{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"biomethane-plants-in-permitting","question":"Where can I get a list of biogas and biomethane projects currently in permitting in Spain, with location, capacity, developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"Aragón publishes files in public participation, and Galicia lists designated strategic projects with their stage. A community table adds Navarra projects. These are partial regional sources; capacity and current status often require checking project documents.","main_caveats":["Aragón data cover only projects in public participation and may not identify technology in every description.","Navarra project statuses need updating against later decisions and the regional moratorium.","Waste input tonnage is not gas production capacity."],"confidence":"low","confidence_reason":"The research is incomplete and regional and national coverage have not yet been checked.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002","s003"],"note":"Municipality in tested Aragón records.","gap":"not_checked","gap_note":"Other regions and additional sources remain to be checked."},{"attribute":"capacity","covered":"no","source_ids":["s003"],"note":"The inherited capacity evidence reports waste throughput, not demonstrated gas production capacity.","gap":"not_checked","gap_note":"Gas production capacity requires a separate check; waste input tonnage is not credited as production capacity."},{"attribute":"developer","covered":"partial","source_ids":["s001","s002","s003"],"note":"Applicant in tested Aragón records.","gap":"not_checked","gap_note":"Other regions and additional sources remain to be checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s002","s003"],"note":"Public participation and resolution status in tested Aragón records.","gap":"not_checked","gap_note":"Other regions and additional sources remain to be checked."},{"attribute":"stage_date","covered":"partial","source_ids":["s001","s002","s003"],"note":"Exposure and opening dates in tested Aragón records.","gap":"not_checked","gap_note":"Other regions and additional sources remain to be checked."}]},"sources":[{"source_id":"s001","name":"INAGA files in public information","publisher":"Gobierno de Aragón","official":true,"landing_url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","data_url":"https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240","access":"direct_download","format":"JSON","license":"CC BY 4.0","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Current public consultation records for Aragón, including some biogas projects.","first_seen_pass":1,"rank":1,"summary":"INAGA files in public information","coverage_note":"Aragón; files in public consultation only","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Aragón; files in public consultation only"},"fine_print":{"unit":{"value":"Individual administrative case","quote":"Expediente INAGA","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","attempts":[]},"inclusion_rule":{"value":"INAGA cases in public information","quote":"Expedientes INAGA en trámites de Información Pública/ Exposición Pública","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["Inspected the catalogue: no dataset-wide snapshot date established.","Downloaded the JSON: per-file opening and public-exposure dates exist; no snapshot date field."]},"update_frequency":{"value":"Instantánea","quote":"Instantánea","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","attempts":["Catalogue inspected; frequency not yet established."]},"exclusions":{"value":"Only files in public participation, excluding other stages","quote":"Expedientes INAGA que en la actualidad se encuentran en periodo de Participación Pública (trámites de exposición pública o de anuncio público).","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","attempts":["Catalogue limits this distribution to public information cases."]}},"key_fields":[{"field":"expediente","meaning":"File identifier"},{"field":"asunto","meaning":"Description"},{"field":"nombre_titular","meaning":"Applicant"},{"field":"municipio_actuacion","meaning":"Municipality code"},{"field":"tipo_resolucion","meaning":"Resolution status"},{"field":"fecha_inicio_exposicion","meaning":"Start date of public exposure"},{"field":"fecha_fin_exposicion","meaning":"End date of public exposure"}],"how_to_use":{"example_request":"curl -sSL 'https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240'","example_result":"50030102202412686; BIORED HOYA DE HUESCA SL; Sietamo; EN TRAMITACIÓN; public exposure 2026-11-09 to 2026-12-22.","steps":["Parse JSON; filter descriptions and inspect case documents to distinguish biogas and biomethane projects."],"reading_traps":["Only files in this publication stage; keyword search misses projects with different descriptions. Public exposure date is not the start or end of the whole permitting procedure.","The separate INAGA ArcGIS participation layer returned 54 features but no BIOGAS or BIOMETANO match on 2026-11-16, while the open-data JSON returned two; the coverage discrepancy is unresolved."