{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"battery-storage","question":"Where can I get a list of battery storage (BESS) installations in operation in Spain, with location, power (MW), energy (MWh), operator and commissioning date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"documents_only","non_official_data":"partial","summary":"A tested August 2026 copy of the European Energy Storage Inventory identifies 26 Spanish electrochemical projects labelled operational with power, energy and coordinates, but lacks operator and commissioning fields. Operator announcements supply those details for selected installations. A national complete, current public BESS list with all requested fields was not verified.","main_caveats":["The snapshot is dated 2026-08-16 and does not establish current status or full coverage.","The JRC reports that some MWh capacities are estimated; the meaning of the snapshot flag needs confirmation.","The snapshot provides no operator or commissioning-date field; coordinates are not validated to the facility.","A construction authorisation, grid permission or market registration does not alone establish operation.","Behind-the-meter and hybrid storage may be absent or recorded under a host facility."],"confidence":"medium","confidence_reason":"The historical snapshot and operator statements were tested; current completeness and the live European download remain unresolved.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002"],"note":"Snapshot has coordinates; operator reports identify municipalities for examples.","gap":"not_checked","gap_note":"Facility-level point accuracy and nationwide coverage are unverified."},{"attribute":"power_mw","covered":"partial","source_ids":["s001","s002"],"note":"Snapshot reports power; companies report approximate values for examples.","gap":"not_checked","gap_note":"Coverage and latest values remain unverified."},{"attribute":"energy_mwh","covered":"partial","source_ids":["s001","s002"],"note":"Snapshot reports capacity and company documents provide example MWh.","gap":"not_checked","gap_note":"Check current capacity and whether estimates apply."},{"attribute":"operator","covered":"partial","source_ids":["s002"],"note":"Named companies report their own installations, not a national listing.","gap":"not_checked","gap_note":"Check current operators for other storage assets."},{"attribute":"commissioning_date","covered":"partial","source_ids":["s002"],"note":"Dated announcements establish operation by their publication date, not exact day.","gap":"not_checked","gap_note":"Check exact commissioning dates and present status for other assets."}]},"sources":[{"source_id":"s001","name":"Archived European Energy Storage Inventory API snapshot (2026-08-16)","publisher":"PyPSA / TU Berlin-hosted mirror of JRC data","official":false,"landing_url":"https://github.com/PyPSA/powerplantmatching/blob/master/powerplantmatching/package_data/config.yaml","data_url":"https://tubcloud.tu-berlin.de/s/ijiN2EWjHfg4NXf/download/european-energy-storage-inventory-20260816-1026.json","access":"direct_download","format":"JSON","license":"unknown","language":"English","has_coordinates":true,"location_precision":"municipality","publisher_type":"academic","adds":"A downloadable snapshot exposes Spain operational battery records with power, energy and approximate coordinates.","first_seen_pass":1,"rank":1,"summary":"Archived European Energy Storage Inventory API snapshot (2026-08-16)","coverage_note":"Europe including Spain","data_date":"2026-08-16 snapshot, inferred from file name; underlying project dates vary.","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Europe including Spain"},"fine_print":{"unit":{"value":"power in MW and capacity in MWh, according to JRC inventory map","quote":"Power (MW):","url":"https://ses.jrc.ec.europa.eu/storage-inventory-maps","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["JRC landing page lists broad technologies but no complete inclusion threshold.","Archived snapshot does not document all inclusion rules."]},"reference_date":{"value":"2026-08-16 snapshot, inferred from file name; underlying project dates vary.","quote":"european-energy-storage-inventory-20260816-1026.json","url":"https://github.com/PyPSA/powerplantmatching/blob/master/powerplantmatching/package_data/config.yaml","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["JRC describes near real-time data, without a precise snapshot frequency.","The snapshot has no refresh schedule in its filename or records."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["JRC page gives technologies but no exhaustive project exclusions.","Snapshot contains no documented exclusion list."]}},"key_fields":[{"field":"country.name, status.name","meaning":"Country and project status"},{"field":"technology.parentName","meaning":"Electrochemical technology family"},{"field":"power, capacity","meaning":"Power and storage capacity"},{"field":"estimated_capacity","meaning":"Indicates estimated capacity"},{"field":"facility.latitude, facility.longitude","meaning":"Coordinates"}],"how_to_use":{"example_request":"https://tubcloud.tu-berlin.de/s/ijiN2EWjHfg4NXf/download/european-energy-storage-inventory-20260816-1026.json","example_result":"Experimental Barásoain Hybrid; Operational; 1.7 MW; 1.09 MWh; Navarre; [42.61,-1.65]; Lithium-ion batteries.","steps":["Parse projects, select country.name = Spain, technology.parentName = Electrochemical and status.name = Operational.","Inspect estimated_capacity and cross-check current status and location against the original operator."],"reading_traps":["This is a snapshot from 2026-08-16, not a current register; the file lacks operator and commissioning date fields.","All 26 operational Spanish electrochemical records have coordinates within broad Spain boxes, but only two decimal places in the examples; point accuracy is not established.","Coordinate precision is unverified; the schema label municipality is conservative, not a guarantee that each point is the municipality centroid."]