{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in Spain, with location, power (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"No complete current national list was established. Vitreous Labs publishes a downloadable gazette-derived inventory with a stand-alone filter, but it omits some regional gazettes and a checked promoter is wrong. BOE and regional notices provide official project details and dated milestones; Catalonia describes a project viewer. A notice or old milestone alone does not prove today’s stage.","main_caveats":["The non-official CSV mixes stand-alone, hybrid and unspecified configurations; filter and verify each project.","The CSV misidentifies the BESS Cuevas promoter as “modificación”; BOE names Soner Picasso SLU.","Regional gazettes are incomplete in the CSV; its location is a municipality, not a precise facility point.","MW of installed power, MVA of inverters, MWh of energy and requested grid access are distinct.","A notice’s publication date and grid-access request do not prove present administrative status."],"confidence":"medium","confidence_reason":"The CSV, a stand-alone BOE case and several regional documents were checked; complete regional and present-status coverage was not established.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002","s003"],"note":"Municipality in CSV and official notices; Catalan viewer described but not sampled.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"power_mw","covered":"partial","source_ids":["s001","s002"],"note":"Battery MW appears in CSV and some official project texts.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"developer","covered":"partial","source_ids":["s001","s002"],"note":"Applicant field in CSV and official notices, with at least one demonstrated error.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s002","s003"],"note":"CSV classifies milestones, BOE provides underlying historical official decisions.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."},{"attribute":"stage_date","covered":"partial","source_ids":["s001","s002"],"note":"CSV dates individual acts; exact present state needs later checks.","gap":"not_checked","gap_note":"Full national coverage and current status have not been checked in every jurisdiction."}]},"sources":[{"source_id":"s001","name":"Vitreous Labs battery installation inventory","publisher":"Vitreous Labs","official":false,"landing_url":"https://vitreouslabs.com/es/project/","data_url":"https://vitreouslabs.com/es/project/installations.csv","access":"direct_download","format":"CSV","license":"unknown","language":"en","has_coordinates":false,"location_precision":"municipality","publisher_type":"community","adds":"Non-official record-level data with stand-alone filter and linked gazette acts.","first_seen_pass":2,"rank":1,"summary":"Vitreous Labs battery installation inventory","coverage_note":"Spain, state and selected regional gazettes","data_date":"Downloaded 2026-11-15; source describes regional and state read-through dates separately.","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Spain, state and selected regional gazettes"},"fine_print":{"unit":{"value":"Battery MW and MWh are separate fields; source says power is battery power.","quote":"Power and storage are the battery’s own, from the latest act that authorises it","url":"https://vitreouslabs.com/es/atlas/","attempts":[]},"inclusion_rule":{"value":"Gazette acts since 2021, state and selected regional sources; configuration includes hybrid and stand-alone.","quote":"every act in which the State, or a region whose gazette allows automated reading, consults on, assesses, authorises or refuses a battery since 2021","url":"https://vitreouslabs.com/es/atlas/","attempts":[]},"reference_date":{"value":"Downloaded 2026-11-15; source describes regional and state read-through dates separately.","quote":"the gazettes of Andalucía (BOJA and the Seville provincial bulletin), Aragón (BOA, CC BY 4.0), Canarias (BOC), Extremadura (DOE), Galicia (DOG), Madrid (BOCM), the Basque Country (BOPV), Murcia (BORM), Asturias (BOPA) and the Balearic energy board, read to 27 October 2026","url":"https://vitreouslabs.com/es/atlas/","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Source describes daily reading of some inputs but no dataset publication cadence established.","CSV download and project index inspected; no reliable refresh guarantee found."]