARK and permit date; companion record 23596067 (gvs.csv, klagen.csv) adds filing/refusal/withdrawal/repowering/lawsuit details; omits developer."},{"name":"Rheinland-Pfalz (SGD Nord ROK WFS — northern RLP only)","landing_url":"https://www.geoportal.rlp.de/mapbender/php/mod_showMetadata.php?resource=wfs&id=539","data_url":"https://rok25online.rlp.de/sgdn_client_suite/apps/service/wfs_getmap.php?mapfile=energie_offentlich&SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=ms:windenergieanlagen_an","access":"api","tested":true,"data_found":true,"note":"2,661 turbines in SGD Nord (371 beantragt, 382 genehmigt, 106 abgelehnt, 442 aufgegeben, 1,198 am Netz) with UTM32 and kW; datum_antr/datum_gen are blank on all rows, developer omitted, and SGD Süd (southern RLP) has no equivalent open WFS."},{"name":"Saarland (GDI-SL Energie_WFS:Windkraftanlagen)","landing_url":"https://geoportal.saarland.de/mapbender/php/mod_showMetadata.php?resource=wfs&id=240","data_url":"https://geoportal.saarland.de/arcgis/services/Internet/Energie_WFS/MapServer/WFSServer?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=Energie_WFS:Windkraftanlagen","access":"api","tested":true,"data_found":true,"note":"307 turbines (36 laufendes Genehmigungsverfahren, 54 genehmigte Anlage with IN_BETRIEB='nein', 217 operational) with GK coordinates, MW and wind farm name (NAMEN); omits developer and decision date."},{"name":"Thüringen (TLVwA Geoproxy WFS tlvwa:WKA)","landing_url":"https://www.geoproxy.geoportal-th.de/geoproxy/services/windenergie_wfs?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetCapabilities","data_url":"https://www.geoproxy.geoportal-th.de/geoproxy/services/windenergie_wfs?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=tlvwa:WKA","access":"api","tested":true,"data_found":true,"note":"1,175 turbines as of 2025-12-31 (242 Genehmigung nach § 4 BImSchG, 72 Genehmigungsvorbescheid nach § 9 BImSchG, 861 Bestand) with UTM32, parcel and kW; omits pending applications, developer and permit dates."},{"name":"Baden-Württemberg (LUBW RIPS WFS Windkraft_Bestand)","landing_url":"https://rips-gdi.lubw.baden-wuerttemberg.de/arcgis/services/wfs/Windkraft_Bestand/MapServer/WFSServer?request=GetCapabilities&service=WFS","data_url":"https://rips-gdi.lubw.baden-wuerttemberg.de/arcgis/services/wfs/Windkraft_Bestand/MapServer/WFSServer?service=WFS&version=2.0.0&request=GetFeature&typeNames=wfs_Windkraft_Bestand:Windkraft__Bestand_","access":"api","tested":true,"data_found":true,"note":"1,144 turbines as of 2026-11-23 (239 'Anlagen genehmigt, nicht in Betrieb', 864 in Betrieb, 41 decommissioned) with UTM32, MW and VERFAHREN_ABSCHLUSS_DATUM; omits pending applications and dedicated developer field."},{"name":"Mecklenburg-Vorpommern (LUNG WFS ie_energieanlagen)","landing_url":"https://umweltkarten.lung-mv.de/dienste/ie_energieanlagen?SERVICE=WFS&REQUEST=GetCapabilities","data_url":"https://umweltkarten.lung-mv.de/dienste/ie_energieanlagen?SERVICE=WFS&VERSION=1.1.0&REQUEST=GetFeature&TYPENAME=wea","access":"api","tested":true,"data_found":false,"note":"All 1,829 returned wind turbines carry commissioning/legacy dates (INBETR_DAT or ALTANLAN_D); pre-operational/pending BImSchG turbines are not included in the statewide WFS."},{"name":"Niedersachsen (MU / NUMIS Umweltportal)","landing_url":"https://www.umwelt.niedersachsen.de/startseite/themen/energie/erneuerbare_energien/windenergie/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"Energieatlas Niedersachsen was shut down on 2026-10-31; NUMIS publishes wind priority areas while statewide turbine status is delegated to MaStR (only individual districts like LK Rotenburg/Leer run local viewers)."},{"name":"Bayern (LfU Energie-Atlas Bayern)","landing_url":"https://www.energieatlas.bayern.de/thema_wind","data_url":"https://www.lfu.bayern.de/gdi/wms/energieatlas/planungsgrundlagen_wind?SERVICE=WMS&REQUEST=GetCapabilities","access":"web_viewer_only","tested":true,"data_found":false,"note":"Publishes planning/zoning WMS layers and MaStR-based operational views, but no open statewide WFS or download of pending/permitted BImSchG wind turbines."},{"name":"Sachsen (LfULG Geoportal / iDA Umweltportal)","landing_url":"https://geoportal.sachsen.de/","data_url":"https://www.umwelt.sachsen.de/umwelt/infosysteme/ida/","access":"registration_required","tested":true,"data_found":false,"note":"Direct request to iDA environmental data system returned HTTP 401 Unauthorized; no open statewide WFS URL for pending wind turbines resolved via GDI-DE CSW."},{"name":"Sachsen-Anhalt (LVermGeo Geodatenportal / ARIS)","landing_url":"https://www.lvermgeo.sachsen-anhalt.de/de/geodatenportal.html","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"ARIS – Windkraftanlagen is exposed only as an interactive web application without an open WFS/download dataset."},{"name":"Berlin (GDI Berlin WFS ea_windkraft)","landing_url":"https://gdi.berlin.de/services/wfs/ea_windkraft?request=GetCapabilities&service=WFS","data_url":"https://gdi.berlin.de/services/wfs/ea_windkraft?service=WFS&version=2.0.0&request=GetFeature&typeNames=ea_windkraft:windkraft_anlagen&outputFormat=application/json","access":"api","tested":true,"data_found":false,"note":"Contains only operational turbines imported from MaStR (quelle='mastr') with inbetriebnahme dates; no permitting pipeline."},{"name":"Hamburg (LGV WFS HH_WFS_Windkraftanlagen)","landing_url":"https://geodienste.hamburg.de/HH_WFS_Windkraftanlagen?SERVICE=WFS&REQUEST=GetCapabilities","data_url":"https://geodienste.hamburg.de/HH_WFS_Windkraftanlagen?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=de.hh.up:wka&COUNT=5","access":"api","tested":true,"data_found":false,"note":"WFS 2.0 GetFeature on de.hh.up:wka returned numberReturned=0 and exposes operational stock rather than pending BImSchG applications."},{"name":"Bremen (SUBV Metaver INSPIRE Download Service)","landing_url":"https://metaver.de/search/dls/?serviceId=1F52716B-70BF-4276-820E-C8C43922ABA9","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"Serves an Angular Atom-feed client wrapper for operational wind turbine sites without structured permitting-stage tables."}],"members_summary":{"total":16,"listed":16,"tested":16,"data_found":8,"scope_note":"All 16 German Bundesländer were checked via GDI-DE CSW, GovData and state portals/WFS: 8 publish structured pre-operational wind turbine data (6 including pending 'im Verfahren' applications; 2 only granted/Vorbescheid) and 8 do not expose open structured permitting lists.","pattern":"Search GDI-DE (gdk.gdi-de.org) or each Land's Geoportal/OpenData portal for 'Windenergieanlagen' or 'Windkraftanlagen' + 'LIS-A' / '4. BImSchV' / 'Genehmigungsverfahren'."},"member_scope":{"total":16,"note":"All 16 German Bundesländer were checked via GDI-DE CSW, GovData and state portals/WFS: 8 publish structured pre-operational wind turbine data (6 including pending 'im Verfahren' applications; 2 only granted/Vorbescheid) and 8 do not expose open structured permitting lists.","pattern":"Search GDI-DE (gdk.gdi-de.org) or each Land's Geoportal/OpenData portal for 'Windenergieanlagen' or 'Windkraftanlagen' + 'LIS-A' / '4. BImSchV' / 'Genehmigungsverfahren'."