},"test":{"tested_on":"2026-11-15","method":"download","http_status":200,"content_type":"text/plain","size_bytes":1873874,"records_total":3613,"records_for_country":348,"problems":[]},"evidence":[{"claim":"PyPSA references this file as an archived EESI project source","url":"https://github.com/PyPSA/powerplantmatching/blob/master/powerplantmatching/package_data/config.yaml","quote":"# from https://ses.jrc.ec.europa.eu/storage-inventory-tool/api/projects"}],"members":[],"members_summary":null},{"source_id":"s002","name":"Storage asset announcements and reports from operators","publisher":"Iberdrola España and ACCIONA Energía","official":true,"landing_url":"https://www.iberdrola.com/sala-comunicacion/noticias/detalle/iberdrola-pone-operacion-baterias-mas-grandes-espana","data_url":null,"access":"web_viewer_only","format":"HTML and PDF","license":"unknown","language":"English","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Named examples with operator-reported battery MW, MWh and commissioning periods.","first_seen_pass":1,"rank":2,"summary":"Storage asset announcements and reports from operators","coverage_note":"Selected installations, not a national census","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Selected installations, not a national census"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]}},"key_fields":[{"field":"potencia","meaning":"Battery power"},{"field":"capacidad","meaning":"Battery energy capacity"}],"how_to_use":{"example_request":"https://www.iberdrola.com/sala-comunicacion/noticias/detalle/iberdrola-pone-operacion-baterias-mas-grandes-espana","example_result":"Romeral and Olmedilla, Alarcón (Cuenca): approximately 30 MW and 60 MWh each, announced operating on 2026-01-23.","steps":["Read the dated operator statement for the battery-specific capacity, location and status.","Check later company reports for status and changes."],"reading_traps":["A dated announcement establishes status at publication, not uninterrupted operation today.","Press release rounds to 60 MWh and near 30 MW; Q1 report says 61 MWh and 29 MW each."]},"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Iberdrola reports two batteries in operation","url":"https://www.iberdrola.com/sala-comunicacion/noticias/detalle/iberdrola-pone-operacion-baterias-mas-grandes-espana","quote":"ha puesto en operación las dos primeras grandes baterías de España en Alarcón (Cuenca)."}],"members":[{"name":"Iberdrola España","landing_url":"https://www.iberdrola.com/sala-comunicacion/noticias/detalle/iberdrola-pone-operacion-baterias-mas-grandes-espana","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"2026 statement covers Romeral and Olmedilla; 2026 financial report also names Revilla-Vallejera."},{"name":"ACCIONA Energía","landing_url":"https://www.acciona.com/es/actualidad/noticias/acciona-pone-marcha-primera-planta-hibrida-almacenamiento-energia-eolica-baterias-espana","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"2017 Barásoain launch; current status not independently established."}],"members_summary":{"total":null,"listed":2,"tested":0,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null},"member_scope":{"total":null,"note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s003","name":"European Energy Storage Inventory","publisher":"European Commission Joint Research Centre","official":true,"landing_url":"https://ses.jrc.ec.europa.eu/storage-inventory","data_url":"https://ses.jrc.ec.europa.eu/storage-inventory-maps","access":"web_viewer_only","format":"Interactive map and dashboard","license":"unknown","language":"English","has_coordinates":null,"location_precision":null,"publisher_type":"supranational","adds":"European multi-source inventory supports filtering by country, status, technology, MW and MWh; Spain records have not yet been retrieved.","first_seen_pass":1,"rank":3,"summary":"European Energy Storage Inventory","coverage_note":"Europe; Spain filter available","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Europe; Spain filter available"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["The source page does not establish this item.","The opened record or supporting announcement does not establish this item."]}},"key_fields":[],"how_to_use":{"example_request":"https://ses.jrc.ec.europa.eu/storage-inventory-maps","example_result":"The static page exposes filters for technology, countries, status, power and capacity; no installation row was returned in the web reader.","steps":[],"reading_traps":["The JRC says some capacity values are estimates; the inventory aggregates commercial and public sources.","The JRC is a public body, but this inventory aggregates commercial and public project data and is not the national administrative register."]},"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":54925,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Some MWh capacity values are estimated","url":"https://ses.jrc.ec.europa.eu/storage-inventory","quote":"Some of the capacities (MWh) have been estimated"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Comisión Nacional de los Mercados y la Competencia","url":"https://www.cnmc.es/sites/default/files/5563559.pdf"},"operators":{"structure":"many","note":"Many producers, consumers and network operators can own storage; autonomous and state authorities authorise facilities.","census_url":null},"publication_obligation":{"exists":"yes","norm":"Real Decreto 1955/2000, article 168","url":"https://www.boe.es/eli/es/rd/2000/12/01/1955/con","what_must_be_published":"Grid-injecting storage, stand-alone or hybrid, receives production-installation registration treatment; publication of all BESS attributes is not established.","frequency":"Registration when applicable; no periodic public reporting frequency identified."