{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"conventional-power-plants","question":"Where can I get a list of thermal and nuclear power plants in Spain, with location, fuel or technology, capacity (MW), operator, status and annual generation?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"No single open Spanish dataset lists all thermal and nuclear power plants with electrical capacity (MW), operator, status, coordinates, and annual generation. MITECO's statutory registry (RAIPEE: REPROv2 and PRETOR) is gated by CAPTCHA/login, while REE's e-sios unit list requires an API token and hits WAF blocks. Best open options: combine EEA Industrial Reporting v16 (thermal >=50 MWth through 2024, coords, thermal MWth and fuel TJ, not GWh), MITECO/IAEA PRIS plus Foro Nuclear 2025 PDF (nuclear MW, operator, status, 2025 GWh), and ENTSO-E (>=100 MW, free registration) for thermal MWe and annual MWh, or GEM GIPT (request form, Sept 2026) for current >=20-30 MW plant lists.","main_caveats":["MITECO RAIPEE (REPROv2/PRETOR) is CAPTCHA/login-gated, REE e-sios requires a token and hits Incapsula WAF, and Electra CSV drops technical fields.","EEA Industrial Reporting v16 (F5_2) and MITECO WFS report rated thermal input (MWth) and fuel input (TJ), NOT electrical MW or GWh, and mix industrial boilers with power plants.","Official MITECO/EEA reporting completeness gaps for Spain are explicitly flagged in EEA v16 metadata; MITECO WFS ei_gp_combustion is frozen at 2018-2019 (still marks closed coal plants functional).","ENTSO-E Transparency Platform (14.1.b, 16.1.a) covers electrical MW and actual generation per unit, but requires registration and excludes units below 100 MW.","Non-official WRI GPPD (2021, 2 coord errors in Spain, 0 reported ES generation) and JRC-PPDB-OPEN (2019, coords on 119/648 thermal/nuclear rows) are outdated."],"confidence":"high","confidence_reason":"Verified directly across MITECO (REPROv2, PRETOR, Electra, WFS, stats), REE/e-sios, CNMC, CSN, BOE, EEA v16, ENTSO-E, IAEA PRIS, Foro Nuclear, GEM, WRI, JRC, and OSM.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002","s005","s006","s007","s008","s009","s010","s011","s012"],"note":"Coords: EEA (1), WFS (8), GEM (9), WRI (10, 2 errors), JRC (11, 119/648), OSM (12, 182 sites). Site/municipality only: ENTSO-E (2), IAEA (5), MITECO/CSN (6), ForoNuc (7).","gap":"not_published","gap_note":"REE e-sios (4) omits location; MITECO/IAEA/ENTSO-E lack coords; JRC lacks coords on 529/648 ES thermal/nuclear rows; thermal units <50 MWth lack open official coordinates."},{"attribute":"fuel_or_technology","covered":"partial","source_ids":["s001","s002","s004","s005","s006","s007","s008","s009","s010","s011","s012"],"note":"EEA (1) & WFS (8) give fuel TJ/burner (>=50MWth); ENTSO-E (2) & e-sios (4) give production type (reg/WAF); nuclear (5-7); GEM (9), WRI (10), JRC (11), OSM (12) classify fuel.","gap":"not_published","gap_note":"No open official bulk table classifies fuel/technology for Spanish thermal plants <50 MWth (RAIPEE 3 is CAPTCHA/login-gated, REE e-sios 4 is token/WAF-blocked, Electra omits technology)."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s001","s002","s003","s004","s005","s006","s007","s008","s009","s010","s011","s012"],"note":"MWe open for nuclear (5-7) & stale WRI/JRC/OSM (10-12); ENTSO-E >=100MW reg (2); RAIPEE/e-sios blocked (3,4); GEM form (9). EEA (1) & WFS (8) give thermal MWth, not MWe.","gap":"not_published","gap_note":"Open official bulk downloads do not publish current electrical capacity (MWe) for Spanish thermal plants <100 MW (RAIPEE 3 is CAPTCHA-gated, REE e-sios 4 is token/WAF-blocked)."},{"attribute":"operator","covered":"partial","source_ids":["s003","s004","s005","s006","s007","s009","s010","s012"],"note":"Nuclear operator/owners: IAEA (5), MITECO/CSN (6), ForoNuc (7). Thermal: RAIPEE holder CAPTCHA (3), e-sios SM/BRP WAF (4), GEM form (9), WRI 2021 owner (10), OSM 69/182 (12).","gap":"not_published","gap_note":"Open official thermal bulk downloads (EEA F5_2/F1_4/F6_1, MITECO WFS, JRC) and ENTSO-E 14.1.b omit operator; Electra CSV lists installation names without fuel or MW."},{"attribute":"status","covered":"partial","source_ids":["s001","s003","s005","s006","s007","s008","s009","s011"],"note":"Nuclear: IAEA/CSN/ForoNuc (5-7). Thermal: EEA F6_1 (1), RAIPEE previa/def CAPTCHA (3), WFS 2018-19 (8), GEM form (9), JRC 117/648 (11). REE e-sios (4) & WRI (10) omit status.","gap":"not_published","gap_note":"Unified current administrative status for all thermal plants is gated inside MITECO REPROv2/PRETOR (3) and BOE closure resolutions; JRC is blank on 531/648 ES thermal/nuclear rows."},{"attribute":"annual_generation","covered":"partial","source_ids":["s002","s007","s010","s011"],"note":"ENTSO-E 16.1.a >=100MW reg (2); Foro Nuclear 2025 GWh for 7 nuclear units (7); WRI modeled 2017 est. only, 0 reported (10); JRC 2015-2018 MWh (11). OSM (12) has none.","gap":"not_published","gap_note":"No open bulk dataset publishes current plant-level annual electricity generation (MWh/GWh) for Spanish thermal plants; EEA (1) gives fuel TJ and IAEA API (5) gives lifetime TWh only."}]},"sources":[{"source_id":"s001","name":"Industrial Reporting under the Industrial Emissions Directive (IED 2010/75/EU) and E-PRTR (v16.0, Feb 2026)","publisher":"European Environment Agency (EEA)","official":true,"landing_url":"https://industry.eea.europa.eu/industrial-emissions/dataset","data_url":"https://sdi.eea.europa.eu/datashare/public.php/webdav/User%20friendly%20.csv%20files.zip","access":"direct_download","format":"ZIP (CSV, XLSX, ACCDB, GPKG, GDB)","license":"EEA standard re-use policy (free open access with attribution)","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"supranational","adds":null,"first_seen_pass":1,"rank":1,"summary":"Industrial Reporting under the Industrial Emissions Directive (IED 2010/75/EU) and E-PRTR (v16.0, Feb 2026)","coverage_note":"EU-27 plus EEA/cooperating countries (31 countries, including Spain)","data_date":"2016-2024 for LCPs (2007-2024 for E-PRTR); database status as of 2026-02-20 (v16.0)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"EU-27 plus EEA/cooperating countries (31 countries, including Spain)"},"fine_print":{"unit":{"value":"MWth (total rated thermal input), TJ (fuel energy input), hours (operating hours), tonnes (pollutants) in F5_2_LCP_Energy_Emissions.csv","quote":"F5_2_LCP_Energy_Emissions contains information about emissions energy input and technical characteristics (total rated thermal input and operating hours) of each reported LCP from 2016","url":"https://sdi.eea.europa.eu/datashare/public.php/webdav/EEA_Industrial_Reporting_Metadata_v16.pdf","attempts":[]},"inclusion_rule":{"value":"Large Combustion Plants (LCPs) >= 50 MW rated thermal input under IED Chapter III, plus E-PRTR Annex I activity 1(c) facilities >= 50 MWth","quote":"The release and emissions data cover the period 2007-2024 as result of the data reported under the E-PRTR facilities, 2017-2024 for IED installations and WI/co-WIs, and 2016-2024 for LCPs.","url":"https://sdi.eea.europa.eu/datashare/s/AnfiqFkZYBSq36B/download?path=%2F&files=README.md","attempts":[]},"reference_date":{"value":"2016-2024 for LCPs (2007-2024 for E-PRTR); database status as of 2026-02-20 (v16.0)","quote":"This metadata refers to the geospatial dataset representing the status of the EEA Industrial Reporting database as of 20 February 2026 (version 16).","url":"https://sdi.eea.europa.eu/datashare/s/AnfiqFkZYBSq36B/download?path=%2F&files=README.md","attempts":[]},"update_frequency":{"value":"Annual (national reporting cycle)","quote":"The reporting occurs annually and is based on the data reported by countries.","url":"https://sdi.eea.europa.eu/datashare/public.php/webdav/EEA_Industrial_Reporting_Metadata_v16.pdf","attempts":[]},"exclusions":{"value":"Excludes nuclear power plants, combustion units <50 MWth, confidential facilities, and omits electrical capacity (MWe), electricity output (GWh), and operator in F5_2/F1_4 CSVs; EEA explicitly flags incomplete reporting for Spain","quote":"Completeness: data reporting under either the EU Registry or the E-PRTR/LCP dataflow is incomplete for the following reporting countries: Cyprus, Czechia, Germany, Lithuania, Malta, Slovakia, Spain, Iceland and Switzerland.","url":"https://sdi.eea.europa.eu/datashare/public.php/webdav/EEA_Industrial_Reporting_Metadata_v16.pdf","attempts":[]}},"key_fields":[{"field":"LCPInspireId","meaning":"INSPIRE ID of the Large Combustion Plant unit/part (F5_2_LCP_Energy_Emissions.csv)"},{"field":"installationPartName","meaning":"Name of the combustion plant/unit"},{"field":"featureType","meaning":"Metric type: LCPCharacteristics (MWth, hours), NaturalGas, Coal, LiquidFuels, Biomass, OtherGases, NOX, SO2, DUST"},{"field":"featureValue","meaning":"Numeric value corresponding to featureType and unit (MW, hours, TJ, tonnes)"},{"field":"Latitude / Longitude","meaning":"WGS84 point coordinates"},{"field":"EPRTRAnnexIMainActivity","meaning":"Activity code in F1_4_Air_Releases_Facilities.csv ('1(c)' = Thermal power stations and other combustion installations)"},{"field":"installationStatus / permitURL","meaning":"IED installation operational status (e.g., functional) and regional permit link in F6_1_IED_Installations.csv"}],"how_to_use":{"example_request":"curl -sL -u AnfiqFkZYBSq36B: -r 82906843-100332245 -o f5_2_slice.bin \"https://sdi.eea.europa.eu/datashare/public.php/webdav/User%20friendly%20.csv%20files.zip\"","example_result":"{\"PublicationDate\": \"2026/02/13\", \"countryName\": \"Spain\", \"reportingYear\": \"2019\", \"LCPInspireId\": \"ES.CAED/000136007.PART\", \"installationPartName\": \"CT SON REUS TG3-END\", \"City_Of_Facility\": \"PALMA\", \"Longitude\": \"2.681304\", \"Latitude\": \"39.650492\", \"featureType\": \"LCPCharacteristics\", \"unit\": \"MW\", \"featureValue\": \"175\"}","steps":["Download User friendly .csv files.zip (147.6 MB) from https://sdi.eea.europa.eu/data/657ac3cb-affa-4295-a4a9-27b4f539adab (share token AnfiqFkZYBSq36B, supports HTTP Range) or use SiteMap.gdb.zip (90.7 MB) from token WQpi7BEjScefLYL.","Extract F5_2_LCP_Energy_Emissions.csv (LCP thermal capacity, operating hours, fuel TJ by year), F1_4_Air_Releases_Facilities.csv (E-PRTR facilities), and F6_1_IED_Installations.csv (IED installationStatus and permitURL).","Filter F5_2 by countryName == 'Spain' (31,356 rows, 356 unique LCPInspireId across 2016-2024, 264 in 2024) and F1_4 by countryName == 'Spain' and EPRTRAnnexIMainActivity == '1(c)' (159 unique facilities).","Pivot F5_2 by (LCPInspireId, reportingYear) and (featureType, unit) to separate rated thermal input (unit == 'MW'), operating hours (unit == 'hours'), and fuel inputs (unit == 'TJ')."],"reading_traps":["unit == 'MW' in F5_2 is rated thermal input (MWth), NOT electrical output capacity (MWe).","Includes industrial boilers, refineries, and chemical heaters alongside power stations (e.g., CALDERA F-5103); cross-filter with F1_4 activity '1(c)' or plant names/CNAE to isolate electricity generators.","Contains fuel energy input in TJ, NOT electricity generated in MWh/GWh, and omits operator in F5_2, F1_4, and F6_1.","Official metadata explicitly notes Spain's EU Registry / LCP reporting has completeness gaps."]