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/json","size_bytes":21045,"records_total":30,"records_for_country":30,"problems":[]},"evidence":[{"claim":"The catalogue provides files in public exposure","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","quote":"Expedientes INAGA en trámites de Información Pública/ Exposición Pública"}],"members":[],"members_summary":null},{"source_id":"s002","name":"Proxectos Industriais Estratéxicos","publisher":"Xunta de Galicia","official":true,"landing_url":"https://economia.xunta.gal/gl/industria/proxectos-industriais-estratexicos","data_url":"https://economia.xunta.gal/gl/industria/proxectos-industriais-estratexicos","access":"web_viewer_only","format":"HTML","license":"unknown","language":"gl","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Galician strategic projects including permitting stage beyond a public consultation window.","first_seen_pass":1,"rank":2,"summary":"Proxectos Industriais Estratéxicos","coverage_note":"Galicia; declared strategic industrial projects only","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Galicia; declared strategic industrial projects only"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"Promotor","meaning":"Developer"},{"field":"Proxecto","meaning":"Project"},{"field":"Localización","meaning":"Municipality"},{"field":"Estado","meaning":"Reported stage"}],"how_to_use":{"example_request":"https://economia.xunta.gal/gl/industria/proxectos-industriais-estratexicos","example_result":"Norbiogas Biometano I, S.L.; Planta de biometano; Curtis (A Coruña); En tramitación ambiental.","steps":["Locate the project in the strategic-project table and inspect linked environmental documents for technical capacity and subsequent decisions."],"reading_traps":["Includes only designated strategic projects, not all biogas projects; investment in euros is not production capacity."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"A biomethane project is listed as in environmental permitting","url":"https://economia.xunta.gal/gl/industria/proxectos-industriais-estratexicos","quote":"Norbiogas Biometano I, S.L. | Planta de biometano | Curtis (A Coruña) | 15,06 M€ | 28 | En tramitación ambiental"}],"members":[],"members_summary":null},{"source_id":"s003","name":"Mapa de las plantas de biometanización en Navarra","publisher":"Fundación Sustrai Erakuntza","official":false,"landing_url":"https://fundacionsustrai.org/mapa-de-las-plantas-de-biometanizacion-en-navarra/","data_url":"https://fundacionsustrai.org/mapa-de-las-plantas-de-biometanizacion-en-navarra/","access":"web_viewer_only","format":"HTML","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"community","adds":"Community list for Navarra, including named projects and links to official notices.","first_seen_pass":1,"rank":3,"summary":"Mapa de las plantas de biometanización en Navarra","coverage_note":"Navarra","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Navarra"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"Nombre proyecto","meaning":"Project name"},{"field":"Localidad","meaning":"Municipality"},{"field":"Promotor","meaning":"Developer"},{"field":"Tamaño (tn/año)","meaning":"Waste throughput, not gas output"},{"field":"Estado tramitación","meaning":"Reported project status"}],"how_to_use":{"example_request":"https://fundacionsustrai.org/mapa-de-las-plantas-de-biometanizacion-en-navarra/","example_result":"Planta de biometanización en Viana; B Power Gen II SLU; 124.500 tn/año; exposición pública finalizada.","steps":["Read the project table and follow its official notices; check more recent decisions and the Navarra moratorium before assigning current status."],"reading_traps":["Table includes operational and authorized plants as well as projects, and its status labels need current verification. Tonnage is input capacity, not gas production capacity."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Table includes project name, locality, developer, size and status","url":"https://fundacionsustrai.org/mapa-de-las-plantas-de-biometanizacion-en-navarra/","quote":"Mapa de las plantas de biometanización en Navarra"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Competent environmental authorities of autonomous communities and municipalities","url":"https://www.congreso.es/entradap/l15p/e9/e_0098231_n_000.pdf"},"operators":{"structure":"many","note":"Authorization is handled by autonomous communities and local authorities; government response: https://www.congreso.es/entradap/l15p/e9/e_0098231_n_000.pdf","census_url":null},"publication_obligation":{"exists":"yes","norm":"CNMC resolution of 19 April 2024, transitional application; replaced by resolution of 13 June 2025","url":"https://www.boe.es/buscar/act.php?id=BOE-A-2025-12803","what_must_be_published":"Network operators report certain connection applications to CNMC; this concerns connection requests, not a complete publication of permitting cases. The 2024 annual reporting obligation applied to applications under that procedure.","frequency":"2024 procedure: annual by 15 February; current arrangements need further verification."