{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in Spain, with project, technology, capacity (MW), connection node, status and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"No single national list of grid connection requests with project, technology, MW, node, status and date exists in what was checked. REE publishes monthly (xlsx/pdf) the individual requests for demand and storage-as-consumption at transport nodes >=220 kV (ID, date, node, position, MW; no project name). Generation and distribution queues appear only aggregated per node/position (REE CSV, CNMC ArcGIS layers, distributor CSVs) or per technology and region (REE GW PDF).","main_caveats":["The REE demand list covers only demand and storage acting as consumption at nodes >=220 kV; it is not the generation queue and has no project names.","Generation queue is aggregated (GW by technology and region, MW by node/position); never sum node values: CNMC says capacities are not directly additive.","The REE demand list is valid one month (publication to 'Fecha fin del mes de publicacion'); older months stay downloadable by changing the month in the file name.","Distribution-level requests: only 'admitted and unresolved' MW per substation bar (CNMC and distributor files); over 300 distributors exist per CNMC, 61 appear in the CNMC layer."],"confidence":"medium","confidence_reason":"Core files opened and tested; negatives rest on REE, CNMC, MITECO and e-distribucion pages. REE interactive map data endpoint not found; other distributors and regions only sampled.","attributes":[{"attribute":"project","covered":"no","source_ids":[],"note":"Request lists carry an ID (e.g. GENT-53853-26), not a project name. Names appear only in BOE/regional permitting notices.","gap":"not_published","gap_note":"Searched REE list xlsx/pdf and Legend sheet, CNMC layer fields, e-distribucion CSV fields; none has promoter or project. See if_unstructured."},{"attribute":"technology","covered":"partial","source_ids":["s001","s002","s003"],"note":"List 1 gives request type (storage vs consumption). Files 2 split MGES/MPE and GEN/ALM; source 3 gives wind/PV/hybrid GW totals.","gap":"not_published","gap_note":"No per-request technology for generation; aggregates only (REE FAQ lists 8 technologies on the map)."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s001","s002","s004","s005"],"note":"Per request for demand (col. Capacidad de acceso solicitada (MW)); per node/position for generation in REE, CNMC and distributor files.","gap":"not_published","gap_note":"Per-request MW for generation/storage injection not found."},{"attribute":"connection_node","covered":"partial","source_ids":["s001","s002","s004","s005"],"note":"Node name+voltage and position per demand request; for generation nodes appear with aggregated MW (CNMC and e-distribucion add coordinates).","gap":"not_published","gap_note":"Node is not tied to an individual generation request."},{"attribute":"status","covered":"partial","source_ids":["s002","s003","s004"],"note":"Aggregated states: en curso / con permiso / en servicio (REE) and admitted-not-resolved (CNMC). Demand list = all admitted for the month.","gap":"not_published","gap_note":"No per-request status outside the demand list."},{"attribute":"event_date","covered":"partial","source_ids":["s001"],"note":"Only the demand list gives request reception date and list publication/closing dates. Other files carry only the monthly cut-off.","gap":"not_published","gap_note":"No request date for generation or distribution requests."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"Listado de solicitudes de acceso de demanda (REE), monthly xlsx/pdf","publisher":"Red Electrica de Espana (transport grid operator)","official":true,"landing_url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/publicacion-solicitudes-acceso-demanda-octubre-2026.xlsx","access":"direct_download","format":"xlsx (also pdf)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"Listado de solicitudes de acceso de demanda (REE), monthly xlsx/pdf","coverage_note":"Spain, transmission nodes with voltage >=220 kV (all regions)","data_date":"Closing date of the list (6 Oct 2026 for the October file, published 15 Oct 2026)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["Server rejects HEAD requests with 403 (Incapsula); GET works with default curl identification."]},"example":{"example_request":"curl -sL -o dem_oct.xlsx \"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/publicacion-solicitudes-acceso-demanda-octubre-2026.xlsx\"  # sheet 'Listado de solicitudes', header on row 6, data from row 7","example_result":"Row 7: GENT-53853-26 | received 46254 (Excel serial = 2026-08-20) | 'Solicitud de almacenamiento conectado a la red de transporte que consume energia de la red.' | ALVARADO 220 | AVR220-SCAL | Extremadura | 46 MW | 46341 (2026-11-15) | NO. File has 36 requests (25 storage, 11 consumption), 1,942.6 MW in total."