{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"gas-injection-capacity","question":"Where can I get the capacity of the gas grid to receive biomethane injection in Spain, by zone or connection point?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"No single national registry publishes biomethane injection capacity by zone or connection point in Spain. Under CNMC Circular 2/2025 (Art. 40), operators must publish capacity by network segment, but only Gas Extremadura publishes granted and in-process injection capacity plus flow percentiles (2023-2025 PDFs for Extremadura). Major DSOs (Nortegas, Nedgia, Redexis, Madrileña Red de Gas) only publish >=16 bar schematics and historical demand/flow proxies, while Enagás Transporte requires registration on ServiceNow; remaining gaps require prior-information requests to each operator.","main_caveats":["Despite Circular 2/2025 Art. 40.3 mandating capacity by segment, 4 of 5 major DSOs tested (Nortegas, Nedgia, Redexis, Madrileña) only publish >=16 bar schematics and historical demand/flows, omitting granted or free injection capacity.","Historical gas demand/flows act only as an upper-bound proxy: already-granted or queued injections, downstream sensitive consumers, and reverse-flow limits can reduce or block actual injection capacity.","Enagás Transporte (national primary transmission grid, P > 60 bar) places network schemes, historical consumptions, and biomethane pre-requests behind mandatory company registration on ServiceNow.","Enagás GTS publishes conditional capacity by area ONLY for hydrogen (a gas requiring mixing, Circular 2/2025 Art. 40.2); biomethane does not require mixing and is governed per operator under Art. 40.3.","Published data live in unstandardized PDFs without machine-readable coordinates; Gas Extremadura omits an explicit unit label on its granted and in-process columns (implicitly Nm3/h matching flow rows)."],"confidence":"high","confidence_reason":"Directly verified BOE Circular 2/2025 & Res. 13/06/2025, CNMC census/reports, MITECO, Enagás GTS/Transporte, all 5 major DSO portals with downloaded PDFs, 4 minor DSOs, and non-official maps in this session.","attributes":[{"attribute":"injection_capacity","covered":"partial","source_ids":["s001","s002","s003"],"note":"Gas Extremadura publishes granted/in-process capacity (Nm3/h) & reverse flow; 4 major DSOs publish only demand/flow proxies; Enagás requires login.","gap":"not_published","gap_note":"Checked CNMC, MITECO, Enagás GTS, and 5 DSO portals; 4 major DSOs omit granted/in-process/remaining capacity despite Circular 2/2025 Art. 40.3."},{"attribute":"zone_or_connection_point","covered":"partial","source_ids":["s001","s002"],"note":"Coverage combines distinct components of the question; see the original detailed evidence and its geographic and technical limits.","gap":"not_checked","gap_note":"The original rows have different scopes. Their combination has not been established as complete; original rows are retained in internal curation."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"Gas Extremadura Renewable Gases Portal (GERenovables) — Network & Pipeline Capacities","publisher":"Distribución y Comercialización de Gas Extremadura, S.A. (Dicogexsa) and Gas Extremadura Transportista, S.L.","official":true,"landing_url":"https://biometano.dcgasextremadura.es/consumptions","data_url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf","access":"pdf","format":"PDF","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":null,"first_seen_pass":1,"rank":1,"summary":"Gas Extremadura Renewable Gases Portal (GERenovables) — Network & Pipeline Capacities","coverage_note":"Extremadura (Badajoz and Cáceres distribution networks and regional transmission pipelines operated by Gas Extremadura)","data_date":"2026-04-05 (snapshot date printed on PDFs; annual flows cover 2023, 2024, and 2025)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Extremadura (Badajoz and Cáceres distribution networks and regional transmission pipelines operated by Gas Extremadura)"},"fine_print":{"unit":{"value":"Nm3/h (explicit on flow rows; Ya concedida and En tramitación lack unit header in PDF, implicitly Nm3/h)","quote":"Q Máximo (Nm3/h): / Q Percentil 5 (Nm3/h): / Ya concedida / En tramitación","url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf","attempts":[]},"inclusion_rule":{"value":"All 7 MOP 16 bar distribution networks (in distribution PDF) and 4 MOP 60/80 bar transmission pipelines (in transmission PDF) operated by Gas Extremadura","quote":"CAPACIDADES REDES DISTRIBUCIÓN ... ALIMENTADAS DESDE GASODUCTO ENAGAS TRANSPORTE ... ALIMENTADAS DESDE GASODUCTO ALMENDRALEJO-JEREZ GAS EXTREMADURA TRANSPORTISTA","url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf","attempts":[]},"reference_date":{"value":"2026-04-05 (snapshot date printed on PDFs; annual flows cover 2023, 2024, and 2025)","quote":"CAPACIDADES REDES DISTRIBUCIÓN 05/04/2026","url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Checked landing page https://biometano.dcgasextremadura.es/consumptions: no update schedule stated, only two PDF download buttons.","Checked both downloaded April 2026 PDFs (CAPACIDADES REDES DISTRIBUCIÓN and CAPACIDADES GASODUCTO): only static print date 05/04/2026 appears, no update frequency stated."]