{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"energy-auctions","question":"Where can I get the results of renewable and storage auctions in Spain, with awarded projects, capacity (MW), price, technology and location?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"Spain has held four REER (renewable) price auctions: 26-01-2021, 19-10-2021, 25-10-2022 and 22-11-2022 (none since). Each is resolved in a BOE resolution (PDF annex: awardee, CIF, technology, offer-unit code, EUR/MWh, kW), mirrored on MITECO. No storage auction has been held yet; no project location is published.","main_caveats":["Latest REER auction is 22-11-2022; MITECO's REER page lists none after it. A new auction or the first capacity-market auction (storage eligible) would add a BOE resolution not yet in this card.","Annex units: kW, dot as thousands separator (10 = 10 kW, not 10 MW). Sum of Jan 2021 annex = 3,034.178 MW; Oct 2021 = 3,123.77 MW; Oct 2022 = 177 MW; Nov 2022 = 45.5 MW.","Awarded capacity is not installed capacity: awardees later register installations; the BOE rows are bids per awardee (CIF + UA code), so no plant name or site can be read from them.","Storage: not auctioned in REER; MITECO/IDAE storage awards are grants (PINALM, 126 projects, 818.3 M EUR) and access-capacity tenders, which are not price auctions.","CNMC supervision reports black out bidder volumes ([CONFIDENCIAL]); only awarded totals and weighted prices are readable."],"confidence":"medium","confidence_reason":"Results and prices verified in downloaded BOE PDFs and CNMC reports; location/storage negatives rest on opened pages, but ERIDE/REPRO and OMIE could not be read (login, 403).","attributes":[{"attribute":"awarded_project","covered":"partial","source_ids":["s001","s004"],"note":"Rows are awardee offer units, not named plants; per-awardee strategic-plan PDFs exist but name no site. Installation identification goes to DGPEM unpublished.","gap":"not_published","gap_note":"Orden TED/1161/2020 art.14 sends installation name/location to DGPEM electronically; no public list found in BOE, MITECO auction pages, CNMC, OMIE (403) or REPRO/ERIDE (login)."},{"attribute":"capacity_mw","covered":"yes","source_ids":["s001","s002"],"note":"Annex column is in kW with dot thousands separator (50.800 = 50.8 MW; 10 = 10 kW).","gap":null,"gap_note":null},{"attribute":"price","covered":"yes","source_ids":["s001","s003"],"note":"EUR/MWh per offer unit in BOE annex (pay-as-bid); CNMC gives weighted averages. 2016-17 auctions have no price column.","gap":null,"gap_note":null},{"attribute":"technology","covered":"yes","source_ids":["s001","s002"],"note":"Technology + RD 413/2014 subgroup (b.1.1 PV, b.2.1 onshore wind, b.6 biomass) per row.","gap":null,"gap_note":null},{"attribute":"location","covered":"no","source_ids":[],"note":"No REER result or registry resolution carries province, municipality or coordinates (checked 9 BOE resolutions, 3 awardee plans).","gap":"not_published","gap_note":"Looked in BOE results and preassignment annexes, MITECO auction pages, plans PDFs, CNMC reports; only Canary-wind 2015 call lists island per project (source 5)."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"REER auction results: DGPEM resolutions resolving each auction (BOE annex I)","publisher":"Ministerio para la Transicion Ecologica (Direccion General de Politica Energetica y Minas), published in BOE and mirrored on miteco.gob.es","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","data_url":"https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf","access":"pdf","format":"PDF (text layer, table in annex I)","license":"unknown (BOE/MITECO public documents; no licence statement read)","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Primary list of awarded offers per auction: awardee, CIF, technology/subgroup, offer-unit code, price EUR/MWh and awarded kW.","first_seen_pass":1,"rank":1,"summary":"REER auction results: DGPEM resolutions resolving each auction (BOE annex I)","coverage_note":"Spain (national auctions); no territorial breakdown in the annex","data_date":"Auction date (26-01-2021, 19-10-2021, 25-10-2022, 22-11-2022); BOE publication days to 2 weeks later","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain (national auctions); no territorial breakdown in the annex"},"fine_print":{"unit":{"value":"Power in kW (dot as thousands separator); price in EUR/MWh","quote":"adjudicados 3.123.770 kW de potencia, a un precio medio ponderado de 30,59 €/MWh","url":"https://www.cnmc.es/sites/default/files/3922210.pdf","attempts":[]},"inclusion_rule":{"value":"Awarded offers only, up to the auction quota (1st: 3,000 MW extendable to 3,180 MW); installed power per art. 3 RD 413/2014","quote":"se establece un cupo de 3.000 MW de potencia instalada, de acuerdo con la definición del artículo 3 del Real Decreto 413/2014, de 6 de junio","url":"https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf","attempts":[]},"reference_date":{"value":"Auction date (26-01-2021, 19-10-2021, 25-10-2022, 22-11-2022); BOE publication days to 2 weeks later","quote":"El 26 de enero de 2021 se celebró la primera subasta para el otorgamiento del régimen económico de energías renovables","url":"https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf","attempts":[]},"update_frequency":{"value":"No periodic update: one resolution per auction; MITECO lists four REER auctions, the latest 22-11-2022","quote":"Subasta de 22 de noviembre de 2022","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Read annex I of the four result resolutions (BOE-A-2021-1251, 2021-17335, 2022-17796, 2022-20540): columns are awardee, CIF, technology, subgroup, UA code, price, kW; no location, project name or unawarded bids.","Read the preassignment annexes and three awardee strategic plans (X-Elio, Ignis, Nearco): still no location (plans only say 'municipios en los que finalmente se enclave el proyecto')."]