{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"energy-auctions","question":"Where can I get the results of renewable and storage auctions in Spain, with awarded projects, capacity (MW), price, technology and location?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"Spain has held four REER (renewable) price auctions: 26-01-2021, 19-10-2021, 25-10-2022 and 22-11-2022 (none since). Each is resolved in a BOE resolution (PDF annex: awardee, CIF, technology, offer-unit code, EUR/MWh, kW), mirrored on MITECO. No storage auction has been held yet; no project location is published.","main_caveats":["Latest REER auction is 22-11-2022; MITECO's REER page lists none after it. A new auction or the first capacity-market auction (storage eligible) would add a BOE resolution not yet in this card.","Annex units: kW, dot as thousands separator (10 = 10 kW, not 10 MW). Sum of Jan 2021 annex = 3,034.178 MW; Oct 2021 = 3,123.77 MW; Oct 2022 = 177 MW; Nov 2022 = 45.5 MW.","Awarded capacity is not installed capacity: awardees later register installations; the BOE rows are bids per awardee (CIF + UA code), so no plant name or site can be read from them.","Storage: not auctioned in REER; MITECO/IDAE storage awards are grants (PINALM, 126 projects, 818.3 M EUR) and access-capacity tenders, which are not price auctions.","CNMC supervision reports black out bidder volumes ([CONFIDENCIAL]); only awarded totals and weighted prices are readable."],"confidence":"medium","confidence_reason":"Results and prices verified in downloaded BOE PDFs and CNMC reports; location/storage negatives rest on opened pages, but ERIDE/REPRO and OMIE could not be read (login, 403).","attributes":[{"attribute":"awarded_project","covered":"partial","source_ids":["s001","s004"],"note":"Rows are awardee offer units, not named plants; per-awardee strategic-plan PDFs exist but name no site. Installation identification goes to DGPEM unpublished.","gap":"not_published","gap_note":"Orden TED/1161/2020 art.14 sends installation name/location to DGPEM electronically; no public list found in BOE, MITECO auction pages, CNMC, OMIE (403) or REPRO/ERIDE (login)."},{"attribute":"capacity_mw","covered":"yes","source_ids":["s001","s002"],"note":"Annex column is in kW with dot thousands separator (50.800 = 50.8 MW; 10 = 10 kW).","gap":null,"gap_note":null},{"attribute":"price","covered":"yes","source_ids":["s001","s003"],"note":"EUR/MWh per offer unit in BOE annex (pay-as-bid); CNMC gives weighted averages. 2016-17 auctions have no price column.","gap":null,"gap_note":null},{"attribute":"technology","covered":"yes","source_ids":["s001","s002"],"note":"Technology + RD 413/2014 subgroup (b.1.1 PV, b.2.1 onshore wind, b.6 biomass) per row.","gap":null,"gap_note":null},{"attribute":"location","covered":"no","source_ids":[],"note":"No REER result or registry resolution carries province, municipality or coordinates (checked 9 BOE resolutions, 3 awardee plans).","gap":"not_published","gap_note":"Looked in BOE results and preassignment annexes, MITECO auction pages, plans PDFs, CNMC reports; only Canary-wind 2015 call lists island per project (source 5)."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"REER auction results: DGPEM resolutions resolving each auction (BOE annex I)","publisher":"Ministerio para la Transicion Ecologica (Direccion General de Politica Energetica y Minas), published in BOE and mirrored on miteco.gob.es","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","data_url":"https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf","access":"pdf","format":"PDF (text layer, table in annex I)","license":"unknown (BOE/MITECO public documents; no licence statement read)","language":"es","has_coordinates":false,"location_precision":"none","summary":"REER auction results: DGPEM resolutions resolving each auction (BOE annex I)","coverage_note":"Spain (national auctions); no territorial breakdown in the annex","data_date":"Auction date (26-01-2021, 19-10-2021, 25-10-2022, 22-11-2022); BOE publication days to 2 weeks later","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sL --max-time 60 -o r1.pdf https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf && pdftotext -layout r1.pdf r1.txt && python3 -I -c \"import re; rows=[re.search(r'^\\s*(.+?)