{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"data-centers","question":"Where can I get a list of data centers in operation in Spain, with location, operator and capacity (IT power in MW or floor area)?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"No free national list of operating data centers with location, operator and capacity was found. The best free combination is PeeringDB (72 facilities, 69 with coordinates, no capacity) plus operator pages that give MW or m2 for their own sites (Templus, Merlin, Iron Mountain, Digital Realty). National totals come from SpainDC (439 MW IT, end 2025, about 97 sites of 50 kW or more) and Colliers (360 MW IT), which disagree. Site-level datasets are paid.","main_caveats":["Totals disagree: SpainDC 439 MW IT (end 2025, 50 kW threshold, hyperscale partly estimated) vs Colliers 360 MW IT (Oct 2025-Mar 2026 snapshot). Do not add or mix them.","PeeringDB lists interconnection facilities, not all data centers, and has no power or area field; its AUP forbids passing the data on in bulk.","Operator pages mix operating and planned MW and use different units (Templus Total power, Merlin MW IT, Iron Mountain MW approved and planned, Digital Realty building size).","Official per-site data exists in the EU ReportENER database (sites of 500 kW IT or more) but is confidential; only aggregates are public.","Planned campuses (Aragon PIGA, Colliers pipeline) are large and widely reported; they are not in operation and must not be counted."],"confidence":"medium","confidence_reason":"Negatives rest on opened official pages and datos.gob.es queries; but only 7 of about 36 SpainDC member operators were sampled and OSM could not be counted (Overpass unreachable).","attributes":[{"attribute":"location","covered":"partial","source_ids":["s002","s001"],"note":"PeeringDB gives lat/lon for 69 of 72; operator pages give street addresses. Address-level only, no verified building footprint.","gap":"not_published","gap_note":"Sites outside PeeringDB and the sampled operators have no free location source (SpainDC database with addresses is not public)."},{"attribute":"operator","covered":"partial","source_ids":["s002","s001"],"note":"PeeringDB org_name for each facility (Templus 7, Equinix 5, Digital Realty 4 ...); operator pages name themselves.","gap":"not_published","gap_note":"Hyperscaler and enterprise sites mostly absent from free lists; SpainDC counts 5 proprietary hyperscale sites without naming them."},{"attribute":"it_power_mw","covered":"no","source_ids":[],"note":"Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence.","gap":"not_checked","gap_note":"The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed."},{"attribute":"floor_area","covered":"no","source_ids":[],"note":"Separate coverage of this canonical requirement was not established in the inherited research; see the complete source evidence.","gap":"not_checked","gap_note":"The previous attributes did not separately establish this requirement. The original answer and all source evidence have been retained; no new research was performed."}]},"sources":[{"source_id":"s001","name":"Operator facility pages and results reports (Digital Realty, Templus, Merlin Edged, Iron Mountain, Nabiax, Data4, Equinix)","publisher":"Data center operators (each its own site)","official":true,"landing_url":"https://templus.com/","data_url":null,"access":"web_viewer_only","format":"HTML pages and PDF reports","license":"unknown","language":"es/en","has_coordinates":false,"location_precision":"address","publisher_type":"operator","adds":"Only source with per-site capacity (MW or m2) and street address, from the titular operator.","first_seen_pass":1,"rank":1,"summary":"Operator facility pages and results reports (Digital Realty, Templus, Merlin Edged, Iron Mountain, Nabiax, Data4, Equinix)","coverage_note":"Only the sites of each operator; 7 operators tried of about 36 SpainDC members and 56 colocation providers.","data_date":null,"caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Only the sites of each operator; 7 operators tried of about 36 SpainDC members and 56 colocation providers."},"fine_print":{"unit":{"value":"Varies per operator: Templus Total power (MW) and m2 IT; Merlin MW IT; Iron Mountain MW (approved and planned); Digital Realty ft2 and m2 of building","quote":"Total power 20MW m² IT 2.600m²","url":"https://templus.com/","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["Opened templus.com and templus.com/data-centers/madrid-mad01/: sites listed without any inclusion rule","Opened digitalrealty.com/data-centers/madrid and nabiax.com: own sites only, no threshold or rule stated"]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["Templus and Digital Realty pages carry no data date; Digital Realty footer shows only 2026 copyright","Merlin FY25 summary covers financial year 2025 with RFS dates to 2027, so one page mixes dates"]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Opened templus.com, digitalrealty.com, ironmountain.com pages: no update frequency stated","Merlin publishes results periodically (FY25 summary dated 2026-02 in its path) but states no schedule on the PDF"]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Iron Mountain page states 79 MW is approved and planned, not operating (only MAD-1 at 3 MW operates)","Templus page says Plataforma operativa y en expansion without per-site status; planned MW may be mixed in"]}},"key_fields":[{"field":"Total power (Templus)","meaning":"Site power in MW; not stated whether IT or total"},{"field":"m2 IT (Templus)","meaning":"IT floor area"},{"field":"MW IT (Merlin)","meaning":"Equipped IT power per site code (MAD-GET 01, BCN-PLZF, BIO-ARA 03)"},{"field":"Total building size (Digital Realty)","meaning":"Building area in ft2 and m2, not IT white space"}],"how_to_use":{"example_request":"curl -sL https://templus.com/ -o templus.html  (then read, per site, the fields 'Total power' and 'm² IT'; Merlin: curl -sL -o fy25.pdf https://ir.merlinproperties.com/wp-content/uploads/2026/02/Resumen-ejecutivo-FY25.pdf && pdftotext -layout fy25.pdf fy25.txt, section DATA CENTERS)","example_result":"Templus: Madrid 01 Total power 20MW, m2 IT 2.600m2; Madrid 02 3,2MW, 1.800m2. Merlin FY25: 'MAD-GET 01 (20 MW)', 'BCN-PLZF (22 MW)', 'BIO-ARA 03 (22 MW)'; '58MW IT equipados ... 