}},"key_fields":[{"field":"Nombre adjudicatario / CIF adjudicatario","meaning":"Awarded company and tax ID; wrapped across two lines in the PDF"},{"field":"Tecnologia / Subgrupo segun articulo 2 RD 413/2014","meaning":"Fotovoltaica b.1.1, Eolica terrestre b.2.1, Biomasa b.6"},{"field":"Codigo de la Unidad de Adjudicacion (UA_yy_mm_nnnnn)","meaning":"One awarded bid block; links to the PER code in the preassignment resolution"},{"field":"Precio de adjudicacion (euros/MWh)","meaning":"Pay-as-bid price of that block"},{"field":"Potencia adjudicada (kW)","meaning":"Awarded installed power in kW"}],"how_to_use":{"example_request":"curl -sL --max-time 60 -o r1.pdf https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf && pdftotext -layout r1.pdf r1.txt && python3 -I -c \"import re; rows=[re.search(r'^\\s*(.+?)\\s{2,}([A-Z]\\d{8})\\s+(Fotovoltaica|Eólica terrestre)\\.\\s+(\\S+)\\s+(UA_\\d+_\\d+_\\d+)\\s+([\\d,]+)\\s+([\\d.]+)\\s*$',l) for l in open('r1.txt',encoding='utf-8')]; rows=[m.groups() for m in rows if m]; print(len(rows), sum(int(r[6].replace('.',''))/1000 for r in rows)); print(rows[0])\"","example_result":"109 3034.178 ; ('AKUO RENOVABLES, S.L.', 'B67430298', 'Fotovoltaica', 'b.1.1', 'UA_21_01_00017', '23,5', '50.800')","steps":["Open https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html, pick the auction page and take the 'Resolución ... por la que se resuelve' PDF (also at boe.es).","Run pdftotext -layout; table rows start after 'ANEXO I'. Parse with a regex on UA_yy_mm_nnnnn; price uses decimal comma, kW uses dot thousands.","Rows whose company name wraps onto a second line still match because the CIF, technology, UA, price and kW sit on the first line; the second name line must be joined by hand if the full name is needed.","Convert kW to MW (/1000) and compare the sum with CNMC totals (source 3) to check extraction: 3,034.178 / 3,123.770 / 177.000 / 45.500 MW.","Join to the preassignment resolutions (source 2) on the UA code for PER code, preassigned min/max energy and registered power."],"reading_traps":["kW with dot thousands: '10' and '5' (RIOS RENOVABLES, ENERGY INVESTMENT AND CONSULTANCY rows in the 1st auction) are 10 kW and 5 kW, not MW.","The 1st-auction annex has 109 UA rows for 32 awardees; 'awarded projects' are companies' bid blocks, not plants.","Oct 2021 technology label is 'Eólica Terrestre' (capital T) and the PV label has no trailing dot, unlike the Jan 2021 file.","Column set differs by auction: the 3rd adds Producto and Reserva minima por especificidad (biomass vs local distributed PV).","Parque Eolico Escepar and Parque Eolico Peralejo appear as PV awardees (hybridisation of wind farms), so company name does not imply technology."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":474111,"records_total":109,"records_for_country":109,"problems":[]},"evidence":[{"claim":"MITECO hosts the auction pages and BOE results","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","quote":"Subasta de 26 de enero de 2021"},{"claim":"The resolution approves the awarded offers in annex I","url":"https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf","quote":"Aprobar la relación de ofertas adjudicatarias de la primera subasta para la asignación del régimen económico de energías renovables que figura en el anexo I de la presente Resolución"},{"claim":"Result of the 4th auction is a DGPEM resolution published in BOE","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","quote":"Resolución de 23 de noviembre de 2022, de la Dirección General de Política Energética y Minas"}],"members":[{"name":"1st auction 26-01-2021 (BOE-A-2021-1251, 109 offer units)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-26-enero-2021.html","data_url":"https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf","access":"pdf","tested":true,"data_found":null,"note":"2,036.264 MW PV + 997.914 MW wind = 3,034.178 MW (my sum equals CNMC 3,034,178 kW)."},{"name":"2nd auction 19-10-2021 (BOE-A-2021-17335, 91 offer units)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-19-octubre-2021.html","data_url":"https://www.boe.es/boe/dias/2021/10/25/pdfs/BOE-A-2021-17335.pdf","access":"pdf","tested":true,"data_found":null,"note":"865.77 MW PV + 2,258.00 MW wind = 3,123.77 MW."},{"name":"3rd auction 25-10-2022 (BOE-A-2022-17796, 16 offer units)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-25-octubre-2022.html","data_url":"https://www.boe.es/boe/dias/2022/10/31/pdfs/BOE-A-2022-17796.pdf","access":"pdf","tested":true,"data_found":null,"note":"146 MW biomass + 31 MW local distributed PV; extra columns Producto and Reserva minima."},{"name":"4th auction 22-11-2022 (BOE-A-2022-20540, 4 offer units)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","data_url":"https://www.boe.es/boe/dias/2022/12/05/pdfs/BOE-A-2022-20540.pdf","access":"pdf","tested":true,"data_found":null,"note":"45.5 MW onshore wind only (Elawan 20, Nearco 25.5); 39.88-45.12 EUR/MWh."