}},{"source_id":"de-uvp-portals-wind","name":"UVP-Verbund der Länder & UVP-Portal des Bundes (Statutory EIA and BImSchG Permitting Portals)","publisher":"Länder-UVP-Verbund (Landesbetrieb Geoinformation und Vermessung Hamburg) & Umweltbundesamt (UBA)","official":true,"landing_url":null,"data_url":null,"access":"web_viewer_only","format":"HTML procedure pages with attached PDFs (and embedded Leaflet JSON on uvp-portal.de/de/vorhaben/karte)","license":"Official statutory public notices under § 20 UVPG / § 10 BImSchG (no open bulk license stated)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"national_government","adds":"Nationwide official procedure notices and downloadable PDFs (Bekanntmachungen, UVP-Berichte, Genehmigungsbescheide, Planfeststellungsbeschlüsse) naming applicants, parcels/coordinates, turbine MW and stage dates for pending applications in the 10 Länder lacking open WFS/CSV lists and in the federal EEZ.","first_seen_pass":1,"rank":3,"summary":"Statutory Länder (uvp-verbund.de) and federal/offshore (uvp-portal.de) EIA portals publishing public-display notices, screenings and permit PDFs.","coverage_note":"1,270 energy Zulassungsverfahren (4,441 total wind hits) on uvp-verbund.de plus 2,080 federal/Espoo 'Windpark' entries on uvp-portal.de; procedure records, not turbine rows.","data_date":"2026-11-25","caveats":["HTML/PDF notices only (no bulk CSV/WFS); omits 1-2 turbine simplified § 19 BImSchG applications without UVP screening.","Portal 'Zuletzt geändert' date reflects upload time, not the underlying permit or filing date inside the PDF."],"coverage":{"geographic":"Germany nationwide: uvp-verbund.de covers state authorities across Länder; uvp-portal.de covers federal authorities including BSH offshore wind in the North Sea and Baltic Sea EEZ (plus Espoo cross-border consultations)."},"fine_print":{"unit":{"value":"Permitting or EIA screening procedure (Vorhaben / Verfahren) per wind farm, amendment, or § 16b BImSchG repowering application.","quote":"Informationen über UVP-pflichtige Vorhaben finden z.B. Verfahrensstände, Termine, Unterlagen, Berichte & Empfehlungen, Entscheidungen","url":"https://www.uvp-verbund.de/","attempts":[]},"inclusion_rule":{"value":"Mandatory publication under §§ 19-20 UVPG for EIA-mandatory wind farms (>=20 WEA under Anlage 1 Nr. 1.6.1 UVPG and offshore wind farms) and EIA-screened cases (3-19 WEA under Nr. 1.6.2-1.6.3 UVPG where screening is negative or triggers UVP).","quote":"Hier finden Sie Informationen zu den Umweltverträglichkeitsprüfungen (UVP) der deutschen Bundesbehörden.","url":"https://www.uvp-portal.de/de","attempts":[]},"reference_date":{"value":"Continuously updated as authorities post notices; latest wind notices observed dated 2026-11-25.","quote":"Negative Vorprüfungen Errichtung und Betrieb einer Windenergieanlage in der Gemarkung Rieden gem. § 4 BImSchG 25.11.2026","url":"https://www.uvp-verbund.de/","attempts":[]},"update_frequency":{"value":"Event-driven continuous publication upon public display, EIA screening decision, or permit issuance.","quote":null,"url":null,"attempts":[{"url":"https://www.uvp-verbund.de/","note":"Checked homepage and search interface; updates occur per statutory procedure event without a fixed calendar schedule."}]},"exclusions":{"value":"Excludes 1-2 turbine simplified § 19 BImSchG procedures that require neither UVP nor UVP-Vorprüfung; provides no CSV/WFS export; some public-display documents are removed after statutory inspection deadlines expire.","quote":null,"url":null,"attempts":[{"url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&category=energie&layer=zv&query=Windenergieanlagen","note":"Verified absence of CSV/WFS download links; /getSearchMarkers endpoint referenced in legacy theme scripts returned HTTP 404."}]}},"key_fields":[{"field":"Verfahrensart / Kategorie","meaning":"Procedure class: 'Zulassungsverfahren' (obj_class_zv) vs 'Negative Vorprüfungen' (obj_class_nv)"},{"field":"Allgemeine Vorhabenbeschreibung","meaning":"Free-text summary often naming applicant, Gemarkung/Flur/Flurstück, turbine count, model and MW"},{"field":"Zuletzt geändert / Datum der Entscheidung","meaning":"Portal update date vs formal screening/permit decision date (distinguish from PDF header date)"},{"field":"Dokumente (PDF)","meaning":"Attached Bekanntmachung, UVP-Bericht, or redacted Genehmigungsbescheid / Planfeststellungsbeschluss"}],"how_to_use":{"example_request":"curl -sL 'https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&category=energie&layer=zv&query=Windenergieanlagen'","example_result":"HTML search results returning '1270 Ergebnisse' under Wärmeerzeugung, Bergbau und Energie / Zulassungsverfahren (4,441 total across all categories for 'Windenergieanlagen'), with per-case links '/trefferanzeige?docuuid=...'.","steps":["Query uvp-verbund.de/freitextsuche with category=energie and query=Windenergieanlagen or Windpark, filtering procedure=obj_class_zv (formal permitting with UVP) and procedure=obj_class_nv (negative EIA screenings in simplified BImSchG permitting), plus provider=<land_code>.","For offshore EEZ wind farms (and federal defence/waterway cases), query https://www.uvp-portal.de/de/vorhaben?fulltext=Windpark (2,080 hits, including cross-border Baltic/North Sea Espoo consultations — filter by German responsible authority BSH).","Open each /trefferanzeige?docuuid=... or /de/node/... detail page and parse the Bekanntmachung or Genehmigungsbescheid PDF for applicant, parcel/UTM coordinates, turbine model/MW, and formal decision date."],"reading_traps":["Hit counts ('4,441 Ergebnisse' on uvp-verbund.de; '2,080 Ergebnisse' on uvp-portal.de) represent cumulative historical and active procedure entries, including foreign Espoo consultations (e.g. Lithuanian 'Curonian Nord' on uvp-portal.de) and grid/substation notices mentioning 'Windpark'.","'Zuletzt geändert' on the portal page is the upload/edit date (e.g. 25.11.2026), which often lags the actual permit decision date inside the PDF (e.g. Genehmigungsbescheid Forst-Briesnig 3 signed 30.09.2026, published 25.11.2026)."]},"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"content_type":"text/html;charset=UTF-8","size_bytes":227195,"records_total":4441,"records_for_country":4441,"problems":["No structured CSV, JSON API or WFS download; legacy map endpoint /getSearchMarkers returned HTTP 404."]},"evidence":[{"claim":"UVP-Verbund search for 'Windenergieanlagen' filtered to energy permitting procedures returns 1,270 procedure entries.","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&category=energie&layer=zv&query=Windenergieanlagen","quote":"1 - 10 von 1270 Ergebnissen"},{"claim":"Federal UVP-Portal search for 'Windpark' returns 2,080 procedure entries.","url":"https://www.uvp-portal.de/de/vorhaben?fulltext=Windpark","quote":"Im Umweltprüfungsportal des Bundes vorhandene Einträge 2080 Ergebnisse für Ihre Suche"}],"members":[{"name":"UVP-Verbund (Gemeinsames UVP-Portal der Länder)","landing_url":"https://www.uvp-verbund.de/","data_url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&category=energie&layer=zv&query=Windenergieanlagen","access":"web_viewer_only","tested":true,"data_found":true,"note":"4,441 total hits for 'Windenergieanlagen' (1,270 in category=energie & layer=zv); individual pages link Bekanntmachung, UVP-Bericht and redacted Genehmigungsbescheid PDFs."},{"name":"UVP-Portal des Bundes (Umweltbundesamt / BSH Offshore)","landing_url":"https://www.uvp-portal.de/de","data_url":"https://www.uvp-portal.de/de/vorhaben?fulltext=Windpark","access":"web_viewer_only","tested":true,"data_found":true,"note":"2,080 hits for 'Windpark', including BSH EEZ offshore wind Planfeststellungsverfahren and cross-border Espoo notices; /de/vorhaben/karte embeds GeoJSON geometries per node in drupalSettings."}],"members_summary":{"total":2,"listed":2,"tested":2,"data_found":2,"scope_note":"Covers both statutory German EIA portals: the joint Länder portal (uvp-verbund.de) and the federal portal (uvp-portal.de).","pattern":"Use uvp-verbund.de for onshore state BImSchG procedures and uvp-portal.de for federal/EEZ BSH offshore procedures."},"member_scope":{"total":2,"note":"Covers both statutory German EIA portals: the joint Länder portal (uvp-verbund.de) and the federal portal (uvp-portal.de).","pattern":"Use uvp-verbund.de for onshore state BImSchG procedures and uvp-portal.de for federal/EEZ BSH offshore procedures."