},"test":{"tested_on":"2026-11-16","method":"headers_only","http_status":200,"content_type":"application/zip","size_bytes":147626010,"records_total":401072,"records_for_country":31356,"problems":["Full CSV ZIP exceeds 100 MB (147.6 MB); F5_2_LCP_Energy_Emissions.csv (31,356 ES rows, 356 unique LCPs, 0/356 outside Spain), F1_4_Air_Releases_Facilities.csv (159 ES 1(c) facilities, 0/159 outside Spain), and F6_1_IED_Installations.csv header/schema were verified via HTTP Range slices."]},"evidence":[{"claim":"F5_2 covers LCP rated thermal input, operating hours, and fuel energy input 2016-2024","url":"https://sdi.eea.europa.eu/datashare/public.php/webdav/EEA_Industrial_Reporting_Metadata_v16.pdf","quote":"F5_2_LCP_Energy_Emissions contains information about emissions energy input and technical characteristics (total rated thermal input and operating hours) of each reported LCP from 2016 (or from the first year the LCP has been reported) onwards."},{"claim":"EEA flags incomplete reporting for Spain in metadata v16","url":"https://sdi.eea.europa.eu/datashare/public.php/webdav/EEA_Industrial_Reporting_Metadata_v16.pdf","quote":"Completeness: data reporting under either the EU Registry or the E-PRTR/LCP dataflow is incomplete for the following reporting countries: Cyprus, Czechia, Germany, Lithuania, Malta, Slovakia, Spain, Iceland and Switzerland."}],"members":[],"members_summary":null},{"source_id":"s002","name":"ENTSO-E Transparency Platform (Art. 14.1.b Production/Generation Units & Art. 16.1.a Actual Generation per Unit)","publisher":"ENTSO-E (data submitted by REE / Redeia)","official":true,"landing_url":"https://transparency.entsoe.eu/","data_url":"https://web-api.tp.entsoe.eu/api","access":"registration_required","format":"XML (REST API), CSV/XLSX (Web UI & File Library FMS)","license":"ENTSO-E Transparency Platform free open access upon registration (Regulation EU 543/2013)","language":"en","has_coordinates":false,"location_precision":"municipality","publisher_type":"supranational","adds":"Only official source with unit-level electrical net capacity (MWe), voltage level, and actual hourly/annual net electricity generation (MWh) for both thermal and nuclear units >=100 MW in Spain.","first_seen_pass":1,"rank":2,"summary":"ENTSO-E Transparency Platform (Art. 14.1.b Production/Generation Units & Art. 16.1.a Actual Generation per Unit)","coverage_note":"Pan-European bidding zones / control areas, including Spain (10YES-REE------0)","data_date":"Continuous (14.1.b published annually for 3 following years; 16.1.a published D+5)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Pan-European bidding zones / control areas, including Spain (10YES-REE------0)"},"fine_print":{"unit":{"value":"MW (installed net generation capacity and actual net generation output per MTU)","quote":"Actual net generation output (MW) per market time unit and per generation unit of 100 MW or more installed generation capacity.","url":"https://eepublicdownloads.entsoe.eu/clean-documents/Transparency/MoP_Ref2_DDD_v3r4.pdf","attempts":[]},"inclusion_rule":{"value":"Production and generation units >= 100 MW installed generation capacity","quote":"Information about production units (existing and planned) with an installed generation capacity equalling to or exceeding 100 MW.","url":"https://eepublicdownloads.entsoe.eu/clean-documents/Transparency/MoP_Ref2_DDD_v3r4.pdf","attempts":[]},"reference_date":{"value":"Continuous (14.1.b published annually for 3 following years; 16.1.a published D+5)","quote":"The information shall be published five days after the end of the operational period.","url":"https://eepublicdownloads.entsoe.eu/clean-documents/Transparency/MoP_Ref2_DDD_v3r4.pdf","attempts":[]},"update_frequency":{"value":"Annual (14.1.b unit master data); Daily D+5 per market time unit (16.1.a generation)","quote":"The information shall be published annually for the three following years no later than one week before the beginning of the first year to which the data relates.","url":"https://eepublicdownloads.entsoe.eu/clean-documents/Transparency/MoP_Ref2_DDD_v3r4.pdf","attempts":[]},"exclusions":{"value":"Excludes all thermal and cogeneration units below 100 MW; does not publish exact street coordinates or operator in standard 14.1.b output; requires user account and API token","quote":"Information about production units (existing and planned) with an installed generation capacity equalling to or exceeding 100 MW.","url":"https://eepublicdownloads.entsoe.eu/clean-documents/Transparency/MoP_Ref2_DDD_v3r4.pdf","attempts":[]}},"key_fields":[{"field":"unit name / EIC","meaning":"Production/generation unit name and 16-character EIC code (e.g., 18W...)"},{"field":"installed generation capacity (MW)","meaning":"Net installed electrical generation capacity in MW (Art. 14.1.b, documentType=A71)"},{"field":"production type","meaning":"ENTSO-E fuel/technology classification (Nuclear, Fossil Gas, Fossil Hard coal, Biomass, etc.)"},{"field":"Actual net generation output (MW)","meaning":"Net electrical output per MTU (Art. 16.1.a, documentType=A73, processType=A16); integrate over year for MWh"},{"field":"location / voltage connection level","meaning":"Administrative location/substation reference and kV connection level"}],"how_to_use":{"example_request":null,"example_result":null,"steps":["Create a free account on https://transparency.entsoe.eu/ and email transparency@entsoe.eu to activate your RESTful API securityToken (or access the File Library FMS).","Query Installed Capacity per Production Unit (documentType=A71, processType=A33, in_Domain=10YES-REE------0) on https://web-api.tp.entsoe.eu/api to retrieve Spain thermal and nuclear units >=100 MW.","Query Actual Generation Output per Generation Unit (documentType=A73, processType=A16, in_Domain=10YES-REE------0) across a full calendar year and aggregate MTU MW outputs to annual MWh per unit."],"reading_traps":["Units < 100 MW (most cogeneration, biomass, waste, and smaller island thermal units) are excluded by regulation.","Help center articles on transparencyplatform.zendesk.com return HTTP 403 (Cloudflare) to automated HTTP clients; technical specs are openly downloadable in MoP_Ref2_DDD_v3r4.pdf on entsoe.eu."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":14498,"records_total":null,"records_for_country":null,"problems":["Web export, File Library (FMS), and REST API require free user registration and token; Zendesk Help Center pages returned 403 to curl."]},"evidence":[{"claim":"14.1.b mandates publishing unit name, MW capacity, location, voltage, bidding zone, and production type for units >= 100 MW","url":"https://eepublicdownloads.entsoe.eu/clean-documents/Transparency/MoP_Ref2_DDD_v3r4.pdf","quote":"Information about production units (existing and planned) with an installed generation capacity equalling to or exceeding 100 MW. The information shall contain: – the unit name; – the installed generation capacity (MW); – the location; – the voltage connection level; – the bidding zone; – the production type."},{"claim":"16.1.a mandates actual net generation output per unit >= 100 MW published D+5","url":"https://eepublicdownloads.entsoe.eu/clean-documents/Transparency/MoP_Ref2_DDD_v3r4.pdf","quote":"Actual net generation output (MW) per market time unit and per generation unit of 100 MW or more installed generation capacity. The information shall be published five days after the end of the operational period."}],"members":[],"members_summary":null},{"source_id":"s003","name":"MITECO Registro Administrativo de Instalaciones de Producción de Energía Eléctrica (RAIPEE: REPROv2 y PRETOR)","publisher":"Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO)","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html","data_url":"https://energia.serviciosmin.gob.es/reprov2/RegistroPublico.aspx","access":"web_viewer_only","format":"Web query interface (ASP.NET) behind CAPTCHA; PRETOR offers Excel export inside CAPTCHA-gated viewer","license":"Spanish public sector information (MITECO legal notice)","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Authoritative statutory national registry of all authorized Spanish electricity generation plants of any capacity (conventional thermal, nuclear, cogeneration, waste, biomass), with official holder, capacity, and registration status.","first_seen_pass":1,"rank":3,"summary":"MITECO Registro Administrativo de Instalaciones de Producción de Energía Eléctrica (RAIPEE: REPROv2 y PRETOR)","coverage_note":"Spain (national)","data_date":"Continuously updated","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Spain (national)"},"fine_print":{"unit":{"value":"MW / kW (installed power)","quote":null,"url":null,"attempts":["Checked https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html (no unit specified on landing page).","Checked https://energia.serviciosmin.gob.es/reprov2/Manuales/Manual_usuario_CIUDADANO_REPRO.pdf (returned HTTP 404) and RegistroPublico.aspx (blocked by CAPTCHA)."]