{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"gas-injection-capacity","question":"Where can I get the capacity of the gas grid to receive biomethane injection in Spain, by zone or connection point?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"No single national registry publishes biomethane injection capacity by zone or connection point in Spain. Under CNMC Circular 2/2025 (Art. 40), operators must publish capacity by network segment, but only Gas Extremadura publishes granted and in-process injection capacity plus flow percentiles (2023-2025 PDFs for Extremadura). Major DSOs (Nortegas, Nedgia, Redexis, Madrileña Red de Gas) only publish >=16 bar schematics and historical demand/flow proxies, while Enagás Transporte requires registration on ServiceNow; remaining gaps require prior-information requests to each operator.","main_caveats":["Despite Circular 2/2025 Art. 40.3 mandating capacity by segment, 4 of 5 major DSOs tested (Nortegas, Nedgia, Redexis, Madrileña) only publish >=16 bar schematics and historical demand/flows, omitting granted or free injection capacity.","Historical gas demand/flows act only as an upper-bound proxy: already-granted or queued injections, downstream sensitive consumers, and reverse-flow limits can reduce or block actual injection capacity.","Enagás Transporte (national primary transmission grid, P > 60 bar) places network schemes, historical consumptions, and biomethane pre-requests behind mandatory company registration on ServiceNow.","Enagás GTS publishes conditional capacity by area ONLY for hydrogen (a gas requiring mixing, Circular 2/2025 Art. 40.2); biomethane does not require mixing and is governed per operator under Art. 40.3.","Published data live in unstandardized PDFs without machine-readable coordinates; Gas Extremadura omits an explicit unit label on its granted and in-process columns (implicitly Nm3/h matching flow rows)."],"confidence":"high","confidence_reason":"Directly verified BOE Circular 2/2025 & Res. 13/06/2025, CNMC census/reports, MITECO, Enagás GTS/Transporte, all 5 major DSO portals with downloaded PDFs, 4 minor DSOs, and non-official maps in this session.","attributes":[{"attribute":"injection_capacity","covered":"partial","source_ids":["s001","s002","s003"],"note":"Gas Extremadura publishes granted/in-process capacity (Nm3/h) & reverse flow; 4 major DSOs publish only demand/flow proxies; Enagás requires login.","gap":"not_published","gap_note":"Checked CNMC, MITECO, Enagás GTS, and 5 DSO portals; 4 major DSOs omit granted/in-process/remaining capacity despite Circular 2/2025 Art. 40.3."},{"attribute":"zone_or_connection_point","covered":"partial","source_ids":["s001","s002"],"note":"Coverage combines distinct components of the question; see the original detailed evidence and its geographic and technical limits.","gap":"not_checked","gap_note":"The original rows have different scopes. Their combination has not been established as complete; original rows are retained in internal curation."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"Gas Extremadura Renewable Gases Portal (GERenovables) — Network & Pipeline Capacities","publisher":"Distribución y Comercialización de Gas Extremadura, S.A. (Dicogexsa) and Gas Extremadura Transportista, S.L.","official":true,"landing_url":"https://biometano.dcgasextremadura.es/consumptions","data_url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf","access":"pdf","format":"PDF","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","summary":"Gas Extremadura Renewable Gases Portal (GERenovables) — Network & Pipeline Capacities","coverage_note":"Extremadura (Badajoz and Cáceres distribution networks and regional transmission pipelines operated by Gas Extremadura)","data_date":"2026-04-05 (snapshot date printed on PDFs; annual flows cover 2023, 2024, and 2025)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["Distribution PDF (398,478 bytes, 7 networks) and transmission PDF (395,748 bytes, 4 pipelines) are Excel-to-PDF exports requiring text/layout parsing.","Covers only Extremadura networks operated by Gas Extremadura."]