{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"biomethane-plants","question":"Where can I get a list of biogas and biomethane plants in operation in Spain, with location, production capacity, feedstock, operator and whether they inject into the gas grid?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"The Enagás GdO public API and Excel list registered renewable-gas facilities with gas type, status, capacity, energy source and production-point logistics, but registration is incomplete. Andalucía publishes separate geolocated biogas and biomethane layers; SEDIGAS lists grid-injecting biomethane plants in a January 2026 PDF. No checked source covers every operating plant and attribute.","main_caveats":["GdO Alta is a registration state, not independent proof of current operation; the API also contains Baja and hydrogen.","Injection-point coordinates can differ from plant coordinates; one of 103 checked points has a suspicious longitude sign.","Andalusia biogas power in MW and biomethane annual production in GWh are different quantities.","SEDIGAS January 2026 table covers grid-injecting biomethane, not all biogas or later plants."],"confidence":"medium","confidence_reason":"GdO API, Excel, Andalusian data and SEDIGAS PDF were tested; completeness and present operating status remain unresolved.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002","s003"],"note":"GdO may give injection point; Andalusia has points and Sedigas municipalities.","gap":"not_checked","gap_note":"Coverage and current operating status for plants outside the checked sources remain unverified."},{"attribute":"production_capacity","covered":"partial","source_ids":["s001","s002","s003"],"note":"GdO reports gas capacity; Andalusia distinguishes MW power and annual GWh.","gap":"not_checked","gap_note":"Coverage and current operating status for plants outside the checked sources remain unverified."},{"attribute":"feedstock","covered":"partial","source_ids":["s001","s002","s003"],"note":"Energy-source codes or broad substrate classes are supplied for covered plants.","gap":"not_checked","gap_note":"Coverage and current operating status for plants outside the checked sources remain unverified."},{"attribute":"operator","covered":"partial","source_ids":["s001","s003"],"note":"Sedigas names operators; GdO has facility identity and entity codes, not always operator name.","gap":"not_checked","gap_note":"Coverage and current operating status for plants outside the checked sources remain unverified."},{"attribute":"grid_injection","covered":"partial","source_ids":["s001","s003"],"note":"GdO gives point logistics; Sedigas covers network-injecting biomethane only.","gap":"not_checked","gap_note":"Coverage and current operating status for plants outside the checked sources remain unverified."}]},"sources":[{"source_id":"s001","name":"Renewable gas guarantees of origin production units","publisher":"Enagás GTS","official":true,"landing_url":"https://www.enagas.es/es/gestion-tecnica-sistema/informacion-general/garantias-origen/","data_url":"https://www.gdogas.es/api/production-unit/search-consultation?page=0&size=2&isoLanguage=ES&registrationTypeEnumRequest=COMPLETED&hasCommissioningAct=true&installationStatus=2","access":"api","format":"JSON and XLSX","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","summary":"Renewable gas guarantees of origin production units","coverage_note":"Spain; only facilities registered with the guarantees of origin scheme.","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"problems":[]},"example":{"example_request":"https://www.gdogas.es/api/production-unit/search-consultation?page=0&size=2&isoLanguage=ES&registrationTypeEnumRequest=COMPLETED&hasCommissioningAct=true&installationStatus=2","example_result":"totalItems 64; Valdemingómez: Biometano, Alta, installationCapacity 39235; organic municipal waste; Inyección al sistema gasista."},"members_summary":null},{"source_id":"s002","name":"DERA energy infrastructure, biogas and biomethane","publisher":"Instituto de Estadística y Cartografía de Andalucía","official":true,"landing_url":"https://ws089.juntadeandalucia.es/institutodeestadisticaycartografia/dega/datos-espaciales-de-referencia-de-andalucia-dera/descarga-de-informacion","data_url":"https://ws089.juntadeandalucia.es/institutodeestadisticaycartografia/dega/sites/default/files/datos/094-dera-10-infraestructuras-energeticas-medioambientales-gpkg.zip","access":"direct_download","format":"ZIP GeoPackage","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","summary":"DERA energy infrastructure, biogas and biomethane","coverage_note":"Andalusia","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-15","method":"download","http_status":200,"problems":[]},"example":{"example_request":"https://ws089.juntadeandalucia.es/institutodeestadisticaycartografia/dega/sites/default/files/datos/094-dera-10-infraestructuras-energeticas-medioambientales-gpkg.zip","example_result":"T10_05_Biogas: EDAR Huelva, biogás autoconsumo, lodos depuradora, 0.3 MW; T10_24_Biometano: GUNVOR, Palos, 45 GWh."},"members_summary":null},{"source_id":"s003","name":"SEDIGAS operating biomethane plants, January 2026","publisher":"SEDIGAS","official":false,"landing_url":"https://biometano.sedigas.es/","data_url":"https://biometano.sedigas.es/wp-content/uploads/2026/01/202512-sedigas-plantas-biometano-operativas-en-espana-24.pdf","access":"pdf","format":"PDF","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","summary":"SEDIGAS operating biomethane plants, January 2026","coverage_note":"Spain, grid-injecting biomethane only, January 2026.","data_date":"January 2026","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://biometano.sedigas.es/wp-content/uploads/2026/01/202512-sedigas-plantas-biometano-operativas-en-espana-24.pdf (page 1)","example_result":"Vila-Sana; Agroganadero; Naturgy; Lleida; Distribución; Nedgia; jul-24; 12 GWh/año."},"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":null},"local_terms":[{"term":"biogás","language":"es","meaning":"biogas"},{"term":"biometano","language":"es","meaning":"biomethane"},{"term":"sustrato","language":"es","meaning":"feedstock"},{"term":"garantía de origen","language":"es","meaning":"guarantee of origin"},{"term":"inyección al sistema gasista","language":"es","meaning":"injection into the gas system"}],"provenance":{"pass_count":2,"models":["Gemini 4 Hydrogen (Low)","Terra 6.1 (High)"],"minutes_estimate":25,"pages_opened":43,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen (Low)"},{"pass":2,"date":"2026-11-15","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/biomethane-plants.json","detail_url":"https://georutter.org/v1/es/biomethane-plants/detail.json","html_url":"https://georutter.org/es/biomethane-plants/","country_url":"https://georutter.org/v1/countries/es.json"}
