{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"data-centers-in-permitting","question":"Where can I get a list of data center projects currently in permitting in Spain, with location, power (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-17","access_checked_on":null,"answer":{"official_data":"documents_only","non_official_data":"partial","summary":"Regional and municipal authorities publish individual permits and supporting documents. An independent downloadable Spanish inventory tracks sites, stages, dates and reported MW with references, but is incomplete and its statuses may lag. Check each current permitting stage against the latest official act.","main_caveats":["A consultation closing date is not a decision or proof that a file remains pending.","IT load, grid connection, thermal input and building power are different quantities.","Environmental review may apply to auxiliary equipment or grid works, rather than every data centre.","The commercial or community status labels must be checked against the latest official acts."],"confidence":"medium","confidence_reason":"The independent national inventory and selected official files were inspected; completeness and present project stages remain uncertain.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s003","s004","s002"],"note":"Some projects have parcels or municipality; third-party pins may be approximate.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"power_mw","covered":"partial","source_ids":["s003","s004","s002"],"note":"Some tracker projects report MW; official documents checked do not consistently provide comparable demand.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"developer","covered":"partial","source_ids":["s001","s003","s004","s002"],"note":"Project notices identify promoters; third-party company may be operator or owner.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s003","s004","s002"],"note":"Notices record dated procedural acts; proposed in the tracker does not by itself establish a permit stage.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."},{"attribute":"stage_date","covered":"partial","source_ids":["s001","s004","s002"],"note":"Notices provide dates of procedural acts; their current stage must be confirmed in later acts.","gap":"not_checked","gap_note":"Other autonomous and municipal registers and subsequent decisions have not been fully checked."}]},"sources":[{"source_id":"s001","name":"Regional public consultation notices and permitting documents","publisher":"Comunidad de Madrid; Gobierno de Aragón","official":true,"landing_url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","data_url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","access":"web_viewer_only","format":"HTML, PDF","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"address","publisher_type":"regional_government","adds":"Individual official projects, promoter, location, dated procedural acts and documentation.","first_seen_pass":1,"rank":1,"summary":"Regional public consultation notices and permitting documents","coverage_note":"Madrid, Aragón, Extremadura and Basque Country examples; not national coverage","data_date":"Individual acts and documents are dated; example consultation 2026-04-15 through 2026-05-06.","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Madrid, Aragón, Extremadura and Basque Country examples; not national coverage"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["Madrid Cignus notice checked: no common nationwide rule stated.","Aragón Microsoft order checked: no common nationwide rule stated."]},"inclusion_rule":{"value":"Madrid publishes non-confidential AAI project materials subjected to public consultation.","quote":"En este apartado pueden consultarse los proyectos de las actividades sujetas a Autorización Ambiental Integrada sometidas a información pública","url":"https://www.comunidad.madrid/medio-ambiente/prevencion-control-integrado-contaminacion-ippc","attempts":[]},"reference_date":{"value":"Individual acts and documents are dated; example consultation 2026-04-15 through 2026-05-06.","quote":"De 15/04/2026 hasta 06/05/2026","url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Madrid Cignus notice checked: no common nationwide rule stated.","Aragón Microsoft order checked: no common nationwide rule stated."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Madrid Cignus notice checked: no common nationwide rule stated.","Aragón Microsoft order checked: no common nationwide rule stated."]}},"key_fields":[{"field":"Municipio","meaning":"Municipality of proposal"},{"field":"Promotor","meaning":"Project developer"},{"field":"Plazo de alegaciones","meaning":"Consultation period, not the complete project permitting status"},{"field":"expediente","meaning":"Administrative file identifier"}],"how_to_use":{"example_request":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","example_result":"Cignus P2DC, S.L.; Daganzo de Arriba; expediente 26-IPPC-00071.6/25; consultation 15 April–6 May 2026.","steps":["Read the notice fields and linked basic project and environmental documents.","Link later acts by file number and project and classify each separate permitting procedure.","Record the date of the act and separately verify whether the application is still pending."],"reading_traps":["The completed comment period is not proof of final approval or of a currently pending permit.","The annex in the Aragón order concerns site urbanisation, not a final decision for the whole data centre.","Thermal capacity triggering an environmental procedure is not IT or grid power.","ACS La Puebla: 150 MW grid capacity is distinct from the 100 MW IT described in the technical plan."]