},"exclusions":{"value":"Covers only Gas Extremadura networks/pipelines; excludes Enagás Transporte main grid in Extremadura and omits a net remaining-capacity column or UTM coordinates","quote":"ALIMENTADAS DESDE GASODUCTO ENAGAS TRANSPORTE","url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf","attempts":[]}},"key_fields":[{"field":"RED / GASODUCTO","meaning":"Distribution network (MOP 16 bar) or transmission pipeline (MOP 60/80 bar) name"},{"field":"AÑO","meaning":"Flow reference year (2023, 2024, 2025)"},{"field":"Q Máximo (Nm3/h)","meaning":"Annual maximum hourly gas flow in Nm3/h"},{"field":"Q Percentil 95 (Nm3/h)","meaning":"95th percentile hourly flow in Nm3/h"},{"field":"Q Promedio (Nm3/h)","meaning":"Annual mean hourly flow in Nm3/h"},{"field":"Q Percentil 5 (Nm3/h)","meaning":"5th percentile hourly flow in Nm3/h (low-demand threshold without reverse flow)"},{"field":"Q Percentil 1 (Nm3/h)","meaning":"1st percentile hourly flow in Nm3/h"},{"field":"Ya concedida","meaning":"Already-granted injection capacity (implicitly Nm3/h)"},{"field":"En tramitación","meaning":"In-process injection capacity (implicitly Nm3/h)"},{"field":"Flujo Inverso","meaning":"Reverse-flow facility status (NO or EN TRAMITACIÓN)"}],"how_to_use":{"example_request":"curl -sL -o ext_dist.pdf \"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf\" && curl -sL -o ext_trans.pdf \"https://biometano.dcgasextremadura.es/storage/files/2026_04/eK6jICQftZHxUN0ZQrRPpvgGHFkOWLAwI8xqtFIf.pdf\" && pdftotext -layout ext_trans.pdf -","example_result":"GASODUCTO MOP 80bar MERIDA-DON BENITO-MIAJADAS | 2023/2024/2025 | Q Máximo: 35.185 / 35.245 / 33.212 | Q Promedio: 6.475 / 7.061 / 6.116 | Q Percentil 5: 997 / 1.143 / 1.140 | Q Percentil 1: 497 / 459 / 620 | Ya concedida: 1.945 | En tramitación: 585 | Flujo Inverso: EN TRAMITACIÓN","steps":["Fetch https://biometano.dcgasextremadura.es/consumptions and extract the two PDF links (DEMANDA Y CAPACIDAD REDES DISTRIBUCION and DEMANDA Y CAPACIDAD REDES TRANSPORTE).","Download both PDFs and run pdftotext -layout (or pdfplumber) to parse each named network/pipeline block.","Compare Ya concedida + En tramitación against Q Percentil 5 / Q Percentil 1 and check Flujo Inverso (note granted capacity can exceed local P5 flow when reverse flow is in progress, as on Mérida-Don Benito-Miajadas).","Cross-reference network names with schematic map PDFs on https://biometano.dcgasextremadura.es/network-info to identify municipalities along each pipeline."],"reading_traps":["Ya concedida and En tramitación lack explicit unit labels in the PDF table; magnitudes match Nm3/h flow rows (e.g. 3,595 granted on Almendralejo-Jerez vs P5 5,800 Nm3/h).","In ext_dist.pdf, RED MOP 16bar VALUENGO shows 'Ya concedida en red Transporte: 3.595', which refers to capacity granted on the upstream Almendralejo-Jerez transmission pipeline, not separate distribution capacity.","No explicit 'remaining capacity' column exists: without reverse flow, injection above Q Percentil 5/1 faces curtailment; where Flujo Inverso is 'EN TRAMITACIÓN', granted capacity already exceeds local minimum demand."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":398478,"records_total":11,"records_for_country":11,"problems":["Distribution PDF (398,478 bytes, 7 networks) and transmission PDF (395,748 bytes, 4 pipelines) are Excel-to-PDF exports requiring text/layout parsing.","Covers only Extremadura networks operated by Gas Extremadura."]},"evidence":[{"claim":"Distribution PDF publishes 2023-2025 flow percentiles plus granted, in-process, and reverse-flow status for 7 MOP 16 bar networks.","url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/4Wf4s9o3mebeYnEoQaMGrB5Y5biGpK2lv4HjxfFp.pdf","quote":"CAPACIDADES REDES DISTRIBUCIÓN 05/04/2026 ... AÑO: 2023 2024 2025 Ya concedida En tramitación Flujo Inverso"},{"claim":"Transmission PDF publishes granted and in-process injection capacities and reverse-flow status for 4 regional pipelines.","url":"https://biometano.dcgasextremadura.es/storage/files/2026_04/eK6jICQftZHxUN0ZQrRPpvgGHFkOWLAwI8xqtFIf.pdf","quote":"GASODUCTO MOP 80bar MERIDA-DON BENITO-MIAJADAS ... Ya concedida 1.945 En tramitación 585 Flujo Inverso EN TRAMITACIÓN"}],"members":[],"members_summary":null},{"source_id":"s002","name":"Spanish Gas DSO Biomethane Portals — Network Schematics & Demand/Flow Proxies (Nortegas, Nedgia, Redexis, Madrileña