},"inclusion_rule":{"value":"All authorized electricity production facilities in Spain (Sección primera RD 1955/2000 arts. 169-174; Sección segunda RD 413/2014)","quote":"En el registro administrativo de instalaciones de producción de energía eléctrica deben inscribirse todas las instalaciones de producción de energía eléctrica que hayan sido autorizadas.","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/energias-renovables/registro-administrativo.html","attempts":[]},"reference_date":{"value":"Continuously updated","quote":"Los datos podrán descargarse a través de una aplicación informática con actualización permanente.","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/energias-renovables/registro-administrativo.html","attempts":[]},"update_frequency":{"value":"Continuous (permanent update upon prior/definitive registration)","quote":"Los datos podrán descargarse a través de una aplicación informática con actualización permanente.","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/energias-renovables/registro-administrativo.html","attempts":[]},"exclusions":{"value":"Does not include annual electricity generation or bulk open download without CAPTCHA/authentication","quote":"A continuación, repita los caracteres de la imagen para evitar abusos de este formulario:","url":"https://energia.serviciosmin.gob.es/reprov2/RegistroPublico.aspx","attempts":[]}},"key_fields":[{"field":"Sección primera (REPROv2)","meaning":"Non-renewable / conventional thermal & nuclear installations >50 MW (RD 1955/2000)"},{"field":"Sección segunda (PRETOR)","meaning":"Renewables, cogeneration, and waste installations (RD 413/2014)"}],"how_to_use":{"example_request":null,"example_result":null,"steps":["Human users can open https://energia.serviciosmin.gob.es/reprov2/RegistroPublico.aspx (conventional/nuclear) or https://energia.serviciosmin.gob.es/Pretor/Vista/Informes/InformesInstalaciones.aspx (cogeneration/biomass/waste), solve the CAPTCHA manually, and filter by autonomous community/province.","Automated bulk extraction is not possible without solving the CAPTCHA or holding an authorized certificate/Cl@ve account."],"reading_traps":["Includes both 'inscripción previa' (authorized/in construction, not yet necessarily operating) and 'inscripción definitiva'.","MITECO's linked REPROv2 citizen user manual PDF returns HTTP 404."]},"test":{"tested_on":"2026-11-16","method":"blocked","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":26142,"records_total":null,"records_for_country":null,"problems":["Public lookup pages in both REPROv2 and PRETOR are gated behind image CAPTCHAs; full portal access requires digital certificate or Cl@ve; REPROv2 citizen manual PDF returns 404."]},"evidence":[{"claim":"REPROv2 is the public interface for Sección primera (conventional non-renewable)","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html","quote":"Los datos relativos a las instalaciones ya inscritas en la Sección primera del registro administrativo de instalaciones de producción de energía eléctrica pueden ser consultados a través del siguiente enlace:"},{"claim":"REPROv2 RegistroPublico requires solving an image CAPTCHA","url":"https://energia.serviciosmin.gob.es/reprov2/RegistroPublico.aspx","quote":"A continuación, repita los caracteres de la imagen para evitar abusos de este formulario:"},{"claim":"PRETOR tracks preliminary and definitive registration status and Ley 24/2013 links authorizations to holders","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/energias-renovables/registro-administrativo.html","quote":"Se incluye las instalaciones inscritas tanto con carácter previo como definitivo."}],"members":[{"name":"REPROv2 - Sección primera (Régimen ordinario / no renovable, cogeneración o residuos)","landing_url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html","data_url":"https://energia.serviciosmin.gob.es/reprov2/RegistroPublico.aspx","access":"web_viewer_only","tested":true,"data_found":null,"note":"Public lookup form gated by image CAPTCHA (ucCaptcha_TxtCpatcha); administrative login requires digital certificate or Cl@ve. Manual PDF URL returned 404."},{"name":"PRETOR - Sección segunda (Energías renovables, cogeneración y residuos)","landing_url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/energias-renovables/registro-administrativo.html","data_url":"https://energia.serviciosmin.gob.es/Pretor/Vista/Informes/InformesInstalaciones.aspx","access":"web_viewer_only","tested":true,"data_found":null,"note":"Public lookup/reports gated by image CAPTCHA (MyCaptcha_TxtCpatcha); queries filtered by province/CCAA."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null},"member_scope":{"total":null,"note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s004","name":"Red Eléctrica (REE / Redeia) e·sios - Unidades Físicas y Unidades de Programación","publisher":"Red Eléctrica de España (REE / Redeia)","official":true,"landing_url":"https://www.esios.ree.es/es/unidades-fisicas","data_url":"https://api.esios.ree.es/archives/81/download_json","access":"registration_required","format":"JSON (API); JSON / CSV / Excel (Web portal export)","license":"Red Eléctrica (Redeia) legal notice / personal API token terms","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Official Spanish TSO structural unit master lists across all capacities and technologies (including thermal and nuclear units <100 MW omitted from ENTSO-E), adding REE UF/UP codes, EIC codes, maximum MW capacity, production type, and linked Balance Responsible Party (SM).","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Spain (national electricity system)"},"fine_print":{"unit":{"value":"MW (Potencia máxima MW / Maximum Power Capacity MW)","quote":"maximum_power_capacity_MW:\"Potencia máxima MW\"","url":"https://www.esios.ree.es/js/app.init.b7c9cf76.js","attempts":[]},"inclusion_rule":{"value":"All physical generation units (Unidades Físicas) and scheduling/programming units (Unidades de Programación) registered in the Spanish electricity system","quote":"list_of_generation_units:\"Listado de unidades físicas\"","url":"https://www.esios.ree.es/js/app.init.b7c9cf76.js","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["Checked https://api.esios.ree.es/archives/81/download_json and https://api.esios.ree.es/archives/82/download_json (returned HTTP 403 Incapsula WAF without personal API token).","Checked https://www.esios.ree.es/es/unidades-fisicas and https://www.esios.ree.es/js/app.init.b7c9cf76.js (live page blocked by HTTP 403 Incapsula WAF; bundle sets default query window dynamically to end of previous month without stating static snapshot date)."]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Checked https://www.esios.ree.es/environment.json and https://www.esios.ree.es/js/app.init.b7c9cf76.js (no update cadence stated for archives 81/82).","Checked https://www.esios.ree.es/es/unidades-fisicas and https://www.ree.es/es/datos/generacion/potencia-instalada-generacion (live e-sios page returned HTTP 403 Incapsula WAF; REE landing page links generically to e-sios)."]},"exclusions":{"value":"Excludes geographic coordinates, municipality, lifecycle status, physical O&M operator (lists market subject/BRP SM instead), and per-plant annual generation; API requires personal token via consultasios@ree.es and WAF blocks automated requests","quote":"API_X_KEY\":\"request_your_personal_token_sending_email_to_consultasios@ree.es","url":"https://www.esios.ree.es/environment.json","attempts":[]}},"key_fields":[{"field":"Código de UF / Código de UP","meaning":"REE physical unit code (UF) or programming unit code (UP)"},{"field":"eic-code","meaning":"ENTSO-E Energy Identification Code (EIC)"},{"field":"Descripción corta / Descripción larga","meaning":"Short and full generation unit name"},{"field":"Potencia máxima MW","meaning":"Maximum installed/registered power capacity in MW"},{"field":"Tipo de producción","meaning":"Fuel/technology production category"},{"field":"Vinculación con SM / Sujeto del Mercado","meaning":"Linked Balance Responsible Party (BRP / SM) code"}],"how_to_use":{"example_request":null,"example_result":null,"steps":["Request a personal API token by emailing consultasios@ree.es as instructed in https://www.esios.ree.es/environment.json, or open https://www.esios.ree.es/es/unidades-fisicas (or /es/unidades-de-programacion) in an interactive browser to pass Incapsula WAF and click EXPORTAR JSON / CSV / EXCEL.","With a token, call GET https://api.esios.ree.es/archives/81/download_json (Unidades Físicas) or /archives/82/download_json (Unidades de Programación) supplying Accept: application/json; application/vnd.esios-api-v1+json and Authorization: Token token=<PERSONAL_TOKEN> (or x-api-key).","Filter by Tipo de producción for thermal and nuclear technologies and join on eic-code with ENTSO-E or JRC-PPDB-OPEN for location or generation."],"reading_traps":["Both api.esios.ree.es/archives/81 and www.esios.ree.es/es/unidades-fisicas reject non-browser automated HTTP clients with HTTP 403 Incapsula WAF (_Incapsula_Resource); non-www esios.ree.es fails DNS resolution.","Vinculación con SM / Sujeto del Mercado identifies the market representative (BRP), which can differ from the physical plant operator or corporate owner.","Omits coordinates, municipality, lifecycle status, and annual generation."]},"test":{"tested_on":"2026-11-16","method":"blocked","http_status":403,"content_type":"text/html","size_bytes":885,"records_total":null,"records_for_country":null,"problems":["api.esios.ree.es/archives/81/download_json and www.esios.ree.es/es/unidades-fisicas returned HTTP 403 Incapsula WAF challenge (_Incapsula_Resource) to curl; non-www esios.ree.es fails DNS resolution; API requires personal token via consultasios@ree.es (environment.json)."]},"evidence":[{"claim":"e-sios environment.json specifies api.esios.ree.es and requires requesting a personal token via consultasios@ree.es","url":"https://www.esios.ree.es/environment.json","quote":"\"API_URL\":\"https://api.esios.ree.es\",\"API_X_KEY\":\"request_your_personal_token_sending_email_to_consultasios@ree.es\""},{"claim":"e-sios bundle queries archives/81 (110 EN) for Unidades Físicas with UF-code, EIC, MW capacity, production type, SM, and UP columns","url":"https://www.esios.ree.es/js/app.init.b7c9cf76.js","quote":"maximum_power_capacity_MW:\"Potencia máxima MW\" ... production_type:\"Tipo de producción\" ... linking_with_SM:\"Vinculación con SM\" ... pairing_with_UP:\"Vinculación con UP\""},{"claim":"Direct automated request to api.esios.ree.es/archives/81/download_json returns Incapsula WAF HTTP 403 block","url":"https://api.esios.ree.es/archives/81/download_json","quote":"Request unsuccessful. Incapsula incident ID:"}],"members":[{"name":"e·sios - Unidades Físicas (Generation units)","landing_url":"https://www.esios.ree.es/es/unidades-fisicas","data_url":"https://api.esios.ree.es/archives/81/download_json","access":"registration_required","tested":true,"data_found":null,"note":"Exports UF code, EIC code, short/large description, maximum power capacity (MW), production type, BRP link (SM), and UP pairing (archives/81 ES, 110 EN). Token required and blocked by HTTP 403 Incapsula WAF to curl."},{"name":"e·sios - Unidades de Programación (Programming units)","landing_url":"https://www.esios.ree.es/es/unidades-de-programacion","data_url":"https://api.esios.ree.es/archives/82/download_json","access":"registration_required","tested":true,"data_found":null,"note":"Exports UP code, EIC code, short/large description, maximum power capacity (MW), production type, trade, regulation zone, market subject (SM), and UP type (archives/82 ES, 111 EN). Token required and blocked by HTTP 403 Incapsula WAF to curl."