{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in Spain, with project, technology, capacity (MW), connection node, status and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"No single national list of grid connection requests with project, technology, MW, node, status and date exists in what was checked. REE publishes monthly (xlsx/pdf) the individual requests for demand and storage-as-consumption at transport nodes >=220 kV (ID, date, node, position, MW; no project name). Generation and distribution queues appear only aggregated per node/position (REE CSV, CNMC ArcGIS layers, distributor CSVs) or per technology and region (REE GW PDF).","main_caveats":["The REE demand list covers only demand and storage acting as consumption at nodes >=220 kV; it is not the generation queue and has no project names.","Generation queue is aggregated (GW by technology and region, MW by node/position); never sum node values: CNMC says capacities are not directly additive.","The REE demand list is valid one month (publication to 'Fecha fin del mes de publicacion'); older months stay downloadable by changing the month in the file name.","Distribution-level requests: only 'admitted and unresolved' MW per substation bar (CNMC and distributor files); over 300 distributors exist per CNMC, 61 appear in the CNMC layer."],"confidence":"medium","confidence_reason":"Core files opened and tested; negatives rest on REE, CNMC, MITECO and e-distribucion pages. REE interactive map data endpoint not found; other distributors and regions only sampled.","attributes":[{"attribute":"project","covered":"no","source_ids":[],"note":"Request lists carry an ID (e.g. GENT-53853-26), not a project name. Names appear only in BOE/regional permitting notices.","gap":"not_published","gap_note":"Searched REE list xlsx/pdf and Legend sheet, CNMC layer fields, e-distribucion CSV fields; none has promoter or project. See if_unstructured."},{"attribute":"technology","covered":"partial","source_ids":["s001","s002","s003"],"note":"List 1 gives request type (storage vs consumption). Files 2 split MGES/MPE and GEN/ALM; source 3 gives wind/PV/hybrid GW totals.","gap":"not_published","gap_note":"No per-request technology for generation; aggregates only (REE FAQ lists 8 technologies on the map)."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s001","s002","s004","s005"],"note":"Per request for demand (col. Capacidad de acceso solicitada (MW)); per node/position for generation in REE, CNMC and distributor files.","gap":"not_published","gap_note":"Per-request MW for generation/storage injection not found."},{"attribute":"connection_node","covered":"partial","source_ids":["s001","s002","s004","s005"],"note":"Node name+voltage and position per demand request; for generation nodes appear with aggregated MW (CNMC and e-distribucion add coordinates).","gap":"not_published","gap_note":"Node is not tied to an individual generation request."},{"attribute":"status","covered":"partial","source_ids":["s002","s003","s004"],"note":"Aggregated states: en curso / con permiso / en servicio (REE) and admitted-not-resolved (CNMC). Demand list = all admitted for the month.","gap":"not_published","gap_note":"No per-request status outside the demand list."},{"attribute":"event_date","covered":"partial","source_ids":["s001"],"note":"Only the demand list gives request reception date and list publication/closing dates. Other files carry only the monthly cut-off.","gap":"not_published","gap_note":"No request date for generation or distribution requests."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"Listado de solicitudes de acceso de demanda (REE), monthly xlsx/pdf","publisher":"Red Electrica de Espana (transport grid operator)","official":true,"landing_url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/publicacion-solicitudes-acceso-demanda-octubre-2026.xlsx","access":"direct_download","format":"xlsx (also pdf)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Only individual-request list found: ID, reception date, type, node, position, region, MW. Covers demand and storage consuming from the grid at nodes >=220 kV.","first_seen_pass":1,"rank":1,"summary":"Listado de solicitudes de acceso de demanda (REE), monthly xlsx/pdf","coverage_note":"Spain, transmission nodes with voltage >=220 kV (all regions)","data_date":"Closing date of the list (6 Oct 2026 for the October file, published 15 Oct 2026)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain, transmission nodes with voltage >=220 kV (all regions)"},"fine_print":{"unit":{"value":"MW (requested access capacity)","quote":"Capacidad de acceso solicitada (MW): Capacidad de acceso de demanda de la instalación de consumo (MW).","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/publicacion-solicitudes-acceso-demanda-octubre-2026.xlsx","attempts":[]},"inclusion_rule":{"value":"Demand requests admitted to processing at transport nodes >=220 kV","quote":"Red Eléctrica publica el listado de solicitudes de acceso de demanda admitidas en nudos de la red de transporte con tensión superior o igual a 220 kV conforme a los criterios de la