},"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Regional notice identifies project and location","url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","quote":"Municipio: Daganzo de Arriba"},{"claim":"Promoter","url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","quote":"Promotor: Cignus P2DC, S.L."}],"members":[{"name":"Comunidad de Madrid","landing_url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","data_url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","access":"web_viewer_only","tested":true,"data_found":null,"note":"Daganzo AAI public consultation, with project documents; public comment ended 2026-05-06."},{"name":"Aragón","landing_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?BASE=BOLE&CMD=VERDOC&DOCN=007961479&SEC=BUSQUEDA_AVANZADA","data_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?BASE=BOLE&CMD=VERDOC&DOCN=007961479&SEC=BUSQUEDA_AVANZADA","access":"web_viewer_only","tested":true,"data_found":null,"note":"September 2026 La Muela urbanisation annex order; related to an environmental assessment of a larger plan. ACS La Puebla initial approval and technical electrical plan also inspected."},{"name":"Extremadura","landing_url":"https://doe.juntaex.es/otrosFormatos/html.php?anio=2026&doe=980o&xml=2026080828","data_url":"https://doe.juntaex.es/otrosFormatos/html.php?anio=2026&doe=980o&xml=2026080828","access":"web_viewer_only","tested":true,"data_found":null,"note":"Badajoz Data Riocaya AAI25/024: consultation notice published 2026-05-25; latest stage unverified."},{"name":"Euskadi","landing_url":"https://www.euskadi.eus/anuncio-administrativo/aau01338-anuncio-del-director-administracion-ambiental-que-se-somete-informacion-publica-proyecto-tecnico-presentado-empresa-data-center-euskadi-s-l-actividad-centro-procesamiento-datos-polo-innovacion-garaia-mondragon-gipuzkoa-obtencion-autorizacion-amb/web01-tramite/es/","data_url":"https://www.euskadi.eus/anuncio-administrativo/aau01338-anuncio-del-director-administracion-ambiental-que-se-somete-informacion-publica-proyecto-tecnico-presentado-empresa-data-center-euskadi-s-l-actividad-centro-procesamiento-datos-polo-innovacion-garaia-mondragon-gipuzkoa-obtencion-autorizacion-amb/web01-tramite/es/","access":"web_viewer_only","tested":true,"data_found":null,"note":"Mondragón AAU01338 public consultation; latest decision unverified. Abanto-Zierbena decision was subsequently granted."}],"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null},"member_scope":{"total":null,"note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s002","name":"Centros de datos en España — sitios.json","publisher":"Centros de datos en España","official":false,"landing_url":"https://datacenters.m19182.dev/datos/","data_url":"https://datacenters.m19182.dev/datos/sitios.json","access":"direct_download","format":"JSON","license":"CC BY 4.0","language":"Spanish","has_coordinates":true,"location_precision":"municipality","publisher_type":"community","adds":"Downloadable national documentary inventory of site status, promoter/operator, dates, power and sources; partial and independently compiled.","first_seen_pass":1,"rank":2,"summary":"Centros de datos en España — sitios.json","coverage_note":"Spain; project reports incomplete coverage","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Spain; project reports incomplete coverage"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"estado","meaning":"Site-level status, filter en_tramitacion"},{"field":"ubicacion","meaning":"Municipality, latitude/longitude, and precision"},{"field":"operador / propietario","meaning":"Operator and owner; compare with official promoter"},{"field":"potencia","meaning":"Array of MW by basis, phase and source"},{"field":"ultima_verificacion","meaning":"Site verification date; not the permit act date"},{"field":"fuentes","meaning":"Underlying evidence and publication date"}],"how_to_use":{"example_request":"https://datacenters.m19182.dev/datos/sitios.json","example_result":"ACS DC Infra — Centro de Datos La Puebla de Alfindén; estado=en_tramitacion; municipio=La Puebla de Alfindén; potencia IT=100 MW; última_verificación=2026-10-17.","steps":["Download the JSON array and filter estado equal to en_tramitacion.","Read potencia array and estado_detalle, follow fuentes for permit acts and their dates; match operator or owner against the official promoter.","Use ubicacion.precision to distinguish municipal centroids, approximate positions and exact positions."],"reading_traps":["The 216 entries include operating and announced sites, not only permit applications.","IT and grid connection MW are different; phases overlap and must not be summed without checking scope.","An en_tramitacion label may be stale or cover only one of several approvals; the publication itself describes incomplete coverage.","Municipal points are not exact facility positions."]},"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":216,"records_for_country":216,"problems":[]},"evidence":[{"claim":"Inventory covers power, phases and source records","url":"https://datacenters.m19182.dev/datos/","quote":"Emplazamientos completos, con potencias, fases, incertidumbres y fuentes."},{"claim":"Coverage is incomplete","url":"https://datacenters.m19182.dev/metodologia/","quote":"Es un registro documental abierto, con cobertura incompleta."