}],"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s002","name":"REER preassignment registry resolutions (BOE annex I with registered power and PER code)","publisher":"Ministerio para la Transicion Ecologica (DGPEM), BOE","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","data_url":"https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf","access":"pdf","format":"PDF (text layer)","license":"unknown (BOE/MITECO public documents; no licence statement read)","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Second pass on the same awards: power registered in preassignment, preassigned min/max energy (MWh) and request code PER-xxxxxx-yyyy-E; shows which awards were actually registered.","first_seen_pass":1,"rank":2,"summary":"REER preassignment registry resolutions (BOE annex I with registered power and PER code)","coverage_note":"Spain; no territorial breakdown","data_date":"Resolution date (17-06-2021, 16-02-2022, 10-03-2022, 09-03-2023, 16-03-2023); BOE publication later","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain; no territorial breakdown"},"fine_print":{"unit":{"value":"kW (power), MWh (energy), EUR/MWh (price)","quote":"Potencia inscrita en estado de preasignación (kW)","url":"https://www.boe.es/boe/dias/2021/07/01/pdfs/BOE-A-2021-10947.pdf","attempts":[]},"inclusion_rule":{"value":"Awardees that applied for preassignment inscription on time","quote":"Los adjudicatarios que figuran en el anexo I de la presente resolución presentaron en tiempo y forma las solicitudes de inscripción en el Registro electrónico del régimen económico de energías renovables en estado de preasignación","url":"https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf","attempts":[]},"reference_date":{"value":"Resolution date (17-06-2021, 16-02-2022, 10-03-2022, 09-03-2023, 16-03-2023); BOE publication later","quote":"Resolución de 17 de junio de 2021, de la Dirección General de Política Energética y Minas","url":"https://www.boe.es/boe/dias/2021/07/01/pdfs/BOE-A-2021-10947.pdf","attempts":[]},"update_frequency":{"value":"One resolution per auction (two for the 2nd); no later REER resolutions found","quote":"La resolución de inscripción se publicará en «Boletín Oficial del Estado»","url":"https://www.boe.es/boe/dias/2021/07/01/pdfs/BOE-A-2021-10947.pdf","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Read annex I of the five resolutions: no location, installation name or coordinates.","Searched for 'estado de explotación' inscription resolutions (art. 27-28 RD 960/2020, which do require location): none found published in BOE or MITECO pages opened."]}},"key_fields":[{"field":"Potencia inscrita en estado de preasignación (kW)","meaning":"Registered power; equal to awarded power in the rows read"},{"field":"Energía mínima / máxima de subasta preasignada (MWh)","meaning":"Power x min/max equivalent hours x delivery years"},{"field":"Código de solicitud","meaning":"PER-nnnnnn-yyyy-E registry request code"}],"how_to_use":{"example_request":"curl -sL --max-time 60 -o 8031.pdf https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf && pdftotext -layout 8031.pdf 8031.txt && grep -n 'PER-0' 8031.txt","example_result":"ELAWAN ENERGY, S.L.  B85146215  Eólica terrestre.  b.2.1  UA_22_11_00001  39,88  20.000,00  20.000,00  528.000,00  840.000,00  PER-000002-2023-E","steps":["Download each PDF listed under the auction's page on miteco.gob.es or from boe.es and run pdftotext -layout.","Parse rows containing PER-; join to source 1 on UA code to add PER code and min/max energy.","For the 2nd auction concatenate BOE-A-2022-4344 and BOE-A-2022-4494 (2 + 89 rows)."],"reading_traps":["Early resolutions print kW as 50.800; later ones as 20.000,00 (dot thousands, decimal comma).","Request codes are not uniform: 'PER-00014-2021-E' (5 digits) appears next to 'PER-000015-2021-E' in BOE-A-2021-10947.","BOE-A-2021-10947 has 102 UA rows against 109 awarded: UA_21_01_00061/62/63/67 (Green Capital Power, 1 kW each) and 00078/87/93 (Energy Investment and Consultancy, 10 kW each) are absent; no later resolution for them was found."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":250983,"records_total":4,"records_for_country":4,"problems":[]},"evidence":[{"claim":"Content mandated for preassignment resolutions","url":"https://www.boe.es/boe/dias/2021/07/01/pdfs/BOE-A-2021-10947.pdf","quote":"la resolución de inscripción se publicará en «Boletín Oficial del Estado» e incluirá, al menos, la identificación del titular, la potencia inscrita en el registro en estado de preasignación, la energía mínima de subasta preasignada, la energía máxima de subasta preasignada, el precio de adjudicación y las tecnologías empleadas"}],"members":[{"name":"1st auction (BOE-A-2021-10947, 17-06-2021)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-26-enero-2021.html","data_url":"https://www.boe.es/boe/dias/2021/07/01/pdfs/BOE-A-2021-10947.pdf","access":"pdf","tested":true,"data_found":null,"note":"102 of the 109 awarded UAs (7 tiny units absent); table split in two parts in the PDF."},{"name":"2nd auction (BOE-A-2022-4344, 16-02-2022; 2 rows)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-19-octubre-2021.html","data_url":"https://www.boe.es/boe/dias/2022/03/18/pdfs/BOE-A-2022-4344.pdf","access":"pdf","tested":true,"data_found":null,"note":"Only 2 inscriptions."