normativa vigente.","url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","attempts":[]},"reference_date":{"value":"Closing date of the list (6 Oct 2026 for the October file, published 15 Oct 2026)","quote":"Fecha de cierre: Solicitudes admitidas a trámite hasta dicha fecha.","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/publicacion-solicitudes-acceso-demanda-octubre-2026.xlsx","attempts":[]},"update_frequency":{"value":"Monthly","quote":"La publicación a la que hace referencia el artículo 20 quater, se realizará mensualmente, tal como se hace actualmente con las capacidades de generación.","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/preguntas-frecuentes-acceso-conexion.html","attempts":[]},"exclusions":{"value":"Generation requests and nodes below 220 kV are not in the list; each list stays in force one month","quote":"Esta información estará disponible durante el periodo de un mes a contar desde la fecha indicada a continuación.","url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","attempts":[]}},"key_fields":[{"field":"ID Solicitud","meaning":"Unique request identifier, e.g. GENT-53853-26 (no project name)"},{"field":"Fecha de recepcion de solicitud","meaning":"Date request was received (Excel serial date in xlsx)"},{"field":"Tipo de solicitud","meaning":"Storage consuming from the grid / consumption (increase of consumption in older lists)"},{"field":"Nombre y tension del nudo RdT","meaning":"Transmission node and kV, e.g. ALVARADO 220"},{"field":"Posicion RdT","meaning":"Connection position code, e.g. AVR220-SCAL"},{"field":"Comunidad Autonoma","meaning":"Region of the node"},{"field":"Capacidad de acceso solicitada (MW)","meaning":"Requested access capacity in MW"},{"field":"Fecha fin del mes de publicacion","meaning":"Date the list ceases to be in force (Excel serial)"},{"field":"CONCURSO","meaning":"SI/NO: whether the node is a demand tender node"}],"how_to_use":{"example_request":"curl -sL -o dem_oct.xlsx \"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/publicacion-solicitudes-acceso-demanda-octubre-2026.xlsx\"  # sheet 'Listado de solicitudes', header on row 6, data from row 7","example_result":"Row 7: GENT-53853-26 | received 46254 (Excel serial = 2026-08-20) | 'Solicitud de almacenamiento conectado a la red de transporte que consume energia de la red.' | ALVARADO 220 | AVR220-SCAL | Extremadura | 46 MW | 46341 (2026-11-15) | NO. File has 36 requests (25 storage, 11 consumption), 1,942.6 MW in total.","steps":["Open the 'Landing' page and take the .xlsx link of the current month; the file name pattern is publicacion-solicitudes-acceso-demanda-<mes>-<aaaa>.xlsx.","Read sheet 'Listado de solicitudes': row 3-4 hold publication and closing dates; row 6 headers; rows 7+ requests.","Convert Excel serial dates (1899-12-30 origin) to dates; MW uses '.' as decimal in xlsx cells (the PDF shows commas).","Earlier months can be fetched by changing the month in the URL (tested: agosto-2026, septiembre-2026, enero-2026, diciembre-2025, mayo-2026 return 200; agosto-2025 and octubre-2025 return 404)."],"reading_traps":["It is a demand/storage list, not a generation queue: no project name, no promoter, no technology other than 'storage' vs 'consumption'.","The 'Leyenda' sheet still shows publication/closing dates of 2025 (18 August 2025 / 12 August 2025) while the data sheet says 15 and 6 October 2026.","Several requests can share a node with the same MW on different positions (May 2026 PDF: DEA-50689-26 and DEA-50694-26, 885 MW each at ARCOS DE LA FRONTERA 400); do not sum blindly.","Reception dates can be months before the closing date (request received 2026-08-20, list closed 2026-10-06): the list holds requests admitted to processing, not requests received that month."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":102621,"records_total":36,"records_for_country":36,"problems":["Server rejects HEAD requests with 403 (Incapsula); GET works with default curl identification."]},"evidence":[{"claim":"Legal basis and content of the list","url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","quote":"En cumplimiento el artículo 20 quater del Real Decreto 1183/2020, de 29 de diciembre, de acceso y conexión a las redes de transporte y distribución de energía eléctrica, Red Eléctrica publica el listado de solicitudes de acceso de demanda admitidas en nudos de la red de transporte con tensión superior o igual a 220 kV"},{"claim":"Closing date meaning","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/publicacion-solicitudes-acceso-demanda-octubre-2026.xlsx","quote":"Fecha de cierre: Solicitudes admitidas a trámite hasta dicha fecha."