}},{"source_id":"de-bnetza-wind-tenders","name":"Bundesnetzagentur — Zuschläge der Ausschreibungen für Windenergie an Land (EEG) und auf See (WindSeeG)","publisher":"Bundesnetzagentur (BNetzA)","official":true,"landing_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/BeendeteAusschreibungen/start.html","data_url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Onshore/Zuschlagslisten/ListeZuschlaegeAugust2026.xlsx?__blob=publicationFile&v=3","access":"direct_download","format":"XLSX per onshore bidding round (4 rounds/year) and PDF/HTML BK6 award notices for offshore WindSeeG rounds","license":"Public statutory disclosure under § 35 Abs. 1 EEG / WindSeeG (no open-data license stated)","language":"de","has_coordinates":false,"location_precision":"municipality","publisher_type":"regulator","adds":"Identifies permitted onshore wind projects that won EEG tariff awards (per-round XLSX with bidder name, kW, parcels, EEG IDs and award date) and offshore WindSeeG auction winners (BK6 decisions), capturing a critical post-permit pre-construction milestone.","first_seen_pass":1,"rank":4,"summary":"Official BNetzA EEG onshore wind (quarterly XLSX) and WindSeeG offshore wind (BK6 PDF) auction award lists naming winning bidders, capacities and sites.","coverage_note":"235 awarded onshore wind bids in the 2026-08-01 round XLSX (plus quarterly archives since 2017 and BK6 offshore site awards); bid awards, not full permit inventory.","data_date":"2026-09-24","caveats":["Onshore awards require an existing BImSchG permit, while offshore WindSeeG awards precede BSH Planfeststellung.","No coordinates in onshore XLSX (join Zuschlags-Nr or EEG9... IDs to MaStR); Gebotsmenge is in kW."],"coverage":{"geographic":"Germany nationwide (onshore EEG bidding rounds since 2017; offshore WindSeeG centralized and non-centralized site auctions)"},"fine_print":{"unit":{"value":"Awarded bid (Zuschlag, WIN...) on sheet 'Zuschläge_Kompakt' (235 awards in the 2026-08-01 round) and individual EEG turbine record (EEG...) on 'Zuschläge_Detailliert'; bid volume Gebotsmenge is in kilowatts (kW).","quote":"Kompakte Darstellung: Pro Zeile wird ein Zuschlag dargestellt.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Onshore/Zuschlagslisten/ListeZuschlaegeAugust2026.xlsx?__blob=publicationFile&v=3","attempts":[]},"inclusion_rule":{"value":"Onshore wind projects holding a BImSchG permit (registered in MaStR ~3-4 weeks before the bidding date) that win an EEG auction award; offshore WindSeeG site auction winners prior to BSH Planfeststellung.","quote":"Die Bundesnetzagentur gibt die Ergebnisse des Verfahrens nach § 35 Abs. 1 EEG für den Gebotstermin 1. August 2026 bekannt.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/BeendeteAusschreibungen/2026/GT03082026/start.html","attempts":[]},"reference_date":{"value":"Latest published onshore award list covers Gebotstermin 2026-08-01 (award announcement Excel serial 46289 = 2026-09-24; 2026-11-01 round still in evaluation on 2026-11-25).","quote":"Zuschläge des Ausschreibungsverfahrens EEG Wind für den Gebotstermin 01.08.2026","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Onshore/Zuschlagslisten/ListeZuschlaegeAugust2026.xlsx?__blob=publicationFile&v=3","attempts":[]},"update_frequency":{"value":"Quarterly for onshore wind (bidding dates 1 February, 1 May, 1 August, 1 November); annual/round-based for offshore WindSeeG tenders.","quote":null,"url":null,"attempts":[{"url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/BeendeteAusschreibungen/start.html","note":"Confirmed quarterly Gebotstermine (Feb, May, Aug, Nov) across 2022-2026 subpages."}]},"exclusions":{"value":"Excludes unsubsidized PPA-only wind farms, small/pilot exemptions outside EEG tenders, unsuccessful bids, and pending BImSchG applications (except offshore WindSeeG auctions, which precede BSH Planfeststellung); contains no coordinates.","quote":null,"url":null,"attempts":[{"url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Onshore/Zuschlagslisten/ListeZuschlaegeAugust2026.xlsx?__blob=publicationFile&v=3","note":"Verified columns: location is text (Bundesland, Landkreis, PLZ, Gemeinde, Gemarkung, Flur/Flurstück) without coordinates."}]}},"key_fields":[{"field":"Name des Bieters","meaning":"Winning bidder / project SPV"},{"field":"Zuschlags-Nr","meaning":"Award identifier (e.g. WIN26-3/374), joinable to MaStR EegZuschlag / Zuschlagsnummern"},{"field":"Gebotsmenge","meaning":"Awarded capacity in kW (e.g. 24800 = 24.8 MW)"},{"field":"Angegebener Standort der Anlage","meaning":"Multiline text with Bundesland, Landkreis, PLZ, Gemeinde, Gemarkung, Flur/Flurstück, per-turbine EEG9... ID and kW"},{"field":"Bekanntgabe des Zuschlags","meaning":"Public award announcement date triggering statutory EEG realization deadlines"}],"how_to_use":{"example_request":"curl -sL -o /tmp/ListeZuschlaegeAugust2026.xlsx 'https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/_DL/Onshore/Zuschlagslisten/ListeZuschlaegeAugust2026.xlsx?__blob=publicationFile&v=3'","example_result":"Sheet 'Zuschläge_Kompakt' (row 6): Name des Bieters='ABO Energy Windpark 15 GmbH & Co. KG', Zuschlags-Nr='WIN26-3/374', Gebotsmenge=24800 (kW), Standort='Rheinland-Pfalz, Landkreis Mayen-Koblenz, PLZ 56332, Gemeinde Niederfell...'","steps":["Download each round's ListeZuschlaege*.xlsx from BeendeteAusschreibungen/YYYY/GT.../start.html (for offshore WindSeeG awards, check BK6_72_Offshore/Ausschr_vorunters_Flaechen/start.html and Ausschr_nicht_zentral_vorunters_Flaechen/start.html).","Read sheet 'Zuschläge_Kompakt' (data starts after metadata header rows at row 6) for bid-level totals or 'Zuschläge_Detailliert' for individual turbine parcels, dividing Gebotsmenge by 1,000 for MW.","Join Zuschlags-Nr (e.g. WIN26-3/374) or embedded EEG9... numbers to MaStR 'In Planung' units to attach exact WGS84 coordinates and identify which permitted turbines still remain unbuilt."],"reading_traps":["Award lists are static point-in-time snapshots per auction round: they do not update when a project later commissions or forfeits its award—always cross-check against MaStR BetriebsStatusName.","Gebotsmenge is in kW without unit text in the column header on 'Zuschläge_Kompakt' (per-turbine kW appears inside 'Angegebener Standort der Anlage')."]},"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":59075,"records_total":235,"records_for_country":235,"problems":[]},"evidence":[{"claim":"BNetzA publishes downloadable XLSX lists of all winning onshore wind EEG bids after each quarterly bidding date.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Wind_Onshore/BeendeteAusschreibungen/2026/GT03082026/start.html","quote":"Liste der Zuschläge zum Gebotstermin 1. August 2026 (xlsx / 58 KB)"},{"claim":"Offshore wind support and site awards since 2021 are run via competitive WindSeeG auctions by Beschlusskammer 6.","url":"https://www.bundesnetzagentur.de/DE/Fachthemen/ElektrizitaetundGas/Ausschreibungen/Offshore/start.html","quote":"Für alle Windenergieanlagen auf See, die ab 2021 in Betrieb genommen werden, wurden Ausschreibungen eingeführt. Die Ausschreibungen führt die Beschlusskammer 6 durch."