},{"name":"2nd auction (BOE-A-2022-4494, 10-03-2022; 89 rows)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-19-octubre-2021.html","data_url":"https://www.boe.es/boe/dias/2022/03/21/pdfs/BOE-A-2022-4494.pdf","access":"pdf","tested":true,"data_found":null,"note":"2+89 = 91 rows, equal to the 91 awarded units."},{"name":"3rd auction (BOE-A-2023-7866, 09-03-2023; 16 rows)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-25-octubre-2022.html","data_url":"https://www.boe.es/boe/dias/2023/03/27/pdfs/BOE-A-2023-7866.pdf","access":"pdf","tested":true,"data_found":null,"note":"All 16 units inscribed."},{"name":"4th auction (BOE-A-2023-8031, 16-03-2023; 4 rows)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","data_url":"https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf","access":"pdf","tested":true,"data_found":null,"note":"Also on MITECO under /22Noviembre/. kW written as 20.000,00."}],"members_summary":{"total":null,"listed":5,"tested":5,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"CNMC supervision reports on REER auction results","publisher":"Comision Nacional de los Mercados y la Competencia","official":true,"landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/informes-de-subastas-de-contratacion-a-plazo","data_url":"https://www.cnmc.es/sites/default/files/3408659_14.pdf","access":"pdf","format":"PDF with some text blacked out as [CONFIDENCIAL]","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"Weighted average, minimum and maximum prices by auction and technology, number of awardees/groups, share of quota awarded; independent check on BOE totals. Not a project list.","first_seen_pass":1,"rank":3,"summary":"CNMC supervision reports on REER auction results","coverage_note":"Spain (national auctions)","data_date":"Report dates 2021-03-04, 2022-01-20 and 2023-07-27 (cover pages and CNMC listing)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain (national auctions)"},"fine_print":{"unit":{"value":"kW and EUR/MWh (weighted prices)","quote":"Al cierre de la subasta, 109 tramos resultaron adjudicados a 32 participantes por un total de 3.034.178 kW de potencia, a un precio medio ponderado de 24,75 €/MWh","url":"https://www.cnmc.es/sites/default/files/3408659_14.pdf","attempts":[]},"inclusion_rule":{"value":"CNMC is the auction supervisor and reports on each REER auction; bidder-level volumes and offers are confidential","quote":"la entidad supervisora de la subasta es la Comisión Nacional de los Mercados y la Competencia","url":"https://www.boe.es/boe/dias/2021/01/28/pdfs/BOE-A-2021-1251.pdf","attempts":[]},"reference_date":{"value":"Report dates 2021-03-04, 2022-01-20 and 2023-07-27 (cover pages and CNMC listing)","quote":"20 de enero de 2022","url":"https://www.cnmc.es/sites/default/files/3922210.pdf","attempts":[]},"update_frequency":{"value":"One report per auction; none after the 4th (listing shows nothing REER after 27-07-2023)","quote":"SUB/DE/004/22","url":"https://www.cnmc.es/expedientes/subde00422","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Read three reports: qualified volumes, offered volumes and top-4 shares are replaced by [CONFIDENCIAL].","No awardee-by-awardee table; only aggregates and some per-group totals."]}},"key_fields":[{"field":"precio medio ponderado / mínimo / máximo","meaning":"Weighted average, min and max award price in EUR/MWh"},{"field":"potencia adjudicada (kW) por tecnología","meaning":"Awarded power split by technology"}],"how_to_use":{"example_request":"curl -sL --max-time 90 -o 3408659_14.pdf https://www.cnmc.es/sites/default/files/3408659_14.pdf && pdftotext 3408659_14.pdf r.txt && grep -n 'precio medio ponderado' r.txt","example_result":"Al cierre de la subasta, 109 tramos resultaron adjudicados a 32 participantes por un total de 3.034.178 kW de potencia, a un precio medio ponderado de 24,75 €/MWh","steps":["Open the CNMC listing, pick the expediente and download the PDF.","Use pdftotext without -layout (the cover prints garbled with -layout).","Search 'Al cierre de la subasta' for totals and prices."],"reading_traps":["In the joint 3rd/4th report the 4th-auction line shows '42,78 €/MWh 20,21' (stray footnote digits).","OMI's integrated report gives 6.381 MW for the four auctions; the sum of the BOE/CNMC figures is 6,380.45 MW.","Cover text of the PDFs is interleaved by pdftotext; take figures from the body."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":1070902,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"2nd auction awardees and price","url":"https://www.cnmc.es/sites/default/files/3922210.pdf","quote":"Al cierre de la subasta, resultaron adjudicados 3.123.770 kW de potencia, a un precio medio ponderado de 30,59 €/MWh (24,75 €/MWh en la 1ª REER)"},{"claim":"4th auction awarded wind only","url":"https://www.cnmc.es/sites/default/files/4872899.pdf","quote":"Al cierre de la subasta, resultaron adjudicados 45.500 kW de potencia, a un precio medio ponderado de 42,78 €/MWh"},{"claim":"OMI (administrator) summary of the four auctions","url":"https://www.omie.es/sites/default/files/2023-05/omi_reporting_integrado_2022_ES.pdf","quote":"Considerando las cuatro subastas de REER celebradas hasta la fecha, se ha adjudicado un total de 6.381 MW de potencia"}],"members":[{"name":"1st auction (SUB/DE/001/21, 4-03-2021)","landing_url":"https://www.cnmc.es/expedientes/subde00121","data_url":"https://www.cnmc.es/sites/default/files/3408659_14.pdf","access":"pdf","tested":true,"data_found":null,"note":"32 awardees, 24.75 EUR/MWh average; PV 24.47, wind 25.31."