{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"data-centers-in-permitting","question":"Where can I get a list of data center projects currently in permitting in Spain, with location, power (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-17","access_checked_on":null,"answer":{"official_data":"documents_only","non_official_data":"partial","summary":"Regional and municipal authorities publish individual permits and supporting documents. An independent downloadable Spanish inventory tracks sites, stages, dates and reported MW with references, but is incomplete and its statuses may lag. Check each current permitting stage against the latest official act.","main_caveats":["A consultation closing date is not a decision or proof that a file remains pending.","IT load, grid connection, thermal input and building power are different quantities.","Environmental review may apply to auxiliary equipment or grid works, rather than every data centre.","The commercial or community status labels must be checked against the latest official acts."],"confidence":"medium","confidence_reason":"The independent national inventory and selected official files were inspected; completeness and present project stages remain uncertain.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s003","s004","s002"],"note":"Some projects have parcels or municipality; third-party pins may be approximate.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"power_mw","covered":"partial","source_ids":["s003","s004","s002"],"note":"Some tracker projects report MW; official documents checked do not consistently provide comparable demand.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"developer","covered":"partial","source_ids":["s001","s003","s004","s002"],"note":"Project notices identify promoters; third-party company may be operator or owner.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s003","s004","s002"],"note":"Notices record dated procedural acts; proposed in the tracker does not by itself establish a permit stage.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"stage_date","covered":"partial","source_ids":["s001","s004","s002"],"note":"Notices provide dates of procedural acts; their current stage must be confirmed in later acts.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."}]},"sources":[{"source_id":"s001","name":"Regional public consultation notices and permitting documents","publisher":"Comunidad de Madrid; Gobierno de Aragón","official":true,"landing_url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","data_url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","access":"web_viewer_only","format":"HTML, PDF","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"address","summary":"Regional public consultation notices and permitting documents","coverage_note":"Madrid, Aragón, Extremadura and Basque Country examples; not national coverage","data_date":"Individual acts and documents are dated; example consultation 2026-04-15 through 2026-05-06.","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","example_result":"Cignus P2DC, S.L.; Daganzo de Arriba; expediente 26-IPPC-00071.6/25; consultation 15 April–6 May 2026."},"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s002","name":"Centros de datos en España — sitios.json","publisher":"Centros de datos en España","official":false,"landing_url":"https://datacenters.m19182.dev/datos/","data_url":"https://datacenters.m19182.dev/datos/sitios.json","access":"direct_download","format":"JSON","license":"CC BY 4.0","language":"Spanish","has_coordinates":true,"location_precision":"municipality","summary":"Centros de datos en España — sitios.json","coverage_note":"Spain; project reports incomplete coverage","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://datacenters.m19182.dev/datos/sitios.json","example_result":"ACS DC Infra — Centro de Datos La Puebla de Alfindén; estado=en_tramitacion; municipio=La Puebla de Alfindén; potencia IT=100 MW; última_verificación=2026-10-17."},"members_summary":null},{"source_id":"s003","name":"Data centers in Spain project directory","publisher":"Global Data Centers","official":false,"landing_url":"https://globaldatacenters.net/data-centers/spain/","data_url":"https://globaldatacenters.net/data-centers/spain/","access":"web_viewer_only","format":"HTML","license":"unknown","language":"English","has_coordinates":false,"location_precision":"municipality","summary":"Data centers in Spain project directory","coverage_note":"Selected Spanish projects; coverage not complete","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://globaldatacenters.net/data-centers/spain/","example_result":"Blackstone Campus Rhodes (Calatorao) | Blackstone (QTS) | Proposed | 650 MW; Microsoft La Muela | Microsoft | Proposed | Not reported."},"members_summary":null}],"other_sources_count":1,"if_unstructured":{"summary":null},"local_terms":[{"term":"centro de procesamiento de datos","language":"Spanish","meaning":"data centre"},{"term":"información pública","language":"Spanish","meaning":"public consultation"},{"term":"autorización ambiental integrada","language":"Spanish","meaning":"integrated environmental permit"},{"term":"promotor","language":"Spanish","meaning":"developer"},{"term":"expediente","language":"Spanish","meaning":"administrative file"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":29,"pages_opened":59,"passes":[{"pass":1,"date":"2026-11-17","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/data-centers-in-permitting.json","detail_url":"https://georutter.org/v1/es/data-centers-in-permitting/detail.json","html_url":"https://georutter.org/es/data-centers-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}