44 MW estan listos para operar'.","steps":["Take the operator names from PeeringDB (org_name) and SpainDC members (spaindc.com/socios).","Open each operator Spain page; read address, MW and m2 per site; keep unit and operating/planned status.","For listed groups use their results PDF (pdftotext -layout) and read the localisation diagram: MW appear in brackets under each site code.","Do not add Digital Realty m2 to MW figures; convert only inside the same unit."],"reading_traps":["Templus Total power is not labelled IT or gross; its m2 are IT floor area.","Digital Realty web m2 (MAD1 8,250; MAD4 21,200) differ from its factsheet PDF (MAD1 11,000; MAD4 35,000 m2).","Iron Mountain 79 MW is approved and planned; only 3 MW operate (MAD-1).","Merlin: 58 MW IT equipped vs 44 MW ready for service; 64 MW leased in phase I; pipeline (254 MW) is not in operation.","Nabiax lists three sites with only company-wide MW; Equinix pages return 403."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html and application/pdf","size_bytes":null,"records_total":null,"records_for_country":null,"problems":["Equinix returns 403 to automated clients on all three domains tried","Capacity is published only for some operators"]},"evidence":[{"claim":"Templus per-site power and IT area","url":"https://templus.com/","quote":"Total power 20MW m² IT 2.600m²"},{"claim":"Merlin site MW IT and RFS","url":"https://ir.merlinproperties.com/wp-content/uploads/2026/02/Resumen-ejecutivo-FY25.pdf","quote":"58MW IT equipados (+6 MW BCN 04/26) de los cuales 44 MW están listos para operar (“RFS”)"},{"claim":"Digital Realty MAD4 building size","url":"https://www.digitalrealty.com/data-centers/emea/madrid/mad4","quote":"Total building size : 228,000 ft² (21,200 m²)"},{"claim":"Iron Mountain MW approved and planned","url":"https://www.ironmountain.com/data-centers/locations/emea/madrid","quote":"MAD-2 & MAD-3 (10 MW each, 2027 delivery)"}],"members":[{"name":"Templus","landing_url":"https://templus.com/","data_url":"https://templus.com/data-centers/madrid-mad01/","access":"web_viewer_only","tested":true,"data_found":null,"note":"Nine Spanish sites with Total power (MW) and m2 IT per site; fetched HTML. Sum of the nine rows: 40.3 MW."},{"name":"Merlin Edged (MERLIN Properties) FY25 results summary","landing_url":"https://ir.merlinproperties.com/","data_url":"https://ir.merlinproperties.com/wp-content/uploads/2026/02/Resumen-ejecutivo-FY25.pdf","access":"pdf","tested":true,"data_found":null,"note":"Downloaded; MAD-GET 01 (20 MW), BCN-PLZF (22 MW), BIO-ARA 03 (22 MW); 58 MW IT equipped, 44 MW ready for service. merlinedged.com gave a TLS error to my fetch tool."},{"name":"Iron Mountain Madrid campus","landing_url":"https://www.ironmountain.com/data-centers/locations/emea/madrid","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"MAD-1 operating with 3 MW and 4,000 m2; MAD-2 and MAD-3 (10 MW each) planned for 2027; 79 MW is approved and planned."},{"name":"Digital Realty Madrid","landing_url":"https://www.digitalrealty.com/data-centers/madrid","data_url":"https://www.digitalrealty.com/data-centers/emea/madrid/mad4","access":"web_viewer_only","tested":true,"data_found":null,"note":"MAD1-MAD4 with address and building size in ft2 and m2; no MW. A factsheet PDF gives different m2 (MAD4 35,000 m2 vs 21,200 m2 on the web)."},{"name":"Nabiax","landing_url":"https://nabiax.com/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"Three sites (Alcala, Julian Camarillo, Terrassa) but only company totals: 36 MW IT and 28,000 m2 IT."},{"name":"Data4 Spain","landing_url":"https://www.data4group.com/en/data-centers/spain/","data_url":"https://www.data4group.com/en/data-center-in-madrid-spain-2/","access":"web_viewer_only","tested":true,"data_found":null,"note":"Spain page gives the Madrid campus address (Avenida de la Industria 15, Alcobendas) without capacity; campus page not opened."},{"name":"Equinix Spain","landing_url":"https://www.equinix.com/data-centers/europe-colocation/spain-colocation","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"403 Access Denied (Akamai) on .com, .es and /it/it with default client identification."}],"members_summary":{"total":null,"listed":7,"tested":6,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null},"member_scope":{"total":null,"note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s002","name":"PeeringDB facility records for Spain","publisher":"PeeringDB (community-run, Internet interconnection database)","official":false,"landing_url":"https://docs.peeringdb.com/","data_url":"https://www.peeringdb.com/api/fac?country=ES&depth=0","access":"api","format":"JSON","license":"PeeringDB Acceptable Use Policy (no bulk redistribution; operational use)","language":"en","has_coordinates":true,"location_precision":"address","publisher_type":"community","adds":"Only free machine-readable list with coordinates and operator across operators (72 records), including sites whose operators publish nothing.","first_seen_pass":1,"rank":2,"summary":"PeeringDB facility records for Spain","coverage_note":"Spain: 72 facility records (Madrid 21, Barcelona 7, Alcobendas 3, Paterna 3, Malaga 2).","data_date":"Per record: updated field; the latest of the 72 is 2026-10-16","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Spain: 72 facility records (Madrid 21, Barcelona 7, Alcobendas 3, Paterna 3, Malaga 2)."