},{"name":"2nd auction (SUB/DE/004/21, 20-01-2022)","landing_url":"https://www.cnmc.es/expedientes/subde00421","data_url":"https://www.cnmc.es/sites/default/files/3922210.pdf","access":"pdf","tested":true,"data_found":null,"note":"26 awardees, 3,123,770 kW, 30.59 average, min 24.4012, max 36.8813."},{"name":"3rd and 4th auctions (SUB/DE/004/22, 27-07-2023)","landing_url":"https://www.cnmc.es/expedientes/subde00422","data_url":"https://www.cnmc.es/sites/default/files/4872899.pdf","access":"pdf","tested":true,"data_found":null,"note":"Biomass 93.09, local PV 53.88, wind 42.78 EUR/MWh."}],"members_summary":{"total":null,"listed":3,"tested":3,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s004","name":"Awardee strategic plans published on MITECO auction pages","publisher":"Ministerio para la Transicion Ecologica (documents written by the awardees)","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-26-enero-2021.html","data_url":null,"access":"pdf","format":"PDF (heterogeneous company documents)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Per-awardee PDF (plan estrategico: investment, jobs, circular economy) whose file name carries awarded MW; the only per-company document beyond the BOE annexes.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Spain; project sites not named in the three plans opened"},"fine_print":{"unit":{"value":"MW in the file name (e.g. 'EOL_PE1 CAPITAL ENERGY, S.L.U. 622 MW')","quote":"Elawan Energy S.L.- [potencia adjudicada 20 MW]","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","attempts":[]},"inclusion_rule":{"value":"Plan required of every awardee in the preassignment application","quote":"La resolución por la que se convoca la subasta establece la obligación de que los adjudicatarios aporten un plan estratégico en las solicitudes de inscripción","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","attempts":[]},"reference_date":{"value":"Plan dates vary (X-Elio March 2021, Ignis Dec 2021)","quote":"Marzo 2021","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/regimen-economico/26Enero/Proyectos%20de%20inversión%20fotovoltaicos%20adjudicatarios%20de%20la%20subasta/FV_PE12%20X-ELIO%20ENERGY,%20S.L.%20315%20MW.pdf","attempts":[]},"update_frequency":{"value":"Static per auction","quote":"Proyectos de inversión eólicos adjudicatarios de la subasta","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Grepped three plans for provincia/municipio/ubicación/coordenadas: only generic statements, no site.","MITECO press note of 2021-06-17 on the 36 plans gives aggregate jobs and investment only."]}},"key_fields":[{"field":"File name","meaning":"Awardee name plus awarded MW (and in 1st auction a PE-n project number)"}],"how_to_use":{"example_request":"curl -sL --max-time 120 -o ignis21.pdf 'https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/regimen-economico/19Octubre/Proyectos%20de%20inversión%20fotovoltaicos%20adjudicatarios%20de%20la%20subasta/PE_13_IGNIS_DESARROLLO_SL.pdf' && pdftotext -layout ignis21.pdf ignis21.txt && head -5 ignis21.txt","example_result":"PLAN ESTRATÉGICO SOBRE EL IMPACTO EN EL EMPLEO LOCAL Y LA CADENA DE VALOR INDUSTRIAL DE UNA PLANTA SOLAR FOTOVOLTAICA de 27,5 MW","steps":["List the 'Proyectos de inversión ... adjudicatarios' links on each auction page.","Match file name to the BOE awardee and MW.","Read the plan only for investment/job estimates."],"reading_traps":["Plans are generic and some are images without text layer.","MW in the file name can be the awardee's total over several UA rows, not one plant."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":null,"records_total":3,"records_for_country":3,"problems":["Nearco 2022 plan has almost no extractable text"]},"evidence":[{"claim":"Press note on strategic plans","url":"https://www.miteco.gob.es/es/prensa/210617npplanesestrategicossubasta26enero_tcm30-528173.pdf","quote":"Los adjudicatarios han presentado 36 planes estratégicos, correspondientes a la potencia adjudicada en la subasta del 26 de enero"}],"members":[{"name":"1st auction plans (36 PDFs, 'Proyectos de inversion ... adjudicatarios')","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-26-enero-2021.html","data_url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/regimen-economico/26Enero/Proyectos%20de%20inversión%20fotovoltaicos%20adjudicatarios%20de%20la%20subasta/FV_PE12%20X-ELIO%20ENERGY,%20S.L.%20315%20MW.pdf","access":"pdf","tested":true,"data_found":null,"note":"X-Elio 315 MW plan opened: no site given."},{"name":"2nd auction plans (~26 PDFs)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-19-octubre-2021.html","data_url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/regimen-economico/19Octubre/Proyectos%20de%20inversión%20fotovoltaicos%20adjudicatarios%20de%20la%20subasta/PE_13_IGNIS_DESARROLLO_SL.pdf","access":"pdf","tested":true,"data_found":null,"note":"Ignis 27.5 MW plan opened: 'en los municipios en los que finalmente se enclave el proyecto'."},{"name":"3rd and 4th auction plans (~12 PDFs)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","data_url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/subastas-convocatorias/Planes_estrategicos_3_pre/Nearco%20Renovables%20S.L.