}],"members":[],"members_summary":null},{"source_id":"s002","name":"REE access capacity per node and per position (generation, storage and demand), monthly csv/xlsx/pdf","publisher":"Red Electrica de Espana (transport grid operator)","official":true,"landing_url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-la-capacidad-de-acceso","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_GRT_generacion.csv","access":"direct_download","format":"csv (semicolon, 2 header rows), xlsx, pdf","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Per-node and per-position MW of granted capacity and of requests in progress for generation, storage and demand (the nearest thing to a generation queue by node).","first_seen_pass":1,"rank":2,"summary":"REE access capacity per node and per position (generation, storage and demand), monthly csv/xlsx/pdf","coverage_note":"Spain, REE transmission-grid nodes (937 rows, incl. non-peninsular systems)","data_date":"Publication date 3 Nov 2026 (monthly)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain, REE transmission-grid nodes (937 rows, incl. non-peninsular systems)"},"fine_print":{"unit":{"value":"MW (PDF headers '[MW]')","quote":"En servicio [MW]","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_Generacion_por_posicion.pdf","attempts":[]},"inclusion_rule":{"value":"Requests handled by REE at transmission nodes (granted, pending commissioning, in progress)","quote":"Capacidad de acceso de generación ocupada por posición de conexión","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_Generacion_por_posicion.pdf","attempts":[]},"reference_date":{"value":"Publication date 3 Nov 2026 (monthly)","quote":"Fecha de publicación: 3 de noviembre de 2026","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_Generacion_por_posicion.pdf","attempts":[]},"update_frequency":{"value":"Monthly","quote":"Actualmente, los gestores de las redes de transporte y distribución publican y actualizan mensualmente en sus webs la información sobre la capacidad de acceso disponible para cada barra de tensión superior a 1 kV de las subestaciones bajo su gestión.","url":"https://www.cnmc.es/prensa/mapas-capacidad-redes-electricas-20260415","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Page https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-la-capacidad-de-acceso says nothing on exclusions","CNMC page says values are informative and not additive: 'sus valores no pueden computarse como directamente sumables'"]}},"key_fields":[{"field":"Nombre y tensión del nudo","meaning":"Node name and kV"},{"field":"Código de subestación","meaning":"Substation code"},{"field":"SITUACIÓN NUDO CAPACIDAD DE ACCESO OTORGADA | ... GEN / ALM","meaning":"Granted access capacity for generation / storage (MW)"},{"field":"SITUACIÓN NUDO CAPACIDAD DE ACCESO EN CURSO DE TRAMITACIÓN | ... GEN / ALM","meaning":"Requested capacity in progress and pending resolution (MW)"},{"field":"PDF per position: En servicio / Pendiente de puesta en servicio / En curso","meaning":"MW by connection position and module type (MGES synchronous, MPE power park)"}],"how_to_use":{"example_request":"curl -sL -o grt_generacion.csv \"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_GRT_generacion.csv\"  # then python3 -I: csv.reader(delimiter=';'), skip the first two header rows","example_result":"937 node rows. ABADIANO 220 (Pais Vasco): otorgada GEN 128, otorgada ALM 6, en curso GEN 0, en curso ALM 0 (MW). PDF row: 'ABONA 220 | Canarias | EvRE_H2026 | ABON220-EvRe1' with En curso values 65 (MGES) and 126 (MPE) as printed in the position table.","steps":["Download the CSV of the month from the REE 'Conoce la capacidad de acceso' page of generator or consumer.","Rows 1-2 are grouped headers; data start in row 3; separator ';' and BOM; numbers use ',' as decimal and '.' as thousands separator.","For per-position detail read Generacion_por_posicion.pdf with pdftotext -layout (columns En servicio, Pendiente de puesta en servicio, En curso, each split MGES/MPE).","Join node names with CNMC layers (source 4) to get coordinates."],"reading_traps":["No project name, promoter or request date: values are aggregated by node or position.","Whether 'otorgada' includes plants already in service is not stated in the CSV; only the position PDF separates the states.","In the PDF some cells are empty rather than 0 and values shift between MGES and MPE columns in text extraction: check against the page image.","Node values are not additive across nodes (CNMC warning)."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"text/csv","size_bytes":298433,"records_total":937,"records_for_country":937,"problems":["HEAD request rejected with 403 by the site; GET works."]},"evidence":[{"claim":"Page offers generation capacity files per node and per position","url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-la-capacidad-de-acceso","quote":"Capacidad de acceso de generación disponible y ocupada en los nudos de la red de transporte (Formato .csv)"},{"claim":"Per-position PDF states publication date","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_Generacion_por_posicion.pdf","quote":"Fecha de publicación: 3 de noviembre de 2026"}],"members":[{"name":"GRT_generacion (per node, csv/xlsx/pdf)","landing_url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-la-capacidad-de-acceso","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_GRT_generacion.csv","access":"direct_download","tested":true,"data_found":null,"note":"937 nodes; columns for capacity granted (MGE, MGES, MPE, GEN, ALM) and in progress pending resolution."