\\s{2,}([A-Z]\\d{8})\\s+(Fotovoltaica|Eólica terrestre)\\.\\s+(\\S+)\\s+(UA_\\d+_\\d+_\\d+)\\s+([\\d,]+)\\s+([\\d.]+)\\s*$',l) for l in open('r1.txt',encoding='utf-8')]; rows=[m.groups() for m in rows if m]; print(len(rows), sum(int(r[6].replace('.',''))/1000 for r in rows)); print(rows[0])\"","example_result":"109 3034.178 ; ('AKUO RENOVABLES, S.L.', 'B67430298', 'Fotovoltaica', 'b.1.1', 'UA_21_01_00017', '23,5', '50.800')"},"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s002","name":"REER preassignment registry resolutions (BOE annex I with registered power and PER code)","publisher":"Ministerio para la Transicion Ecologica (DGPEM), BOE","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","data_url":"https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf","access":"pdf","format":"PDF (text layer)","license":"unknown (BOE/MITECO public documents; no licence statement read)","language":"es","has_coordinates":false,"location_precision":"none","summary":"REER preassignment registry resolutions (BOE annex I with registered power and PER code)","coverage_note":"Spain; no territorial breakdown","data_date":"Resolution date (17-06-2021, 16-02-2022, 10-03-2022, 09-03-2023, 16-03-2023); BOE publication later","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sL --max-time 60 -o 8031.pdf https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf && pdftotext -layout 8031.pdf 8031.txt && grep -n 'PER-0' 8031.txt","example_result":"ELAWAN ENERGY, S.L.  B85146215  Eólica terrestre.  b.2.1  UA_22_11_00001  39,88  20.000,00  20.000,00  528.000,00  840.000,00  PER-000002-2023-E"},"members_summary":{"total":null,"listed":5,"tested":5,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"CNMC supervision reports on REER auction results","publisher":"Comision Nacional de los Mercados y la Competencia","official":true,"landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/informes-de-subastas-de-contratacion-a-plazo","data_url":"https://www.cnmc.es/sites/default/files/3408659_14.pdf","access":"pdf","format":"PDF with some text blacked out as [CONFIDENCIAL]","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"CNMC supervision reports on REER auction results","coverage_note":"Spain (national auctions)","data_date":"Report dates 2021-03-04, 2022-01-20 and 2023-07-27 (cover pages and CNMC listing)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sL --max-time 90 -o 3408659_14.pdf https://www.cnmc.es/sites/default/files/3408659_14.pdf && pdftotext 3408659_14.pdf r.txt && grep -n 'precio medio ponderado' r.txt","example_result":"Al cierre de la subasta, 109 tramos resultaron adjudicados a 32 participantes por un total de 3.034.178 kW de potencia, a un precio medio ponderado de 24,75 €/MWh"},"members_summary":{"total":null,"listed":3,"tested":3,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"other_sources_count":2,"if_unstructured":{"summary":null},"local_terms":[{"term":"subasta REER","language":"es","meaning":"Auction for the Régimen Económico de Energías Renovables (RD 960/2020): long-term price per MWh"},{"term":"unidad de adjudicación (UA_yy_mm_nnnnn)","language":"es","meaning":"Awarded bid block; the row unit in the result annex"},{"term":"estado de preasignación / explotación","language":"es","meaning":"Two states of the REER electronic registry"},{"term":"régimen retributivo específico","language":"es","meaning":"Earlier support scheme (RD 413/2014) used in the 2016-2017 auctions and cogeneration"},{"term":"mercado de capacidad / potencia firme","language":"es","meaning":"Capacity market created by Orden TED/966/2026; storage may bid"},{"term":"concurso de capacidad de acceso","language":"es","meaning":"Competitive tender for grid access at a node; not a price auction"},{"term":"cupo","language":"es","meaning":"MW quota offered in an auction"},{"term":"Resolución ... por la que se resuelve la subasta","language":"es","meaning":"Title to search in BOE section III for each result"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5"],"minutes_estimate":13,"pages_opened":60,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/energy-auctions.json","detail_url":"https://georutter.org/v1/es/energy-auctions/detail.json","html_url":"https://georutter.org/es/energy-auctions/","country_url":"https://georutter.org/v1/countries/es.json"}