%2025%20MW.pdf","access":"pdf","tested":true,"data_found":null,"note":"Nearco 25.5 MW plan: text layer nearly empty (images)."}],"members_summary":{"total":null,"listed":3,"tested":3,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s005","name":"Earlier specific-regime auctions and Canary wind call (2016, 2017) - BOE result annexes","publisher":"Ministerio de Industria/Energia (now MITECO), BOE","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias.html","data_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2017-8997","access":"direct_download","format":"BOE HTML (tables) and PDF","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Pre-REER auctions: Jan 2016 (biomass 200 MW, wind 500 MW), May 2017 and Jul 2017 (up to 3,000 MW, PV and wind) and the 2nd Canary wind call (project names and island). Different mechanism: bid is a discount on investment remuneration, so no EUR/MWh price.","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Peninsular system (2016-2017 auctions); Canary Islands (wind call)"},"fine_print":{"unit":{"value":"kW per awardee per reference installation type (ITR)","quote":"Potencia adjudicada – kW","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2017-8997","attempts":[]},"inclusion_rule":{"value":"Up to 3,000 MW of new PV (b.1.1) and wind (b.2) on the peninsula for the 2017 auctions","quote":"máximo de 3.000 MW","url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias/subasta-17-mayo-2017.html","attempts":[]},"reference_date":{"value":"Resolution dates 18-01-2016, 19-05-2017, 27-07-2017","quote":"Resolución de 27 de julio de 2017, de la Dirección General de Política Energética y Minas, por la que se resuelve el procedimiento de subasta","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2017-8997","attempts":[]},"update_frequency":{"value":"Closed: no further auctions under RD 413/2014 for renewables listed","quote":"Subasta de 26 de julio de 2017","url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias.html","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Read annexes of BOE-A-2016-552, 2017-5848, 2017-8997, 2017-11737: no price, no site.","Canary call PDF lists island only; municipality absent."]}},"key_fields":[{"field":"Nombre adjudicatario","meaning":"Awarded company"},{"field":"Código de identificación de la instalación tipo de referencia (ITR-0101/0103/0104)","meaning":"Reference installation type: biomass, wind, PV"},{"field":"Potencia adjudicada (kW)","meaning":"Awarded kW, dot thousands"}],"how_to_use":{"example_request":"curl -sL --max-time 60 'https://www.boe.es/diario_boe/txt.php?id=BOE-A-2017-8997' -o b8997.html && python3 -I -c \"import re,html;t=open('b8997.html',encoding='utf-8').read();t=re.sub(r'<[^>]+>',' ',t);t=re.sub(r'\\s+',' ',html.unescape(t));print(t[t.find('ANEXO I'):][:400])\"","example_result":"ANEXO I Resultado de la subasta para la asignación del régimen retributivo específico convocado al amparo del Real Decreto 650/2017, de 16 de junio Nombre adjudicatario Código de identificación de la instalación tipo de referencia Potencia adjudicada – kW Alfanar CO. ITR-0103 720.000","steps":["Take the BOE links from each auction page.","Strip HTML; each awardee row is name, ITR code, kW.","For the Canary call parse the PDF table with pdftotext -layout."],"reading_traps":["Some May-2017 rows show awarded power of only 1, 2 or 3 kW; read them as kW, not MW.","Values are kW with dot thousands: 1.550.000 = 1,550 MW."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"text/html","size_bytes":43314,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"2017 auction result annex","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2017-8997","quote":"Resultado de la subasta para la asignación del régimen retributivo específico convocado al amparo del Real Decreto 650/2017, de 16 de junio"},{"claim":"Canary call result table with island","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/subastas-convocatorias/SiteAssets/Resolucion-segunda-convocatoria-eolica-Canarias.pdf","quote":"RESULTADO DE LA CONVOCATORIA PARA EL ESTABLECIMIENTO DE UN RÉGIMEN RETRIBUTIVO ESPECÍFICO PARA UN MÁXIMO DE 450 MW"}],"members":[{"name":"Auction 14-01-2016 (BOE-A-2016-552)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias/subasta-eolica-biomasa-14-enero-2016.html","data_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2016-552","access":"direct_download","tested":true,"data_found":null,"note":"Biomass and wind awardees with kW per reference installation (ITR-0101 ...)."},{"name":"Auction 17-05-2017 (BOE-A-2017-5848)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias/subasta-17-mayo-2017.html","data_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2017-5848","access":"direct_download","tested":true,"data_found":null,"note":"Wind ITR-0103 (e.g. 1,200,000 kW for the first awardee) and others."},{"name":"Auction 26-07-2017 (BOE-A-2017-8997; preassignment BOE-A-2017-11737)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias/subasta-26-julio-2017.html","data_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2017-8997","access":"direct_download","tested":true,"data_found":null,"note":"Wind ITR-0103 and PV ITR-0104; awardee, ITR code, kW."