Red de Gas)","publisher":"Major Spanish gas distribution operators (Nortegas Energía Distribución, Nedgia / Naturgy, Redexis, Madrileña Red de Gas)","official":true,"landing_url":"https://areacliente.nortegas.es/es/gases-renovables","data_url":"https://cms-areacliente.nortegas.es/uploads/03_BIZKAIA_PCT_Ds_Qh_v2_13527cf9df.pdf","access":"pdf","format":"PDF","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Covers most of mainland Spain's distribution footprint across 12+ autonomous communities with >=16 bar network maps and historical consumption/flow tables (demand-side upper proxy, lacking granted/available biomethane capacity).","first_seen_pass":1,"rank":2,"summary":"Spanish Gas DSO Biomethane Portals — Network Schematics & Demand/Flow Proxies (Nortegas, Nedgia, Redexis, Madrileña Red de Gas)","coverage_note":"Most of mainland Spain distribution areas (Basque Country, Cantabria, Asturias via Nortegas; 11 CCAA via Nedgia; 19 provinces via Redexis; Madrid via Madrileña)","data_date":"2022-2025 flows (Nortegas 2026-05, Madrileña 2025-08), 2022-2024 emissions (Redexis 2025-07), annual consumption PDFs (Nedgia 2026-09)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Most of mainland Spain distribution areas (Basque Country, Cantabria, Asturias via Nortegas; 11 CCAA via Nedgia; 19 provinces via Redexis; Madrid via Madrileña)"},"fine_print":{"unit":{"value":"Nm3/h (Nortegas), m3/h (Madrileña), annual kWh & m3 (Nedgia), Kwh/año (Redexis)","quote":"Todos los valores de caudal indicados son Nm3/h","url":"https://cms-areacliente.nortegas.es/uploads/03_BIZKAIA_PCT_Ds_Qh_v2_13527cf9df.pdf","attempts":[]},"inclusion_rule":{"value":"Networks >=16 bar and PCTD/ERM supply points required under Circular 2/2025 Art. 40.1.a and Res. 13/06/2025 Tercero.5","quote":"Caudales de puntos de conexión, transporte y distribución (PCTD)","url":"https://areacliente.nortegas.es/es/gases-renovables","attempts":[]},"reference_date":{"value":"2022-2025 flows (Nortegas 2026-05, Madrileña 2025-08), 2022-2024 emissions (Redexis 2025-07), annual consumption PDFs (Nedgia 2026-09)","quote":"2025: Calculados respecto al Qhmedio","url":"https://cms-areacliente.nortegas.es/uploads/03_BIZKAIA_PCT_Ds_Qh_v2_13527cf9df.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Checked Nortegas portal (areacliente.nortegas.es/es/gases-renovables) and Bizkaia PDF: no update cadence stated.","Checked Nedgia, Redexis, and Madrileña portals: PDFs carry creation timestamps (2025-07 to 2026-09) without a published refresh schedule."]},"exclusions":{"value":"None of the 4 DSO portals publicly report granted, queued, or remaining biomethane injection capacity; Nedgia and Redexis also omit hourly min/P5 flows","quote":"Puedes consultar aquí los esquemas generales con la ubicación y consumos de nuestras redes de gas P>16bar.","url":"https://www.nedgia.es/conexiones-y-actuaciones-en-la-red/solicitudes-conexion-de-biometano/","attempts":[]}},"key_fields":[{"field":"PCTD / RED / Posición / IDENTIFICADOR","meaning":"Connection point or distribution network identifier (often naming municipality or supply zone)"},{"field":"MIN / 5% / MEDIO / 95% / MAX (Nm3/h)","meaning":"Hourly flow statistics (Nortegas; Madrileña gives Min/Med/Max m3/h)"},{"field":"ENERGIA ANUAL (Kwh) / Emisiones (Kwh/año)","meaning":"Annual gas energy supplied by network or position (Nedgia / Redexis)"}],"how_to_use":{"example_request":"curl -sL -o bizkaia_pctd.pdf \"https://cms-areacliente.nortegas.es/uploads/03_BIZKAIA_PCT_Ds_Qh_v2_13527cf9df.pdf\" && pdftotext -layout bizkaia_pctd.pdf -","example_result":"43_01_DURANGO  TD_20_AA-03  2022: 25.138/7.773/1.519  2023: 23.353/7.581/0  2024: 24.800/7.407/0/11.880/3.818  2025: 25.647/7.567/1.524/12.217/4.229","steps":["Select the target DSO portal covering the province/autonomous community (Nortegas, Nedgia, Redexis, or Madrileña Red de Gas).","Download the provincial/regional network schematic PDF to identify the >=16 bar network code (e.g. RED, Posición) and the matching demand/flow PDF.","For Nortegas and Madrileña, use 5th-percentile / minimum hourly flow (Nm3/h or m3/h) as an unadjusted demand-floor proxy; for Nedgia and Redexis, annual energy only indicates annual scale.","To get actual remaining injection capacity after existing reservations and reverse-flow constraints, submit a prior-information request via each operator portal."],"reading_traps":["None of these 4 DSOs publish already-granted or queued biomethane injection capacity: a high 5th-percentile demand point may already have full capacity reserved.","Redexis serves PDF URLs inside its compiled JS bundle (inyeccion-gases-renovables.redexis.es/build/assets/main-*.js) because /esquema-redes is a client-rendered SPA.","Nedgia's www.nedgia.es triggers a Radware CAPTCHA (HTTP 200 text/html) on rapid repeated requests; fetch PDFs individually and verify Content-Type is application/pdf.","Nortegas's linked Inkolan map viewer (inkolan.atelcosoluciones.es) fails TLS verification with default curl."