},{"name":"GRT_demanda (per node, csv/xlsx/pdf)","landing_url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-la-capacidad-de-acceso","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_GRT_demanda.csv","access":"direct_download","tested":true,"data_found":null,"note":"937 nodes; columns for demand and storage granted and 'en curso y pendiente de resolver'."},{"name":"Generacion_por_posicion (pdf)","landing_url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-la-capacidad-de-acceso","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_Generacion_por_posicion.pdf","access":"pdf","tested":true,"data_found":null,"note":"Per connection position: En servicio / Pendiente de puesta en servicio / En curso, MW, MGES and MPE; published 3 Nov 2026."},{"name":"Demanda_por_posicion (pdf)","landing_url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-la-capacidad-de-acceso","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/2026_11_03_Demanda_por_posicion.pdf","access":"pdf","tested":false,"data_found":null,"note":"Link seen on the page; not opened."}],"members_summary":{"total":null,"listed":4,"tested":3,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"REE status of access and connection requests for wind, solar PV and hybrid generation (GW by technology, state, region), monthly PDF and map","publisher":"Red Electrica de Espana (transport grid operator)","official":true,"landing_url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","data_url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/AccesoRed/Informacion_gestion_acceso_actualiz_31Oct26.pdf","access":"pdf","format":"pdf (5 pages) + interactive map (desktop only)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Status split in three states (en curso / con permiso / en servicio) by technology and autonomous community, with month-by-month evolution.","first_seen_pass":1,"rank":3,"summary":"REE status of access and connection requests for wind, solar PV and hybrid generation (GW by technology, state, region), monthly PDF and map","coverage_note":"Spain: national, peninsular, by autonomous community (by node location) and by node (map)","data_date":"31 Oct 2026 (cumulative)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain: national, peninsular, by autonomous community (by node location) and by node (map)"},"fine_print":{"unit":{"value":"GW (PDF totals), MW in the by-region charts","quote":"GW acumulados a 31/10/2026","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/AccesoRed/Informacion_gestion_acceso_actualiz_31Oct26.pdf","attempts":[]},"inclusion_rule":{"value":"Installations that went through access and connection at REE (above 1 MW peninsular, 0.5 MW non-peninsular)","quote":"capacidad de acceso mayor de 1 MW en el sistema peninsular y de 0,5 MW en los sistemas no peninsulares","url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","attempts":[]},"reference_date":{"value":"31 Oct 2026 (cumulative)","quote":"Fecha: 31 de octubre de 2026","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/AccesoRed/Informacion_gestion_acceso_actualiz_31Oct26.pdf","attempts":[]},"update_frequency":{"value":"Monthly, first working days, data at close of previous month","quote":"Esta información es de carácter mensual y se actualiza en los primeros días hábiles del mes con datos a cierre del mes anterior.","url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","attempts":[]},"exclusions":{"value":"PDF covers wind, PV and hybrid only; the map also covers storage, thermosolar, hydro, pumping and others","quote":"La información publicada se desglosa en ocho tecnologías: eólica, solar fotovoltaica, baterías, hibridación, termosolar, hidráulica, bombeo y el contingente de otras tecnologías.","url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","attempts":[]}},"key_fields":[{"field":"Generación en servicio / solicitada con permiso de acceso / solicitada sin permiso con gestión en curso","meaning":"The three states, GW by technology"},{"field":"CC.AA. (según situación del nudo)","meaning":"Region of the transmission node, not of the plant"}],"how_to_use":{"example_request":"curl -sL -o gestion.pdf \"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/AccesoRed/Informacion_gestion_acceso_actualiz_31Oct26.pdf\" && pdftotext -layout gestion.pdf gestion.txt","example_result":"Page 1, national totals at 31/10/2026: Eolica 23,8 / 15,5 / 11,9 GW; Solar fotovoltaica 22,5 / 39,8 / 13,1; Hibridaciones 30,5 / 16,0 / 3,8; Total 76,8 / 71,3 / 28,8 GW (en servicio / con permiso / en curso sin permiso).","steps":["Take the PDF link from the REE access page (Informacion_gestion_acceso_actualiz_<ddMmmyy>.pdf) or the page 'Estado de las solicitudes'.","pdftotext -layout; page 3 has the table by autonomous community, page 2 the 6-month evolution."],"reading_traps":["Regions are assigned by the substation where the plant injects, not by plant location (REE FAQ).","Figures will not match REE Datos / redOS: 'en servicio' here means APESp issued, not RAIPEE-inscribed.","Hybrid installations were added to the aggregates from September 2023."