{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"curtailment-and-redispatch","question":"Where can I get renewable curtailment and redispatch volumes in Spain, by zone or node and by period?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"REE (the TSO) publishes monthly renewable curtailment from day-ahead technical constraints by grid node (ERNI, GWh, PDF on ESIOS; Peninsula plus Baleares/Canarias in MWh). Redispatch volumes (technical-constraint energy up/down, PDBF phase I and real time) are open as national monthly/yearly series via the REData API, not by node. Per-unit data is restricted to market subjects; economic curtailment and daily series were not found public.","main_caveats":["ERNI by node is a monthly Power BI PDF export (no CSV): the table lists only the Top 30 nodes (Oct 2026: 355 of 578 GWh); the chart shows more nodes but its values need image/chart reading.","ERNI counts only D-1 phase I technical constraints vs PDBF, renewable units with specific electrical location; the report itself says node values may not match the aggregate monthly value on ESIOS.","Colours in the PDF legend decide RTT vs RTD: text extraction loses the mapping (Oct 2026: RTT 569.4 GWh, RTD 8.7 GWh read from the rendered chart).","REData energia-restricciones has no unit field; values match REE report GWh x1000 (MWh). Down values are negative. Wider period/geo options (day, baleares, ccaa) returned HTTP 400.","Redispatch (restricciones tecnicas) is not renewable-only: it includes gas/other units scheduled for voltage control and stability; do not equate it with renewable curtailment."],"confidence":"medium","confidence_reason":"Core sources opened and tested (PDF, API, report) with cross-check; ESIOS API, per-unit files and ENTSO-E could not be tested without credentials, and the full ERNI archive was only sampled by document id.","attributes":[{"attribute":"renewable_curtailment","covered":"partial","source_ids":["s001","s002"],"note":"ERNI = renewable energy not integrable due to day-ahead (D-1) grid constraints only; real-time and economic curtailment not published as such.","gap":"not_published","gap_note":"Economic curtailment and real-time curtailment: no public series found in ESIOS PDFs, REData, REE reports, CNMC (see audit.search_log)."},{"attribute":"redispatch_volume","covered":"yes","source_ids":["s002","s003"],"note":"Technical-constraint energy up/down (PDBF phase I and real time), MWh, month/year; REData and REE annual report agree for 2024-2025.","gap":null,"gap_note":null},{"attribute":"spatial_breakdown","covered":"partial","source_ids":["s001"],"note":"Curtailment by grid node (name+kV) and by RTT/RTD cause; no zone/province split. Redispatch by node or zone not published.","gap":"not_published","gap_note":"Redispatch per node: not in REData, ESIOS PDFs or REE reports; per-unit data exists only for market subjects (PO 9.1, 90 days)."},{"attribute":"reference_period","covered":"partial","source_ids":["s001","s002","s003"],"note":"ERNI: monthly (Jun 2025 to Oct 2026 found). Redispatch: month/year in REData; day returned HTTP 400; hourly only via ESIOS token (untested).","gap":"not_checked","gap_note":"Daily/hourly redispatch via ESIOS API needs a token (request to consultasios@ree.es); not obtained. ERNI before Jun 2025 not located."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence.","gap":"not_checked","gap_note":"The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence.","gap":"not_checked","gap_note":"The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence.","gap":"not_checked","gap_note":"The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed."}]},"sources":[{"source_id":"s001","name":"ESIOS monthly publication per node of Renewable Energy Not Integrable (ERNI) due to D-1 technical constraints","publisher":"Red Electrica de Espana (ESIOS)","official":true,"landing_url":"https://www.esios.ree.es/es","data_url":"https://api.esios.ree.es/documents/3386/download?locale=es","access":"direct_download","format":"PDF (Power BI export, 4-5 pages; chart plus Top 30 table)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"ESIOS monthly publication per node of Renewable Energy Not Integrable (ERNI) due to D-1 technical constraints","coverage_note":"Peninsular system by transmission/distribution-connected grid node (e.g. ACECA 220); Baleares and Canarias islands in separate TNP files. Months found: 2025-06 to 2026-10 (scan of document ids; earlier months not located).","data_date":"Calendar month (Oct 2026: 01/10/2026 to 31/10/2026)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["HEAD request returns 403 (GET returns 200)","No machine-readable table; PDF only"]},"example":{"example_request":"curl -sL --max-time 60 -o erni_202610.pdf 'https://api.esios.ree.es/documents/3386/download?locale=es' && pdftotext -f 3 -l 3 -layout erni_202610.pdf -","example_result":"ACECA 220   Programa PDBF 77,28 GWh   ERNI 36,23 GWh   46,88 % nudo   0,30 % peninsular ; ALARCOS 220   20,68   9,63   46,55 %   0,08 %. Page 2 pie: RTT 569,4 GWh (98%), RTD 8,7 GWh (2%)."