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":57102,"records_total":9,"records_for_country":9,"problems":["Tested sample PDFs across all 4 DSOs: Nortegas Bizkaia (9 PCTDs, 57,102 bytes) & Gipuzkoa (11 PCTDs, 59,026 bytes); Nedgia CyL (41 rows, 56,346 bytes) & Madrid (13 rows, 39,557 bytes); Redexis emission (97 positions, 430,660 bytes) & detail (192 rows, 451,067 bytes); Madrileña Alcalá (3 campaigns, 33,913 bytes).","Does not provide granted, in-process, or net available biomethane injection capacity."]},"evidence":[{"claim":"Nortegas publishes 2022-2025 hourly flow percentiles (MAX, MEDIO, MIN, 5%, 95%) in Nm3/h for 5 northern provinces.","url":"https://areacliente.nortegas.es/es/gases-renovables","quote":"Para consultar los caudales de la demanda de los últimos 3 años de nuestras redes, seleccione la provincia a la que perteneces."},{"claim":"Nedgia publishes >=16 bar network maps and annual consumption PDFs (updated Sep 2026) for 11 autonomous communities.","url":"https://www.nedgia.es/conexiones-y-actuaciones-en-la-red/solicitudes-conexion-de-biometano/","quote":"Puedes consultar aquí los esquemas generales con la ubicación y consumos de nuestras redes de gas P>16bar."},{"claim":"Redexis publishes position-level annual emissions (Kwh/año) and provincial network diagrams, while assigning conditional capacity per request.","url":"https://inyeccion-gases-renovables.redexis.es/build/assets/Procedimiento%20gesti%C3%B3n%20conexiones%20para%20web-BRKkYOH5.pdf","quote":"en la contestación a la solicitud de conexión se incluye un apartado de condiciones técnicas en el que se informa de la capacidad condicional de conexión asignada a la solicitud en kWh/día"}],"members":[{"name":"Nortegas Energía Distribución, S.A.U.","landing_url":"https://areacliente.nortegas.es/es/gases-renovables","data_url":"https://cms-areacliente.nortegas.es/uploads/03_BIZKAIA_PCT_Ds_Qh_v2_13527cf9df.pdf","access":"pdf","tested":true,"data_found":null,"note":"5 provincial PCTD PDFs (Bizkaia, Araba, Cantabria, Asturias, Gipuzkoa) with 2022-2025 MAX, MEDIO, MIN, 5%, 95% flows in Nm3/h; omits granted/queued capacity. Linked Inkolan network viewer (inkolan.atelcosoluciones.es) failed SSL verification in curl."},{"name":"Nedgia (Grupo Naturgy — 12 DSO entities)","landing_url":"https://www.nedgia.es/conexiones-y-actuaciones-en-la-red/solicitudes-conexion-de-biometano/","data_url":"https://www.nedgia.es/wp-content/uploads/2026/09/consumo_castilla_leon.pdf","access":"pdf","tested":true,"data_found":null,"note":"Publishes 11 CCAA schematic PDFs (2024-10) and 11 consumption PDFs (2026-09) with annual kWh and m3 per network ID (APA/APB/APB60); omits hourly/percentile lows and granted/queued capacity. Note: www.nedgia.es may serve a Radware CAPTCHA (text/html 200) on repeated automated requests."},{"name":"Redexis (Redexis, S.A. & Redexis Gas Murcia, S.A.)","landing_url":"https://inyeccion-gases-renovables.redexis.es/esquema-redes","data_url":"https://inyeccion-gases-renovables.redexis.es/build/assets/redexis_emision_posiciones-CVZqD0VH.pdf","access":"pdf","tested":true,"data_found":null,"note":"SPA bundle exposes 19 province map PDFs, 2 emission PDFs (2022-2024 Kwh/año across 97 positions and 192 sub-ERMs), and connection procedure PDF (2025-07); omits hourly minimums and granted/queued capacity."},{"name":"Madrileña Red de Gas, S.A.U.","landing_url":"https://madrilena.es/inyectar-energia-a-la-red/","data_url":"https://madrilena.es/wp-content/uploads/2025/08/Red-de-distribucion-Alcala-de-Henares-Torrejon-de-Ardoz.pdf","access":"pdf","tested":true,"data_found":null,"note":"Publishes 9 MOP 16 bar schematic PDFs (2024-11) and 9 zone consumption PDFs (2025-08) with bar charts of Mínimo, Medio, Máximo m3/h across 2022/23-2024/25; omits granted/queued injection capacity."}],"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"Enagás Transporte — Green Link Biomethane Connection Platform (ServiceNow)","publisher":"Enagás Transporte, S.A.U.","official":true,"landing_url":"https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/","data_url":"https://enagas.service-now.com/login.do","access":"registration_required","format":"Web portal (ServiceNow)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Covers Spain's national high-pressure primary transmission network (P > 60 bar), where network schemas, historical consumptions, and biomethane pre-requests require company registration.","first_seen_pass":1,"rank":3,"summary":"Enagás Transporte — Green Link Biomethane Connection Platform (ServiceNow)","coverage_note":"National primary transmission gas pipeline network across mainland Spain","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"National primary transmission gas pipeline network across mainland Spain"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["Opened Enagás connections page (conexiones-red-transporte/): detailed schematics and historical consumptions are behind ServiceNow login.","Opened ServiceNow login page (enagas.service-now.com/login.do): displays authentication wall with no public dataset or unit metadata."]