}],"members":[],"members_summary":null},{"source_id":"eu-emodnet-offshore-windfarms","name":"EMODnet Human Activities — Offshore Wind Farms (WFS emodnet:windfarmspoly)","publisher":"European Marine Observation and Data Network (EMODnet, European Commission / CINEA)","official":true,"landing_url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetCapabilities","data_url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=emodnet:windfarmspoly&CQL_FILTER=country='Germany'&outputFormat=application/json","access":"api","format":"OGC WFS 2.0.0 (GeoJSON, GML, Shapefile)","license":"CC BY 4.0 / EMODnet open reuse with attribution","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"supranational","adds":"Open pan-European WFS delivering wind-farm-level offshore polygons for Germany that explicitly distinguish 'Planned' (55), 'Approved' (5), 'Construction' (2) and 'Production' (31) stages with MW capacity—working reliably while BSH's CONTIS Offshore-Windfarms-WFS returned HTTP 500.","first_seen_pass":1,"rank":5,"summary":"EU EMODnet WFS polygon layer of German offshore wind farms and FEP zones separating Planned, Approved and Construction stages.","coverage_note":"62 pre-operational German offshore polygons (55 Planned, 5 Approved, 2 Construction; out of 93 total); wind farm/zone polygons, offshore only.","data_date":"2026","caveats":["Offshore only; omits developer names and exact permit dates, and mixes named projects with unauctioned FEP zones (e.g. N-12.4).","Use emodnet:windfarmspoly (polygons), not emodnet:windfarms (incomplete point layer)."],"coverage":{"geographic":"German North Sea and Baltic Sea Exclusive Economic Zone (AWZ) and territorial waters (within pan-European marine coverage)"},"fine_print":{"unit":{"value":"Offshore wind farm project or development zone polygon (emodnet:windfarmspoly); capacity power_mw is in megawatts (MW).","quote":"\"name\":\"EnBW He Dreiht\",\"n_turbines\":64,\"power_mw\":960.0,\"status\":\"Approved\",\"updateyear\":\"2026\"","url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=emodnet:windfarmspoly&CQL_FILTER=country='Germany'&outputFormat=application/json","attempts":[]},"inclusion_rule":{"value":"Offshore wind farms and designated FEP development sites in marine waters compiled from national authorities (BSH CONTIS for Germany), covering Planned, Approved, Construction, Production and Dismantled statuses.","quote":null,"url":null,"attempts":[{"url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetCapabilities","note":"Checked WFS capabilities and German feature properties; includes both named wind farm projects and BSH FEP areas (e.g. N-12.4)."}]},"reference_date":{"value":"updateyear='2026' across German offshore wind farm features (queried live 2026-11-25).","quote":"\"updateyear\":\"2026\"","url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=emodnet:windfarmspoly&CQL_FILTER=country='Germany'&outputFormat=application/json","attempts":[]},"update_frequency":{"value":"Periodic (typically annual/semi-annual synchronization with national marine authorities).","quote":null,"url":null,"attempts":[{"url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetCapabilities","note":"WFS metadata does not specify an exact refresh interval."}]},"exclusions":{"value":"Offshore only (zero onshore wind coverage); omits developer/operator column and exact permit decision dates (only expected commissioning/status year in 'year').","quote":null,"url":null,"attempts":[{"url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=emodnet:windfarmspoly&CQL_FILTER=country='Germany'&outputFormat=application/json","note":"Inspected all property keys on 93 German polygons: no operator/developer or decision-date field exists."}]}},"key_fields":[{"field":"name","meaning":"Offshore wind farm name or BSH FEP zone code (e.g. 'EnBW He Dreiht', 'Baltic Eagle', 'N-12.4')"},{"field":"status","meaning":"'Planned' (55), 'Approved' (5), 'Construction' (2), or 'Production' (31) in Germany"},{"field":"power_mw","meaning":"Project or zone capacity in MW"},{"field":"year / updateyear","meaning":"Commissioning or target horizon year and dataset update year ('2026')"}],"how_to_use":{"example_request":"curl -sG 'https://ows.emodnet-humanactivities.eu/wfs' --data-urlencode 'service=WFS' --data-urlencode 'version=2.0.0' --data-urlencode 'request=GetFeature' --data-urlencode 'typeNames=emodnet:windfarmspoly' --data-urlencode \"CQL_FILTER=country='Germany' AND status IN ('Planned','Approved','Construction')\" --data-urlencode 'outputFormat=application/json'","example_result":"{\"type\":\"FeatureCollection\",\"features\":[{\"id\":\"windfarmspoly.1\",\"properties\":{\"country\":\"Germany\",\"name\":\"EnBW He Dreiht\",\"n_turbines\":64,\"power_mw\":960.0,\"status\":\"Approved\",\"updateyear\":\"2026\"}}]}","steps":["Query emodnet:windfarmspoly (polygon layer, 93 German features; do not confuse with emodnet:windfarms point layer which has only 21 coastal/test points for Germany) filtering country='Germany' and status IN ('Planned','Approved','Construction').","Separate named projects ('EnBW He Dreiht', 'Baltic Eagle') from unauctioned BSH FEP zones ('N-12.4') and cross-reference MaStR ('Windenergie auf See') or BSH notices for developer names and exact Planfeststellungsbeschluss dates."],"reading_traps":["emodnet:windfarms (points) has only 21 German records, whereas emodnet:windfarmspoly (polygons) has all 93 German offshore wind farms/zones (62 pre-operational).","Status updates can lag live commissioning by several months (e.g. 'Baltic Eagle' still listed as 'Construction' in the 2026 layer); verify against MaStR."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json;charset=UTF-8","size_bytes":146820,"records_total":93,"records_for_country":93,"problems":[]},"evidence":[{"claim":"EMODnet WFS returns 93 German offshore wind farm polygons including 55 Planned, 5 Approved and 2 Construction records updated in 2026.","url":"https://ows.emodnet-humanactivities.eu/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=emodnet:windfarmspoly&CQL_FILTER=country='Germany'&outputFormat=application/json","quote":"\"country\":\"Germany\",\"name\":\"Baltic Eagle\",\"n_turbines\":83,\"power_mw\":476.0,\"status\":\"Construction\",\"type_inst\":\"Grounded\",\"updateyear\":\"2026\""}],"members":[],"members_summary":null},{"source_id":"de-bsh-offshore-fep","name":"Bundesamt für Seeschifffahrt und Hydrographie (BSH) — Flächenentwicklungsplan (FEP) WFS/Atom & CONTIS Offshore Maps","publisher":"Bundesamt für Seeschifffahrt und Hydrographie (BSH)","official":true,"landing_url":"https://www.bsh.de/DE/THEMEN/Offshore/Meeresfachplanung/Flaechenentwicklungsplan_2025/flaechenentwicklungsplan_2025_node.html","data_url":"https://gdi.bsh.de/en/mapservice/Site-Development-Plan-in-the-German-Maritime-Area-2023-WFS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetFeature&TYPENAMES=Site_Development_Plan_2023:Site","access":"api","format":"OGC WFS 2.0.0, INSPIRE Atom ZIP/GeoPackage/GeoJSON, and CONTIS PDF maps","license":"GeoNutzV / dl-de/by-2-0 (BSH GDI open geodata)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"national_government","adds":"Official German EEZ marine spatial planning polygons (Site_Development_Plan_2023:Site = 23 offshore wind sites; FEP 2025 second amendment 2026-10-08) and CONTIS cartographic PDFs showing operational, under-construction, approved and planned offshore wind farms.","first_seen_pass":1,"rank":6,"coverage":{"geographic":"German Exclusive Economic Zone (AWZ) of the North Sea and Baltic Sea"},"fine_print":{"unit":{"value":"Designated offshore wind development site polygon (Fläche, e.g. 