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null},"member_scope":{"total":null,"note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s005","name":"IAEA Power Reactor Information System (PRIS)","publisher":"International Atomic Energy Agency (IAEA)","official":true,"landing_url":"https://pris-stats.iaea.org/","data_url":"https://pris-stats.iaea.org/reactor/reactors-by-code/ES","access":"api","format":"JSON","license":"IAEA PRIS terms (free public consultation)","language":"en","has_coordinates":false,"location_precision":"municipality","publisher_type":"supranational","adds":"Clean open JSON API covering all 10 Spanish nuclear power reactors (7 operational and 3 permanently shut down), with net/gross MWe, thermal MWt, reactor model, operator, owner, status, lifecycle dates, and cumulative lifetime TWh.","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Global (filtered to countryCode=ES for Spain)"},"fine_print":{"unit":{"value":"MWe (net and gross electrical capacity), MWt (thermal power), TWh (lifetimeGeneration)","quote":"\"thermalPower\":2947,\"grossElectricalCapacity\":1049,\"netElectricalCapacity\":1011","url":"https://pris-stats.iaea.org/reactor/reactor-by-id/153","attempts":[]},"inclusion_rule":{"value":"All commercial nuclear power reactors (operational, under construction, and permanently shut down / decommissioning)","quote":"statusName\":\"Operational\" ... \"statusName\":\"Permanent Shutdown\"","url":"https://pris-stats.iaea.org/reactor/reactors-by-code/ES","attempts":[]},"reference_date":{"value":"2025 (reportYear: 2025 in reactor-by-id lifetimeFactor)","quote":"\"reportYear\":2025,\"lifetimeGeneration\":310.300","url":"https://pris-stats.iaea.org/reactor/reactor-by-id/153","attempts":[]},"update_frequency":{"value":"Annual (plus operational status updates)","quote":"Its data are submitted directly by officially nominated national liaison officers and data providers in IAEA Member States","url":"https://pris-stats.iaea.org/main.1998896eb388d394.js","attempts":[]},"exclusions":{"value":"Nuclear power reactors only (excludes thermal fossil/biomass plants); JSON API omits coordinates and single-year annual GWh (single-year production charts are embedded via Power BI)","quote":"EmbedUrl\":\"https://app.powerbi.com/reportEmbed?reportId=12749967-8d91-46cd-a792-093b776499c2","url":"https://pris-stats.iaea.org/databrowser/report-by-id/12749967-8d91-46cd-a792-093b776499c2","attempts":[]}},"key_fields":[{"field":"unitName / siteName","meaning":"Reactor unit and nuclear site name (e.g., ALMARAZ-1, siteName=ALMARAZ)"},{"field":"typeCode","meaning":"Reactor technology code (PWR, BWR, GCR)"},{"field":"netElectricalCapacity / grossElectricalCapacity / thermalPower","meaning":"Net MWe, gross MWe, and thermal MWt capacities"},{"field":"operatorName / ownerName","meaning":"Operating entity (e.g., CNAT, ANAV, Iberdrola) and owners"},{"field":"statusName","meaning":"Lifecycle status: Operational (7 units) or Permanent Shutdown (3 units)"}],"how_to_use":{"example_request":"curl -sL \"https://pris-stats.iaea.org/reactor/reactors-by-code/ES\"","example_result":"{\"id\":153,\"countryCode\":\"ES\",\"unitName\":\"ALMARAZ-1\",\"typeCode\":\"PWR\",\"statusName\":\"Operational\",\"siteName\":\"ALMARAZ\",\"thermalPower\":2947,\"grossElectricalCapacity\":1049,\"netElectricalCapacity\":1011,\"operatorName\":\"CENTRALES NUCLEARES ALMARAZ-TRILLO (ID/UFG/ENDESA/HC/NUCLENOR)\"}","steps":["GET https://pris-stats.iaea.org/reactor/reactors-by-code/ES to obtain the JSON array (items[]) of all 10 Spanish nuclear reactors.","Optionally GET https://pris-stats.iaea.org/reactor/reactor-by-id/<id> for cumulative lifetime generation (TWh) and availability/load factors up to reportYear 2025."],"reading_traps":["Old pris.iaea.org URLs redirect to the Angular SPA at https://pris-stats.iaea.org/.","Reports both gross and net electrical capacity (e.g., Almaraz-1: 1,049 gross vs 1,011 net MWe)."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":13960,"records_total":10,"records_for_country":10,"problems":[]},"evidence":[{"claim":"IAEA PRIS ES endpoint returns 10 reactors (7 operational, 3 permanent shutdown)","url":"https://pris-stats.iaea.org/reactor/reactors-by-code/ES","quote":"\"unitName\":\"ALMARAZ-1\",\"typeName\":\"Pressurized Light-Water-Moderated and Cooled Reactor\",\"statusName\":\"Operational\",\"countryName\":\"Spain\",\"grossElectricalCapacity\":1049,\"netElectricalCapacity\":1011"}],"members":[],"members_summary":null},{"source_id":"s006","name":"MITECO Centrales Nucleares en España & CSN Estados Operativos","publisher":"Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO) y Consejo de Seguridad Nuclear (CSN)","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/nuclear/centrales/espana.html","data_url":null,"access":"web_viewer_only","format":"HTML tables and plant web pages","license":"Spanish public sector reuse notice","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Official Spanish national nuclear fleet table with exact ownership percentages, municipality/province, gross MWe (7,398.77 MW), plus CSN daily operational status and license renewal dates (e.g., Orden TED/864/2026).","first_seen_pass":1,"rank":6,"coverage":{"geographic":"Spain (national)"},"fine_print":{"unit":{"value":"MW (gross electrical capacity on MITECO table)","quote":"Potencia eléctrica(MW) ... Total 7.398,77","url":"https://www.miteco.gob.es/es/energia/nuclear/centrales/espana.html","attempts":[]},"inclusion_rule":{"value":"All 5 active nuclear sites (7 reactors) plus 3 decommissioning sites","quote":"En España se encuentran en funcionamiento 5 centrales nucleares, situadas en 5 emplazamientos (ver tabla adjunta), 2 de las cuales disponen de 2 reactores cada una (Almaraz y Ascó), por lo que suman 7 reactores","url":"https://www.miteco.gob.es/es/energia/nuclear/centrales/espana.html","attempts":[]},"reference_date":{"value":"2026 (includes Orden TED/864/2026 on CSN)","quote":"Orden TED/864/2026, de 12 de agosto, por la que se concede la renovación de la autorización de explotación de la Central Nuclear Almaraz, Unidades I y II.","url":"https://www.csn.es/central-nuclear/almaraz/informacion-general","attempts":[]},"update_frequency":{"value":"Daily for CSN operational states; ad-hoc upon license changes for MITECO","quote":"Cada día, la web del CSN actualiza los estados operativos de centrales nucleares que operan en España con los datos facilitados por los titulares de las instalaciones.","url":"https://www.csn.es/estados-operativos-de-centrales-nucleares","attempts":[]},"exclusions":{"value":"Nuclear plants only (no thermal fossil/biomass); MITECO nuclear production subpage gives national total only (55,983 GWh in 2022), not per-plant annual generation","quote":"La producción de energía eléctrica nuclear en España durante 2022 fue de 55.983 GWh.","url":"https://www.miteco.gob.es/es/energia/nuclear/centrales/espana/produccion.html","attempts":[]}},"key_fields":[{"field":"Reactor / Emplazamiento","meaning":"Reactor name, municipality, and province"},{"field":"Titular / Propietarios","meaning":"Operating entity (CNAT, ANAV, Iberdrola) and exact equity % per owner"},{"field":"Potencia eléctrica(MW) / Tipo","meaning":"Gross electrical capacity in MW and reactor type (PWR/BWR)"}],"how_to_use":{"example_request":null,"example_result":null,"steps":["Parse the HTML <table> at https://www.miteco.gob.es/es/energia/nuclear/centrales/espana.html for the 7 active reactors, ownership shares, and municipality/province.","Consult https://www.csn.es/centrales-nucleares-de-espana and https://www.csn.es/estados-operativos-de-centrales-nucleares for daily operational status and decommissioning plants (José Cabrera, Garoña, Vandellós I)."],"reading_traps":["MITECO table reports gross capacity (7,398.77 MW), whereas REE/MITECO energy statistics report net nuclear capacity (7,117 MW).","MITECO page mentions José Cabrera and Garoña in decommissioning, but omits Vandellós I (listed on CSN)."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":66748,"records_total":9,"records_for_country":9,"problems":[]},"evidence":[{"claim":"MITECO lists 7 active nuclear reactors with owners, gross MW, type, and municipality","url":"https://www.miteco.gob.es/es/energia/nuclear/centrales/espana.html","quote":"Almaraz I | Almaraz Cáceres | Centrales Nucleares Almaraz-Trillo, AIE. (CNAT) | Iberdrola Generación Nuclear, S.A. (52,7%), ENDESA Generación, S.A. (36,0%), Naturgy Energy Group, S.A. (11,3%) | 1.049,40 | PWR | 1983"}],"members":[{"name":"MITECO - Centrales Nucleares en España","landing_url":"https://www.miteco.gob.es/es/energia/nuclear/centrales/espana.html","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"HTML table of 7 active reactors with Titular, % Propietarios, Potencia eléctrica (MW), Tipo (PWR/BWR), and year; lists José Cabrera & Garoña as decommissioning."},{"name":"CSN - Centrales nucleares en España y Estados Operativos","landing_url":"https://www.csn.es/centrales-nucleares-de-espana","data_url":"https://www.csn.es/estados-operativos-de-centrales-nucleares","access":"web_viewer_only","tested":true,"data_found":null,"note":"Daily operational state portal plus per-plant pages (e.g., Almaraz Orden TED/864/2026) and decommissioning pages (includes Vandellós I)."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null},"member_scope":{"total":null,"note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s007","name":"Foro Nuclear: Resultados Nucleares 2025 (PDF) y fichas de centrales","publisher":"Foro de la Industria Nuclear Española (Foro Nuclear)","official":false,"landing_url":"https://www.foronuclear.org/descubre-la-energia-nuclear/energia-nuclear-en-espana/","data_url":"https://www.foronuclear.org/wp-content/uploads/2026/05/Informe-Resultados-Nucleares-2025.pdf","access":"pdf","format":"PDF (98 pages, image/outlined text; plus HTML plant pages)","license":"Industry association public report","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"community","adds":"Publishes exact 2025 annual gross electricity generation (GWh) for all 7 individual Spanish nuclear reactors (total 53,935.45 GWh), plus net/gross MWe and operating license expiry dates.","first_seen_pass":1,"rank":7,"coverage":{"geographic":"Spain (national)"},"fine_print":{"unit":{"value":"MWe (potencia bruta and neta), GWh (producción bruta annual generation)","quote":"Durante el año 2025, la energía eléctrica neta producida por el parque nuclear español fue de 51.846,16 GWh ... La producción bruta fue de 53.935,45 GWh.","url":"https://www.foronuclear.org/wp-content/uploads/2026/05/Informe-Resultados-Nucleares-2025.pdf","attempts":[]},"inclusion_rule":{"value":"All 7 operational Spanish nuclear reactors (plus decommissioning summary)","quote":"el parque nuclear español está formado por siete reactores en operación en cinco emplazamientos, con una potencia bruta instalada conjunta de 7.443 MWe (7.117 MWe netos)","url":"https://www.foronuclear.org/descubre-la-energia-nuclear/energia-nuclear-en-espana/","attempts":[]},"reference_date":{"value":"2025-12-31 (published May/June 2026)","quote":"Datos a 31 de diciembre de 2025","url":"https://www.foronuclear.org/wp-content/uploads/2026/05/Informe-Resultados-Nucleares-2025.pdf","attempts":[]},"update_frequency":{"value":"Annual PDF report (plus monthly generation updates on plant HTML pages)","quote":"Producción mensual (septiembre 2026)","url":"https://www.foronuclear.org/descubre-la-energia-nuclear/energia-nuclear-en-espana/central-nuclear-de-almaraz-i/","attempts":[]},"exclusions":{"value":"Nuclear fleet only (excludes thermal fossil/biomass); PDF uses outlined glyphs so pdftotext yields blank spaces and requires raster rendering/OCR","quote":null,"url":null,"attempts":["Ran pdftotext on Informe-Resultados-Nucleares-2025.pdf (returned 0 GWh matches due to outlined fonts).","Rendered PDF pages 13-16 (printed pp. 24-31) with pdftoppm -png -r 80 and verified tables visually."]