},"exclusions":{"value":"Some regional gazettes not yet read; Balearic energy board contributes a partial route.","quote":"Five regions are not yet read: Cataluña, Castilla y León, Castilla-La Mancha, the Balearic Islands and Valencia","url":"https://vitreouslabs.com/es/atlas/","attempts":[]}},"key_fields":[{"field":"configuration","meaning":"stand-alone, hybrid, or not stated"},{"field":"battery_mw","meaning":"Power field"},{"field":"promoter","meaning":"Applicant or developer"},{"field":"step","meaning":"Latest mapped stage"},{"field":"acts","meaning":"Official gazette act identifiers"},{"field":"consultation / environmental / previa / construccion","meaning":"Dates of documented milestones, not necessarily latest present state"},{"field":"gazette","meaning":"State or regional source coverage"}],"how_to_use":{"example_request":"curl -sSL --max-time 40 'https://vitreouslabs.com/es/project/installations.csv'","example_result":"PB Babor 7, Arena Power Ren 29 SL, stand-alone, 66 MW, First authorisation; official BOE-A-2026-14321 confirms these fields.","steps":["Read CSV and filter configuration = stand-alone; exclude refused, withdrawn or rejected as appropriate.","Use acts identifiers to open the official notices and check whether a later milestone changed status."],"reading_traps":["BESS Cuevas promoter is erroneously listed as modificación; BOE identifies Soner Picasso SLU.","Geographic coverage is incomplete and municipality is not an exact installation position.","Rows with hybrid or not stated configuration cannot be assumed to be stand-alone.","The CSV has 501 rows: 134 stand-alone, 337 hybrid, 30 not stated; 4 stand-alone rows are refused, withdrawn or rejected.","The provider states five gazettes not read while also listing a Balearic energy-board partial source; do not assume complete regional coverage."]},"test":{"tested_on":"2026-11-15","method":"download","http_status":200,"content_type":"text/csv","size_bytes":123357,"records_total":501,"records_for_country":501,"problems":[]},"evidence":[{"claim":"The provider uses gazette acts and indicates its incomplete territorial coverage.","url":"https://vitreouslabs.com/es/atlas/","quote":"Five regions are not yet read: Cataluña, Castilla y León, Castilla-La Mancha, the Balearic Islands and Valencia"}],"members":[],"members_summary":null},{"source_id":"s002","name":"Boletín Oficial del Estado (BOE) - Datos Abiertos API (Sumario)","publisher":"Agencia Estatal Boletín Oficial del Estado (AEBOE)","official":true,"landing_url":"https://www.boe.es/datosabiertos/","data_url":"https://boe.es/datosabiertos/api/boe/sumario/20261113","access":"api","format":"JSON / XML","license":"Open data (BOE)","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Daily structured JSON/XML index of all BOE publications, including MITECO >50 MW storage permitting notices (información pública, DIA, AAP, AAC) with developer, location, MW, stage, and date in the linked notice texts.","first_seen_pass":1,"rank":2,"summary":"Boletín Oficial del Estado (BOE) - Datos Abiertos API (Sumario)","coverage_note":"Spain, BOE notices from state and some regional authorities","data_date":"Daily (YYYYMMDD)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Spain, BOE notices from state and some regional authorities"},"fine_print":{"unit":{"value":"MW (reported in individual notice text)","quote":null,"url":null,"attempts":["Checked daily sumario API JSON; MW is inside individual notice XML/HTML/PDF documents, not in the sumario index."]},"inclusion_rule":{"value":"Daily BOE summary indexes notices published in the gazette, including state and some regional notices; it is not an exhaustive register of all projects.","quote":null,"url":null,"attempts":["Verified BOE sumario API returns daily sections including 'III. Otras disposiciones' and 'V. Anuncios. - B. Otros anuncios oficiales'."]},"reference_date":{"value":"Daily (YYYYMMDD)","quote":"\"fecha_publicacion\": \"20261113\"","url":"https://boe.es/datosabiertos/api/boe/sumario/20261113","attempts":[]},"update_frequency":{"value":"Daily (Monday to Saturday)","quote":null,"url":null,"attempts":["Verified daily sumario endpoint for 20261113."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["BOE autonomous notice BOE-B-2026-24989 is present, so the prior claim of excluding regional projects is false.","BOE API describes daily summary but does not establish comprehensive regional publication."]