},{"name":"2nd Canary wind call (resolution PDF)","landing_url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias/convocatoria-eolica-canaria-segun-disposicion-adicional-sexta.html","data_url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/subastas-convocatorias/SiteAssets/Resolucion-segunda-convocatoria-eolica-Canarias.pdf","access":"pdf","tested":true,"data_found":null,"note":"Table with PER code, titular, installation name, MW, island, result: the only list found with a location (island)."}],"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"sector":{"regulator":{"name":"MITECO (DGPEM resolves; Secretaria de Estado de Energia convenes) and CNMC as auction supervisor","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html"},"operators":{"structure":"few","note":"Auction administrator: OMI-Polo Espanol (OMIE) per RD 960/2020 art.10, run by OMEL Diversificacion (OMI Group integrated report 2022); capacity market: Red Electrica (art.17 Orden TED/966/2026).","census_url":null},"publication_obligation":{"exists":"yes","norm":"RD 960/2020 art.26 (preassignment resolution published in BOE with holder, power, energy, price, technologies); Orden TED/1161/2020 art.7.2.e (DGPEM resolves each auction)","url":"https://www.boe.es/boe/dias/2021/07/01/pdfs/BOE-A-2021-10947.pdf","what_must_be_published":"Awardee identity, awarded power, preassigned min/max energy, award price and technology","frequency":"Once per auction (resolution within days; preassignment months later)"},"consolidated_republication":{"found":"yes","note":"MITECO republishes the BOE resolutions per auction; no downloadable table (CSV/Excel) was found anywhere.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","saw":"Hub listing the four REER auctions (26-01-2021, 19-10-2021, 25-10-2022, 22-11-2022) with links to BOE resolutions and awardee PDFs"},{"organization":"CNMC","url":"https://www.cnmc.es/sectores-que-regulamos/energia/informes-de-subastas-de-contratacion-a-plazo","saw":"Supervision reports per auction (SUB/DE/001/21, 004/21, 004/22 covering 3rd and 4th); no REER entry after 2023-07-27"},{"organization":"OMIE","url":"https://www.omie.es/sites/default/files/2023-05/omi_reporting_integrado_2022_ES.pdf","saw":"OMI Group integrated report 2022: totals for the four auctions (6.381 MW) and prices; omie.es REER FAQ page returned 403"}]}},"national_registry":{"exists":"restricted","note":"The Registro electronico del REER (preasignacion/explotacion) exists (RD 960/2020 art.24) but is operated through ERIDE/REPRO with certificate login; only BOE preassignment resolutions are public.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/renovables/registro.html","saw":"Page 'Registros y aplicacion ERIDE' links the ERIDE login and model/guide documents, no list of inscribed installations"},{"organization":"MITECO (REPROv2)","url":"https://energia.serviciosmin.gob.es/Reprov2/","saw":"Login screen (user/password, certificate or Cl@ve); 'Registro Publico' tab needs JavaScript; not usable without a browser"},{"organization":"CNMC","url":"https://www.cnmc.es/sectores-que-regulamos/energia/informes-de-subastas-de-contratacion-a-plazo","saw":"Reports of auctions only; no registry of awarded installations"},{"organization":"Agencia Estatal BOE","url":"https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf","saw":"Preassignment inscription resolution (Nov 2022 auction): rows with CIF, UA, kW, EUR/MWh, PER code; no location"}]},"if_unstructured":{"summary":null,"recipe":["Download the four result resolutions (source 1) and parse annex I rows by UA code (tested on BOE-A-2021-1251: 109 rows, 3,034.178 MW).","Download the preassignment resolutions (source 2) and join on UA code to add PER code and registered power (tested on BOE-A-2023-8031).","Validate totals with CNMC (source 3): 3,034,178 kW; 3,123,770 kW; 31,000 + 146,000 kW; 45,500 kW.","Convert kW to MW and keep awardee-level rows; do not label them as plants.","For location there is no step supported by the auction documents: see location_method."],"location_method":"Neither result nor preassignment resolutions contain a site. Under Orden TED/1161/2020 art. 14 the awardee identifies installations (name, location, power) to DGPEM electronically within six months; no public list of those identifications was found. DGPEM authorisation resolutions in BOE do give municipalities per promoter (BOE-A-2024-7243, Cuenca), but that document does not cite the auction, and its 29.42 MW is not the 28.8 MW awarded to the same company, so linking them is unconfirmed.","cross_with":["BOE authorisation and environmental resolutions searched by promoter name (link to an auction award unconfirmed unless the text cites the auction).","CNMC supervision reports for totals and weighted prices.","Catastro / PNOA services in country_basics once a site is known from another document."],"where_published":[{"name":"BOE Seccion III (Otras disposiciones)","url":"https://www.boe.es/buscar/","what":"Result and preassignment resolutions of each REER auction; also administrative authorisations of projects.","how_to_search_inside":"BOE 'Búsqueda avanzada' by text: 'régimen económico de energías renovables' 'preasignación' (Ministerio para la Transición Ecológica); results are PDFs/HTML, no structured export.","example_document":{"url":"https://www.boe.es/boe/dias/2023/03/29/pdfs/BOE-A-2023-8031.pdf","what_it_gives":"Annex I row: 'ELAWAN ENERGY, S.L. B85146215 Eólica terrestre. b.2.1 UA_22_11_00001 39,88 20.000,00 20.000,00 528.000,00 840.000,00 PER-000002-2023-E' (page 45947)."