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":190830,"records_total":null,"records_for_country":null,"problems":["The interactive map is flagged 'Solo disponible para version escritorio' and no data endpoint was found in page source."]},"evidence":[{"claim":"Three states and monthly update","url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","quote":"Esta información es de carácter mensual y se actualiza en los primeros días hábiles del mes con datos a cierre del mes anterior."},{"claim":"Map shows only aggregates","url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","quote":"Se muestran las magnitudes agregadas asociadas a instalaciones de generación diferenciando entre instalaciones puestas en servicio, con permisos de acceso y conexión en vigor y en curso de tramitación de acceso."}],"members":[],"members_summary":null},{"source_id":"s004","name":"CNMC maps of available access capacity (ArcGIS FeatureServer layers behind the Generacion and Demanda viewers)","publisher":"Comision Nacional de los Mercados y la Competencia (CNMC)","official":true,"landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","data_url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Generacion_en_Transporte/FeatureServer/0","access":"api","format":"ArcGIS REST JSON (query)","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","publisher_type":"regulator","adds":"Only consolidated national source including distribution nodes: per substation bar MW occupied and admitted-and-unresolved (pending queue), with coordinates, for transport and distribution.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Spain: transport (937 nodes) and distribution (about 6,200 bars) for generation and demand"},"fine_print":{"unit":{"value":"MW (field aliases: 'Capacidad ocupada (MW)', 'Capacidad admitida y no resuelta (MW)')","quote":"Capacidad admitida y no resuelta (MW)","url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Generacion_en_Transporte/FeatureServer/0?f=json","attempts":[]},"inclusion_rule":{"value":"Each voltage bar above 1 kV of substations of transport and distribution managers","quote":"publican y actualizan mensualmente en sus webs la información sobre la capacidad de acceso disponible para cada barra de tensión superior a 1 kV de las subestaciones bajo su gestión.","url":"https://www.cnmc.es/prensa/mapas-capacidad-redes-electricas-20260415","attempts":[]},"reference_date":{"value":"Period layer says Octubre 2026; layer last edited 2026-11-11","quote":"PERIODO 102026, MES Octubre, ANIO 2026 (Capacidad_Periodo query result)","url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Capacidad_Periodo/FeatureServer/10/query?where=1%3D1&outFields=*&f=json","attempts":[]},"update_frequency":{"value":"Monthly","quote":"Tras recopilar y tratar los datos recibidos, la CNMC publica mensualmente la información sobre capacidad de acceso en los mapas correspondientes.","url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","attempts":[]},"exclusions":{"value":"Informative values, not additive; requests must be sent to the grid manager","quote":"Dichas capacidades deben considerarse como informativas y, debido a la influencia de unos nudos sobre otros, sus valores no pueden computarse como directamente sumables.","url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","attempts":[]}},"key_fields":[{"field":"SUBESTACION / NIVEL_TENSION","meaning":"Substation name and voltage of the bar"},{"field":"CAP_OCUPADA","meaning":"Occupied access capacity (MW)"},{"field":"CAP_ADMITIDA_NO_RESUELTA","meaning":"Capacity of requests admitted and not yet resolved (MW)"},{"field":"CAP_DISPONIBLE_MPE / CAP_DISPONIBLE_MGES","meaning":"Available capacity by module type (transport generation layer)"},{"field":"GESTOR_RED / DESCRIPCION","meaning":"Manager code and name"}],"how_to_use":{"example_request":"curl -sL \"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Generacion_en_Transporte/FeatureServer/0/query?where=1%3D1&outFields=SUBESTACION,NIVEL_TENSION,CAP_OCUPADA,CAP_ADMITIDA_NO_RESUELTA,PROVINCIA&resultRecordCount=2&returnGeometry=false&f=json\"","example_result":"{'SUBESTACION': 'ALI', 'NIVEL_TENSION': 220, 'CAP_OCUPADA': 0, 'CAP_ADMITIDA_NO_RESUELTA': 87.61, 'PROVINCIA': 'Araba/Alava'}, {'SUBESTACION': 'AYALA', 'NIVEL_TENSION': 220, 'CAP_OCUPADA': 80, 'CAP_ADMITIDA_NO_RESUELTA': 0, 'PROVINCIA': 'Araba/Alava'}. Count query (returnCountOnly=true) returned {\"count\":937}.","steps":["The layers are found in the item data of the CNMC ArcGIS Experience apps (https://www.arcgis.com/sharing/rest/content/items/<experience id>/data?f=json): Generacion app 0dac803d644f41519fdd11da11ef10ae, Demanda app c7dc433cb2e44d53a908a8a467523f5a.","Query with where=1=1, outFields and resultRecordCount; add outSR=4326 for lon/lat (tested: all 937 transport points fall inside Spain's bounding box).","Filter CAP_ADMITIDA_NO_RESUELTA>0 to list nodes with requests pending evaluation."],"reading_traps":["These are node-level aggregates; no request, promoter or project date.","Point geometry is the substation (Web Mercator by default), not the plant.","Layer ids differ between services (0, 4, 11, 10): index 0 does not exist in the distribution and period services.","The service is the data behind a viewer; the CNMC page does not document it as a public API and gives no licence."