}},"key_fields":[{"field":"data.sumario.diario[].seccion[]","meaning":"BOE sections (e.g., 'III. Otras disposiciones', 'V. Anuncios. - B. Otros anuncios oficiales')"}],"how_to_use":{"example_request":"curl -sSL --max-time 30 -H 'Accept: application/json' 'https://boe.es/datosabiertos/api/boe/sumario/20261113'","example_result":"BOE issue 283, metadata fecha_publicacion 20261113; linked individual notices give project details.","steps":["Iterate daily summaries and filter storage-related titles; open each linked notice.","Check whether the text identifies stand-alone storage and join later notices by project and file number."],"reading_traps":["Daily summaries are event indexes, not current lists.","BOE also includes notices from autonomous authorities such as Cantabria BESS CAMARREAL.","The legal phrase referring to stand-alone or hybrid storage does not establish a project configuration."]},"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":377850,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"The official API provides the BOE daily summary.","url":"https://www.boe.es/datosabiertos/","quote":"El sumario del diario oficial BOE."}],"members":[],"members_summary":null},{"source_id":"s003","name":"Catalan environmental renewable energy project viewer","publisher":"Generalitat de Catalunya","official":true,"landing_url":"https://mediambient.gencat.cat/ca/detalls/Articles/visor","data_url":"https://sig.gencat.cat/visorHipermapa/?ID=2305","access":"web_viewer_only","format":"web map","license":"unknown","language":"ca","has_coordinates":null,"location_precision":null,"publisher_type":"regional_government","adds":"Catalan viewer describes stand-alone battery project locations and environmental stage, complementing gazette-based list.","first_seen_pass":2,"rank":3,"summary":"Catalan environmental renewable energy project viewer","coverage_note":"Catalonia","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Catalonia"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[],"how_to_use":{"example_request":"https://sig.gencat.cat/visorHipermapa/?ID=2305","example_result":"The map description identifies stand-alone battery projects in prior administrative authorisation.","steps":["The map page and its layer names were opened; the underlying battery service and individual records were not successfully examined."],"reading_traps":["No project sample or current layer contents were tested, so individual field coverage is unverified."]},"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Catalan viewer describes battery applications.","url":"https://mediambient.gencat.cat/ca/detalls/Articles/visor","quote":"les sol·licituds de parcs eòlics, solars i de bateries a Catalunya, en el tràmit d'autorització administrativa prèvia."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"CNMC; MITECO and autonomous energy authorities","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-electrico"},"operators":{"structure":"many","note":"Many BESS developers; REE manages transmission access and distribution operators their networks.","census_url":null},"publication_obligation":{"exists":"yes","norm":"Real Decreto 1955/2000, article 125; Decreto-ley 12/2025 Cataluña","url":"https://www.boe.es/buscar/doc.php?id=BOE-A-2025-16905","what_must_be_published":"Applicable authorisation procedure includes public information; scope and exceptions vary by case.","frequency":"At procedural milestones."},"consolidated_republication":{"found":"unknown","note":"Aggregate grid-access publications do not constitute a complete BESS authorisation register.","checked_pages":[{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Demand access spreadsheet blends independent and hybrid storage without promoter."},{"organization":"MITECO","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido?idContenido=40445","saw":"Environmental assessment search page; no complete national stand-alone register established."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-electrico","saw":"Regulator electricity-market page, no national BESS permitting list identified."}]}},"national_registry":{"exists":"unknown","note":"No complete stand-alone BESS permitting register was established from the checked pages.","checked_pages":[{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Demand access spreadsheet blends independent and hybrid storage without promoter."},{"organization":"MITECO","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido?idContenido=40445","saw":"Environmental assessment search page; no complete national stand-alone register established."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-electrico","saw":"Regulator electricity-market page, no national BESS permitting list identified."