}},"key_fields":[{"field":"Central nuclear","meaning":"Reactor name (Almaraz I, Almaraz II, Ascó I, Ascó II, Cofrentes, Trillo, Vandellós II)"},{"field":"Potencia bruta / Potencia neta (MWe)","meaning":"Gross and net electrical capacity in MWe (PDF p. 26)"},{"field":"Producción bruta (GWh)","meaning":"2025 annual gross electricity generation per reactor (PDF p. 28)"},{"field":"Cese de la explotación previsto","meaning":"Scheduled closure dates under 2019 protocol and current licenses (PDF p. 30)"},{"field":"Empresa propietaria / Localización (HTML)","meaning":"Owner shares, reactor type, and municipality/province on Foro Nuclear plant web pages"}],"how_to_use":{"example_request":"curl -sL -o fn_2025.pdf \"https://www.foronuclear.org/wp-content/uploads/2026/05/Informe-Resultados-Nucleares-2025.pdf\" && pdftoppm -png -r 80 -f 14 -l 16 fn_2025.pdf page","example_result":"Page 28 (PDF page 15) table 'INDICADORES DE FUNCIONAMIENTO DE LAS CENTRALES NUCLEARES ESPAÑOLAS EN 2025': Almaraz I: 7.969,37 GWh; Almaraz II: 7.399,85 GWh; Ascó I: 8.338,42 GWh; Ascó II: 7.577,93 GWh; Cofrentes: 7.434,26 GWh; Trillo: 7.500,24 GWh; Vandellós II: 7.715,37 GWh; TOTAL: 53.935,45 GWh.","steps":["Download Informe-Resultados-Nucleares-2025.pdf.","Render PDF pages 13-16 (printed pages 24-31) using pdftoppm -png -r 80 (because text extraction yields blank spaces from outlined fonts).","Read MWe capacity from printed page 26, 2025 annual GWh per reactor from printed page 28, and authorization dates from printed page 30."],"reading_traps":["PDF text layer is unreadable with pdftotext (must render pages as images).","Per-reactor table on page 28 reports gross generation (53,935.45 GWh total), whereas page 24 also reports fleet net generation (51,846.16 GWh).","Page 26 sums gross capacity to 7,398.7 MWe but text on page 26 also mentions 7,443 MWe elsewhere on the website."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":6649958,"records_total":7,"records_for_country":7,"problems":["PDF uses outlined fonts so pdftotext fails; requires pdftoppm rendering."]},"evidence":[{"claim":"Individual HTML plant pages also publish annual gross GWh (e.g., Almaraz I 2024)","url":"https://www.foronuclear.org/descubre-la-energia-nuclear/energia-nuclear-en-espana/central-nuclear-de-almaraz-i/","quote":"Durante 2024, la producción de energía eléctrica bruta correspondiente a la unidad I fue de 7.589,78 GWh"},{"claim":"PDF page 28 lists exact 2025 GWh generation per active reactor","url":"https://www.foronuclear.org/wp-content/uploads/2026/05/Informe-Resultados-Nucleares-2025.pdf","quote":"INDICADORES DE FUNCIONAMIENTO DE LAS CENTRALES NUCLEARES ESPAÑOLAS EN 2025 ... TOTAL/GLOBAL 53.935,45"}],"members":[],"members_summary":null},{"source_id":"s008","name":"MITECO GeoServer WFS: Grandes Plantas de Combustión (ei_gp_combustion) e Instalaciones IPPC (ei_instalaciones)","publisher":"Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO)","official":true,"landing_url":"https://www.miteco.gob.es/es/cartografia-y-sig/ide/descargas/calidad-y-evaluacion-ambiental/emisiones.html","data_url":"https://gis.miteco.gob.es/geoserver/evaluacionambiental/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=evaluacionambiental:ei_gp_combustion&outputFormat=application/json","access":"api","format":"GeoJSON / GML (OGC WFS 2.0.0)","license":"Spanish public sector INSPIRE open data","language":"es","has_coordinates":true,"location_precision":"exact","publisher_type":"national_government","adds":"Open Spanish OGC WFS endpoint bypassing the Altcha proof-of-work download gate on DescargaFichero, providing direct links (permiturl, sitevisiturl) to regional Integrated Environmental Authorizations (AAI) and inspection reports.","first_seen_pass":1,"rank":8,"coverage":{"geographic":"Spain (national, EPSG:4258)"},"fine_print":{"unit":{"value":"MWth (totalratedthermalinput), TJ (energyinputtj_*), hours (numberofoperatinghours), tonnes (emissions)","quote":"Se entiende por gran instalación de combustión (GIC) a una instalación de combustión cuya potencia térmica nominal sea igual o superior a 50 MWt","url":"https://gis.miteco.gob.es/descargas/info/EI_GPC.pdf","attempts":[]},"inclusion_rule":{"value":"Spanish Large Combustion Plants >= 50 MWth under RD 815/2013 and PRTR-España","quote":"Grandes plantas de Combustión dentro del ámbito de aplicación del Capítulo III de la Directiva de Emisiones Industriales (2010/75/UE, DEI) y del Capítulo V del Reglamento de Emisiones Industriales (Real Decreto 815/2013).","url":"https://gis.miteco.gob.es/descargas/info/EI_GPC.pdf","attempts":[]},"reference_date":{"value":"2018-2019 (updated May 2021)","quote":"La presente versión corresponde a las instalaciones incluidas en su normativa aplicada a GIC para todas las instalaciones ubicadas en territorio español para el periodo 2018 y 2019. Los datos que pueden consultarse en este servicio están actualizados a fecha de mayo del año 2021.","url":"https://gis.miteco.gob.es/descargas/info/EI_GPC.pdf","attempts":[]},"update_frequency":{"value":"Static snapshot (unupdated since May 2021)","quote":"Los datos que pueden consultarse en este servicio están actualizados a fecha de mayo del año 2021.","url":"https://gis.miteco.gob.es/descargas/info/EI_GPC.pdf","attempts":[]},"exclusions":{"value":"Excludes nuclear, <50 MWth plants, post-2019 changes/closures, electrical capacity (MWe), electricity output (GWh), and operator","quote":"La presente versión corresponde a las instalaciones incluidas en su normativa aplicada a GIC para todas las instalaciones ubicadas en territorio español para el periodo 2018 y 2019.","url":"https://gis.miteco.gob.es/descargas/info/EI_GPC.pdf","attempts":[]}},"key_fields":[{"field":"installation_part_inspire_id / nameoffeature","meaning":"EU-Registry part ID and plant/unit name"},{"field":"combustionplantcategory","meaning":"GasTurbine (356), Boiler (158), Others (120), NA (110), DieselEngine (12), GasEngine (2)"},{"field":"totalratedthermalinput","meaning":"Rated thermal input in MWth (populated in 652/758 features)"},{"field":"status","meaning":"2018-2019 status: functional, decommissioned, disused, notRegulated, enconstruccion"},{"field":"permiturl / sitevisiturl (in ei_instalaciones)","meaning":"Direct URL to regional AAI environmental permit and inspection report"}],"how_to_use":{"example_request":"curl -sL \"https://gis.miteco.gob.es/geoserver/evaluacionambiental/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=evaluacionambiental:ei_gp_combustion&outputFormat=application/json\"","example_result":"{\"reportingyear\": 2018, \"installation_part_inspire_id\": \"000516000.PART\", \"nameoffeature\": \"GENFIBRE, S.A.\", \"status\": \"functional\", \"pointgeometrylat\": 42.6825, \"pointgeometrylon\": -2.9233}","steps":["Avoid DescargaFichero?f=grandesplantascombustion-pf.zip (which is gated by an Altcha anti-bot proof-of-work form) and query MITECO GeoServer WFS directly.","Deduplicate ei_gp_combustion (758 features = 379 units x 2 years: 2018 and 2019).","Also query ei_instalaciones with CQL_FILTER=mainactivitycode LIKE '1.1%' (187 features, 2019) to retrieve permiturl links to regional AAI permits."],"reading_traps":["Frozen at 2018-2019 (May 2021): coal plants decommissioned after 2019 still appear as functional; use EEA v16 for data through 2024.","758 features represent 379 units repeated twice (2018 and 2019).","Legacy mapama.gob.es URLs from datos.gob.es time out (HTTP 000); use gis.miteco.gob.es."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json;charset=UTF-8","size_bytes":921093,"records_total":758,"records_for_country":758,"problems":["Bulk ZIP download on gis.miteco.gob.es/descargas/app/DescargaFichero is gated by an Altcha widget; GeoServer WFS works openly without Altcha. Data frozen at 2018-2019."]},"evidence":[{"claim":"MITECO ei_gp_combustion WFS serves 2018-2019 LCP dataset updated May 2021","url":"https://gis.miteco.gob.es/descargas/info/EI_GPC.pdf","quote":"La presente versión corresponde a las instalaciones incluidas en su normativa aplicada a GIC para todas las instalaciones ubicadas en territorio español para el periodo 2018 y 2019."}],"members":[],"members_summary":null},{"source_id":"s009","name":"Global Energy Monitor: Global Integrated Power Tracker (GIPT)","publisher":"Global Energy Monitor (GEM)","official":false,"landing_url":"https://globalenergymonitor.org/projects/global-integrated-power-tracker","data_url":null,"access":"request_form","format":"XLSX / GIS formats (delivered via email/presign form)","license":"CC BY 4.0","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Most recent (September 2026 release) non-official unified unit-level inventory across coal (>=30 MW), oil/gas (>=20 MW in EU), bioenergy (>=20 MW), and nuclear (all capacities), including status and corporate ownership chains.","first_seen_pass":1,"rank":9,"coverage":{"geographic":"Global (including Spain)"},"fine_print":{"unit":{"value":"MW (electrical capacity)","quote":"The tracker monitors every unit with a capacity of 30+ megawatts","url":"https://globalenergymonitor.org/projects/global-coal-plant-tracker/methodology/","attempts":[]},"inclusion_rule":{"value":"Coal >=30 MW, Oil/Gas >=20 MW in EU (>=50 MW globally), Bioenergy >=20 MW, Nuclear any capacity","quote":"The tracker’s multi-sector dataset of power stations provides unit-level information on thermal power (coal, oil, gas, nuclear, geothermal, and bioenergy) and renewables (solar, wind, and hydropower).","url":"https://globalenergymonitor.org/projects/global-integrated-power-tracker","attempts":[]},"reference_date":{"value":"2026-09 (September 2026 release)","quote":"The recommended citation is \"Global Integrated Power Tracker, Global Energy Monitor, September 2026 release.