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":937,"records_for_country":937,"problems":[]},"evidence":[{"claim":"CNMC publishes consolidated capacity maps for generation and demand","url":"https://www.cnmc.es/prensa/mapas-capacidad-redes-electricas-20260415","quote":"Integran la información dispersa en las webs de los gestores y se actualizarán mensualmente."},{"claim":"Data come from the managers' submissions","url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","quote":"En cumplimiento de la Circular informativa 6/2025, de la CNMC los gestores de red envían de forma sistemática información relevante sobre acceso y conexión a las redes de transporte y distribución de electricidad."}],"members":[{"name":"Generacion_en_Transporte layer 0","landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","data_url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Generacion_en_Transporte/FeatureServer/0","access":"api","tested":true,"data_found":null,"note":"count 937; sum of CAP_ADMITIDA_NO_RESUELTA = 47,924.23 MW (outStatistics)"},{"name":"Generacion_en_Distribucion layer 4","landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","data_url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Generacion_en_Distribucion/FeatureServer/4","access":"api","tested":true,"data_found":null,"note":"count 6227; 61 distinct managers"},{"name":"Demanda_en_Transporte_v2 layer 11","landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","data_url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Demanda_en_Transporte_v2/FeatureServer/11","access":"api","tested":true,"data_found":null,"note":"count 937"},{"name":"Demanda_en_Distribucion layer 4","landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","data_url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Demanda_en_Distribucion/FeatureServer/4","access":"api","tested":true,"data_found":null,"note":"count 6182"},{"name":"Capacidad_Periodo layer 10","landing_url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","data_url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Capacidad_Periodo/FeatureServer/10","access":"api","tested":true,"data_found":null,"note":"one record: PERIODO 102026, MES Octubre, ANIO 2026"}],"members_summary":{"total":null,"listed":5,"tested":5,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s005","name":"Distribution managers' monthly capacity files (e-distribucion, EASA, Ceuta), csv/xlsx","publisher":"Distribution grid managers (e-distribucion/Endesa as sampled)","official":true,"landing_url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","data_url":"https://www.edistribucion.com/content/dam/edistribucion/conexion-a-la-red/descargables/nodos/generacion/202611/2026_11_04_R1299_generación.csv","access":"direct_download","format":"csv (semicolon, BOM) and xlsx","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"Own-site files for the distribution grid with substation coordinates, municipality, occupied MW and admitted-and-unresolved MW per voltage bar; history by month.","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Areas served by e-distribucion (and the two small distributors listed on its page)"},"fine_print":{"unit":{"value":"MW","quote":"Capacidad admitida y no resuelta (MW)","url":"https://www.edistribucion.com/content/dam/edistribucion/conexion-a-la-red/descargables/nodos/generacion/202611/2026_11_04_R1299_generación.csv","attempts":[]},"inclusion_rule":{"value":"Bars above 1 kV of AT/AT and AT/MT substations operated by the manager","quote":"1 kV de las subestaciones AT/AT y AT/MT operadas por EDistribución Redes Digitales SLU.","url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","attempts":[]},"reference_date":{"value":"File of 4 Nov 2026 (November 2026 edition)","quote":"Capacidad de generación en e-distribución noviembre 2026 csv","url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","attempts":[]},"update_frequency":{"value":"Monthly, data of the previous month","quote":"Las capacidades se actualizan mensualmente, con datos del mes anterior.","url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","attempts":[]},"exclusions":{"value":"A node can show capacity already committed by requests admitted before publication","quote":"Es posible que un nudo muestre capacidad disponible que haya sido comprometida por solicitudes admitidas antes de la fecha de publicación.","url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","attempts":[]}},"key_fields":[{"field":"Coordenada UTM X / Y","meaning":"Substation coordinates, ETRS89 UTM zone 30 peninsula/Ceuta/Melilla, 28 Canarias, 31 Baleares (per CNMC circular)"},{"field":"Subestación / Nivel de Tensión (kV)","meaning":"Substation code and voltage bar"},{"field":"Capacidad ocupada (MW)","meaning":"Occupied capacity"},{"field":"Capacidad admitida y no resuelta (MW)","meaning":"Admitted requests pending resolution"},{"field":"Nudo Afección RdT","meaning":"Transport node