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["API record keys listed (fac object): no power or floor-area field; only available_voltage_services and diverse_serving_substations","docs.peeringdb.com home page opened: no description of fac fields"]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["docs.peeringdb.com home page: no definition of what facilities are admitted","AUP page: only reuse terms"]},"reference_date":{"value":"Per record: updated field; the latest of the 72 is 2026-10-16","quote":null,"url":"https://www.peeringdb.com/api/fac?country=ES&depth=0","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["docs page and AUP opened: no frequency; records are edited by registrants","Record dates in the response range from 2010 creation to updates in 2026"]},"exclusions":{"value":"Only facilities registered for peering/interconnection; no capacity data","quote":"Users will not be able to download the full contents of the database","url":"https://www.peeringdb.com/aup","attempts":[]}},"key_fields":[{"field":"name / name_long / aka","meaning":"Facility name; former names in notes"},{"field":"org_name","meaning":"Operator or owner organization"},{"field":"address1, city, zipcode, state","meaning":"Street address"},{"field":"latitude, longitude","meaning":"Coordinates (null in 3 of 72)"},{"field":"status","meaning":"ok for all 72; not a guarantee of operation"},{"field":"net_count, ix_count, carrier_count","meaning":"Networks, exchanges and carriers present"}],"how_to_use":{"example_request":"curl -s 'https://www.peeringdb.com/api/fac?country=ES&depth=0'","example_result":"72 records. {'name':'Espanix Datacenter','org_name':'Asociación ESpanix','city':'Madrid','address1':'Mesena 80','latitude':40.466022,'longitude':-3.660963,'status':'ok'}; {'name':'Equinix BA1 - Barcelona','org_name':'Equinix, Inc.','city':'Barcelona','address1':\"Carrer de l'Acer 30-32\",'latitude':41.351557,'longitude':2.137457}","steps":["GET the URL; the list is in data[].","Group by org_name for the operator view; city for the location view.","Drop records with latitude null (3) from maps and geocode their address instead.","Join with operator pages or SpainDC totals for capacity; PeeringDB has none."],"reading_traps":["No power or floor-area field at all.","72 records are interconnection facilities; SpainDC counts about 97 commercial sites of 50 kW or more, so neither list contains the other.","Some rows are former names (notes: formerly ITconic Madrid-1) and some org_name are individuals or small firms.","69 of 72 have coordinates; all fall inside Spain (two in the Canary Islands, Civicos Networking DCLAGUNA and DCARRECIFE).","AUP forbids passing the data on in bulk."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":70086,"records_total":72,"records_for_country":72,"problems":[]},"evidence":[{"claim":"Reuse restriction","url":"https://www.peeringdb.com/aup","quote":"The PeeringDB data may not be passed on in bulk to any other person or organization unless approved by PeeringDB."},{"claim":"AUP applies to the API","url":"https://docs.peeringdb.com/","quote":"By using this service, you agree to adhere to PeeringDB's Acceptable Use Policy."}],"members":[],"members_summary":null},{"source_id":"s003","name":"SpainDC Informe Anual 2025 del sector de Centros de Datos en España","publisher":"SpainDC (Asociacion Espanola de Data Centers) with Pb7 Research","official":false,"landing_url":"https://spaindc.com/informes/","data_url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","access":"pdf","format":"PDF (95 pages)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"community","adds":"National and regional IT power (MW) and site counts by size class; the only national total built on a site-level database.","first_seen_pass":1,"rank":3,"summary":"SpainDC Informe Anual 2025 del sector de Centros de Datos en España","coverage_note":"Spain, with regional split (Madrid, Cataluna, Aragon, others); commercial colocation and hyperscale only.","data_date":"End of 2025","caveats":["The complete reading traps, inclusion rules, units and access evidence are in the detail. The main caveats of this card also apply."],"coverage":{"geographic":"Spain, with regional split (Madrid, Cataluna, Aragon, others); commercial colocation and hyperscale only."},"fine_print":{"unit":{"value":"MW of IT power; installed ready-for-service capacity","quote":"en los datos de este año sólo se incluye la capacidad lista para servicio","url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","attempts":[]},"inclusion_rule":{"value":"Colocation and hyperscale data centers with at least 50 kW of IT power","quote":"ofrezcan servicios de colocation con una potencia informática de al menos 50 kW","url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","attempts":[]},"reference_date":{"value":"End of 2025","quote":"alcanzó los 297 MW a finales de 2025","url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","attempts":[]},"update_frequency":{"value":"Annual report (editions 2022, 2024, 2025)","quote":"Informe anual 2025 del sector de Centros de Datos en España. Situación actual y perspectivas para 2030","url":"https://spaindc.com/informes/","attempts":[]},"exclusions":{"value":"Enterprise facilities and small long-tail sites are estimated, not listed; hyperscale figures partly estimated","quote":"estén incompletos o sean confidenciales (como suele ocurrir con los centros de datos hiperescalares), se realizan estimaciones","url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","attempts":[]}},"key_fields":[{"field":"Potencia IT (MW)","meaning":"Installed IT power: 439 MW total, 297 colocation (196 retail/wholesale + 101 scale colocation) and 142 proprietary hyperscale"},{"field":"Instalaciones por tipo y potencia","meaning":"97 sites: colocation 82, scale colocation 10, proprietary hyperscale 5; size classes from 50 kW to 49 MW"}],"how_to_use":{"example_request":"curl -sL -o SpainDC-Informe-Anual-2025_.pdf https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf && pdftotext -layout SpainDC-Informe-Anual-2025_.pdf informe.txt  (pages 21-22 and appendix, page 91)","example_result":"Fig. 