}]},"if_unstructured":{"summary":null,"recipe":["Filter gazette notices for batteries and inspect project descriptions for independent connection rather than a hybrid module.","In BOE-A-2026-14321 read the title and body for promoter, 66 MW, Tarifa and prior authorisation; preserve resolution and publication dates separately.","Search the project and expediente for later decisions and check the relevant autonomous gazette before treating status as current."],"location_method":"Use the project municipality or parcels and coordinates stated in official project documents; a municipality centroid is not a plant location.","cross_with":["Regional environmental decisions and subsequent gazette notices.","SABIA environmental search for state cases."],"where_published":[{"name":"BOE official notices","url":"https://www.boe.es/","what":"State and some autonomous authorisation and environmental notices.","how_to_search_inside":"Search text for BESS, stand alone, almacenamiento and the project or expediente; read all subsequent acts.","example_document":{"url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-14321","what_it_gives":"PB Babor 7, stand alone; Arena Power Ren 29 SL; 66 MW; Tarifa; prior authorisation resolution 2026-06-17."}},{"name":"BOIB","url":"https://www.caib.es/eboibfront/pdf/es/2026/139/1231793","what":"Autonomous regional notices with project descriptions.","how_to_search_inside":"Search BOIB for BESS, stand-alone or expediente BAT; inspect corrections and later acts.","example_document":{"url":"https://www.caib.es/eboibfront/pdf/es/2026/139/1231793","what_it_gives":"BESS Son Reus I, Foresight Energy Storage Spain 1 SL, 39,48 MW / 128,76 MWh, Bunyola, BAT 2026/161; revised public consultation."}}]},"related_not_answering":[{"name":"REE demand access request list","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","why":"Mixed hybrid and stand-alone demand access requests have no applicant or configuration flag and do not establish BESS permitting or installed MW."},{"name":"Cantabria BESS sites layer","url":"https://geoservicios.cantabria.es/inspire/rest/services/Energia/MapServer/57","why":"Seven BESS geometries include promoter and status, but tested fields do not distinguish stand-alone and express inverter capacity in MVA."},{"name":"IDAE 2024 storage grant decisions","url":"https://sede.idae.gob.es/sites/default/files/documentos/2024/almacenamiento/_388_resolucion_definitiva.pdf","why":"Funding decisions are not a current permitting register."},{"name":"REE access capacity","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-la-capacidad-de-acceso","why":"Network node capacity does not identify projects currently in permitting."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-15","role":"research","model":"Gemini 4 Hydrogen (Low)","rules_version":"6.11","note":"First pass: no single national structured registry exists. REE publishes monthly >=220 kV demand access requests (XLSX) without developer or stand-alone/hybrid split; project-level notices are in BOE/regional gazettes and MITECO SABIA.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"no_evidence_found"},"sources":{"total":2,"new":2,"dropped":0},"negatives":{"overturned":0,"confirmed":1},"effort":{"pages":6,"minutes":10}},{"pass":2,"date":"2026-11-15","role":"revision","model":"Terra 6.1 (High)","rules_version":"6.11","note":"Found a gazette-derived standalone filter and verified official examples; identified a wrong promoter and moved mixed REE requests to related data.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"unknown"},"sources":{"total":3,"new":2,"dropped":1},"negatives":{"overturned":2,"confirmed":0},"effort":{"pages":42,"minutes":20}}],"local_terms":[{"term":"almacenamiento independiente","language":"es","meaning":"stand-alone energy storage"},{"term":"baterías electroquímicas","language":"es","meaning":"electrochemical batteries"},{"term":"información pública","language":"es","meaning":"public consultation"},{"term":"autorización administrativa previa","language":"es","meaning":"prior administrative authorisation"},{"term":"autorización administrativa de construcción","language":"es","meaning":"construction authorisation"}],"provenance":{"pass_count":2,"models":["Gemini 4 Hydrogen (Low)","Terra 6.1 (High)"],"minutes_estimate":30,"pages_opened":48,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen (Low)"},{"pass":2,"date":"2026-11-15","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/es/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/es/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}
