{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"conventional-power-plants","question":"Where can I get a list of thermal and nuclear power plants in Spain, with location, fuel or technology, capacity (MW), operator, status and annual generation?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"No single open Spanish dataset lists all thermal and nuclear power plants with electrical capacity (MW), operator, status, coordinates, and annual generation. MITECO's statutory registry (RAIPEE: REPROv2 and PRETOR) is gated by CAPTCHA/login, while REE's e-sios unit list requires an API token and hits WAF blocks. Best open options: combine EEA Industrial Reporting v16 (thermal >=50 MWth through 2024, coords, thermal MWth and fuel TJ, not GWh), MITECO/IAEA PRIS plus Foro Nuclear 2025 PDF (nuclear MW, operator, status, 2025 GWh), and ENTSO-E (>=100 MW, free registration) for thermal MWe and annual MWh, or GEM GIPT (request form, Sept 2026) for current >=20-30 MW plant lists.","main_caveats":["MITECO RAIPEE (REPROv2/PRETOR) is CAPTCHA/login-gated, REE e-sios requires a token and hits Incapsula WAF, and Electra CSV drops technical fields.","EEA Industrial Reporting v16 (F5_2) and MITECO WFS report rated thermal input (MWth) and fuel input (TJ), NOT electrical MW or GWh, and mix industrial boilers with power plants.","Official MITECO/EEA reporting completeness gaps for Spain are explicitly flagged in EEA v16 metadata; MITECO WFS ei_gp_combustion is frozen at 2018-2019 (still marks closed coal plants functional).","ENTSO-E Transparency Platform (14.1.b, 16.1.a) covers electrical MW and actual generation per unit, but requires registration and excludes units below 100 MW.","Non-official WRI GPPD (2021, 2 coord errors in Spain, 0 reported ES generation) and JRC-PPDB-OPEN (2019, coords on 119/648 thermal/nuclear rows) are outdated."],"confidence":"high","confidence_reason":"Verified directly across MITECO (REPROv2, PRETOR, Electra, WFS, stats), REE/e-sios, CNMC, CSN, BOE, EEA v16, ENTSO-E, IAEA PRIS, Foro Nuclear, GEM, WRI, JRC, and OSM.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002","s005","s006","s007","s008","s009","s010","s011","s012"],"note":"Coords: EEA (1), WFS (8), GEM (9), WRI (10, 2 errors), JRC (11, 119/648), OSM (12, 182 sites). Site/municipality only: ENTSO-E (2), IAEA (5), MITECO/CSN (6), ForoNuc (7).","gap":"not_published","gap_note":"REE e-sios (4) omits location; MITECO/IAEA/ENTSO-E lack coords; JRC lacks coords on 529/648 ES thermal/nuclear rows; thermal units <50 MWth lack open official coordinates."},{"attribute":"fuel_or_technology","covered":"partial","source_ids":["s001","s002","s004","s005","s006","s007","s008","s009","s010","s011","s012"],"note":"EEA (1) & WFS (8) give fuel TJ/burner (>=50MWth); ENTSO-E (2) & e-sios (4) give production type (reg/WAF); nuclear (5-7); GEM (9), WRI (10), JRC (11), OSM (12) classify fuel.","gap":"not_published","gap_note":"No open official bulk table classifies fuel/technology for Spanish thermal plants <50 MWth (RAIPEE 3 is CAPTCHA/login-gated, REE e-sios 4 is token/WAF-blocked, Electra omits technology)."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s001","s002","s003","s004","s005","s006","s007","s008","s009","s010","s011","s012"],"note":"MWe open for nuclear (5-7) & stale WRI/JRC/OSM (10-12); ENTSO-E >=100MW reg (2); RAIPEE/e-sios blocked (3,4); GEM form (9). EEA (1) & WFS (8) give thermal MWth, not MWe.","gap":"not_published","gap_note":"Open official bulk downloads do not publish current electrical capacity (MWe) for Spanish thermal plants <100 MW (RAIPEE 3 is CAPTCHA-gated, REE e-sios 4 is token/WAF-blocked)."