'Instalaciones de centros de datos en España por tipo y potencia (50 kW o superior), finales de 2025': Colocation (82), 'Scale colocation' (10), Hiperescalares propietarios (5), Total (97). Fig.: '439 MW Potencia TI total España' (196 colocation, 101 scale colocation, 142 hyperscale).","steps":["Download the PDF and extract text with pdftotext -layout (some figure titles come out garbled; read pages 21-22 as images if needed).","Use pages 21-22 for national totals and the regional figure for MW by autonomous community.","Read the appendix (page 91) for methodology: the underlying Pb7 database holds operator name, address and MW IT per site but is not published."],"reading_traps":["No site list: only aggregates; the Pb7 database is not public.","2030 forecast appears as 2,537 MW and 2.6 GW in different places of press coverage.","Colliers reports 360 MW IT operating in Spain for Oct 2025-Mar 2026, against 439 MW here; definitions differ.","Madrid 2024 figure was revised from 195 to 189 MW in this edition."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":11218405,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Inclusion threshold and database fields","url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","quote":"En la base de datos se incluye el nombre del operador, su ubicación (dirección) y su capacidad de potencia IT (en MW)."},{"claim":"About 100 sites of 50 kW or more","url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","quote":"se compone de algo menos de 100 instalaciones con una capacidad instalada de, al menos, 50 kW"}],"members":[],"members_summary":null},{"source_id":"s004","name":"Colliers Data Centers Iberian Region Snapshot (semi-annual)","publisher":"Colliers","official":false,"landing_url":"https://go.colliers.com/rs/427-KXE-423/images/Colliers_DC_Snapshot_Oct25_Mar26_.pdf","data_url":"https://go.colliers.com/rs/427-KXE-423/images/Colliers_DC_Snapshot_Oct25_Mar26_.pdf","access":"pdf","format":"PDF","license":"unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"commercial","adds":"Second independent national estimate and market-level MW (Madrid, Barcelona, Aragon) with maps marking DC in operation; latest edition seen only via press.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Spain and Portugal; Spanish markets Madrid, Barcelona, Aragon and others."},"fine_print":{"unit":{"value":"MW IT","quote":"In Spain, this is reflected in 360 MW IT currently operational and 2,780 MW IT in pipeline","url":"https://go.colliers.com/rs/427-KXE-423/images/Colliers_DC_Snapshot_Oct25_Mar26_.pdf","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["Read the text of the Oct 2025-Mar 2026 snapshot: no threshold stated","Read the Apr-Sep 2025 snapshot and the press on the Apr-Sep 2026 edition (brainsre): no methodology or threshold"]},"reference_date":{"value":"Edition Oct 2025 - Mar 2026 (older: Apr 2025 - Sep 2025)","quote":"Colliers_DC_Snapshot_Oct25_Mar26_","url":"https://go.colliers.com/rs/427-KXE-423/images/Colliers_DC_Snapshot_Oct25_Mar26_.pdf","attempts":[]},"update_frequency":{"value":"Semi-annual","quote":"Data Centers Iberian Region Snapshot Apr 2025 - Sep 2025","url":"https://go.colliers.com/rs/427-KXE-423/images/Colliers_DataCenter_Snapshot_Abr25_Sep25.pdf","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Both PDFs read: maps note that DCs in operation include those expanding","No exclusion list found; Apr-Sep 2026 PDF not located (searched twice)"]}},"key_fields":[{"field":"Current supply (MW IT)","meaning":"Operational IT power per market, e.g. Madrid 175 MW IT (Oct 25-Mar 26), 162 MW IT in 47 sites (Apr-Sep 25)"}],"how_to_use":{"example_request":"curl -sL -o c2.pdf https://go.colliers.com/rs/427-KXE-423/images/Colliers_DC_Snapshot_Oct25_Mar26_.pdf && pdftotext -layout c2.pdf c2.txt  (first page text and market pages)","example_result":"'In Spain, this is reflected in 360 MW IT currently operational and 2,780 MW IT in pipeline'; Madrid 'Current Supply 175 MW IT'.","steps":["Download the PDF; text of figures is extractable.","Read the market page of each region for Current Supply and the DC in operation map (image only).","For the Apr-Sep 2026 edition, only press summaries were found (Madrid 212 MW IT, Barcelona 63, Aragon 108); do not cite them as the PDF."],"reading_traps":["Maps with DC in operation are images without names or coordinates.","Pipeline MW (2,780 or 1,028 in earlier edition) are not in operation.","Press says about 450 MW IT for Spain and Portugal combined (Apr-Sep 2026); not comparable with the 360 MW Spain-only figure."