\"","url":"https://globalenergymonitor.org/projects/global-integrated-power-tracker","attempts":[]},"update_frequency":{"value":"Bi-annual (~January and July/August/September per sector tracker)","quote":"The GOGPT tracker map and underlying data are updated bi-annually, around January and July.","url":"https://globalenergymonitor.org/projects/global-oil-gas-plant-tracker/","attempts":[]},"exclusions":{"value":"Excludes thermal units <20 MW (gas/oil/bioenergy) and <30 MW (coal); does not include annual electricity generation","quote":null,"url":null,"attempts":["Checked https://globalenergymonitor.org/projects/global-integrated-power-tracker (no annual generation field advertised).","Checked https://globalenergymonitor.org/projects/global-oil-gas-plant-tracker/ and https://globalenergymonitor.org/projects/global-coal-plant-tracker/methodology/ (tracks capacity, status, ownership, location)."]}},"key_fields":[{"field":"Plant / Unit name","meaning":"Power station and generating unit identifier, linked to GEM.wiki pages"},{"field":"Technology / Fuel","meaning":"Coal, oil/gas, bioenergy, nuclear, etc."},{"field":"Capacity (MW)","meaning":"Unit electrical capacity in MW"},{"field":"Status","meaning":"Operating, construction, pre-construction, announced, shelved, cancelled, retired, mothballed"},{"field":"Owner / Parent","meaning":"Direct owner and parent corporate ownership chain"}],"how_to_use":{"example_request":null,"example_result":null,"steps":["Open https://globalenergymonitor.org/projects/global-integrated-power-tracker#download and submit the request form (gem-download-form.bundle.js) accepting the CC BY 4.0 license to receive the XLSX/GIS download link.","Filter by Country/Area == 'Spain' and Technology/Type in coal, oil/gas, bioenergy, nuclear."],"reading_traps":["Download requires submitting an online form (not executed per research rules); summary country totals are publicly linked in Google Sheets on the landing page.","Smaller thermal/cogeneration units (<20 MW gas/bioenergy, <30 MW coal) are excluded."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":100101,"records_total":null,"records_for_country":null,"problems":["Direct file download requires filling out the web request form (gem-download-form.bundle.js)."]},"evidence":[{"claim":"September 2026 release provides unit-level thermal and nuclear power plant data","url":"https://globalenergymonitor.org/projects/global-integrated-power-tracker","quote":"The tracker’s multi-sector dataset of power stations provides unit-level information on thermal power (coal, oil, gas, nuclear, geothermal, and bioenergy) and renewables (solar, wind, and hydropower)."},{"claim":"GEM data is licensed under CC BY 4.0","url":"https://api.globalenergymonitor.org/static/gem-download-form.bundle.js","quote":"Creative Commons Attribution 4.0 International (CC BY 4.0)"}],"members":[],"members_summary":null},{"source_id":"s010","name":"WRI Global Power Plant Database (v1.3.0, 2021)","publisher":"World Resources Institute (WRI)","official":false,"landing_url":"https://github.com/wri/global-power-plant-database/blob/master/output_database/global_power_plant_database.csv","data_url":"https://raw.githubusercontent.com/wri/global-power-plant-database/master/output_database/global_power_plant_database.csv","access":"direct_download","format":"CSV","license":"CC BY 4.0","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Single open CSV download containing 120 Spanish thermal & nuclear plants (with capacity_mw, coordinates, primary_fuel, owner, and modeled 2017 generation estimates), though unmaintained since 2021.","first_seen_pass":1,"rank":10,"coverage":{"geographic":"Global (34,936 plants; 829 in Spain, of which 120 thermal/nuclear)"},"fine_print":{"unit":{"value":"MW (capacity_mw), GWh (estimated_generation_gwh_*)","quote":"Generation capacity ... Annual generation","url":"https://raw.githubusercontent.com/wri/global-power-plant-database/master/README.md","attempts":[]},"inclusion_rule":{"value":"Utility-scale plants compiled from national/global sources up to v1.3.0","quote":"The latest database release (v1.3.0) is available in CSV format here under a Creative Commons-Attribution 4.0 (CC BY 4.0) license.","url":"https://raw.githubusercontent.com/wri/global-power-plant-database/master/README.md","attempts":[]},"reference_date":{"value":"2021 (v1.3.0; generation estimates through 2017)","quote":"This project is not currently maintained by WRI. There are no planned updates as of this time (early 2022). The last version of this database is version 1.3.0.","url":"https://raw.githubusercontent.com/wri/global-power-plant-database/master/README.md","attempts":[]},"update_frequency":{"value":"Discontinued / static (no updates since early 2022)","quote":"This project is not currently maintained by WRI. There are no planned updates as of this time (early 2022).","url":"https://raw.githubusercontent.com/wri/global-power-plant-database/master/README.md","attempts":[]},"exclusions":{"value":"Omits operational status; 0/120 Spanish thermal/nuclear plants have reported generation_gwh_2013..2019 (only modeled 2017 estimates); misses post-2020 coal retirements","quote":"This project is not currently maintained by WRI. There are no planned updates as of this time (early 2022).","url":"https://raw.githubusercontent.com/wri/global-power-plant-database/master/README.md","attempts":[]}},"key_fields":[{"field":"name / gppd_idnr","meaning":"Power plant name and WRI unique identifier"},{"field":"primary_fuel","meaning":"Spain thermal/nuclear counts: Gas (58), Oil (26), Coal (15), Waste (15), Nuclear (5), Biomass (1)"},{"field":"capacity_mw","meaning":"Installed electrical capacity in MW"},{"field":"latitude / longitude","meaning":"WGS84 coordinates"},{"field":"owner","meaning":"Plant owner name (populated on all 120 ES thermal/nuclear rows)"},{"field":"estimated_generation_gwh_2017","meaning":"Modeled annual generation in GWh (populated on 119/120 ES thermal/nuclear rows; reported generation_gwh_2019 is blank on all 120)"}],"how_to_use":{"example_request":"curl -sL -o wri_gppd.csv \"https://raw.githubusercontent.com/wri/global-power-plant-database/master/output_database/global_power_plant_database.csv\"","example_result":"ESP | ABONO 2 | Coal | 877.66 MW | lat=43.5528, lon=-5.7231 | owner=HIDROELECTRICA DEL CANTABRICO S.A. | generation_gwh_2019='' | estimated_generation_gwh_2017=4003.64","steps":["Download global_power_plant_database.csv (11.97 MB) from GitHub.","Filter country == 'ESP' (829 rows) and primary_fuel in ('Gas','Oil','Coal','Waste','Nuclear','Biomass') (120 rows)."],"reading_traps":["2 of 120 Spanish thermal/nuclear plants have bad coordinates outside Spain: ESCOMBRERAS GRUPO 1 (lat=7.5732, lon=-0.9392, missing leading '3') and GARONA VERDA (lat=0.7046, lon=42.8025, swapped lat/lon).","All 120 Spanish thermal/nuclear rows lack reported generation_gwh_2013..2019 (only modeled 2017 estimates exist).","Unmaintained since 2021 (v1.3.0): closed coal plants like Aboño/Compostilla/Meirama remain listed without a status field."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"text/plain; charset=utf-8","size_bytes":11973385,"records_total":34936,"records_for_country":829,"problems":["Unmaintained since 2021; 2 of 120 Spanish thermal/nuclear plants fall outside Spain bounding box due to coordinate typos/swaps."]},"evidence":[{"claim":"WRI GPPD v1.3.0 is discontinued and CC BY 4.0 licensed","url":"https://raw.githubusercontent.com/wri/global-power-plant-database/master/README.md","quote":"This project is not currently maintained by WRI. There are no planned updates as of this time (early 2022). The last version of this database is version 1.3.0."}],"members":[],"members_summary":null},{"source_id":"s011","name":"JRC Open Power Plants Database (JRC-PPDB-OPEN v1.0, 2019)","publisher":"European Commission - Joint Research Centre (JRC)","official":true,"landing_url":"https://zenodo.org/records/3574566","data_url":"https://zenodo.org/records/3574566/files/JRC-PPDB-OPEN.ver1.0.zip?download=1","access":"direct_download","format":"ZIP (CSV + JSON datapackage + PDF)","license":"CC BY 4.0","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"supranational","adds":"Open unit-level EU dataset (648 Spanish thermal/nuclear units, 518 unique eic_p) with ENTSO-E EIC codes, 2015-2018 historical annual MWh generation (617 Spain rows), and cross-dataset linkages, though frozen at Dec 2019.","first_seen_pass":1,"rank":11,"coverage":{"geographic":"Europe (7,117 units total; 1,827 in Spain, of which 648 thermal/nuclear)"},"fine_print":{"unit":{"value":"MW (net capacity_p / capacity_g), MWh (Generation in JRC_OPEN_TEMPORAL.csv)","quote":"Sum of reported generation in the time series in MWh","url":"https://zenodo.org/records/3574566/files/JRC-PPDB-OPEN.ver1.0.zip?download=1","attempts":[]},"inclusion_rule":{"value":"European power plant units compiled from ENTSO-E, WRI, GEO, FRESNA, and EEA","quote":"The JRC-PPDB-OPEN is primarily based on a collection of all the information published by ENTSO-E on the European power plants at unit level. This information was extended, improved, and where possible corrected using information contained in open datasets published by WRI Powerwatch , Global energy observatory , FRESNA and the EEA.","url":"https://zenodo.org/records/3574566","attempts":[]},"reference_date":{"value":"2019-12-13 (temporal generation covers 2015-2018)","quote":"Published December 13, 2019","url":"https://zenodo.org/records/3574566","attempts":[]},"update_frequency":{"value":"Static snapshot (no updates since Dec 2019)","quote":"Published December 13, 2019","url":"https://zenodo.org/records/3574566","attempts":[]},"exclusions":{"value":"Omits operator/owner; coordinates missing on 529/648 Spanish thermal/nuclear rows; status_g blank on 531/648; temporal generation only covers 151-158 ES units/year in 2015-2018","quote":"The JRC-PPDB-OPEN database is a first attempt towards a more detailed and coherent, albeit still incomplete, dataset of European power plants.","url":"https://zenodo.org/records/3574566","attempts":[]}},"key_fields":[{"field":"eic_p / eic_g","meaning":"ENTSO-E EIC code for producing and generating unit (18W... for Spain)"},{"field":"name_p / name_g","meaning":"Production and generating unit names"},{"field":"capacity_p / capacity_g","meaning":"Net electrical capacity in MW"},{"field":"type_g","meaning":"ENTSO-E production type (Fossil Gas 420, Biomass 111, Coal-derived gas 55, Hard coal 30, Waste 23, Nuclear 8, Lignite 1)"},{"field":"Generation (in JRC_OPEN_TEMPORAL.csv)","meaning":"Annual generation in MWh for 2015-2018 (join on eic_p/eic_g)"}],"how_to_use":{"example_request":"curl -sL -o JRC-PPDB-OPEN.ver1.0.zip \"https://zenodo.org/records/3574566/files/JRC-PPDB-OPEN.ver1.0.zip?download=1\"","example_result":"JRC_OPEN_UNITS: {'eic_p': '18WCOF1-12345-0O', 'name_p': 'COFRENTES', 'capacity_p': '1063.9', 'type_g': 'Nuclear', 'lat': '39.213', 'lon': '-1.051', 'status_g': 'COMMISSIONED'} | JRC_OPEN_TEMPORAL: {'eic_p': '18WALZ1-12345-0E', 'cyear': '2015', 'Generation': '8412832'}","steps":["Download JRC-PPDB-OPEN.ver1.0.zip (1.30 MB) from Zenodo.","Filter JRC_OPEN_UNITS.csv by country == 'Spain' (1,827 rows; 648 thermal/nuclear).","Join JRC_OPEN_TEMPORAL.csv (617 Spain rows, 2015-2018) and JRC_OPEN_LINKAGES.csv (214 Spain rows) using eic_p / eic_g (those tables have no country column)."],"reading_traps":["JRC_OPEN_TEMPORAL.csv and JRC_OPEN_LINKAGES.csv have no 'country' column; filtering directly by country returns 0 rows unless joined with JRC_OPEN_UNITS.csv on eic_p/eic_g.","Only 119 of 648 Spanish thermal/nuclear rows have lat/lon, and 531 of 648 have blank status_g.","datapackage.json inside the archive contains a JSON syntax error at line 175."