}},{"name":"MITECO auction pages (REER hub)","url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico.html","what":"One page per auction with links to BOE resolutions and per-awardee strategic-plan PDFs.","how_to_search_inside":"No search box; browse the four auction pages listed in the left menu.","example_document":{"url":"https://www.miteco.gob.es/es/energia/renovables/regimen-economico/subasta-22-noviembre-2022.html","what_it_gives":"Quote: 'Fecha de celebración de la subasta: 22 de noviembre de 2022. Cupo del producto 3.300 MW de potencia instalada.'"}},{"name":"BOE project authorisations (to look for sites)","url":"https://www.boe.es/boe/dias/2024/04/12/pdfs/BOE-A-2024-7243.pdf","what":"Administrative-authorisation resolutions of DGPEM give plant name, MW and municipalities.","how_to_search_inside":"BOE text search by promoter name (e.g. 'Parque Eólico Escepar'); one real hit read.","example_document":{"url":"https://www.boe.es/boe/dias/2024/04/12/pdfs/BOE-A-2024-7243.pdf","what_it_gives":"'instalación fotovoltaica «Híbridación Escepar», de 29,42 MW de potencia instalada, e infraestructura de evacuación, en Villalba del Rey y Tinajas (Cuenca)' (page 40850). The text never mentions the auction."}}]},"related_not_answering":[{"name":"IDAE/MITECO PINALM storage grants, definitive resolution (30-12-2025)","url":"https://sede.idae.gob.es/sites/default/files/2025-12/resol_definitiva_dgpem_pinalm.pdf","why":"456-page grant call (126 projects, 818.3 M EUR FEDER) with storage projects by region; a competitive subsidy, not an auction, and no auction price."},{"name":"Orden TED/966/2026 capacity market (BOE 17-09-2026)","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2026-19329","why":"Creates pay-as-bid capacity auctions open to storage, with results to be published by BOE resolution, but no auction has been held and no date is given."},{"name":"Concurso de capacidad de acceso Mudejar 400 kV (Orden TED/1157/2026, BOE 03-11-2026)","url":"https://boe.es/boe/dias/2026/11/03/pdfs/BOE-A-2026-23086.pdf","why":"Competitive tender for grid access capacity at a node (lists PV, wind and 79.8 MW battery projects by MW); it awards access, not a price, so it is not an energy auction."},{"name":"Primer concurso de potencia firme en territorios no peninsulares (MITECO note 24-02-2026)","url":"https://www.miteco.gob.es/content/dam/miteco/es/prensa/20260224_NdP_Los_sistemas_el%C3%A9ctricos_no_peninsulares_recibir%C3%A1n_una.pdf","why":"Competitive procedure for the additional remuneration regime of generation groups in Canarias, Ceuta, Melilla and the Balearics; results by system in MW, not a renewable or storage price auction."},{"name":"Subasta de cogeneración 2027 (MITECO)","url":"https://www.miteco.gob.es/es/energia/renovables/subastas-convocatorias/subasta-de-cogeneracion-2027.html","why":"Specific-regime auction of 650 MW of high-efficiency cogeneration called 5-11-2026; no results and not a renewable auction."},{"name":"pv magazine report on the 1st auction","url":"http://www.pv-magazine.com/2021/01/28/winners-prices-of-spains-latest-renewables-auction/","why":"News summary with totals; winners are in an image and no project data or locations."}],"open_questions":["Whether DGPEM resolutions that include identified installations (art. 14 Orden TED/1161/2020) or explotación inscriptions are published anywhere: none found; needs a query to MITECO.","Date of the first capacity-market auction: not given in BOE-A-2026-19329 (press reports disagree: end 2026 or 1H 2027)."],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Claude Sonnet 5.5","rules_version":"6.12","note":"REER results (4 auctions 2021-22) are in BOE PDFs with price/kW/technology but no location; no storage auction has been held; capacity market (Sep 2026) has no auction yet.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"restricted"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":60,"minutes":13}}],"local_terms":[{"term":"subasta REER","language":"es","meaning":"Auction for the Régimen Económico de Energías Renovables (RD 960/2020): long-term price per MWh"},{"term":"unidad de adjudicación (UA_yy_mm_nnnnn)","language":"es","meaning":"Awarded bid block; the row unit in the result annex"},{"term":"estado de preasignación / explotación","language":"es","meaning":"Two states of the REER electronic registry"},{"term":"régimen retributivo específico","language":"es","meaning":"Earlier support scheme (RD 413/2014) used in the 2016-2017 auctions and cogeneration"},{"term":"mercado de capacidad / potencia firme","language":"es","meaning":"Capacity market created by Orden TED/966/2026; storage may bid"},{"term":"concurso de capacidad de acceso","language":"es","meaning":"Competitive tender for grid access at a node; not a price auction"},{"term":"cupo","language":"es","meaning":"MW quota offered in an auction"},{"term":"Resolución ... por la que se resuelve la subasta","language":"es","meaning":"Title to search in BOE section III for each result"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5"],"minutes_estimate":13,"pages_opened":60,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/energy-auctions.json","detail_url":"https://georutter.org/v1/es/energy-auctions/detail.json","html_url":"https://georutter.org/es/energy-auctions/","country_url":"https://georutter.org/v1/countries/es.json"}