},"inclusion_rule":{"value":"Enagás Transporte high-pressure transmission grid connections for biomethane injection and distributor/transporter reverse-flow systems","quote":"El servicio Green Link ofrece la posibilidad a los diferentes agentes del Sistema Gasista de solicitar la conexión de sus instalaciones de producción de biometano y/o hidrógeno a la red de transporte gestionada por Enagás.","url":"https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["Checked conexiones-red-transporte/: no reference date for internal biomethane network schemas/consumptions (public PCTT inventory PDF is dated sep-23).","Checked ServiceNow login.do: gated behind authentication."]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Checked conexiones-red-transporte/: no update cadence specified for biomethane capacity/consumption files inside the portal.","Checked ServiceNow login.do: gated behind authentication."]},"exclusions":{"value":"Public access excluded without company registration; excludes DSO networks (handled by each distributor)","quote":"Las compañías interesadas en solicitar el servicio de inyección de biometano deben registrarse y posteriormente acceder a la plataforma habilitada para tal fin.","url":"https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/","attempts":[]}},"key_fields":[],"how_to_use":{"example_request":null,"example_result":null,"steps":["Open https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/ and navigate to 'Conexiones de gases renovables a la red - Green link'.","Register a company account via the ServiceNow registration link (https://enagas.service-now.com/com.glideapp.servicecatalog_cat_item_view.do?v=1&sysparm_id=edf2b847875cc7505745a7573cbb35e4) and log in at https://enagas.service-now.com/login.do.","Inside the authenticated platform, consult Enagás Transporte network schematics and historical consumptions or submit a prior-information request (cost-free) or formal connection request (3,000 EUR + VAT)."],"reading_traps":["Unlike the hydrogen section (which publishes conditional capacity by area in open PDF/XLSX files under Art. 40.2), Enagás restricts its transmission network schemas and historical consumptions behind ServiceNow registration.","Reverse-flow requests on PCTT/PCTD interconnections to Enagás Transporte can only be submitted by the interconnected network owner (TSO/DSO), never directly by a biomethane plant promoter."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":221392,"records_total":null,"records_for_country":null,"problems":["Mandatory company registration and login on ServiceNow (enagas.service-now.com/login.do) to view network schemes, historical consumptions, and submit prior-information or connection requests."]},"evidence":[{"claim":"Biomethane injection into Enagás Transporte's transmission grid requires registration on the ServiceNow portal.","url":"https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/","quote":"Las compañías interesadas en solicitar el servicio de inyección de biometano deben registrarse y posteriormente acceder a la plataforma habilitada para tal fin."},{"claim":"Registration is required to consult Enagás Transporte general network schemes and historical consumptions.","url":"https://www.enagas.es/es/transicion-energetica/red-gasista/servicios-gasistas/conexiones-red-transporte/","quote":"Este registro es indispensable para poder consultar información detallada relacionada con el proceso de solicitudes de conexión (entre otros, esquemas generales de la red de Enagás Transporte y consumos históricos)"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Comisión Nacional de los Mercados y la Competencia (CNMC)","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-gas"},"operators":{"structure":"many","note":"Primary transmission is led by Enagás Transporte (plus Enagás Transporte del Norte, Redexis Infraestructuras, Reganosa, Gas Natural Transporte SDG, Gas Extremadura Transportista). CNMC distributor census lists 27 entries (22 active companies across ~10 groups: Nedgia [12 entities], Redexis [2], Nortegas, Madrileña Red de Gas, D.C. Gas Extremadura, plus Iberdrola Distribución de Gas [legacy], Tolosa Gasa, Domus Mil Natural, Gas Directo, Gasificadora Regional Canaria).","census_url":"https://sede.cnmc.gob.es/listado/censo/3"},"publication_obligation":{"exists":"yes","norm":"Circular 2/2025, de 9 de abril, de la CNMC (Art. 40.1 y 40.3) y Resolución de 13 de junio de 2025 (Apartado Tercero.4-5)","url":"https://www.boe.es/eli/es/cir/2025/04/09/2/con","what_must_be_published":"All transmission and distribution network owners must operate free public web platforms publishing >=16 bar network schematics by province, >=3 years of demand at PCTT/PCTD/PCDD, calculation protocols, and for gases not requiring mixing (biomethane) available connection capacity by network segment plus capacity already assigned and in process.","frequency":"Maintained continuously updated (\"manteniendo actualizada la información\", Art. 40.1 and 40.3), with demand covering at least the 3 preceding years."