}],"members":[],"members_summary":null},{"source_id":"s003","name":"Data centers in Spain project directory","publisher":"Global Data Centers","official":false,"landing_url":"https://globaldatacenters.net/data-centers/spain/","data_url":"https://globaldatacenters.net/data-centers/spain/","access":"web_viewer_only","format":"HTML","license":"unknown","language":"English","has_coordinates":false,"location_precision":"municipality","publisher_type":"community","adds":"A cross-region project table with company, indicative status and MW when reported.","first_seen_pass":1,"rank":3,"summary":"Data centers in Spain project directory","coverage_note":"Selected Spanish projects; coverage not complete","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Selected Spanish projects; coverage not complete"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"Project","meaning":"Project or campus name and place"},{"field":"Company","meaning":"Company associated with the project"},{"field":"Status","meaning":"Tracker category, not necessarily a permit phase"},{"field":"Power","meaning":"Published MW where known; basis varies"}],"how_to_use":{"example_request":"https://globaldatacenters.net/data-centers/spain/","example_result":"Blackstone Campus Rhodes (Calatorao) | Blackstone (QTS) | Proposed | 650 MW; Microsoft La Muela | Microsoft | Proposed | Not reported.","steps":["Read the project table by region and record proposed items as leads.","Open the project source and verify the current permit stage and power basis in official documentation."],"reading_traps":["Proposed is broader than in permitting. Some site locations are explicitly unconfirmed.","Methodology prioritises projects above 50 MW, above 200 acres, or with notable public attention; smaller sites are generally excluded.","Power is missing for some projects and may be measured on different bases."]},"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Directory provides fields","url":"https://globaldatacenters.net/data-centers/spain/","quote":"Project  | Company  | Status  | Power"},{"claim":"Tracker status can lag records","url":"https://globaldatacenters.net/sources","quote":"A project status on this site reflects the last public record we could verify"}],"members":[],"members_summary":null},{"source_id":"s004","name":"Centres de dades i supercomputació als territoris de parla catalana","publisher":"intel·ligència artificial.cat","official":false,"landing_url":"https://inteligencia-artificial.cat/centres-de-dades","data_url":"https://inteligencia-artificial.cat/centres-de-dades","access":"web_viewer_only","format":"HTML","license":"unknown","language":"Catalan","has_coordinates":false,"location_precision":"municipality","publisher_type":"community","adds":"Catalonia and other Catalan-speaking territories: individual project descriptions with source links, dates and evidence levels.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Catalonia, Valencia, Balearic Islands and Andorra"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"Project","meaning":"Project or campus name and place"},{"field":"Company","meaning":"Company associated with the project"},{"field":"Status","meaning":"Tracker category, not necessarily a permit phase"},{"field":"Power","meaning":"Published MW where known; basis varies"}],"how_to_use":{"example_request":"https://inteligencia-artificial.cat/centres-de-dades","example_result":"Centre de dades urbà d’Ark a la Maquinista | Ark Data Centres | Barcelona | 45 MW according to developer | en tramitació; last verified 2026-11-02.","steps":["Read individual project entries and chronology; distinguish official documents from developer statements.","Filter entries marked en tramitació, then verify actual open permit proceedings in the underlying official file."],"reading_traps":["Some projects classified en tramitació have no published official permitting act located; the label alone does not establish a pending application.","The map says locations are approximate and overlapping points may be displaced."]},"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Coordinates are approximate","url":"https://inteligencia-artificial.cat/centres-de-dades","quote":"Les ubicacions són aproximades: municipi, polígon o barri."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Regional and municipal authorities; for Madrid, Dirección General de Transición Energética y Economía Circular","url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025"},"operators":{"structure":"many","note":"Projects are promoted by many companies; permits involve local and regional authorities. Madrid guide identifies municipal urban planning permits and environmental review. No operator census was established.","census_url":null},"publication_obligation":{"exists":"unknown","norm":null,"url":null,"what_must_be_published":"Madrid publishes non-confidential AAI proposals in public consultation, but no nationwide publication obligation for every data-centre project was established.","frequency":null},"consolidated_republication":{"found":"unknown","note":"No consolidated inventory established; search incomplete.","checked_pages":[{"organization":"MITECO","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","saw":"Federal environmental evaluation search has project title, promoter and procedural state filters; not shown to be complete for regionally or locally authorised projects."},{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Demand access applications at transmission nodes and aggregated grid status; not all project permitting."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia","saw":"Energy regulator sector page; a national list of data-centre permits not identified."