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":3897189,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Colliers operating MW for Spain","url":"https://go.colliers.com/rs/427-KXE-423/images/Colliers_DC_Snapshot_Oct25_Mar26_.pdf","quote":"In Spain, this is reflected in 360 MW IT currently operational and 2,780 MW IT in pipeline"}],"members":[],"members_summary":null},{"source_id":"s005","name":"OpenStreetMap telecom=data_center features","publisher":"OpenStreetMap contributors","official":false,"landing_url":"https://taginfo.openstreetmap.org/tags/telecom=data_center","data_url":"https://nominatim.openstreetmap.org/search?q=data+center&countrycodes=es&format=jsonv2&limit=40&extratags=1","access":"api","format":"JSON (Nominatim); OSM data via Overpass","license":"ODbL 1.0","language":"es/en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Building footprints and some operator tags for sites missing elsewhere (e.g. KIO Murcia/Valencia, Altia, bank data centers).","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Spain, incomplete and uneven; global tag count 4,859 (taginfo)."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["Nominatim extratags of 21 features: no power or capacity tag present","taginfo tag stats open: counts only"]},"inclusion_rule":{"value":"Any mapper tagging telecom=data_center; no threshold","quote":null,"url":"https://taginfo.openstreetmap.org/api/4/tag/stats?key=telecom&value=data_center","attempts":[]},"reference_date":{"value":"taginfo data until 2026-11-16","quote":null,"url":"https://taginfo.openstreetmap.org/api/4/tag/stats?key=telecom&value=data_center","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Nominatim and taginfo responses: continuous community edits, no schedule","Overpass endpoints unreachable from this environment, so timestamp not checked"]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Nominatim sample includes government CPDs and a ruin (Antiguo Centro de Datos del Banco Herrero) so not all hits are operating commercial sites","Overpass count of telecom=data_center for Spain not obtainable here"]}},"key_fields":[{"field":"telecom=data_center","meaning":"Tag for a data center building or site"},{"field":"operator","meaning":"Operator name, present only in some features"},{"field":"building:levels","meaning":"Floors; no power or area tags seen"}],"how_to_use":{"example_request":"curl -s 'https://nominatim.openstreetmap.org/search?q=data+center&countrycodes=es&format=jsonv2&limit=40&extratags=1'","example_result":"Data Center KIO Murcia (way 1253983161) telecom=data_center, operator=KIO Networks España, building:levels=3; Data Center 2 Bilbao Arasur (way 1482291761) operator=Merlin Properties.","steps":["Preferred: Overpass query nwr[\"telecom\"=\"data_center\"](area of ES) with out center; this could not be run here (all public instances unreachable).","Fallback used: Nominatim text searches (data center, centro de datos, datacenter) with countrycodes=es; 21 unique features over three queries.","Filter by extratags telecom=data_center and drop landuse, ruin and government CPD hits."],"reading_traps":["Nominatim is a text search, not a count: 21 unique features is a floor, not coverage.","Names like Centro de Datos GlobalSwitch are office nodes, not building footprints.","No capacity tag in any of the 21 features."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":21,"records_for_country":21,"problems":[]},"evidence":[{"claim":"Licence in the Nominatim response","url":"https://nominatim.openstreetmap.org/search?q=data+center&countrycodes=es&format=jsonv2&limit=2","quote":"Data © OpenStreetMap contributors, ODbL 1.0. http://osm.org/copyright"}],"members":[],"members_summary":null},{"source_id":"s006","name":"Commercial data center directories and portfolio reports (Baxtel, DC Hub, Arizton, datacentermap.com)","publisher":"Baxtel; DC Hub; Arizton; Data Center Map","official":false,"landing_url":"https://baxtel.com/data-center/spain","data_url":null,"access":"paid","format":"HTML, API, PDF/Excel","license":"proprietary (DC Hub records CC-BY-4.0)","language":"en","has_coordinates":true,"location_precision":"municipality","publisher_type":"commercial","adds":"Facility-level IT load and white floor area exist here, but behind payment; shows what a paid route would give.","first_seen_pass":1,"rank":6,"coverage":{"geographic":"Spain; counts differ by vendor (Baxtel 219, Arizton 70 existing)."},"fine_print":{"unit":{"value":"IT Load Capacity (MW) and White-Floor Area per facility (Arizton)","quote":"Core & Shell Power Capacity (IT Load Capacity)","url":"https://www.arizton.com/market-reports/spain-data-center-portfolio","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["Baxtel Spain page: counts 219 facilities with no inclusion rule stated","Arizton landing page: 70 existing facilities, no threshold stated; full report paid"]},"reference_date":{"value":"Arizton: published June 2026, updated August 2026","quote":null,"url":"https://www.arizton.com/market-reports/spain-data-center-portfolio","attempts":[]},"update_frequency":{"value":"Arizton: ninth edition; DC Hub: page says verified 2026-11-16 against PeeringDB","quote":null,"url":"https://dchub.cloud/facilities/digital-realty-digital-realty-madrid-mad3-dedfbc3b","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Baxtel and DC Hub pages: capacity, address and coordinates masked or gated without payment","Arizton page: contents not shown beyond field names"]}},"key_fields":[{"field":"Operator/Owner Name, Location, IT Load Capacity, White-Floor Area, rack capacity (Arizton)","meaning":"Fields promised per existing facility"}],"how_to_use":{"example_request":"curl -s 'https://dchub.cloud/api/v1/facilities/digital-realty-digital-realty-madrid-mad3-dedfbc3b'","example_result":"{'data':{'city':'Madrid','country':'ES','latitude':40.43,'longitude':-3.62,'name':'Digital Realty Madrid MAD3','status':'Operational'},'_gated':true,'_withheld_fields':['provider','region','source']}","steps":["Anonymous DC Hub records give name, status and coordinates rounded to two decimals only.","Baxtel and Arizton site-level data requires a paid dataset or report; the free pages only name operators and facilities."],"reading_traps":["Coordinates rounded to about 1.1 km: only fit for a city-level map.","Facility counts differ (Baxtel 219, Arizton 70, PeeringDB 72) because definitions differ.","DC Hub records derive from PeeringDB, so they are not an independent source."