affected"}],"how_to_use":{"example_request":"curl -sL -o ed_gen.csv \"https://www.edistribucion.com/content/dam/edistribucion/conexion-a-la-red/descargables/nodos/generacion/202611/2026_11_04_R1299_generación.csv\"  # python3 -I csv.reader(delimiter=';', encoding utf-8-sig)","example_result":"Row: R1-299;04;04079;535771,67;4074262,07;58038225;66;0,00;0;0,00;0,00;;;BERJA 220;0;0;;01 - Andalucía;AGUADULC;Almería;Roquetas de Mar (1,853 rows; 59 with admitted-unresolved MW > 0).","steps":["Take the current-month link from the e-distribucion 'capacidad-generacion' page (also a demand page exists).","Convert ',' decimals; UTM zone is not a column: derive it from the region (30 peninsula, 28 Canarias, 31 Baleares).","For other distributors use the CNMC layer (source 4), which holds 61 managers."],"reading_traps":["Admitted-unresolved MW is aggregate per bar, not per project.","Column names repeat (Provincia, Municipio appear twice, as code and as name).","Only e-distribucion (code R1-299) was tested; other managers' own sites were not opened."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"text/csv; charset=UTF-8","size_bytes":290942,"records_total":1853,"records_for_country":1853,"problems":["Coordinates are UTM without a zone column (x ranges 104,131 to 1,010,079 across zones)."]},"evidence":[{"claim":"Monthly update and committed-capacity warning","url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","quote":"Las capacidades se actualizan mensualmente, con datos del mes anterior. Es posible que un nudo muestre capacidad disponible que haya sido comprometida por solicitudes admitidas antes de la fecha de publicación."}],"members":[{"name":"e-distribucion (R1-299)","landing_url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","data_url":"https://www.edistribucion.com/content/dam/edistribucion/conexion-a-la-red/descargables/nodos/generacion/202611/2026_11_04_R1299_generación.csv","access":"direct_download","tested":true,"data_found":null,"note":"1,853 rows in Nov 2026; 59 rows with admitted-unresolved MW>0 (sum 761.95 MW)"},{"name":"EASA (R1-026)","landing_url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","data_url":"https://www.edistribucion.com/content/dam/edistribucion/conexion-a-la-red/descargables/nodos/generacion/202611/2026_11_04_R1026_generación.csv","access":"direct_download","tested":false,"data_found":null,"note":"Listed on the e-distribucion page"},{"name":"Empresa de Alumbrado Electrico de Ceuta Distribucion (R1-030)","landing_url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","data_url":"https://www.edistribucion.com/content/dam/edistribucion/conexion-a-la-red/descargables/nodos/generacion/202611/2026_11_04_R1030_generación.csv","access":"direct_download","tested":false,"data_found":null,"note":"Listed on the e-distribucion page"}],"members_summary":{"total":null,"listed":3,"tested":1,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"sector":{"regulator":{"name":"CNMC (Comision Nacional de los Mercados y la Competencia)","url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes"},"operators":{"structure":"many","note":"One transport operator (Red Electrica, REE) and many distribution managers: the CNMC circular text says there are over 300 distributors; the CNMC ArcGIS distribution layer lists 61 managers.","census_url":"https://services9.arcgis.com/F9FmuOlj5xjEjPRZ/arcgis/rest/services/Generacion_en_Distribucion/FeatureServer/4"},"publication_obligation":{"exists":"yes","norm":"Real Decreto 1183/2020 art. 20 quater (demand requests list); Circular 1/2021 art. 12 (capacity per substation bar); Circular informativa 6/2025 (monthly submission to CNMC)","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-20259","what_must_be_published":"Per bar >1 kV: name, georeference, voltage, available capacity, occupied capacity and capacity of requests admitted and not yet resolved; REE also lists demand requests at >=220 kV nodes.","frequency":"monthly"},"consolidated_republication":{"found":"partial","note":"CNMC consolidates node-level capacity (incl. admitted-not-resolved MW) for transport and distribution, but not individual requests.","checked_pages":[{"organization":"CNMC","url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","saw":"Page 'Informacion de acceso y conexion a las redes': two ArcGIS Experience maps (Demanda, Generacion), published monthly from data managers send under Circular informativa 6/2025."},{"organization":"CNMC","url":"https://www.cnmc.es/prensa/mapas-capacidad-redes-electricas-20260415","saw":"Press release 15-04-2026: maps integrate information previously scattered on each manager's website; nodal capacity only."},{"organization":"CNMC / BOE","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-20259","saw":"Circular informativa 6/2025 annexes: monthly node-level fields per distributor and for the transport operator."