},"consolidated_republication":{"found":"no_evidence_found","note":"Neither CNMC, MITECO, Enagás GTS, nor Sedigas republishes a consolidated national dataset of biomethane grid injection capacity by zone or connection point. Enagás GTS only publishes area-level conditional capacity for hydrogen (Art. 40.2).","checked_pages":[{"organization":"CNMC","url":"https://www.cnmc.es/sites/default/files/6559138.pdf","saw":"Annual capacity report IS/DE/002/26 (21 Apr 2026) only aggregates Q4 2025 contracts nationally (68 contracts, 7 operators, 20 points: 807 MWh/d transmission, 1,288 MWh/d distribution); no zonal/point breakdown."},{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/hidrocarburos-nuevos-combustibles/gas/biometano.html","saw":"General informational page on biomethane; no consolidated capacity dataset or registry."},{"organization":"Enagás GTS","url":"https://www.enagas.es/content/dam/enagas/es/ficheros/gestion-tecnica-sistema/energy-data/publicaciones/capacidades-y-planificacion/Rangos%20Admisibles%202027-2042_WEB_adenda%20Noviembre.pdf","saw":"Rangos Admisibles 2027-2042 (11 Nov 2026) reports national aggregate biomethane connection request counts (591 received, 273 viabilized, 341 in process as of 14/05/2026) and transmission area ranges (Ain/Aout), not biomethane capacity by zone/point."},{"organization":"Sedigas","url":"https://www.sedigas.es/new/anuario/empresas-gasistas/","saw":"Industry directory of 7 transporters and 17 distributors; no consolidated injection capacity map or dataset."}]}},"national_registry":{"exists":"no_evidence_found","note":"No unified national public registry exists for biomethane gas grid injection capacity in Spain. Publication responsibility is decentralized to individual TSO and DSO connection platforms under CNMC Circular 2/2025 Art. 40.3.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/hidrocarburos-nuevos-combustibles/gas/listado-autorizaciones.html","saw":"Natural gas registries page redirects to CNMC for supplier lists; contains no biomethane grid capacity registry."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-gas","saw":"Supervision portal with aggregate reports (IS/DE/002/26, IS/DE/005/26) and individual infrastructure reports (INF/DE/145/26); no national biomethane capacity registry."},{"organization":"Enagás GTS","url":"https://www.enagas.es/es/gestion-tecnica-sistema/procesos-sistema-gasista/","saw":"GTS processes index has an area-capacity portal only for hydrogen (conexion-hidrogeno/), not for biomethane."},{"organization":"datos.gob.es","url":"https://datos.gob.es/","saw":"National open data portal returned no datasets on gas grid biomethane injection capacity in searches."}]},"if_unstructured":{"summary":null,"recipe":["1. Identify the network owner for the target municipality/province using CNMC's distributor census (sede.cnmc.gob.es/listado/censo/3) and operator >=16 bar network schematic PDFs (e.g. Nedgia red_<ccaa>.pdf, Redexis province PDFs, Madrileña schematic PDFs, Gas Extremadura /network-info).","2. For Extremadura, extract granted ('Ya concedida'), in-process ('En tramitación'), reverse-flow status, and 2023-2025 P5/P1 flows directly from Gas Extremadura's distribution and transmission capacity PDFs.","3. For Nortegas and Madrileña Red de Gas, extract minimum / 5th-percentile hourly flow (Nm3/h or m3/h) from the provincial/zonal PDFs as an upper-bound demand baseline; for Nedgia and Redexis, extract annual energy (kWh/yr) only as an approximate scale indicator.","4. To obtain exact remaining injection capacity, already-granted capacity, and UTM connection coordinates at a specific point—or anywhere on Enagás Transporte's primary grid—register/submit a 'petición de información previa' (CNMC Res. 13/06/2025 Apartado Cuarto), which the operator must answer within 1 month.","5. Cross-check CNMC authorization reports (cnmc.es) and BOE/regional gazette/EIA filings to spot new biomethane injection connections not yet reflected in annual PDFs."],"location_method":"Extract named PCTD/ERM codes from operator schematic PDFs (which contain vector/raster maps without coordinates) or cadastral polygon/parcel identifiers and UTM coordinates from prior-information responses