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html; application/json","size_bytes":null,"records_total":null,"records_for_country":null,"problems":["Site-level capacity requires payment or a paid key","datacentermap.com returns 429"]},"evidence":[{"claim":"DC Hub licence and source","url":"https://dchub.cloud/facilities/digital-realty-digital-realty-madrid-mad3-dedfbc3b","quote":"Source: DC Hub (dchub.cloud), CC-BY-4.0"},{"claim":"Arizton fields","url":"https://www.arizton.com/market-reports/spain-data-center-portfolio","quote":"Core & Shell Power Capacity (IT Load Capacity)"}],"members":[{"name":"Baxtel Spain","landing_url":"https://baxtel.com/data-center/spain","data_url":null,"access":"paid","tested":true,"data_found":null,"note":"219 facilities, 94 providers; most numbers masked as NN with Request Dataset links."},{"name":"DC Hub","landing_url":"https://dchub.cloud/facilities/digital-realty-digital-realty-madrid-mad3-dedfbc3b","data_url":"https://dchub.cloud/api/v1/facilities/digital-realty-digital-realty-madrid-mad3-dedfbc3b","access":"api","tested":true,"data_found":null,"note":"Anonymous JSON gives name, city, status Operational and coordinates rounded to about 1.1 km; power, provider and street address gated. Page says record sourced from PeeringDB, CC-BY-4.0."},{"name":"Arizton Spain Existing and Upcoming Data Center Portfolio","landing_url":"https://www.arizton.com/market-reports/spain-data-center-portfolio","data_url":null,"access":"paid","tested":false,"data_found":null,"note":"70 existing facilities with location, operator, IT load (MW) and white floor area; PDF or Excel, 3,999 USD one time (page, Aug 2026). Content not seen."},{"name":"Data Center Map Spain","landing_url":"https://www.datacentermap.com/spain/","data_url":null,"access":"web_viewer_only","tested":false,"data_found":null,"note":"429 Too Many Requests even on a header request; not opened."}],"members_summary":{"total":null,"listed":4,"tested":2,"data_found":0,"scope_note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null},"member_scope":{"total":null,"note":"The inherited list is a sample or documented publisher list; successful retrieval has not been separately reclassified in this structural migration. See individual notes.","pattern":null}},{"source_id":"s007","name":"EU ReportENER database and Policy Reporting Platform dashboard (data centers of 500 kW IT or more)","publisher":"European Commission with MITECO (Spain)","official":true,"landing_url":"https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en","data_url":"https://link.europa.eu/q7x39t","access":"web_viewer_only","format":"Qlik Sense dashboard","license":"unknown","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"supranational","adds":"The official per-facility data set required by law; only aggregates are public, so it does not answer the question but defines where an official list would come from.","first_seen_pass":1,"rank":7,"coverage":{"geographic":"EU member states; Spain sites of 500 kW IT or more"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["Commission page opened: names aggregated data per the directive annex, no unit stated","Dashboard URL fetched: Qlik app loader only (no content without scripts)"]},"inclusion_rule":{"value":"Data centers with IT power demand of 500 kW or more","quote":"con una demanda de potencia eléctrica de los sistemas de tecnologías de la información de 500 kW como mínimo","url":"https://www.miteco.gob.es/fr/energia/eficiencia/centros-de-datos/preguntas-frecuentes.html","attempts":[]},"reference_date":{"value":"Reports due 2024-09-15, then each 15 May","quote":"a más tardar el 15 de septiembre de 2024, luego a más tardar el 15 de mayo de 2025, y posteriormente todos los años.","url":"https://www.miteco.gob.es/fr/energia/eficiencia/centros-de-datos/preguntas-frecuentes.html","attempts":[]},"update_frequency":{"value":"Dashboard updated monthly with validated data","quote":null,"url":"https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en","attempts":[]},"exclusions":{"value":"Defence and civil protection data centers are exempt (per search summary; not confirmed on opened page)","quote":null,"url":null,"attempts":["MITECO FAQ and Commission page opened: no exclusion list quoted","Search result mentions defence exemption only"]}},"key_fields":[{"field":"Annex I and II of Delegated Regulation (EU) 2024/1364","meaning":"Data reported by operators (energy performance, renewables, water)"}],"how_to_use":{"example_request":"curl -sL https://link.europa.eu/q7x39t  (redirects to the Qlik dashboard; the response is a JavaScript loader)","example_result":"HTTP 307 to https://dashboard.tech.ec.europa.eu/qs_digit_dashboard_mt/public/sense/app/940a61c3-bcfe-47d6-a786-25d93aa63b85/...; body is the Qlik Sense loader.","steps":["Open the dashboard in a browser capable of scripts to read aggregated figures per country.","Per-facility data is not exposed; operators enter it into ReportENER with their own access."],"reading_traps":["Data is confidential per site and public only in aggregate (MITECO FAQ).","Public disclosure in Spain applies only once the directive is transposed in the BOE (FAQ); the draft Royal Decree art. 14 would publish it on the MITECO portal."