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/octet-stream","size_bytes":1296714,"records_total":7117,"records_for_country":1827,"problems":["Static Dec 2019 snapshot; coordinates missing on 529/648 thermal/nuclear Spain units; datapackage.json fails strict JSON parsing."]},"evidence":[{"claim":"JRC-PPDB-OPEN v1.0 aggregates ENTSO-E, WRI, GEO, FRESNA, and EEA under CC BY 4.0","url":"https://zenodo.org/records/3574566","quote":"Published December 13, 2019 ... The JRC-PPDB-OPEN is primarily based on a collection of all the information published by ENTSO-E on the European power plants at unit level."}],"members":[],"members_summary":null},{"source_id":"s012","name":"OpenStreetMap (via Overpass API)","publisher":"OpenStreetMap contributors","official":false,"landing_url":"https://maps.mail.ru/osm/tools/overpass/api/status","data_url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","access":"api","format":"JSON / OSM XML","license":"ODbL","language":"es","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Crowd-mapped exact plant centroids/footprints for 182 thermal and nuclear power=plant elements in Spain (useful to verify site footprints), though incomplete on capacity, operator, status, and lacking annual generation.","first_seen_pass":1,"rank":12,"coverage":{"geographic":"Spain (ISO3166-1=ES)"},"fine_print":{"unit":{"value":"MW (free-text plant:output:electricity tag)","quote":"'plant:output:electricity': '50 MW'","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","attempts":[]},"inclusion_rule":{"value":"Community-mapped features tagged power=plant with thermal/nuclear plant:source or generator:source","quote":"'power': 'plant', 'plant:source': 'coal'","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","attempts":[]},"reference_date":{"value":"2026-11-16 (live query)","quote":"Current time: 2026-11-16T06:58:19Z","url":"https://maps.mail.ru/osm/tools/overpass/api/status","attempts":[]},"update_frequency":{"value":"Continuous (crowd-edited)","quote":"Current time: 2026-11-16T06:58:19Z","url":"https://maps.mail.ru/osm/tools/overpass/api/status","attempts":[]},"exclusions":{"value":"No annual generation; incomplete operator (69/182), name (119/182), capacity (165/182), and lifecycle status (only 1 explicit disused tag, e.g. cancelled Lemoiz nuclear site)","quote":"'disused': 'yes', 'disused:power': 'plant', 'name:es': 'Central nuclear de Lemoiz'","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","attempts":[]}},"key_fields":[{"field":"name / name:es","meaning":"Plant name (present on 119/182 elements)"},{"field":"plant:source / generator:source","meaning":"Fuel: gas (99), biomass (31), waste (15), diesel (8), oil (7), biogas (7), nuclear (6), coal (5), etc."},{"field":"plant:output:electricity","meaning":"Electrical output string (present on 165/182, sometimes 'yes' instead of MW)"},{"field":"operator","meaning":"Plant operator (present on 69/182)"}],"how_to_use":{"example_request":"curl -sL --data-urlencode 'data=[out:json][timeout:60];area[\"ISO3166-1\"=\"ES\"][admin_level=2]->.es;(nwr[\"power\"=\"plant\"][\"plant:source\"~\"coal|gas|nuclear|oil|diesel|biomass|biogas|waste|fossil|thermal\",i](area.es);nwr[\"power\"=\"plant\"][\"generator:source\"~\"coal|gas|nuclear|oil|diesel|biomass|biogas|waste|fossil|thermal\",i](area.es););out center tags;' \"https://maps.mail.ru/osm/tools/overpass/api/interpreter\"","example_result":"{'type': 'way', 'id': 12365023, 'center': {'lat': 43.2725334, 'lon': -5.809241}, 'tags': {'name': 'Central térmica de la Pereda', 'operator': 'Hunosa', 'plant:output:electricity': '50 MW', 'plant:source': 'coal', 'power': 'plant'}}","steps":["Run the Overpass query against an available Overpass mirror (overpass-api.de returned connection refused during testing; maps.mail.ru succeeded).","Parse plant:output:electricity numerically (ignoring non-numeric values like 'yes') and check lifecycle tags (disused/abandoned/construction) to filter out cancelled or retired sites like Lemoiz."],"reading_traps":["Includes abandoned/never-completed sites (e.g., Central nuclear de Lemoiz) and retired coal plants still tagged power=plant.","plant:output:electricity can contain 'yes' instead of MW, and 63/182 elements lack a name tag."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":75251,"records_total":182,"records_for_country":182,"problems":["Primary overpass-api.de refused connection on port 443 during testing; mirror maps.mail.ru/osm/tools/overpass/api/interpreter returned 200."]},"evidence":[{"claim":"Overpass returned 182 thermal/nuclear power=plant elements inside Spain (0 outside Spain bbox)","url":"https://maps.mail.ru/osm/tools/overpass/api/interpreter","quote":"Central térmica de la Pereda ... 'plant:output:electricity': '50 MW', 'plant:source': 'coal', 'power': 'plant'"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Comisión Nacional de los Mercados y la Competencia (CNMC); Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO); Consejo de Seguridad Nuclear (CSN) para seguridad nuclear","url":"https://sede.cnmc.gob.es/"},"operators":{"structure":"many","note":"Competitive generation market with multiple private/corporate utilities and industrial cogenerators (e.g., Iberdrola, Endesa, Naturgy, EDP, Repsol, CNAT, ANAV, ContourGlobal). MITECO's Electra producer census lists 1,081 ordinary-regime and 70,646 special-regime installation entries across all technologies.","census_url":"https://datos.gob.es/es/catalogo/e05068001-registro-de-productores-de-energia-electrica"},"publication_obligation":{"exists":"yes","norm":"Ley 24/2013, de 26 de diciembre, del Sector Eléctrico (art. 21); Real Decreto 1955/2000 (arts. 169-174); Real Decreto 413/2014 (Título V, Cap. II); Reglamento (UE) 543/2013 (arts. 14.1.b y 16.1.a); Directiva 2010/75/UE (art. 72) y Real Decreto 815/2013","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2013-13645","what_must_be_published":"Mandatory registration in MITECO RAIPEE (installed capacity and authorization conditions); TSO reporting to ENTSO-E of production/generation units >=100 MW (capacity, type, location, net generation per MTU); annual environmental reporting of >=50 MWth combustion plants (rated thermal input, fuel TJ, operating hours, emissions) to PRTR-España and EEA.","frequency":"Continuous/permanent update for RAIPEE; annual for ENTSO-E 14.1.b and PRTR/LCP; D+5 per market time unit for ENTSO-E 16.1.a."},"consolidated_republication":{"found":"partial","note":"No Spanish body republishes a complete open bulk dataset across all thermal and nuclear plants with all requested attributes; fragments exist across MITECO (nuclear HTML, WFS 2018-19 LCP, Electra names), REE e-sios (token+WAF), ENTSO-E (>=100 MW, registration), and EEA v16 (>=50 MWth, no MWe/GWh).","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/servicios/registros.html","saw":"Lists official energy registries: electricity generation splits into Sección primera (REPROv2) and Sección segunda (PRETOR), both CAPTCHA-gated in public view; no bulk technical CSV."},{"organization":"MITECO","url":"https://datos.gob.es/es/catalogo/e05068001-registro-de-productores-de-energia-electrica","saw":"Electra bulk CSV (71,727 rows) only exports AUTOID, INSTALACIONID, REGIMEN, INSTALACION, AUTONOMIA—omits fuel/technology, MW, coords, operator, status, and generation."},{"organization":"Red Eléctrica de España (REE / Redeia)","url":"https://www.esios.ree.es/en/generation-units","saw":"e-sios publishes Unidades Físicas (archives/81, 110 EN) and Unidades de Programación (archives/82, 111 EN) via API requiring personal x-api-key token and blocked by Incapsula WAF (403) to curl."},{"organization":"CNMC","url":"https://data.cnmc.es/","saw":"CNMC Data only publishes aggregated statistics for renewables, cogeneration, and waste by technology/CCAA; excludes conventional thermal/nuclear plant lists. www.cnmc.es returned 403."},{"organization":"CSN","url":"https://www.csn.es/centrales-nucleares-de-espana","saw":"Publishes facility pages, daily operational states, and decommissioning status for nuclear plants only."}]}},"national_registry":{"exists":"restricted","note":"Spain maintains an authoritative statutory registry—Registro Administrativo de Instalaciones de Producción de Energía Eléctrica (RAIPEE), split into Sección primera (REPROv2, ordinary regime) and Sección segunda (PRETOR, renewables/cogeneration/waste)—but does not publish it as an open bulk download: administrative access requires digital certificate/Cl@ve, public web lookups are gated by image CAPTCHA, and the open Electra CSV drops all technical fields.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/regimen-ordinario/registro-instalaciones.html","saw":"Links Sección primera (non-renewable/conventional) to REPROv2; public query at RegistroPublico.aspx requires solving an image CAPTCHA."},{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/energias-renovables/registro-administrativo.html","saw":"Links Sección segunda (RD 413/2014, <=50 MW & cogeneration/waste) to PRETOR; public reports at InformesInstalaciones.aspx require solving an image CAPTCHA."},{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/estrategia-normativa/balances/publicaciones/electricas-anuales/electricas-2022-2024.html","saw":"Annual electricity statistics (2024 ODS/PDF) publish only national and provincial aggregates by broad technology (Nuclear 7,117 MW; Combustibles 38,379 MW)."