}]}},"national_registry":{"exists":"unknown","note":"No national list established in pages checked; this is not proof that none exists. The EU operational energy reporting database is not a permitting registry.","checked_pages":[{"organization":"MITECO","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","saw":"Environmental assessment search for its projects."},{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Electricity transmission demand access applications."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia","saw":"Energy regulator sector page."}]},"if_unstructured":{"summary":null,"recipe":["Read the Daganzo notice and capture promoter, municipality, parcel numbers, case number and dated consultation.","Open its executive summary: pages 4, 6 and 8 contain location, promoter and parcel references; extract text and preserve parcel identifiers as strings.","Find later documents by case number and compare dates before recording the current procedural stage; review each separate planning and environmental process.","Capture any expressly stated electrical demand in MW with its precise basis; leave blank when absent and do not use the 50 MW thermal threshold as demand.","For ACS La Puebla, electrical project p. 1 identifies both 150 MW electrical consumption and 100 MW IT; p. 2 gives the promoter. Compare the 2025 initial plan approval with later 2026 amendments."],"location_method":"Daganzo executive summary page 8 gives five cadastral references; cadastral parcels define an area, not the centre point of a facility.","cross_with":["Later regional gazette acts and municipal planning files for current stage.","Cadastral parcels to check location; orthophotos predate construction and do not prove a proposed project exists."],"where_published":[{"name":"Madrid transparency portal, environmental authorisation public notices","url":"https://www.comunidad.madrid/transparencia/solicitud-autorizacion-ambiental-integrada-cignus-p2dc-sl-daganzo-arriba-exp-26-ippc-0007162025","what":"Consultation notice links project documents and gives promoter, parcels, period and file number.","how_to_search_inside":"Use the portal text search for centro de datos or promotor; AAI public information page lists current consultations and may not list older ones.","example_document":{"url":"https://www.comunidad.madrid/transparencia/sites/default/files/regulation/documents/4._resumen_no_tecnico_aai.pdf","what_it_gives":"Project summary p. 4: “Polígono 1 parcelas 184, 182, 181, 10180 y 1180”; p. 6: “CIGNUS P2DC S.L.”; p. 8: “28053A001001840000HU”."}},{"name":"Boletín Oficial de Aragón","url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?BASE=BOLE&CMD=VERDOC&DOCN=007961479&SEC=BUSQUEDA_AVANZADA","what":"Regional notices and orders on a data-centre-related plan.","how_to_search_inside":"Use gazette advanced text search for centro de datos and developer; read chronological orders.","example_document":{"url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?BASE=BOLE&CMD=VERDOC&DOCN=007961479&SEC=BUSQUEDA_AVANZADA","what_it_gives":"Order of 28 September 2026 identifies “Microsoft 7724 Spain, SLU” and “La Muela”; it submits an urbanisation EIA annex to “información y participación pública”."}},{"name":"Boletín Oficial de Aragón, plan and technical project","url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1425305720606","what":"Official plan approval and individual project dimensions, location, promoter and dated procedural stage.","how_to_search_inside":"Search the BOA advanced text index using the project title or promoter; check subsequent orders.","example_document":{"url":"https://www.aragon.es/documents/d/guest/tomo-ii-libro-d-4-proyecto-de-subestacion-cd-campus-220-30-kv-1","what_it_gives":"Technical project p. 1: “150 MW de consumo eléctrico (100 MW potencia IT)”; p. 2: “ACS DC INFRA LA PUEBLA, S.L.”; La Puebla de Alfindén (Zaragoza)."}}]},"related_not_answering":[{"name":"EU data-centre energy performance reporting","url":"https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en?prefLang=nl","why":"Performance reporting and aggregate statistics do not identify a current permitting pipeline."},{"name":"REE demand access applications","url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","why":"Transmission grid access requests are not all data-centre project permitting; distribution requests are excluded."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-17","role":"research","model":"Terra 6.1 (High)","rules_version":"6.12","note":"A downloadable independent national project inventory adds status, power and sources; coverage is incomplete and current permit stages need verification.","headline":{"official_data":"documents_only","non_official_data":"partial","national_registry":"unknown"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":59,"minutes":29}}],"local_terms":[{"term":"centro de procesamiento de datos","language":"Spanish","meaning":"data centre"},{"term":"información pública","language":"Spanish","meaning":"public consultation"},{"term":"autorización ambiental integrada","language":"Spanish","meaning":"integrated environmental permit"},{"term":"promotor","language":"Spanish","meaning":"developer"},{"term":"expediente","language":"Spanish","meaning":"administrative file"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":29,"pages_opened":59,"passes":[{"pass":1,"date":"2026-11-17","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/data-centers-in-permitting.json","detail_url":"https://georutter.org/v1/es/data-centers-in-permitting/detail.json","html_url":"https://georutter.org/es/data-centers-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}