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":7624,"records_total":null,"records_for_country":null,"problems":["Dashboard content requires scripts; not readable by plain HTTP","Per-facility data not public"]},"evidence":[{"claim":"Only aggregated data public","url":"https://www.miteco.gob.es/es/energia/eficiencia/centros-de-datos.html","quote":"La Comisión Europea ha habilitado una web donde se muestran los datos agregados reportados en esta base de datos."},{"claim":"Draft Royal Decree would publish on MITECO portal","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-rd-cpds-sostenibles/PRD%20CPDs%20audiencia%20publica.pdf","quote":"se pondrá a disposición del público en el portal web del Ministerio para la Transición Ecológica y el Reto Demográfico."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"MITECO (Subdireccion General de Eficiencia y Acceso a la Energia) for energy-efficiency reporting; Ministerio para la Transformacion Digital for digital sovereignty; CNMC for grid access","url":"https://www.miteco.gob.es/es/energia/eficiencia/centros-de-datos.html"},"operators":{"structure":"many","note":"SpainDC counts 56 colocation providers and about 97 commercial sites; its members page shows about 36 member logos.","census_url":"https://spaindc.com/socios/"},"publication_obligation":{"exists":"yes","norm":"Directive (EU) 2023/1791 art. 12 and Delegated Regulation (EU) 2024/1364: operators of data centers with 500 kW IT or more report to the EU ReportENER database; public disclosure applies once transposed in Spain (draft Royal Decree art. 14 not adopted per pages opened)","url":"https://www.miteco.gob.es/fr/energia/eficiencia/centros-de-datos/preguntas-frecuentes.html","what_must_be_published":"Annex I and II data of Reg. 2024/1364 (energy performance, renewables, water); public only in aggregate at EU level","frequency":"Annual, by 15 May"},"consolidated_republication":{"found":"no_evidence_found","note":"Only EU-level aggregates are republished; per-facility data stays in ReportENER (confidential per Reg. 2024/1364 art. 5(5), as stated on the MITECO FAQ).","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/eficiencia/centros-de-datos.html","saw":"Only the EU ReportENER database and an aggregated Commission dashboard; no Spanish list or register of data centers."},{"organization":"MITECO","url":"https://www.miteco.gob.es/fr/energia/eficiencia/centros-de-datos/normativa.html","saw":"Only EU norms and best practices; no Spanish Royal Decree adopted and no register."},{"organization":"European Commission DG ENER","url":"https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en","saw":"European database plus a monthly dashboard of aggregated data; no per-facility publication stated."},{"organization":"MITECO (consulta publica)","url":"https://www.miteco.gob.es/es/energia/participacion/2026/detalle-participacion-publica-k-851.html","saw":"Draft Royal Decree on data center sustainability (hearing closed 2026-09-10); no register of data centers, only a declaracion responsable before operation."}]}},"national_registry":{"exists":"restricted","note":"Per-facility data of sites of 500 kW IT or more is held in the EU ReportENER database (Commission and MITECO); not public. No Spanish public register of data centers found on the pages opened.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/fr/energia/eficiencia/centros-de-datos/preguntas-frecuentes.html","saw":"500 kW IT threshold; operators enter data in ReportENER; data confidential, public only in aggregate; no national register described."},{"organization":"European Commission DG ENER","url":"https://energy.ec.europa.eu/topics/energy-efficiency/energy-efficiency-targets-directive-and-rules/energy-efficiency-directive/energy-performance-data-centres_en","saw":"European database collecting data; public dashboard with aggregated data."},{"organization":"Ministerio para la Transformacion Digital y de la Funcion Publica","url":"https://digital.gob.es/content/dam/portal-mtdfp/comunicacion/comunicacion_ministro/2026/08/27-08-26/270826NdP.RD%20Centros%20de%20Datos.pdf","saw":"Press note 2026-08-27 on the draft Royal Decree; mentions over 12 GW of access rights granted since 2021; no register or list."},{"organization":"Comunidad de Madrid","url":"https://www.comunidad.madrid/node/102211","saw":"46 infrastructures (35 operating, 11 under construction), 216 MW in service in 2024; aggregates only, no list."},{"organization":"CNMC","url":"https://cnmc.es/prensa/mapas-capacidad-redes-electricas-20260415","saw":"Monthly grid access capacity maps per node; do not list data centers."},{"organization":"datos.gob.es","url":"https://datos.gob.es/es/catalogo","saw":"Catalog (web page renders empty without scripts); API and SPARQL queries returned no data center dataset."}]},"if_unstructured":{"summary":null,"recipe":["Take the 72 facilities from PeeringDB (api/fac?country=ES) as the skeleton: name, operator, address, lat/lon.","Group by org_name and open each operator Spain page (done for Templus, Digital Realty, Iron Mountain, Nabiax, Data4; Equinix returned 403).","For operators that report to investors (Merlin Properties), download the results PDF and run pdftotext -layout; MW per site are in the DATA CENTERS section diagram (tested on the FY25 summary).","Record per site: MW or m2, unit label, operating or planned; do not convert ft2 or building size into MW.","Check the sum of operator MW against SpainDC (439 MW IT, 50 kW threshold) and Colliers (360 MW IT) and state the gap instead of scaling."],"location_method":"PeeringDB latitude/longitude (69 of 72) or street addresses from operator pages (address-level). Verify