},"members_summary":null},{"source_id":"s002","name":"REE access capacity per node and per position (generation, storage and demand), monthly csv/xlsx/pdf","publisher":"Red Electrica de Espana (transport grid operator)","official":true,"landing_url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-la-capacidad-de-acceso","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_GRT_generacion.csv","access":"direct_download","format":"csv (semicolon, 2 header rows), xlsx, pdf","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"REE access capacity per node and per position (generation, storage and demand), monthly csv/xlsx/pdf","coverage_note":"Spain, REE transmission-grid nodes (937 rows, incl. non-peninsular systems)","data_date":"Publication date 3 Nov 2026 (monthly)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["HEAD request rejected with 403 by the site; GET works."]},"example":{"example_request":"curl -sL -o grt_generacion.csv \"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_GRT_generacion.csv\"  # then python3 -I: csv.reader(delimiter=';'), skip the first two header rows","example_result":"937 node rows. ABADIANO 220 (Pais Vasco): otorgada GEN 128, otorgada ALM 6, en curso GEN 0, en curso ALM 0 (MW). PDF row: 'ABONA 220 | Canarias | EvRE_H2026 | ABON220-EvRe1' with En curso values 65 (MGES) and 126 (MPE) as printed in the position table."},"members_summary":{"total":null,"listed":4,"tested":3,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"REE status of access and connection requests for wind, solar PV and hybrid generation (GW by technology, state, region), monthly PDF and map","publisher":"Red Electrica de Espana (transport grid operator)","official":true,"landing_url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/AccesoRed/Informacion_gestion_acceso_actualiz_31Oct26.pdf","access":"pdf","format":"pdf (5 pages) + interactive map (desktop only)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"REE status of access and connection requests for wind, solar PV and hybrid generation (GW by technology, state, region), monthly PDF and map","coverage_note":"Spain: national, peninsular, by autonomous community (by node location) and by node (map)","data_date":"31 Oct 2026 (cumulative)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["The interactive map is flagged 'Solo disponible para version escritorio' and no data endpoint was found in page source."]},"example":{"example_request":"curl -sL -o gestion.pdf \"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/AccesoRed/Informacion_gestion_acceso_actualiz_31Oct26.pdf\" && pdftotext -layout gestion.pdf gestion.txt","example_result":"Page 1, national totals at 31/10/2026: Eolica 23,8 / 15,5 / 11,9 GW; Solar fotovoltaica 22,5 / 39,8 / 13,1; Hibridaciones 30,5 / 16,0 / 3,8; Total 76,8 / 71,3 / 28,8 GW (en servicio / con permiso / en curso sin permiso)."},"members_summary":null}],"other_sources_count":2,"if_unstructured":{"summary":null},"local_terms":[{"term":"solicitud de acceso y conexion","language":"es","meaning":"formal request to the grid manager for access capacity and a connection point"},{"term":"capacidad de acceso","language":"es","meaning":"maximum active power that can be injected or consumed at a node"},{"term":"nudo de la red de transporte (RdT)","language":"es","meaning":"transmission-grid node, named with voltage, e.g. ALVARADO 220"},{"term":"red de distribucion (RdD)","language":"es","meaning":"distribution grid managed by distribuidoras"},{"term":"permiso de acceso / permiso de conexion","language":"es","meaning":"permits issued by the grid manager; 'con permisos' means pending commissioning"},{"term":"concurso de capacidad de acceso","language":"es","meaning":"tender when requests compete for scarce node capacity (art. 20 quater for demand)"},{"term":"informe de aceptabilidad","language":"es","meaning":"REE report on a request to a distribution grid (above 5 MW peninsular / 500 kW non-peninsular)"},{"term":"MGES / MPE","language":"es","meaning":"synchronous generation module / power park module (types of generation capacity)"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (High)"],"minutes_estimate":10,"pages_opened":40,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/grid-connection-queue.json","detail_url":"https://georutter.org/v1/es/grid-connection-queue/detail.json","html_url":"https://georutter.org/es/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/es.json"}