'N-3.8') in FEP WFS; wind farm polygons on CONTIS Nordsee/Ostsee-OffshoreWindparks.pdf maps.","quote":"Die aktuellen Geodaten für den Flächenentwicklungsplan 2025 sind als Web Map Service sowie als Web Feature Service verfügbar. Diese können beispielsweise über den Atom- basierten Downloaddienst im GeoSeaPortal abgerufen werden.","url":"https://www.bsh.de/DE/THEMEN/Offshore/Meeresfachplanung/Flaechenentwicklungsplan_2025/flaechenentwicklungsplan_2025_node.html","attempts":[]},"inclusion_rule":{"value":"All offshore wind development areas designated under WindSeeG in the federal Flächenentwicklungsplan.","quote":"Der Flächenentwicklungsplan 2025 sowie die zugehörigen Umweltberichte für Nordsee und Ostsee wurden am 30. Januar 2025 bekanntgemacht und veröffentlicht sowie durch die Änderung des Flächenentwicklungsplans 2025 vom 30.01.2026 und durch die Zweite Änderung des Flächenentwicklungsplans 2025 vom 08.10.2026 geändert.","url":"https://www.bsh.de/DE/THEMEN/Offshore/Meeresfachplanung/Flaechenentwicklungsplan_2025/flaechenentwicklungsplan_2025_node.html","attempts":[]},"reference_date":{"value":"FEP 2025 2nd amendment published 2026-10-08; tested public WFS endpoint serves FEP 2023 site polygons (published 2023-01-20); BSH's tabular Liste_Windparkvorhaben.pdf is frozen at 2016-12-19.","quote":"Liste über Offshore-Windparkvorhaben im Sinne des § 26 WindSeeG, Stand 19.12.2016","url":"https://www.bsh.de/SharedDocs/Meldungen_Oeffentl_Bekanntmachungen/_Anlagen/Downloads/Liste_Windparkvorhaben.pdf?__blob=publicationFile","attempts":[]},"update_frequency":{"value":"Periodic plan revisions and amendments (2019, 2020, 2023, 2025, 2026 amendments).","quote":null,"url":null,"attempts":[{"url":"https://gdi.bsh.de/de/feed/Site-Development-Plan-in-the-German-Maritime-Area-series.xml","note":"Inspected INSPIRE Atom series feed entries (2019, 2020, 2023, 2023 2nd draft)."}]},"exclusions":{"value":"FEP WFS polygons contain zone codes (name_fep) and publication dates without developer, MW or permit status; BSH's CONTIS Offshore-Windfarms-WFS returned HTTP 500 on 2026-11-26, and Nordsee/Ostsee-OffshoreWindparks.pdf maps have vector graphics without extractable text.","quote":null,"url":null,"attempts":[{"url":"https://gdi.bsh.de/en/mapservice/Offshore-Windfarms-WFS?SERVICE=WFS&VERSION=2.0.0&REQUEST=GetCapabilities","note":"Returned HTTP 500 Internal Server Error on 2026-11-26."}]}},"key_fields":[{"field":"name_fep","meaning":"Official FEP site identifier (e.g. 'N-3.8'), linking to BNetzA WindSeeG auctions and MaStR"},{"field":"publishing","meaning":"Plan publication date (YYYYMMDD)"},{"field":"geom","meaning":"Polygon geometry of the offshore wind site"}],"how_to_use":{"example_request":"curl -sG 'https://gdi.bsh.de/en/mapservice/Site-Development-Plan-in-the-German-Maritime-Area-2023-WFS' --data-urlencode 'SERVICE=WFS' --data-urlencode 'VERSION=2.0.0' --data-urlencode 'REQUEST=GetFeature' --data-urlencode 'TYPENAMES=Site_Development_Plan_2023:Site'","example_result":"GML 3.2 FeatureCollection with 23 Site polygons (e.g. name_fep='N-3.8', publishing='20230120', remark='planning scale 1:400.000').","steps":["Fetch FEP site polygons via WFS or the INSPIRE Atom feed (https://gdi.bsh.de/de/feed/Site-Development-Plan-in-the-German-Maritime-Area-series.xml).","Join name_fep to BNetzA BK6 offshore auction awards and BSH Öffentliche Bekanntmachungen (Planfeststellungsbeschlüsse) for developer, MW, and approval date, or use EMODnet emodnet:windfarmspoly while CONTIS Offshore-Windfarms-WFS returns HTTP 500."],"reading_traps":["Do not mistake BSH's downloadable Liste_Windparkvorhaben.pdf for a current pipeline list: it is a historical § 26 WindSeeG transitional list frozen on 19.12.2016.","Nordsee-OffshoreWindparks.pdf and Ostsee-OffshoreWindparks.pdf have outlined/rasterized labels (pdftotext extracts 0 characters); render with pdftoppm if reading visually."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"application/gml+xml; version=3.2","size_bytes":32062,"records_total":23,"records_for_country":23,"problems":["BSH CONTIS Offshore-Windfarms-WFS (https://gdi.bsh.de/en/mapservice/Offshore-Windfarms-WFS) returned HTTP 500 Internal Server Error; Atom feed had not yet added the 2025/2026 FEP ZIPs alongside 2019-2023."]},"evidence":[{"claim":"BSH publishes FEP geodata via WFS and Atom download services in GeoSeaPortal and promulgated the second 2025 FEP amendment on 2026-10-08.","url":"https://www.bsh.de/DE/THEMEN/Offshore/Meeresfachplanung/Flaechenentwicklungsplan_2025/flaechenentwicklungsplan_2025_node.html","quote":"08.10.2026 Zweite Änderung des Flächenentwicklungsplans 2025"}],"members":[],"members_summary":null},{"source_id":"osm-overpass-wind-permitting","name":"OpenStreetMap — Planned and Under-Construction Wind Plants and Turbines (Overpass API)","publisher":"OpenStreetMap Contributors","official":false,"landing_url":"https://www.openstreetmap.org/","data_url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","access":"api","format":"JSON / OSM XML via Overpass QL","license":"Open Data Commons Open Database License (ODbL 1.0)","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Separates onshore wind turbines and wind farms physically under construction ('power=construction' / 'construction:power': 1,082 turbines and 54 plants) from proposed units (66 turbines, 2 plants), filling the 'im Bau' gap left by MaStR and Länder registries.","first_seen_pass":1,"rank":7,"coverage":{"geographic":"Germany nationwide (crowdsourced, uneven regional completeness)"},"fine_print":{"unit":{"value":"Mixed OSM elements: individual wind turbines (generator:source=wind: 1,148 elements) and wind farm polygons/relations (plant:source=wind: 56 elements); capacity tags carry explicit unit strings (e.g. '4.2 MW').","quote":null,"url":null,"attempts":[{"url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","note":"Verified unit strings across all 1,204 returned German OSM elements."}]},"inclusion_rule":{"value":"Volunteer-mapped wind turbines and wind farms tagged with OSM lifecycle prefixes/values 'construction' or 'proposed'.","quote":null,"url":null,"attempts":[{"url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","note":"Queried both power=construction/proposed and construction:power/proposed:power tagging schemes."}]},"reference_date":{"value":"Live OSM database queried on 2026-11-25.","quote":null,"url":null,"attempts":[{"url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","note":"Live Overpass query executed 2026-11-25."}]},"update_frequency":{"value":"Continuous (minute-level replication from OpenStreetMap).","quote":null,"url":null,"attempts":[{"url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","note":"Standard Overpass minute-diff feed."}]},"exclusions":{"value":"The 1,204 OSM elements represent roughly 14% of the 8,808 MaStR units in 'In Planung' by raw count, without matching individual records. Only 156 OSM elements carry operator/developer tags and 510 carry start_date/opening_date. There is no formal permitting stage or permit date.","quote":null,"url":null,"attempts":[{"url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","note":"Counted tag completeness across all 1,204 returned elements."