the building with Catastro WMS or PNOA orthophoto; do not use rounded DC Hub coordinates.","cross_with":["PeeringDB facility list","SpainDC annual report totals by region","Colliers snapshot by market","OpenStreetMap telecom=data_center features","EU ReportENER aggregates (when MITECO publishes under the draft Royal Decree art. 14)"],"where_published":[{"name":"Operator results reports and investor presentations (example Merlin Properties)","url":"https://ir.merlinproperties.com/wp-content/uploads/2026/02/Resumen-ejecutivo-FY25.pdf","what":"Per-site MW IT of the operator own data centers, operating and pipeline separated.","how_to_search_inside":"Download PDF, pdftotext -layout, search for DATA CENTERS and the site codes (MAD-GET, BCN-PLZF, BIO-ARA); MW appear in brackets in the localisation diagram. Only listed operators have this.","example_document":{"url":"https://ir.merlinproperties.com/wp-content/uploads/2026/02/Resumen-ejecutivo-FY25.pdf","what_it_gives":"'MAD-GET 01 (20 MW)'; 'BCN-PLZF (22 MW)'; 'BIO-ARA 03 (22 MW)' (DATA CENTERS section); '58MW IT equipados (+6 MW BCN 04/26) de los cuales 44 MW están listos para operar'."}},{"name":"Operator Spain pages (example Templus)","url":"https://templus.com/","what":"Per-site Total power (MW) and m2 IT for the operator own sites.","how_to_search_inside":"Open the Spain locations; each site has a ficha with the same fields; no search box needed.","example_document":{"url":"https://templus.com/data-centers/madrid-mad01/","what_it_gives":"'Total power 20 MW', 'Superficie IT 2.600 m²', 'Densidad por rack 4 kW – 120 kW', Tier III (MAD01 ficha)."}},{"name":"SpainDC annual report (aggregates by class and region)","url":"https://spaindc.com/informes/","what":"National and regional IT MW and site counts; list of reports since 2022.","how_to_search_inside":"Download each PDF; no search interface; figure titles may extract garbled so view pages as images.","example_document":{"url":"https://spaindc.com/wp-content/uploads/2025/09/SpainDC-Informe-Anual-2025_.pdf","what_it_gives":"Figure (pages 21-22): Colocation (82), 'Scale colocation' (10), Hiperescalares propietarios (5), Total (97); '439 MW Potencia TI total España'."}}]},"related_not_answering":[{"name":"CNMC grid access capacity maps","url":"https://cnmc.es/prensa/mapas-capacidad-redes-electricas-20260415","why":"Shows spare access capacity per grid node, not data center facilities."},{"name":"Aragon PIGA ACS DC La Puebla (aragon.es)","url":"https://www.aragon.es/-/piga-acs-dc-la-puebla","why":"A planned 150 MW electrical campus under initial approval; not in operation."},{"name":"Comunidad de Madrid press: 46 infrastructures (35 operating)","url":"https://www.comunidad.madrid/node/102211","why":"Regional count and MW without any list of sites."},{"name":"Draft Royal Decree on data center sustainability (MITECO consultation)","url":"https://www.miteco.gob.es/es/energia/participacion/2026/detalle-participacion-publica-k-851.html","why":"Draft norm: obligations and a future publication, not data on sites in operation."},{"name":"Colliers Apr-Sep 2026 press coverage (brainsre.news)","url":"https://brainsre.news/capacidad-operativa-centros-datos-crece-17/","why":"Secondary article with market MW (Madrid 212, Barcelona 63, Aragon 108); no list and the PDF was not found."},{"name":"Ara.cat: data centers in Catalonia","url":"https://es.ara.cat/economia/tecnologia/gobierno-establece-siete-polos-instalar-centros-datos-cataluna_1_5707351.html","why":"Estimate of more than fifteen sites of 1-16 MW without source or list."}],"open_questions":["Whether the draft Royal Decree (hearing closed 2026-09-10) was adopted and when MITECO will publish per-site data under its art. 14: not determinable from the pages opened.","Why Colliers (360 MW IT, Oct 2025-Mar 2026) and SpainDC (439 MW IT, end 2025) differ: neither publishes the site list; the organisations would have to be asked."],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Claude Sonnet 5.5 (High)","rules_version":"6.12","note":"No public list with capacity exists; best route is PeeringDB (list/location/operator) plus operator pages and SpainDC/Colliers aggregates for MW. Per-site MW only for some operators.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"restricted"},"sources":{"total":7,"new":7,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":40,"minutes":45}}],"local_terms":[{"term":"centro de datos","language":"es","meaning":"Data center, the usual term in norms and press"},{"term":"CPD / centro de proceso (procesamiento) de datos","language":"es","meaning":"Administrative term; used by regional governments and in OSM names"},{"term":"potencia TI / potencia IT (MW)","language":"es","meaning":"IT power capacity as used by SpainDC and Colliers"},{"term":"colocation / scale colocation / hiperescalar","language":"es/en","meaning":"SpainDC size and business classes (scale colocation: 20 MW or more)"},{"term":"superficie IT (m2 IT)","language":"es","meaning":"IT floor area, as in Templus pages"},{"term":"declaracion responsable","language":"es","meaning":"Self-declaration to be filed before operation under the draft Royal Decree"},{"term":"DIGA / PIGA","language":"es","meaning":"Aragon declaracion de interes general and Plan de Interes General de Aragon: planning documents for new campuses"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (High)"],"minutes_estimate":45,"pages_opened":40,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/data-centers.json","detail_url":"https://georutter.org/v1/es/data-centers/detail.json","html_url":"https://georutter.org/es/data-centers/","country_url":"https://georutter.org/v1/countries/es.json"}