},"consolidated_republication":{"found":"partial","note":null,"checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/calidad-y-evaluacion-ambiental/temas/evaluacion-ambiental.html","saw":"SABIA covers environmental cases handled by the ministry; no evidence here of all regional permitting."},{"organization":"CNMC","url":"https://www.cnmc.es/sites/default/files/5927268.pdf","saw":"2024 report publishes connection request and contract counts, not a national individual permitting list."}]}},"national_registry":{"exists":"unknown","note":null,"checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/calidad-y-evaluacion-ambiental/temas/evaluacion-ambiental.html","saw":"SABIA covers environmental cases handled by the ministry; no evidence here of all regional permitting."},{"organization":"CNMC","url":"https://www.cnmc.es/sites/default/files/4344591.pdf","saw":"Renewable gas guarantees register is discussed; coverage and public access for permitting projects not established."},{"organization":"Enagás","url":"https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/","saw":"Connection applications require registration; this is not an identified national list of permitting projects."}]},"if_unstructured":{"summary":null,"recipe":["Read page 1 of the notice and extract developer, municipality, file number and published stage; cross-check the INAGA JSON for its current public-exposure dates and resolution status. Capacity is absent from this notice and remains to be obtained from the technical project.","In the Gálvez HTML decision, extract the holder, municipality, UTM coordinate system, authorized treatment capacity and dates from the decision and annexes; compare later decisions. This case was granted an AAI on 2026-06-09 and must not be counted as currently pending solely on the basis of earlier notices."],"location_method":"Where the decision gives UTM coordinates, retain its specified datum and zone; notices may instead only identify a municipality.","cross_with":["INAGA public information JSON using the file number; subsequently published decisions."],"where_published":[{"name":"Boletín Oficial de Aragón","url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1473575210808","what":"Individual notices of public information and environmental permitting.","how_to_search_inside":"Search the gazette for biogás, biometano, developer or INAGA case identifier; verify subsequent notices. Search mechanism not yet tested.","example_document":{"url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1473575210808","what_it_gives":"Page 1: Biored Hoya de Huesca, SL; Siétamo (Huesca); INAGA 500301/02/2024/12686; public information for AAI and environmental impact assessment."}},{"name":"Diario Oficial de Castilla-La Mancha","url":"https://docm.jccm.es/docm/verArchivoHtml.do?ruta=2026%2F06%2F22%2Fhtml%2F2026_4621.html&tipo=rutaDocm","what":"Environmental decisions and their procedural history.","how_to_search_inside":"Search the gazette for biometano, company or file identifier; search function not yet tested.","example_document":{"url":"https://docm.jccm.es/docm/verArchivoHtml.do?ruta=2026%2F06%2F22%2Fhtml%2F2026_4621.html&tipo=rutaDocm","what_it_gives":"Resolution 09/06/2026, AAI-TO-497: Nortiben Green Energy I, SL; Gálvez (Toledo); UTM ETRS89 zone 30 X = 392.317,23 Y = 4.398.147; permitted input 189.990 Tn/año."}}]},"related_not_answering":[{"name":"SANDACH list of approved biogas establishments","url":"https://www.mapa.gob.es/va/ganaderia/temas/sanidad-animal-higiene-ganadera/06pbiogas_tcm39-442924.pdf","why":"Approved establishments processing animal by-products are not a list of all projects currently in permitting."},{"name":"Sedigas theoretical biomethane potential","url":"https://biometano.sedigas.es/estudio-biometano","why":"Potential modelled plants are not permitting projects."},{"name":"European Biomethane Map 2026","url":"https://www.gie.eu/publications/maps/european-biomethane-map/","why":"Its 2026 edition covers operating facilities, not pending projects."}],"open_questions":["Why did the participation GIS return no keyword matches when the open-data JSON listed two biogas files on the same date?"],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Terra 6.1 (High)","rules_version":"6.12","note":"Aragón and Galicia official sources and Navarra community table checked; search budget exhausted with regional coverage incomplete.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"unknown"},"sources":{"total":3,"new":3,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":41,"minutes":19}}],"local_terms":[],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":19,"pages_opened":41,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/biomethane-plants-in-permitting.json","detail_url":"https://georutter.org/v1/es/biomethane-plants-in-permitting/detail.json","html_url":"https://georutter.org/es/biomethane-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}
