{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in Spain, with location, power (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"No complete current national list was established. Vitreous Labs publishes a downloadable gazette-derived inventory with a stand-alone filter, but it omits some regional gazettes and a checked promoter is wrong. BOE and regional notices provide official project details and dated milestones; Catalonia describes a project viewer. A notice or old milestone alone does not prove today’s stage.","main_caveats":["The non-official CSV mixes stand-alone, hybrid and unspecified configurations; filter and verify each project.","The CSV misidentifies the BESS Cuevas promoter as “modificación”; BOE names Soner Picasso SLU.","Regional gazettes are incomplete in the CSV; its location is a municipality, not a precise facility point.","MW of installed power, MVA of inverters, MWh of energy and requested grid access are distinct.","A notice’s publication date and grid-access request do not prove present administrative status."],"confidence":"medium","confidence_reason":"The CSV, a stand-alone BOE case and several regional documents were checked; complete regional and present-status coverage was not established.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002","s003"],"note":"Municipality in CSV and official notices; Catalan viewer described but not sampled.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"power_mw","covered":"partial","source_ids":["s001","s002"],"note":"Battery MW appears in CSV and some official project texts.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"developer","covered":"partial","source_ids":["s001","s002"],"note":"Applicant field in CSV and official notices, with at least one demonstrated error.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s002","s003"],"note":"CSV classifies milestones, BOE provides underlying historical official decisions.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"stage_date","covered":"partial","source_ids":["s001","s002"],"note":"CSV dates individual acts; exact present state needs later checks.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."}]},"sources":[{"source_id":"s001","name":"Vitreous Labs battery installation inventory","publisher":"Vitreous Labs","official":false,"landing_url":"https://vitreouslabs.com/es/project/","data_url":"https://vitreouslabs.com/es/project/installations.csv","access":"direct_download","format":"CSV","license":"unknown","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"Vitreous Labs battery installation inventory","coverage_note":"Spain, state and selected regional gazettes","data_date":"Downloaded 2026-11-15; source describes regional and state read-through dates separately.","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-15","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sSL --max-time 40 'https://vitreouslabs.com/es/project/installations.csv'","example_result":"PB Babor 7, Arena Power Ren 29 SL, stand-alone, 66 MW, First authorisation; official BOE-A-2026-14321 confirms these fields."},"members_summary":null},{"source_id":"s002","name":"Boletín Oficial del Estado (BOE) - Datos Abiertos API (Sumario)","publisher":"Agencia Estatal Boletín Oficial del Estado (AEBOE)","official":true,"landing_url":"https://www.boe.es/datosabiertos/","data_url":"https://boe.es/datosabiertos/api/boe/sumario/20261113","access":"api","format":"JSON / XML","license":"Open data (BOE)","language":"es","has_coordinates":false,"location_precision":"municipality","summary":"Boletín Oficial del Estado (BOE) - Datos Abiertos API (Sumario)","coverage_note":"Spain, BOE notices from state and some regional authorities","data_date":"Daily (YYYYMMDD)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"problems":[]},"example":{"example_request":"curl -sSL --max-time 30 -H 'Accept: application/json' 'https://boe.es/datosabiertos/api/boe/sumario/20261113'","example_result":"BOE issue 283, metadata fecha_publicacion 20261113; linked individual notices give project details."},"members_summary":null},{"source_id":"s003","name":"Catalan environmental renewable energy project viewer","publisher":"Generalitat de Catalunya","official":true,"landing_url":"https://mediambient.gencat.cat/ca/detalls/Articles/visor","data_url":"https://sig.gencat.cat/visorHipermapa/?ID=2305","access":"web_viewer_only","format":"web map","license":"unknown","language":"ca","has_coordinates":null,"location_precision":null,"summary":"Catalan environmental renewable energy project viewer","coverage_note":"Catalonia","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://sig.gencat.cat/visorHipermapa/?ID=2305","example_result":"The map description identifies stand-alone battery projects in prior administrative authorisation."},"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":null},"local_terms":[{"term":"almacenamiento independiente","language":"es","meaning":"stand-alone energy storage"},{"term":"baterías electroquímicas","language":"es","meaning":"electrochemical batteries"},{"term":"información pública","language":"es","meaning":"public consultation"},{"term":"autorización administrativa previa","language":"es","meaning":"prior administrative authorisation"},{"term":"autorización administrativa de construcción","language":"es","meaning":"construction authorisation"}],"provenance":{"pass_count":2,"models":["Gemini 4 Hydrogen (Low)","Terra 6.1 (High)"],"minutes_estimate":30,"pages_opened":48,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen (Low)"},{"pass":2,"date":"2026-11-15","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/es/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/es/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}