},"example":{"example_request":"curl -sL -o ext_dist.pdf \"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf\" && curl -sL -o ext_trans.pdf \"https://biometano.dcgasextremadura.es/storage/files/2026_04/eK6jICQftZHxUN0ZQrRPpvgGHFkOWLAwI8xqtFIf.pdf\" && pdftotext -layout ext_trans.pdf -","example_result":"GASODUCTO MOP 80bar MERIDA-DON BENITO-MIAJADAS | 2023/2024/2025 | Q Máximo: 35.185 / 35.245 / 33.212 | Q Promedio: 6.475 / 7.061 / 6.116 | Q Percentil 5: 997 / 1.143 / 1.140 | Q Percentil 1: 497 / 459 / 620 | Ya concedida: 1.945 | En tramitación: 585 | Flujo Inverso: EN TRAMITACIÓN"},"members_summary":null},{"source_id":"s002","name":"Spanish Gas DSO Biomethane Portals — Network Schematics & Demand/Flow Proxies (Nortegas, Nedgia, Redexis, Madrileña Red de Gas)","publisher":"Major Spanish gas distribution operators (Nortegas Energía Distribución, Nedgia / Naturgy, Redexis, Madrileña Red de Gas)","official":true,"landing_url":"https://areacliente.nortegas.es/es/gases-renovables","data_url":"https://cms-areacliente.nortegas.es/uploads/03_BIZKAIA_PCT_Ds_Qh_v2_13527cf9df.pdf","access":"pdf","format":"PDF","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","summary":"Spanish Gas DSO Biomethane Portals — Network Schematics & Demand/Flow Proxies (Nortegas, Nedgia, Redexis, Madrileña Red de Gas)","coverage_note":"Most of mainland Spain distribution areas (Basque Country, Cantabria, Asturias via Nortegas; 11 CCAA via Nedgia; 19 provinces via Redexis; Madrid via Madrileña)","data_date":"2022-2025 flows (Nortegas 2026-05, Madrileña 2025-08), 2022-2024 emissions (Redexis 2025-07), annual consumption PDFs (Nedgia 2026-09)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["Tested sample PDFs across all 4 DSOs: Nortegas Bizkaia (9 PCTDs, 57,102 bytes) & Gipuzkoa (11 PCTDs, 59,026 bytes); Nedgia CyL (41 rows, 56,346 bytes) & Madrid (13 rows, 39,557 bytes); Redexis emission (97 positions, 430,660 bytes) & detail (192 rows, 451,067 bytes); Madrileña Alcalá (3 campaigns, 33,913 bytes).","Does not provide granted, in-process, or net available biomethane injection capacity."]},"example":{"example_request":"curl -sL -o bizkaia_pctd.pdf \"https://cms-areacliente.nortegas.es/uploads/03_BIZKAIA_PCT_Ds_Qh_v2_13527cf9df.pdf\" && pdftotext -layout bizkaia_pctd.pdf -","example_result":"43_01_DURANGO  TD_20_AA-03  2022: 25.138/7.773/1.519  2023: 23.353/7.581/0  2024: 24.800/7.407/0/11.880/3.818  2025: 25.647/7.567/1.524/12.217/4.229"},"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"Enagás Transporte — Green Link Biomethane Connection Platform (ServiceNow)","publisher":"Enagás Transporte, S.A.U.","official":true,"landing_url":"https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/","data_url":"https://enagas.service-now.com/login.do","access":"registration_required","format":"Web portal (ServiceNow)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"Enagás Transporte — Green Link Biomethane Connection Platform (ServiceNow)","coverage_note":"National primary transmission gas pipeline network across mainland Spain","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"problems":["Mandatory company registration and login on ServiceNow (enagas.service-now.com/login.do) to view network schemes, historical consumptions, and submit prior-information or connection requests."]},"example":null,"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":null},"local_terms":[{"term":"capacidad condicional","language":"es","meaning":"Conditional firm connection/access capacity granted to renewable gas plants subject to predefined flow, demand, and gas-quality conditions."},{"term":"otros gases","language":"es","meaning":"Legal category in Circular 2/2025 for injectable non-fossil gases; split into gases not needing mixing (biomethane) and gases needing mixing (hydrogen)."},{"term":"flujo inverso / flujo reverso","language":"es","meaning":"Reverse flow from a distribution/secondary grid upstream into transmission when biomethane supply exceeds local downstream demand."},{"term":"PCTT / PCTD / PCDD","language":"es","meaning":"Connection points between transmission-transmission (PCTT), transmission-distribution (PCTD), and distribution-distribution (PCDD) networks."},{"term":"PCTG","language":"es","meaning":"Connection point for biomethane/renewable gas injection into a transmission pipeline (punto de conexión para inyección en gasoducto de transporte)."},{"term":"red básica / transporte secundario / distribución","language":"es","meaning":"Spanish gas grid tiers under Law 34/1998: >=60 bar (primary transmission), 16-60 bar (secondary transmission), and <=16 bar (distribution)."},{"term":"petición de información previa","language":"es","meaning":"Formal pre-application inquiry (Res. 13/06/2025 Apartado Cuarto) requiring network owners to reply within 1 month with UTM points, P5/P95 flows, and granted/queued capacity."},{"term":"SL-ATR","language":"es","meaning":"Sistema Logístico de Acceso de Terceros, the Enagás GTS platform where commissioned biomethane injection points are registered for PVB market access."}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":25,"pages_opened":70,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/gas-injection-capacity.json","detail_url":"https://georutter.org/v1/es/gas-injection-capacity/detail.json","html_url":"https://georutter.org/es/gas-injection-capacity/","country_url":"https://georutter.org/v1/countries/es.json"}