},"consolidated_republication":{"found":"partial","note":"The public pages opened do not establish a national asset-level export containing every requested BESS attribute.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html","saw":"National production register publishes registered plant data including power."},{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Aggregates access and connection requests, including batteries and hybridisation."}]}},"national_registry":{"exists":"partial","note":"RAIPEE covers grid-injecting storage under generation registration rules; coverage of all BESS including non-exporting behind-the-meter systems and public BESS-specific fields is not established.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html","saw":"Production registration and power information."},{"organization":"CNMC","url":"https://www.cnmc.es/sites/default/files/5563559.pdf","saw":"Storage injecting to the grid is treated as generation for access."},{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Connection status aggregates; not a comprehensive named operational inventory."}]},"if_unstructured":{"summary":null,"recipe":["Search the BOE for a battery facility name and read the heading and the resolution stage.","For Revilla-Vallejera extract 27.46 MW and Vallejera from the 2024 construction authorisation; do not infer battery operation from the existing solar host.","For a documented commissioning example, read the Navarra Barásoain announcement pages 1–2 and record the two battery MW/MWh values and 2017 commissioning evidence.","Cross-check dated company results or subsequent operating authorisations for later status and changed specifications."],"location_method":"The tested documents provide municipalities, not precise battery coordinates; consult project plans or official geospatial services before assigning a point.","cross_with":["RAIPEE registry when applicable","Regional official gazettes and authorisations","Dated reports from facility operators"],"where_published":[{"name":"BOE official gazette","url":"https://www.boe.es/buscar/boe.php","what":"State authorisation and environmental decisions for storage projects.","how_to_search_inside":"Search full text by plant name and almacenamiento; assess administrative stage and use regional bulletins for regional cases.","example_document":{"url":"https://www.boe.es/boe/dias/2024/10/07/pdfs/BOE-A-2024-20263.pdf","what_it_gives":"Title and resolution: «BESS Hibridación FV Revilla-Vallejera», «27,46 MW», «Vallejera (Burgos)», with construction authorisation; the text states that the photovoltaic host, not the battery, was already operating."}},{"name":"Government of Navarra news","url":"https://www.navarra.es/NR/rdonlyres/531086FD-EAEF-44FD-A128-C50185A74BBB/391207/InauguracionplantaBarasoain1.pdf","what":"Government announcements can document commissioning of a named facility.","how_to_search_inside":"Search published government announcements for the installation name and battery-storage terms.","example_document":{"url":"https://www.navarra.es/NR/rdonlyres/531086FD-EAEF-44FD-A128-C50185A74BBB/391207/InauguracionplantaBarasoain1.pdf","what_it_gives":"Pages 1–2: «Barásoain»; two batteries «1 MW/0,39 MWh» and «0,7 MW/0,7 MWh»; inauguration 20 September 2017."}}]},"related_not_answering":[{"name":"OMIE bidding units","url":"https://www.omie.es/informes_mercado/listados/lista_unidades.PDF","why":"A bidding unit or agent is not necessarily one physical battery in operation and has no MW/MWh or commissioning fields."},{"name":"REE access and connection information","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","why":"The published information is aggregated and can count facilities in test operation; it is not an asset-level operating BESS list."},{"name":"Vitreous Labs battery project list","url":"https://vitreouslabs.com/es/project/","why":"Project authorisations and consultations do not prove that facilities are in operation."}],"open_questions":["What do the archived JRC estimated_capacity flag and coordinate precision mean for individual projects?"],"history":[{"pass":1,"date":"2026-11-15","role":"research","model":"Terra 6.1 (High)","rules_version":"6.10","note":"Tested an August JRC snapshot and operator statements; current comprehensive BESS coverage remains unverified.","headline":{"official_data":"documents_only","non_official_data":"partial","national_registry":"partial"},"sources":{"total":3,"new":3,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":39,"minutes":9}}],"local_terms":[{"term":"almacenamiento mediante baterías","language":"Spanish","meaning":"battery energy storage"},{"term":"módulo de almacenamiento","language":"Spanish","meaning":"storage module"},{"term":"hibridación","language":"Spanish","meaning":"hybridisation with generation"},{"term":"autorización de explotación","language":"Spanish","meaning":"operating authorisation"},{"term":"puesta en servicio","language":"Spanish","meaning":"commissioning"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":9,"pages_opened":39,"passes":[{"pass":1,"date":"2026-11-15","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/battery-storage.json","detail_url":"https://georutter.org/v1/es/battery-storage/detail.json","html_url":"https://georutter.org/es/battery-storage/","country_url":"https://georutter.org/v1/countries/es.json"}