},{"attribute":"operator","covered":"partial","source_ids":["s003","s004","s005","s006","s007","s009","s010","s012"],"note":"Nuclear operator/owners: IAEA (5), MITECO/CSN (6), ForoNuc (7). Thermal: RAIPEE holder CAPTCHA (3), e-sios SM/BRP WAF (4), GEM form (9), WRI 2021 owner (10), OSM 69/182 (12).","gap":"not_published","gap_note":"Open official thermal bulk downloads (EEA F5_2/F1_4/F6_1, MITECO WFS, JRC) and ENTSO-E 14.1.b omit operator; Electra CSV lists installation names without fuel or MW."},{"attribute":"status","covered":"partial","source_ids":["s001","s003","s005","s006","s007","s008","s009","s011"],"note":"Nuclear: IAEA/CSN/ForoNuc (5-7). Thermal: EEA F6_1 (1), RAIPEE previa/def CAPTCHA (3), WFS 2018-19 (8), GEM form (9), JRC 117/648 (11). REE e-sios (4) & WRI (10) omit status.","gap":"not_published","gap_note":"Unified current administrative status for all thermal plants is gated inside MITECO REPROv2/PRETOR (3) and BOE closure resolutions; JRC is blank on 531/648 ES thermal/nuclear rows."},{"attribute":"annual_generation","covered":"partial","source_ids":["s002","s007","s010","s011"],"note":"ENTSO-E 16.1.a >=100MW reg (2); Foro Nuclear 2025 GWh for 7 nuclear units (7); WRI modeled 2017 est. only, 0 reported (10); JRC 2015-2018 MWh (11). OSM (12) has none.","gap":"not_published","gap_note":"No open bulk dataset publishes current plant-level annual electricity generation (MWh/GWh) for Spanish thermal plants; EEA (1) gives fuel TJ and IAEA API (5) gives lifetime TWh only."}]},"sources":[{"source_id":"s001","name":"Industrial Reporting under the Industrial Emissions Directive (IED 2010/75/EU) and E-PRTR (v16.0, Feb 2026)","publisher":"European Environment Agency (EEA)","official":true,"landing_url":"https://industry.eea.europa.eu/industrial-emissions/dataset","data_url":"https://sdi.eea.europa.eu/datashare/public.php/webdav/User%20friendly%20.csv%20files.zip","access":"direct_download","format":"ZIP (CSV, XLSX, ACCDB, GPKG, GDB)","license":"EEA standard re-use policy (free open access with attribution)","language":"en","has_coordinates":true,"location_precision":"exact","summary":"Industrial Reporting under the Industrial Emissions Directive (IED 2010/75/EU) and E-PRTR (v16.0, Feb 2026)","coverage_note":"EU-27 plus EEA/cooperating countries (31 countries, including Spain)","data_date":"2016-2024 for LCPs (2007-2024 for E-PRTR); database status as of 2026-02-20 (v16.0)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-16","method":"headers_only","http_status":200,"problems":["Full CSV ZIP exceeds 100 MB (147.6 MB); F5_2_LCP_Energy_Emissions.csv (31,356 ES rows, 356 unique LCPs, 0/356 outside Spain), F1_4_Air_Releases_Facilities.csv (159 ES 1(c) facilities, 0/159 outside Spain), and F6_1_IED_Installations.csv header/schema were verified via HTTP Range slices."]},"example":{"example_request":"curl -sL -u AnfiqFkZYBSq36B: -r 82906843-100332245 -o f5_2_slice.bin \"https://sdi.eea.europa.eu/datashare/public.php/webdav/User%20friendly%20.csv%20files.zip\"","example_result":"{\"PublicationDate\": \"2026/02/13\", \"countryName\": \"Spain\", \"reportingYear\": \"2019\", \"LCPInspireId\": \"ES.CAED/000136007.PART\", \"installationPartName\": \"CT SON REUS TG3-END\", \"City_Of_Facility\": \"PALMA\", \"Longitude\": \"2.681304\", \"Latitude\": \"39.650492\", \"featureType\": \"LCPCharacteristics\", \"unit\": \"MW\", \"featureValue\": \"175\"}"},"members_summary":null},{"source_id":"s002","name":"ENTSO-E Transparency Platform (Art. 14.1.b Production/Generation Units & Art. 16.1.a Actual Generation per Unit)","publisher":"ENTSO-E (data submitted by REE / Redeia)","official":true,"landing_url":"https://transparency.entsoe.eu/","data_url":"https://web-api.tp.entsoe.eu/api","access":"registration_required","format":"XML (REST API), CSV/XLSX (Web UI & File Library FMS)","license":"ENTSO-E Transparency Platform free open access upon registration (Regulation EU 543/2013)","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"ENTSO-E Transparency Platform (Art. 14.1.b Production/Generation Units & Art. 16.1.a Actual Generation per Unit)","coverage_note":"Pan-European bidding zones / control areas, including Spain (10YES-REE------0)","data_date":"Continuous (14.1.b published annually for 3 following years; 16.1.a published D+5)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"problems":["Web export, File Library (FMS), and REST API require free user registration and token; Zendesk Help Center pages returned 403 to curl."]},"example":null,"members_summary":null},{"source_id":"s003","name":"MITECO Registro Administrativo de Instalaciones de Producción de Energía Eléctrica (RAIPEE: REPROv2 y PRETOR)","publisher":"Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO)","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html","data_url":"https://energia.serviciosmin.gob.es/reprov2/RegistroPublico.aspx","access":"web_viewer_only","format":"Web query interface (ASP.NET) behind CAPTCHA; PRETOR offers Excel export inside CAPTCHA-gated viewer","license":"Spanish public sector information (MITECO legal notice)","language":"es","has_coordinates":false,"location_precision":"municipality","summary":"MITECO Registro Administrativo de Instalaciones de Producción de Energía Eléctrica (RAIPEE: REPROv2 y PRETOR)","coverage_note":"Spain (national)","data_date":"Continuously updated","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-16","method":"blocked","http_status":200,"problems":["Public lookup pages in both REPROv2 and PRETOR are gated behind image CAPTCHAs; full portal access requires digital certificate or Cl@ve; REPROv2 citizen manual PDF returns 404."]},"example":null,"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}}],"other_sources_count":9,"if_unstructured":{"summary":null},"local_terms":[{"term":"central térmica convencional","language":"es","meaning":"Conventional thermal power plant (coal, fuel-oil, natural gas)"},{"term":"central de ciclo combinado (CTCC)","language":"es","meaning":"Combined cycle gas turbine (CCGT) power plant"},{"term":"central nuclear","language":"es","meaning":"Nuclear power plant"},{"term":"cogeneración","language":"es","meaning":"Combined heat and power (CHP) thermal plant"},{"term":"régimen ordinario / régimen especial","language":"es","meaning":"Historical Spanish regulatory split between large conventional plants (>50 MW, Sección 1ª REPROv2) and renewables/cogeneration/waste (Sección 2ª PRETOR)"},{"term":"RAIPEE (Registro Administrativo de Instalaciones de Producción de Energía Eléctrica)","language":"es","meaning":"Official national registry of electricity production facilities at MITECO"},{"term":"potencia instalada / potencia neta / potencia bruta","language":"es","meaning":"Installed electrical capacity (gross vs net MWe)"},{"term":"grandes instalaciones de combustión (GIC / LCP)","language":"es","meaning":"Large combustion plants (>=50 MWth thermal input) under EU IED / RD 815/2013"}],"provenance":{"pass_count":1,"models":["Gemini 4 Hydrogen (Extra High)"],"minutes_estimate":35,"pages_opened":113,"passes":[{"pass":1,"date":"2026-11-16","model":"Gemini 4 Hydrogen (Extra High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/conventional-power-plants.json","detail_url":"https://georutter.org/v1/es/conventional-power-plants/detail.json","html_url":"https://georutter.org/es/conventional-power-plants/","country_url":"https://georutter.org/v1/countries/es.json"}