}]}},"key_fields":[{"field":"power / construction:power / proposed:power","meaning":"Lifecycle stage ('construction' vs 'proposed') and asset level ('generator' vs 'plant')"},{"field":"generator:output:electricity / plant:output:electricity","meaning":"Rated capacity string (numeric on 690 elements; literal 'yes' on 401 elements)"},{"field":"operator / developer","meaning":"Operator or developer name (present on 156/1,204 elements)"},{"field":"opening_date / start_date","meaning":"Expected commissioning date (present on 510/1,204 elements)"},{"field":"ref:mastr","meaning":"Cross-reference to MaStR SEE... unit ID when mapped"}],"how_to_use":{"example_request":"curl -sL --data-urlencode 'data=[out:json][timeout:25];area(3600051477)->.de;(nwr[\"power\"=\"construction\"][\"generator:source\"=\"wind\"](area.de);nwr[\"power\"=\"proposed\"][\"generator:source\"=\"wind\"](area.de);nwr[\"construction:power\"=\"generator\"][\"generator:source\"=\"wind\"](area.de);nwr[\"proposed:power\"=\"generator\"][\"generator:source\"=\"wind\"](area.de);nwr[\"power\"=\"construction\"][\"plant:source\"=\"wind\"](area.de);nwr[\"power\"=\"proposed\"][\"plant:source\"=\"wind\"](area.de);nwr[\"construction:power\"=\"plant\"][\"plant:source\"=\"wind\"](area.de);nwr[\"proposed:power\"=\"plant\"][\"plant:source\"=\"wind\"](area.de););out center tags;' 'https://maps.mail.ru/osm/tools/overpass/api/interpreter'","example_result":"{\"elements\":[{\"type\":\"node\",\"id\":9517173597,\"lat\":48.8470499,\"lon\":10.0984,\"tags\":{\"generator:output:electricity\":\"4.2 MW\",\"generator:source\":\"wind\",\"model\":\"V150-4.2\",\"opening_date\":\"2026-10\",\"operator\":\"ENBW\",\"proposed:power\":\"generator\",\"ref:mastr\":\"SEE931818767260\"}}]}","steps":["Use Germany's relation-derived area ID area(3600051477) so the Overpass query finishes in <5 seconds rather than timing out on ISO3166-1 lookup.","Query both lifecycle conventions (power=construction/proposed and construction:power/proposed:power) and separate plant polygons (56) from generator points (1,148) to avoid double-counting MW.","Parse numeric MW only where generator:output:electricity contains digits (401 of 1,091 tagged elements contain the boolean string 'yes')."],"reading_traps":["overpass-api.de rejected default unspoofed curl/urllib clients with HTTP 406 Not Acceptable, and overpass.private.coffee timed out; the public mirror maps.mail.ru/osm/tools/overpass/api/interpreter served HTTP 200 without custom headers.","401 of 1,204 elements set generator:output:electricity='yes' rather than a MW figure, and some proposed nodes carry 'note=Position grob geschätzt'."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":498312,"records_total":1204,"records_for_country":1204,"problems":["Main instance overpass-api.de returned HTTP 406 Not Acceptable to default non-browser HTTP clients; overpass.private.coffee timed out."]},"evidence":[{"claim":"Overpass query for Germany returned 1,204 wind permitting/construction elements (1,082 construction generators, 66 proposed generators, 54 construction plants, 2 proposed plants).","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","quote":"\"opening_date\": \"2026-10\", \"operator\": \"ENBW\", \"proposed:power\": \"generator\", \"ref\": \"WN29-1\", \"ref:mastr\": \"SEE931818767260\""}],"members":[],"members_summary":null},{"source_id":"global-energy-monitor-gwpt","name":"Global Energy Monitor — Global Wind Power Tracker (GWPT)","publisher":"Global Energy Monitor (GEM)","official":false,"landing_url":"https://globalenergymonitor.org/projects/global-wind-power-tracker","data_url":"https://globalenergymonitor.org/download-data","access":"registration_required","format":"XLSX (via web registration form) and interactive web map","license":"CC BY 4.0 (mixed with attribution terms per tracker release)","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Wind-farm-phase level spreadsheet (>=10 MW) harmonizing pre-construction ('announced', 'pre-construction', 'permitted'), 'construction', 'shelved' and 'cancelled' stages with developer/owner names across onshore and offshore Germany.","first_seen_pass":1,"rank":8,"coverage":{"geographic":"Global including Germany (onshore and offshore wind farm phases >=10 MW)"},"fine_print":{"unit":{"value":"Wind farm project phase (MW).","quote":"The Global Wind Power Tracker is composed of worldwide facility-level data for utility-scale onshore and offshore wind power facilities (10 MW+).","url":"https://globalenergymonitor.org/projects/global-wind-power-tracker","attempts":[]},"inclusion_rule":{"value":"Utility-scale onshore and offshore wind farm phases of at least 10 MW capacity.","quote":"166 country/areas included 32,227 phases tracked","url":"https://globalenergymonitor.org/projects/global-wind-power-tracker","attempts":[]},"reference_date":{"value":"Semi-annual global releases (landing page verified 2026-11-25; XLSX not downloaded due to registration wall).","quote":null,"url":null,"attempts":[{"url":"https://globalenergymonitor.org/download-data","note":"Download requires submitting a registration form."}]},"update_frequency":{"value":"Semi-annual updates.","quote":null,"url":null,"attempts":[{"url":"https://globalenergymonitor.org/projects/global-wind-power-tracker","note":"Checked tracker overview page without submitting download form."}]},"exclusions":{"value":"Excludes wind projects below 10 MW (many 1-2 turbine German onshore BImSchG applications are 5.5-9 MW and fall below GEM's threshold).","quote":"utility-scale onshore and offshore wind power facilities (10 MW+).","url":"https://globalenergymonitor.org/projects/global-wind-power-tracker","attempts":[]}},"key_fields":[{"field":"Project Name / Phase Name","meaning":"Wind farm and phase identifier"},{"field":"Capacity (MW)","meaning":"Phase capacity in MW"},{"field":"Status","meaning":"Development stage (announced, pre-construction, construction, operating, shelved, cancelled)"},{"field":"Owner / Parent","meaning":"Project developer/owner and parent company"},{"field":"Latitude / Longitude","meaning":"Exact or approximate project coordinates"}],"how_to_use":{"example_request":"Open https://globalenergymonitor.org/download-data and select 'Global Wind Power Tracker' (registration form required; not submitted in this session).","example_result":"Landing page reports 32,227 wind farm phases tracked across 166 countries/areas (>=10 MW threshold).","steps":["Request the Global Wind Power Tracker XLSX on https://globalenergymonitor.org/download-data, filter Country='Germany' and Status in ('announced', 'pre-construction', 'construction', 'shelved', 'cancelled').","Supplement <10 MW German onshore wind projects using MaStR and Länder LIS-A datasets."],"reading_traps":["10 MW threshold omits single-turbine (5-7 MW) German BImSchG applications that constitute a significant share of onshore permitting."]},"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":115477,"records_total":32227,"records_for_country":null,"problems":["Bulk spreadsheet download requires filling out a user registration form on /download-data."]},"evidence":[{"claim":"GEM's Global Wind Power Tracker covers utility-scale wind facilities of 10 MW or larger across 166 countries.","url":"https://globalenergymonitor.org/projects/global-wind-power-tracker","quote":"The Global Wind Power Tracker is composed of worldwide facility-level data for utility-scale onshore and offshore wind power facilities (10 MW+)."}],"members":[],"members_summary":null},{"source_id":"commercial-de-wind-trackers","name":"Commercial German Wind Permitting Databases (Nefino.LI / enervis)","publisher":"Nefino GmbH / enervis energy advisors GmbH","official":false,"landing_url":"https://www.nefino.de/","data_url":null,"access":"paid","format":"Proprietary SaaS / GIS layers and paid market reports","license":"Commercial subscription","language":"de","has_coordinates":true,"location_precision":"exact","publisher_type":"commercial","adds":"Paid commercial aggregation reconciling municipal zoning, UVP/Amtsblatt notices, Länder LIS-A tables, and MaStR into a unified pre-permit and post-permit German project pipeline.","first_seen_pass":1,"rank":9,"coverage":{"geographic":"Germany nationwide"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.nefino.de/","note":"Commercial product landing page does not publish schema specifications publicly."}]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.nefino.de/","note":"Commercial SaaS behind paid contract."}]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.nefino.de/","note":"Live commercial platform."}]},"update_frequency":{"value":"Continuous news/notice monitoring claimed ('tagesaktuelle Entwicklungen').","quote":"Sie suchen zuverlässige Flächeninformationen, präzise Analysen oder tagesaktuelle Entwicklungen im Energiesektor?","url":"https://www.nefino.de/","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.nefino.de/","note":"Not inspectable without paid license."