},"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s002","name":"REData API widget energia-restricciones (energy by technical constraints at PDBF and in real time)","publisher":"Red Electrica de Espana (REData)","official":true,"landing_url":"https://www.ree.es/es/apidatos","data_url":"https://apidatos.ree.es/es/datos/mercados/energia-restricciones?start_date=2026-09-01T00:00&end_date=2026-10-31T23:59&time_trunc=month","access":"api","format":"JSON","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"REData API widget energia-restricciones (energy by technical constraints at PDBF and in real time)","coverage_note":"Peninsular system (default geo gave the same values as geo_limit=peninsular&geo_ids=8741); baleares and ccaa requests returned HTTP 400","data_date":"Series start dates per month/year (e.g. 2026-10-01); last-update fields 2026-11-01 (PDBF) and 2026-11-11 (real time)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"problems":["No day granularity or non-peninsular geography accepted","No unit in the payload"]},"example":{"example_request":"curl -sL --max-time 60 'https://apidatos.ree.es/es/datos/mercados/energia-restricciones?start_date=2026-09-01T00:00&end_date=2026-10-31T23:59&time_trunc=month'","example_result":"id 701 Energía a subir restricciones técnicas al PDBF (fase I): 2026-09-01 2505899.7 ; 2026-10-01 2203504.6. id 702 a bajar: -991163 ; -600357.9. id 720 TR a subir: 262934.6 ; 224801.8."},"members_summary":null},{"source_id":"s003","name":"REE Informe del Sistema Electrico 2025: Servicios de ajuste e intercambios internacionales","publisher":"Red Electrica de Espana (sistemaelectrico-ree.es)","official":true,"landing_url":"https://www.sistemaelectrico-ree.es/es/informe-del-sistema-electrico","data_url":"https://www.sistemaelectrico-ree.es/sites/default/files/informes/2026/servicio-ajuste-2025.pdf","access":"pdf","format":"PDF (14 pages)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"REE Informe del Sistema Electrico 2025: Servicios de ajuste e intercambios internacionales","coverage_note":"Peninsular system, national totals; years 2024-2025 (edition March 2026)","data_date":"Calendar year 2025 (footer: March 2026)","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["Landing page links to a www.ree.es path that returns 404; same path on sistemaelectrico-ree.es works"]},"example":{"example_request":"curl -sL --max-time 120 -o ajuste2025.pdf 'https://www.sistemaelectrico-ree.es/sites/default/files/informes/2026/servicio-ajuste-2025.pdf' && pdftotext -layout ajuste2025.pdf - | grep 'Restricciones técnicas'","example_result":"Restricciones técnicas PDBF 13.588 1.717 21.340 3.611 57,0 110,3 ; Restricciones técnicas en tiempo real 5.429 701 5.091 1.487 -6,2 112,1 (GWh, 2024 up/down, 2025 up/down, % up, % down)."},"members_summary":null}],"other_sources_count":4,"if_unstructured":{"summary":null},"local_terms":[{"term":"restricciones técnicas","language":"es","meaning":"Technical constraints; the process (PO 3.2) that redispatches units to solve grid problems"},{"term":"ERNI (energía renovable no integrable)","language":"es","meaning":"Renewable energy that cannot be integrated; REE's curtailment measure by node"},{"term":"vertidos / curtailment","language":"es/en","meaning":"Press terms for non-integrated renewable energy"},{"term":"RTT / RTD","language":"es","meaning":"Restricción técnica de red de transporte / de distribución"},{"term":"PDBF / PDVP","language":"es","meaning":"Programa Diario Base de Funcionamiento / Programa Diario Viable Provisional"},{"term":"nudo","language":"es","meaning":"Grid node (substation busbar by name and kV)"},{"term":"TNP / SNP","language":"es","meaning":"Territorios / sistemas no peninsulares (islands)"},{"term":"unidad de programación (UP)","language":"es","meaning":"Scheduling unit used for per-unit constraint results"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (High)"],"minutes_estimate":12,"pages_opened":38,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/curtailment-and-redispatch.json","detail_url":"https://georutter.org/v1/es/curtailment-and-redispatch/detail.json","html_url":"https://georutter.org/es/curtailment-and-redispatch/","country_url":"https://georutter.org/v1/countries/es.json"}