and CNMC/EIA authorization documents (e.g., INF/DE/145/26), then locate them via Catastro WMS or PNOA orthophotos.","cross_with":["CNMC official distributor census (https://sede.cnmc.gob.es/listado/censo/3)","Enagás GTS Rangos Admisibles 2027-2042 (national request/viability totals and transmission area stress-test ranges)","CNMC IS/DE/002/26 and IS/DE/005/26 annual gas supervision reports"],"where_published":[{"name":"Mandatory Operator Prior Information Requests (Petición de información previa, CNMC Res. 13/06/2025)","url":"https://www.boe.es/buscar/doc.php?id=BOE-A-2025-12803","what":"Non-binding regulatory inquiry mechanism through each TSO/DSO single-contact portal where operators must provide point-specific capacity data within 1 month.","how_to_search_inside":"Submit plant UTM coordinates, delivery pressure, and min/max daily flow via the operator's web portal (e.g., Enagás ServiceNow, Nedgia SCI, Redexis, Nortegas, Madrileña Forms, Gas Extremadura GERenovables).","example_document":{"url":"https://www.boe.es/buscar/doc.php?id=BOE-A-2025-12803","what_it_gives":"Apartado Cuarto.3 specifies mandatory output fields: 'indicando, al menos, los puntos de conexión posibles (coordenadas UTM), y para las redes de transporte secundario y distribución, los caudales máximo, mínimo, percentil 95, percentil 5 y medio anual de gas vehiculado por la red al menos del último año, la capacidad condicional de conexión ya concedida y la solicitada en tramitación en la misma red.'"}},{"name":"CNMC Infrastructure Authorization Reports (Expedientes de Energía)","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-gas","what":"Advisory Council reports on DGPEM authorizations for new transmission/injection positions (PCTG), giving pipeline specs, nominal/min/max biomethane flow, pressure, and parcel locations.","how_to_search_inside":"Search CNMC expedientes for 'inyección de biometano' or 'PCTG' under Energia -> Mercado de gas or Expedientes.","example_document":{"url":"https://www.cnmc.es/sites/default/files/6753856.pdf","what_it_gives":"INF/DE/145/26 (30 Jul 2026, Sanchonuño/Segovia Norte PCTG, p. 3): 'adyacentes a la posición CUEVAL-01 (Sanchonuño), vértices V-0 y V-1 de la posición, en las parcelas 130 y 131 del Polígono 2 de Sanchonuño' and 'presión máxima de operación (MOP) de 59 bar y un caudal nominal de 800 Nm3/h, con un mínimo de 300 Nm3/h y un máximo de 960 Nm3/h.'"}},{"name":"Official Gazettes & Environmental Assessment Portals (BOE, Regional Bulletins like BOA, and MITECO SABIA)","url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1408509710404","what":"Public declarations of biomethane plants and connecting pipelines (EIAs, AAIs, and autonomous interest declarations) naming promoters, target gas pipelines, and plant output capacities.","how_to_search_inside":"Search BOE (boe.es/buscar/), MITECO SABIA (sede.miteco.gob.es/.../navServicioContenido), or regional gazettes by keywords 'biometano', 'inyección', and 'gasoducto'.","example_document":{"url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1408509710404","what_it_gives":"ORDEN PEJ/1019/2025 (BOA no. 161, 21 Aug 2025, pp. 1-4): declares autonomous interest for 'Plantas de digestión anaerobia de residuos orgánicos y producción de biometano en Alcañiz, Cella (Teruel) y en Fraga (Huesca) e infraestructuras asociadas' promoted by Redexis Renovables subsidiaries."}}]},"related_not_answering":[{"name":"Enagás Energy Data — Biomethane Production Injected (PCBT / PCBD)","url":"https://www.enagas.es/en/technical-management-system/energy-data/physical-parameters/biomethane/","why":"Reports actual historical/daily injected biomethane volumes (kWh) aggregated nationally into transmission (PCBT) and distribution (PCBD), not grid injection capacity by zone or connection point."},{"name":"Enagás GTS — Rangos Admisibles 2027-2042 (Nov 2026 Addendum)","url":"https://www.enagas.es/content/dam/enagas/es/ficheros/gestion-tecnica-sistema/energy-data/publicaciones/capacidades-y-planificacion/Rangos%20Admisibles%202027-2042_WEB_adenda%20Noviembre.pdf","why":"Gives national aggregate biomethane connection request counts (591 requests, 273 viabilized) and transmission area Ain/Aout ranges for LNG/storage/interconnectors, not biomethane injection capacity by zone or point."},{"name":"Enagás GTS — Hydrogen Connection Conditional Capacity by Area (2026)","url":"https://www.enagas.es/es/gestion-tecnica-sistema/procesos-sistema-gasista/conexion-hidrogeno/","why":"Publishes available conditional capacity by area ONLY for hydrogen (gases requiring mixing under Circular 2/2025 Art. 40.2), not biomethane."},{"name":"CNMC — Capacity Allocation Supervision Report IS/DE/002/26","url":"https://www.cnmc.es/sites/default/files/6559138.pdf","why":"Section 3.3 summarizes national aggregate Q4 2025 entry-to-PVB contracts (807 MWh/d transmission, 1,288 MWh/d distribution) without identifying zones or connection points."