}]}},"key_fields":[],"how_to_use":{"example_request":"Commercial subscription inquiry via https://www.nefino.de/ (not accessed).","example_result":"Public product page describes Nefino.LI News hub covering wind/solar areas and project developments in Germany.","steps":["Requires commercial licensing; for open workflows combine MaStR, the 8 Länder datasets, and UVP-Verbund/Amtsblatt notices instead."],"reading_traps":[]},"test":{"tested_on":"2026-11-26","method":"page_only","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":141210,"records_total":null,"records_for_country":null,"problems":["Paid commercial subscription required."]},"evidence":[{"claim":"Nefino markets a commercial German renewable energy spatial and news platform covering wind farm areas and project developments.","url":"https://www.nefino.de/","quote":"Software Nefino.LI News Deutschlands einziger zentraler Informations-Hub für die Energiewende: Umfassende Daten zu Flächen für Wind- und Solarparks"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Bundesnetzagentur (BNetzA) — Marktstammdatenregister & EEG/WindSeeG Tenders; Bundesamt für Seeschifffahrt und Hydrographie (BSH) — Offshore EEZ Permitting; Immissionsschutzbehörden der 16 Länder — Onshore BImSchG Permitting","url":"https://www.marktstammdatenregister.de/"},"operators":{"structure":"many","note":"Thousands of project-specific SPVs (typically 'Windpark ... GmbH & Co. KG'), municipal utilities, citizen-energy cooperatives (Bürgerenergiegesellschaften), and major developers (EnBW, RWE, Ørsted, ABO Energy, ENERCON, wpd, UKA, LEAG); 8,808 'In Planung' MaStR wind units are held by legal-entity and natural-person operators registered with ABR... IDs.","census_url":"https://www.marktstammdatenregister.de/MaStR/Akteur/Marktakteur/IndexOeffentlich"},"publication_obligation":{"exists":"yes","norm":"§ 5 Abs. 4-5 & § 15 Marktstammdatenregisterverordnung (MaStRV); § 10 BImSchG & § 21a 9. BImSchV; §§ 19-20 UVPG; § 35 Abs. 1 EEG; §§ 45 & 73 WindSeeG","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","what_must_be_published":"Operators must register wind units in MaStR within 1 month after BImSchG/WindSeeG permit notification (published openly except <=30 kW coordinates and natural-person names). Permitting authorities must publish EIA-screened/mandatory applications and permit decisions on UVP portals, and BNetzA must publish EEG/WindSeeG auction awards. Non-UVP simplified § 19 BImSchG pending applications have no federal publication mandate.","frequency":"Within 1 month of permit notification in MaStR (daily export update); event-driven per statutory milestone on UVP portals and BSH notices; quarterly for onshore EEG awards."},"consolidated_republication":{"found":"partial","note":"BNetzA's MaStR consolidates permitted wind turbines nationwide (post-approval), and UVP-Verbund / UVP-Portal consolidate EIA-relevant procedure notices across Länder and federal authorities, but no federal agency republishes all pending pre-approval BImSchG wind applications from the 16 Länder's LIS-A immissions-control databases.","checked_pages":[{"organization":"Bundesnetzagentur — Marktstammdatenregister","url":"https://www.marktstammdatenregister.de/MaStR/Datendownload","saw":"Nationwide daily XML and JSON API covering 8,808 'In Planung' wind units, of which 8,571 have a permit identifier. Section 5(4) MaStRV requires registration once a required federal permit is granted."},{"organization":"UVP-Verbund der Länder","url":"https://www.uvp-verbund.de/freitextsuche?rstart=0&currentSelectorPage=1&category=energie&layer=zv&query=Windenergieanlagen","saw":"1,270 energy Zulassungsverfahren (4,441 total wind hits) as HTML/PDF procedure notices without structured tabular export or non-UVP 1-2 turbine cases."},{"organization":"Umweltbundesamt — UVP-Portal des Bundes","url":"https://www.uvp-portal.de/de/vorhaben?fulltext=Windpark","saw":"2,080 federal/EEZ offshore and cross-border EIA procedure pages without downloadable structured capacity/stage tables."},{"organization":"Bundesamt für Seeschifffahrt und Hydrographie (BSH)","url":"https://www.bsh.de/SharedDocs/Meldungen_Oeffentl_Bekanntmachungen/Sonstige_Bekanntmachungen/Liste_ueber_Offshore_Windparkvorhaben.html?nn=280624","saw":"Offshore wind project list PDF is frozen at Stand 19.12.2016; current BSH Planfeststellungsbeschlüsse are individual HTML/PDF notices and CONTIS Offshore-Windfarms-WFS returned HTTP 500."},{"organization":"Fachagentur Wind und Solar (FA Wind)","url":"https://www.fachagentur-wind-solar.de/veroeffentlichungen/mediathek/detail/daten-zu-genehmigungen-von-windenergieanlagen","saw":"Publishes monthly/annual aggregate permitted MW charts by Land and district from MaStR, not project-level lists."}]}},"national_registry":{"exists":"partial","note":"MaStR is the statutory national register. Among 8,808 wind units in 'In Planung', 8,571 have a permit identifier. Registration becomes mandatory after a required federal permit is granted under § 5(4) MaStRV. The status does not distinguish construction from permit approval and does not systematically cover pending, refused or withdrawn applications.","checked_pages":[{"organization":"Bundesministerium der Justiz / Bundesnetzagentur (MaStRV)","url":"https://www.gesetze-im-internet.de/mastrv/__5.html","saw":"Confirmed § 5 Abs. 4-5 MaStRV: mandatory project registration applies only once BImSchG or WindSeeG Zulassung has been granted."},{"organization":"Bundesnetzagentur (MaStR Erweiterte Einheitenübersicht)","url":"https://www.marktstammdatenregister.de/MaStR/Einheit/Einheiten/ErweiterteOeffentlicheEinheitenuebersicht","saw":"Verified Betriebs-Status options ('In Planung', 'In Betrieb', 'Vorübergehend stillgelegt', 'Endgültig stillgelegt')—no 'im Genehmigungsverfahren', 'im Bau' or 'abgelehnt' status exists."},{"organization":"UVP-Verbund der Länder","url":"https://www.uvp-verbund.de/","saw":"Document-based EIA notice portal across Länder; not a structured national inventory of all pending BImSchG wind applications."},{"organization":"GDI-DE Geodatenkatalog","url":"https://gdk.gdi-de.org/gdi-de/srv/ger/csw","saw":"Queried national INSPIRE/GDI-DE CSW catalogue: wind permitting WFS/downloads are published separately by individual Länder with heterogeneous schemas and no federal WFS aggregation."}]},"if_unstructured":{"summary":"To capture pending onshore BImSchG applications in the 10 Länder without open 'im Verfahren' tables, exact permit/application dates, and offshore AWZ Planfeststellung details, extract fields from official BImSchG public-display/permit PDFs (Bekanntmachungen and redacted Genehmigungsbescheide) and BSH Öffentliche Bekanntmachungen.","recipe":["Collect new Bekanntmachung and Genehmigungsbescheid PDFs from UVP-Verbund, state Amtsblätter, and BSH Öffentliche Bekanntmachungen, and extract text with 'pdftotext -layout'.","From Section I ('Entscheidung') or the 1-2 page Bekanntmachung text, extract: (a) Antragstellerin / Vorhabenträger (developer), (b) procedure type (§ 4 BImSchG new permit, § 9 Vorbescheid, § 16a/16b type-change/repowering, or § 45 WindSeeG Planfeststellung), (c) turbine count × unit MW (e.g. 19 × 6.0 MW = 114.0 MW in G-10-2026-047; 14 × 7.2 MW = 100.8 MW in 40.104.00/24), and (d) both the application date ('Antrag vom ...') and decision date on page 1.","Extract the 'Standorte der WKA' coordinate table (typically Section II or Tabelle 1/2 in ETRS89/UTM Zone 32N or 33N, plus the WGS84 DMS aviation obstacle table in Condition IV); watch out for German thousand-separator dots in UTM metres ('471.800' = 471800 m Easting, whereas '261,00' uses a comma decimal).","Deduplicate multi-notice lifecycles by permit docket number (Aktenzeichen / Reg.