},{"organization":"Red Eléctrica de España (REE)","url":"https://www.ree.es/es/datos/generacion/potencia-instalada-generacion","saw":"Public REE capacity/generation pages and REData API provide aggregated series by technology/CCAA; unit-level catalogs live in e-sios behind token/WAF."},{"organization":"CNMC","url":"https://data.cnmc.es/energia/energia-electrica/renovables-cogeneracion-y-residuos/evolucion-anual-de-la-produccion-de","saw":"Publishes aggregated annual renewables/cogeneration/waste production and capacity only; sede.cnmc.gob.es has regulatory filings, no plant registry export."},{"organization":"CSN","url":"https://www.csn.es/estados-operativos-de-centrales-nucleares","saw":"Publishes daily operational states for Spain's 7 active nuclear reactors, not thermal plants."}]},"if_unstructured":{"summary":null,"recipe":["1. Start from the combined baseline list of EEA v16 (F5_2 & F1_4 for >=50 MWth thermal) + IAEA PRIS + Foro Nuclear 2025 PDF (nuclear) + MITECO WFS ei_instalaciones (for permiturl/PRTR IDs).","2. For any missing or uncertain status/closure/license renewal, search BOE advanced search (https://www.boe.es/buscar/boe.php) by exact plant name under Sección III to confirm closure resolutions (e.g., BOE-A-2020-17142) or nuclear extensions (BOE-A-2021-5109).","3. Open each thermal plant's PRTR-España ficha (fichacomplejo.aspx?Id_Complejo=...) or the permiturl from MITECO WFS ei_instalaciones to verify exact operator/parent company, operational status, and regional AAI permit technical annex (which states electrical MW when not shown in EEA).","4. For nuclear annual generation (GWh), extract printed page 28 of Foro Nuclear's annual PDF (render via pdftoppm -png because pdftotext fails on outlined glyphs). Note: annual plant-level generation for thermal plants <100 MW is not available in unstructured public documents and requires ENTSO-E (>=100 MW, registered) or e-sios/TSO access."],"location_method":"Use exact WGS84 coordinates from EEA v16 (F5_2/F1_4), PRTR-España fichacomplejo.aspx (embedded Leaflet lat/lng), or MITECO WFS (EPSG:4258); for nuclear sites or plants missing coordinates, locate the plant footprint via OpenStreetMap Overpass or IGN PNOA Máxima Actualidad orthophoto (WMTS) and cross-check municipality/parcel in Sede Electrónica del Catastro.","cross_with":["https://sdi.eea.europa.eu/datashare/public.php/webdav/User%20friendly%20.csv%20files.zip (EEA F5_2 & F1_4)","https://pris-stats.iaea.org/reactor/reactors-by-code/ES (IAEA PRIS nuclear API)","https://gis.miteco.gob.es/geoserver/evaluacionambiental/wfs (MITECO WFS ei_instalaciones permiturl)","https://www.ign.es/wmts/pnoa-ma?SERVICE=WMTS&REQUEST=GetCapabilities&VERSION=1.0.0 (IGN PNOA orthophoto)"],"where_published":[{"name":"Boletín Oficial del Estado (BOE)","url":"https://www.boe.es/buscar/boe.php","what":"Official ministerial authorizations, renewals, and definitive closure/cancellation orders for thermal, combined cycle, and nuclear power plants (including capacity, operator/holder, municipality, and RAIPEE cancellation).","how_to_search_inside":"Use BOE advanced search at https://www.boe.es/buscar/boe.php filtering Departamento='Ministerio para la Transición Ecológica y el Reto Demográfico', Sección='III. Otras disposiciones', and Texto/Título terms like '\"central térmica\" \"cierre\"' or '\"central nuclear\" \"autorización de explotación\"'.","example_document":{"url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2020-17142","what_it_gives":"BOE-A-2020-17142 (28/12/2020, pp. 121467-121468): 'Autorizar a Naturgy Generación, S.L.U. el cierre de los grupos 2 y 3 de la Central Térmica de Narcea' and 'Cancelar la inscripción en el Registro Administrativo de Instalaciones de Producción de Energía Eléctrica de los grupos 2 y 3 de la Central Térmica de Narcea'. Also BOE-A-2021-5109 (Cofrentes nuclear): 'Iberdrola Generación Nuclear, S.A.U.', 'hasta el 30 de noviembre de 2030', 'potencia térmica de 3.237 MWt'."}},{"name":"PRTR-España (Fichas detalladas de complejos industriales e IPPC)","url":"https://prtr-es.miteco.gob.es/Informes/InventarioInstalacionesIPPC.aspx","what":"Individual plant pages for combustion plants >=50 MWth with exact coordinates, parent company, operational status, rated thermal input (MWth), fuel type, combustion unit names, and links to regional AAI permits and inspections.","how_to_search_inside":"Search by installation name or activity 1.c on https://prtr-es.miteco.gob.es/informes/seriesPlanta.aspx or look up Id_Complejo directly from PRTR_Espana_MITECO_Complejos.xml / MITECO WFS ei_instalaciones.","example_document":{"url":"https://prtr-es.miteco.gob.es/informes/fichacomplejo.aspx?Id_Complejo=4222","what_it_gives":"CT Arrúbal (Cod. PRTR 4922): 'EMPRESA MATRIZ: CONTOURGLOBAL LA RIOJA,S.L.', 'Latitud: 42,419287', 'Longitud: -2,251731', 'Estado: En funcionamiento', 'CNAE - 2009: 35.16', 'CTCC ARRUBAL-CG 1: Potencia térmica nominal (en MWth): 718, Turbina de gas', 'CTCC ARRUBAL-CG 2: Potencia térmica nominal (en MWth): 709, Turbina de gas', plus AAI 03-2003."}},{"name":"Proyecto SABIA - Evaluación Ambiental (Sede MITECO)","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","what":"Environmental Impact Assessment (EIA/DIA) files for new thermal plants, repowering, and thermal/nuclear decommissioning projects.","how_to_search_inside":"Select Autonomous Community on the map or dropdown in SABIA and filter by project title or sector/year.","example_document":{"url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","what_it_gives":"Public consultation status, project developer, province/municipality, and EIA resolution PDFs for large state-competence energy projects (>50 MW)."}}]},"related_not_answering":[{"name":"MITECO Electra - Registro de productores de energía eléctrica","url":"https://datos.gob.es/es/catalogo/e05068001-registro-de-productores-de-energia-electrica","why":"CSV (71,727 rows) exports only 5 columns (AUTOID, INSTALACIONID, REGIMEN, INSTALACION, AUTONOMIA); omits technology/fuel, MW capacity, coordinates, operator, status, and generation, so thermal/nuclear plants cannot be identified."},{"name":"MITECO Estadísticas Eléctricas Anuales 2024","url":"https://www.miteco.gob.es/es/energia/estrategia-normativa/balances/publicaciones/electricas-anuales/electricas-2022-2024.html","why":"Publishes national and provincial aggregate generation and net capacity by broad technology (e.g., Nuclear 7,117 MW, Combustibles 38,379 MW), not an individual plant list."},{"name":"REE Potencia Instalada / Informe del Sistema Eléctrico / REData API","url":"https://www.sistemaelectrico-ree.es/es/informe-del-sistema-electrico/potencia-instalada","why":"Publishes aggregate national/regional capacity and generation by technology (not plant-level lists); apidatos.ree.es potencia-instalada returned HTTP 500 during testing."},{"name":"CNMC Data - Evolución anual de producción (renovables, cogeneración y residuos)","url":"https://data.cnmc.es/energia/energia-electrica/renovables-cogeneracion-y-residuos/evolucion-anual-de-la-produccion-de","why":"Publishes aggregate regional/technology totals only and excludes conventional non-cogeneration thermal and nuclear power plants."},{"name":"PRTR-España XML Complejos y Emisiones","url":"https://prtr-es.miteco.gob.es/informes/descargas.aspx","why":"PRTR_Espana_MITECO_Complejos.xml (9,430 complexes; 188 in 1.c/IPPC 1.1) omits coordinates, MW capacity, status, and electricity generation (covered with coordinates in EEA v16 and MITECO WFS)."},{"name":"MITECO WFS Instalaciones Comercio de Derechos de Emisión (CDE)","url":"https://gis.miteco.gob.es/geoserver/cambioclimatico/wfs?service=WFS&version=2.0.0&request=GetFeature&typeNames=cambioclimatico:mc_inst_com_der_emision&outputFormat=application/json","why":"Lists 1,438 EU ETS industrial sites with CO2 emissions only through 2017/2020 (2021-2025 fields empty); lacks activity/technology classification, MW capacity, and electricity generation."},{"name":"Govern de les Illes Balears - Grups centrals convencionals de producció energètica","url":"https://datos.gob.es/es/catalogo/a04003003-grupos-centrales1","why":"Balearic Islands GeoJSON (45 points) contains only a CATEGORIA code ('T10'-'T60') and coordinates—no plant name, fuel, MW capacity, operator, status, or annual generation."}],"open_questions":["Does REE's token-authenticated api.esios.ree.es/archives/81 (Unidades Físicas) export unit-level fuel/technology and installed capacity without WAF blocking once a personal x-api-key header is supplied?","Do MITECO's CAPTCHA-gated REPROv2/PRETOR applications expose coordinates or municipal location only, and do their internal records distinguish active vs hibernated/mothballed units?"],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Gemini 4 Hydrogen (Extra High)","rules_version":"6.12","note":"Initial research pass mapping RAIPEE (REPROv2/PRETOR CAPTCHA-gated), REE e-sios (WAF/token-blocked), MITECO WFS/nuclear, EEA IED/LCP v16, ENTSO-E, IAEA PRIS, Foro Nuclear, GEM, WRI, JRC, and OSM.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"restricted"},"sources":{"total":12,"new":12,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":113,"minutes":35}}],"local_terms":[{"term":"central térmica convencional","language":"es","meaning":"Conventional thermal power plant (coal, fuel-oil, natural gas)"},{"term":"central de ciclo combinado (CTCC)","language":"es","meaning":"Combined cycle gas turbine (CCGT) power plant"},{"term":"central nuclear","language":"es","meaning":"Nuclear power plant"},{"term":"cogeneración","language":"es","meaning":"Combined heat and power (CHP) thermal plant"},{"term":"régimen ordinario / régimen especial","language":"es","meaning":"Historical Spanish regulatory split between large conventional plants (>50 MW, Sección 1ª REPROv2) and renewables/cogeneration/waste (Sección 2ª PRETOR)"},{"term":"RAIPEE (Registro Administrativo de Instalaciones de Producción de Energía Eléctrica)","language":"es","meaning":"Official national registry of electricity production facilities at MITECO"},{"term":"potencia instalada / potencia neta / potencia bruta","language":"es","meaning":"Installed electrical capacity (gross vs net MWe)"},{"term":"grandes instalaciones de combustión (GIC / LCP)","language":"es","meaning":"Large combustion plants (>=50 MWth thermal input) under EU IED / RD 815/2013"}],"provenance":{"pass_count":1,"models":["Gemini 4 Hydrogen (Extra High)"],"minutes_estimate":35,"pages_opened":113,"passes":[{"pass":1,"date":"2026-11-16","model":"Gemini 4 Hydrogen (Extra High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/conventional-power-plants.json","detail_url":"https://georutter.org/v1/es/conventional-power-plants/detail.json","html_url":"https://georutter.org/es/conventional-power-plants/","country_url":"https://georutter.org/v1/countries/es.json"}