},{"name":"EBA & GIE — European Biomethane Map 2026","url":"https://www.europeanbiogas.eu/publication/european-biomethane-map-2026/","why":"Lists 26 operational biomethane production plants in Spain (ES-1 to ES-26) and plant feed-in outputs, not gas grid hosting/injection capacity."},{"name":"Datadista — Mapa interactivo del biogás y biometano en España","url":"https://especiales.datadista.com/medioambiente/la-guerra-del-biogas/mapa-interactivo-biogas/","why":"Maps proposed and operating biogas/biomethane production plants from environmental/gazette filings alongside pipeline geometries, not grid injection capacity."},{"name":"Gasnam — Mapa de plantas de producción de biometano","url":"https://gasnam.es/mapa-de-plantas-de-produccion-de-biometano-1/","why":"Maps biomethane production plants on the Iberian Peninsula (Google My Maps embed), not gas grid injection capacity."},{"name":"ENTSOG — Report on Annual Renewable Gas Injections into Gas Networks 2026","url":"https://www.entsog.eu/sites/default/files/2026-02/ENTSOG%20Report%20on%20Annual%20Renewable%20Gas%20Injections%20into%20Gas%20Networks%202026.pdf","why":"Reports national annual injected biomethane volumes (GWh) by EU country, not grid injection capacity by zone or connection point."},{"name":"Enagás Transporte — Inventario de Conexiones PCTT","url":"https://www.enagas.es/content/dam/enagas/es/ficheros/transicion-energetica/red-gasista/servicios-logisticos/conexiones-red-transporte-pctt/INVENTARIO%20CONEXIONES%20WEB%20-%20PCTT.pdf","why":"Lists existing transmission-to-transmission interconnection points (PCTT) and operating pressures (rev. sep-23), not biomethane injection capacity."}],"open_questions":["What exact remaining available biomethane injection capacity and queued requests exist inside Enagás Transporte's registration-gated ServiceNow platform, and when will Enagás, Nedgia, Nortegas, Redexis, and Madrileña Red de Gas publish remaining/assigned capacity by segment as required by Circular 2/2025 Art. 40.3?","Do minor local distributors (Tolosa Gasa, Gas Directo, Domus Mil Natural, Gasificadora Regional Canaria) or other TSOs (Reganosa, Enagás Transportes del Norte) hold unpublished capacity figures accessible only via individual prior-information requests?"],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Terra 6.1 (High)","rules_version":"6.12","note":"First-pass research: Circular 2/2025 mandates capacity by segment, but only Gas Extremadura publishes granted/queued capacity; 4 major DSOs publish demand proxies and Enagas requires login.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"no_evidence_found"},"sources":{"total":3,"new":3,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":70,"minutes":25}}],"local_terms":[{"term":"capacidad condicional","language":"es","meaning":"Conditional firm connection/access capacity granted to renewable gas plants subject to predefined flow, demand, and gas-quality conditions."},{"term":"otros gases","language":"es","meaning":"Legal category in Circular 2/2025 for injectable non-fossil gases; split into gases not needing mixing (biomethane) and gases needing mixing (hydrogen)."},{"term":"flujo inverso / flujo reverso","language":"es","meaning":"Reverse flow from a distribution/secondary grid upstream into transmission when biomethane supply exceeds local downstream demand."},{"term":"PCTT / PCTD / PCDD","language":"es","meaning":"Connection points between transmission-transmission (PCTT), transmission-distribution (PCTD), and distribution-distribution (PCDD) networks."},{"term":"PCTG","language":"es","meaning":"Connection point for biomethane/renewable gas injection into a transmission pipeline (punto de conexión para inyección en gasoducto de transporte)."},{"term":"red básica / transporte secundario / distribución","language":"es","meaning":"Spanish gas grid tiers under Law 34/1998: >=60 bar (primary transmission), 16-60 bar (secondary transmission), and <=16 bar (distribution)."},{"term":"petición de información previa","language":"es","meaning":"Formal pre-application inquiry (Res. 13/06/2025 Apartado Cuarto) requiring network owners to reply within 1 month with UTM points, P5/P95 flows, and granted/queued capacity."},{"term":"SL-ATR","language":"es","meaning":"Sistema Logístico de Acceso de Terceros, the Enagás GTS platform where commissioned biomethane injection points are registered for PVB market access."}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":25,"pages_opened":70,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/gas-injection-capacity.json","detail_url":"https://georutter.org/v1/es/gas-injection-capacity/detail.json","html_url":"https://georutter.org/es/gas-injection-capacity/","country_url":"https://georutter.org/v1/countries/es.json"}