-Nr.): a single wind farm emits an application notice, an EIA report upload, a permit notice, and sometimes a § 16b Abs. 7 BImSchG turbine-type amendment before construction."],"location_method":"Full Genehmigungsbescheide and UVP-Kurzbeschreibungen include exact mast-centre UTM coordinates (EPSG:25832 or EPSG:25833) and WGS84 DMS aviation coordinates. Short 1-page Auslegungsbekanntmachungen (e.g. Temnitzquell G-10-2026-047) list only PLZ, Gemarkung, Flur and Flurstück—resolve those exact cadastral parcels via the respective Land ALKIS WFS/cadastre viewer.","cross_with":"Cross-check Aktenzeichen and parcel numbers against MaStR ('AktenzeichenGenehmigung' / 'GenehmigungsMastrNummer') within 30 days after permit grant, BNetzA quarterly EEG Zuschlagslisten, and OpenStreetMap 'power=construction' nodes for physical construction start.","where_published":[{"name":"Immissionsschutzbehörden der Länder — Öffentliche Bekanntmachungen & Genehmigungsbescheide nach § 10 BImSchG / § 21a 9. BImSchV","url":"https://www.uvp-verbund.de/trefferanzeige?docuuid=011e3d93-4838-4dbf-8a80-7e0f43c6cdca&rstart=0&currentSelectorPage=1&category=energie&procedure=obj_class_zv&query=Windpark%20MW","what":"Official public notices of pending formal BImSchG wind farm applications (Auslegungsbekanntmachung) and full redacted BImSchG permit decisions (Genehmigungsbescheid) issued by Landesumweltämter, Bezirksregierungen, SGD Nord/Süd, Regierungspräsidien or Landkreise.","how_to_search_inside":"Filter by Bundesland and 'Zulassungsverfahren' or 'Negative Vorprüfungen' with 'Windkraftanlagen' / 'Windenergieanlagen' / '§ 16b BImSchG', or check each permitting authority's 'Öffentliche Bekanntmachungen Immissionsschutz' page and state Amtsblatt; download the Bekanntmachung PDF and, when posted, the redacted Genehmigungsbescheid ('GB ... geschwärzt.pdf').","example_document":{"url":"https://www.uvp-verbund.de/documents-ige-ng/igc_bb/011e3d93-4838-4dbf-8a80-7e0f43c6cdca/GB%2040.104.00_24_geschw%C3%A4rzt_14%20WKA_WP%20Forst-Briesnig%203%20und%20A.pdf","what_it_gives":"Page 1: 'Genehmigung Nr. 40.104.00/24/1.6.2V/T12', decision date 'Cottbus, 30.09.2026', filing date 'Antrag der LEWP Forst Briesnig 3 GmbH & Co. KG vom 18. Dezember 2024', developer 'LEWP Forst Briesnig 3 GmbH & Co. KG, Leagplatz 1 in 03050 Cottbus', capacity '14 WKA des Typs VESTAS EnVentusTM V172-7.2 MW' (= 100.8 MW); Tabelle 2 (ETRS 89 Zone 33): WEA 1 'Gemarkung Briesnig, Flur 1, Flurstück 315, Ostwert 471.800, Nordwert 5.740.433' (and WGS84 aviation table: 'WEA 1: 51° 48' 50.5\" N, 14° 35' 27.3\" E')."}},{"name":"BSH — Öffentliche Bekanntmachungen für Offshore-Windparks (§ 45 & § 73 WindSeeG)","url":"https://www.bsh.de/DE/THEMEN/Offshore/Oeff-Bekanntmachungen/oeff-bekanntmachungen_node.html","what":"Official BSH notices of public hearings, cross-border consultations, and Planfeststellungsbeschlüsse / Plangenehmigungen for offshore wind farms in the German North Sea and Baltic Sea EEZ.","how_to_search_inside":"Browse chronological notices on oeff-bekanntmachungen_node.html for 'Offshore-Windpark' and 'Planfeststellungsbeschluss' (also published in Nachrichten für Seefahrer); open each notice page for docket number, FEP site code, and decision date.","example_document":{"url":"https://www.bsh.de/SharedDocs/Meldungen_Oeffentl_Bekanntmachungen/_Meldungen/2024/Bekanntmachung-Auslegung-Planfeststellungsbeschlusses-Errichtung-Offshore-Windpark-NC1.html?nn=280624","what_it_gives":"Header & Section I: 'Offshore-Windparks „NC 1“ (ehemals OWP N-3.7) in der deutschen ausschließlichen Wirtschaftszone (AWZ) der Nordsee', stage & date 'am 14. Juni 2024 den Planfeststellungsbeschluss für das o. g. Vorhaben – Az. BSH / 5111/NC1/PFV – erlassen' (notice published 29.07.2024)."}}]},"related_not_answering":[{"name":"Fachagentur Wind und Solar — Wind-Monitor: Daten zu Genehmigungen von Windenergieanlagen","url":"https://www.fachagentur-wind-solar.de/veroeffentlichungen/mediathek/detail/daten-zu-genehmigungen-von-windenergieanlagen","why":"Publishes aggregate monthly and annual newly permitted wind capacity (MW), turbine counts and mean permitting durations by Land and Landkreis (via 23degrees charts), not a list of identifiable wind projects."},{"name":"Fachagentur Wind und Solar — Genehmigte und noch nicht installierte Windenergieleistung","url":"https://www.fachagentur-wind-solar.de/veroeffentlichungen/mediathek/detail/genehmigte-und-noch-nicht-installierte-windenergieleistung","why":"Provides only spatial density indicators (kW/km²) and regional totals of permitted unbuilt wind capacity derived from MaStR, without project-level locations, developers or dates."}],"open_questions":["When BSH will restore its CONTIS Offshore-Windfarms-WFS endpoint (https://gdi.bsh.de/en/mapservice/Offshore-Windfarms-WFS), which returned HTTP 500 Internal Server Error on 2026-11-26 while FEP 2023 WFS remained operational.","Whether Sachsen's iDA portal (HTTP 401 on direct request) exposes an unauthenticated WFS GetCapabilities URL for LIS-A wind permitting stages ('im Genehmigungsverfahren' / 'vor Inbetriebnahme') referenced in regional metadata summaries."],"history":[{"pass":1,"date":"2026-11-26","role":"research","model":"Gemini 4 Carbon","rules_version":"2026-11-25-de-red-y-tramitacion","note":"Initial research in session f843b96e-b516-44f8-8831-ee71816fec53: tested MaStR (8,808 In Planung WEA), all 16 Länder portals/WFS (8 structured, 6 with pending), UVP portals, BNetzA awards, EMODnet/BSH offshore and Overpass.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"partial"},"sources":{"total":9,"new":9,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":71,"minutes":32}},{"pass":2,"date":"2026-11-26","role":"revision","model":"GPT-6 (Codex)","note":"Editorial review: distinguished MaStR planning status from documented permit identifiers.","headline":{},"sources":{},"negatives":{},"effort":{}}],"local_terms":[{"term":"In Planung","language":"de","meaning":"MaStR Betriebs-Status (code 31) for permitted pre-operational wind units"},{"term":"im Genehmigungsverfahren","language":"de","meaning":"Pending BImSchG permit application status in Länder LIS-A datasets ('im Gen.Verf.')"},{"term":"vor Inbetriebnahme","language":"de","meaning":"BImSchG permit granted but turbine not yet commissioned (BB, SH, HE status)"},{"term":"Genehmigungsmonitoring Windenergie","language":"de","meaning":"NRW LANUK open dataset tracking pending, approved, refused and withdrawn WEA"},{"term":"Windenergieanlage (WEA) / Windkraftanlage (WKA)","language":"de","meaning":"Individual wind turbine unit (standard record unit in MaStR and Länder WFS)"},{"term":"Bundes-Immissionsschutzgesetz (BImSchG)","language":"de","meaning":"Federal Immissions Control Act governing onshore wind permits (>50 m height)"},{"term":"Repowering (§ 16b BImSchG)","language":"de","meaning":"Replacement of existing wind turbines by modern units under § 16b BImSchG"},{"term":"Planfeststellungsbeschluss (WindSeeG)","language":"de","meaning":"BSH offshore wind farm approval decision in the Exclusive Economic Zone (AWZ)"}],"provenance":{"pass_count":2,"models":["Gemini 4 Carbon","GPT-6 (Codex)"],"minutes_estimate":null,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-26","model":"Gemini 4 Carbon"},{"pass":2,"date":"2026-11-26","model":"GPT-6 (Codex)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/de/wind-farms-in-permitting.json","detail_url":"https://georutter.org/v1/de/wind-farms-in-permitting/detail.json","html_url":"https://georutter.org/de/wind-farms-in-permitting/","country_url":"https://georutter.org/v1/countries/de.json"}