}]}},"national_registry":{"exists":"partial","note":"REE (single transport operator) publishes a national individual-request list, but only for demand/storage-consumption at >=220 kV nodes. For generation, only aggregates. No national list of generation or distribution requests found.","checked_pages":[{"organization":"Red Electrica de Espana","url":"https://www.ree.es/es/clientes/consumidor/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Monthly 'Listado de solicitudes de acceso de demanda' (xlsx/pdf), nodes >=220 kV, plus list of nodes susceptible of demand tender and an aggregated map."},{"organization":"Red Electrica de Espana","url":"https://www.ree.es/es/clientes/generador/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Generation: only an aggregated Leaflet map (national/peninsular/CCAA/nodes), 3 states, 8 technologies, monthly; no request list."},{"organization":"CNMC","url":"https://www.cnmc.es/sectores-que-regulamos/energia/supervision-del-mercado-electrico/informe-acceso-y-conexion-redes","saw":"Consolidated node-capacity maps; no request-level data."},{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/preguntas-frecuentes-acceso-conexion.html","saw":"FAQ on access and connection: art. 20 quater monthly publication for demand; no generation request list."},{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/infraestructuras-integracion/division-de-proyectos.html","saw":"Section 'Mapa interactivo de estado de tramitacion de instalaciones de energias renovables' with button 'MAPA (En construccion)' and no link."},{"organization":"e-distribucion (Endesa)","url":"https://www.edistribucion.com/es/red-electrica/nodos-capacidad-red/capacidad-generacion.html","saw":"Monthly CSV/XLSX of generation capacity per substation bar with 'Capacidad admitida y no resuelta (MW)'; no request list."}]},"if_unstructured":{"summary":null,"recipe":["1. Get the BOE daily summary: curl -sL -H 'Accept: application/json' https://www.boe.es/datosabiertos/api/boe/sumario/AAAAMMDD (tested for 20260911: 131 items).","2. Keep items whose 'titulo' mentions 'autorizacion administrativa' and 'MW'; the title already gives project, MW and province (e.g. BOE-A-2026-19045 'Alto Cabrera' 144 MW, a refusal).","3. Download url_pdf.texto and run pdftotext -layout; read the first page for promoter, filing date, technology and the evacuation text (tested on BOE-B-2026-29448: node 'Carmona 220 kV').","4. Match the node name to the REE per-node/position files (source 2) or CNMC layers (source 4) to see aggregated MW at that node.","5. For tender nodes, read the BOE order (e.g. Orden TED/578/2026) for awarded MW and promoter."],"location_method":"Substation coordinates come from the CNMC ArcGIS layers (source 4) or e-distribucion UTM columns (source 5); notices give municipality and sometimes polygon coordinates in annexes (not checked).","cross_with":["REE per-position generation PDF (source 2) to see MW at the same node/position","CNMC ArcGIS node layers (source 4)","REE demand request list (source 1) for storage/consumption requests at the same node"],"where_published":[{"name":"BOE section V-B announcements (and regional notice boards)","url":"https://www.boe.es/datosabiertos/api/boe/sumario/20260911","what":"Permitting notices (autorizacion administrativa previa/construccion) giving project name, MW, technology, promoter, municipality and often the evacuation node and filing date. They are permitting documents, not the grid-access queue.","how_to_search_inside":"BOE API daily summary by date (send Accept: application/json), filter item titles containing 'autorizacion administrativa' and 'MW'; full-text search at https://www.boe.es/buscar/. Regional boards: Andalucia (juntadeandalucia.es participacion page) and Castilla-La Mancha (jccm.es tablon-de-anuncios) list notices with dates.","example_document":{"url":"https://boe.es/boe/dias/2026/09/11/pdfs/BOE-B-2026-29448.pdf","what_it_gives":"BOE-B-2026-29448 (11-09-2026), p. 1: 'Modulo de Almacenamiento de Energia por baterias \"BESS Rey III Solar\" de 35,12 MW'; 'Con fecha 10 de agosto de 2026, ha tenido entrada ... escrito de Villablanca Solar 1, S.L.'; connection 'subestacion electrica Carmona 220 kV, propiedad de Red Electrica de Espana'."}},{"name":"MITECO orders resolving access-capacity tenders (BOE section III)","url":"https://boe.es/boe/dias/2026/06/09/pdfs/BOE-A-2026-12506.pdf","what":"Awarded access capacity per tender node with promoter and installation name.","how_to_search_inside":"BOE search for 'concurso publico para la concesion de capacidad de acceso' (Orden TED/...); one order per node.","example_document":{"url":"https://boe.es/boe/dias/2026/06/09/pdfs/BOE-A-2026-12506.pdf","what_it_gives":"Orden TED/578/2026 (BOE 09-06-2026), p. 79839: 'adjudicacion definitiva de 408 MW (MGES) de capacidad de acceso ... en favor de Coventina Renovables, SL para su instalacion denominada <<CHR Meirama>>' at node Meirama 220 kV."}}]},"related_not_answering":[{"name":"REE node capacity files for demand and generation (included as source 2 for queue MW); capacity tender node list","url":"https://www.ree.es/sites/default/files/12_CLIENTES/Documentos/15-10-26-relacion-nudos-susceptibles-convocatoria-concurso-capacidad-acceso-demanda-octubre-2026.pdf","why":"List of nodes where a demand tender may be convened; shows nodes, not requests (not opened beyond the link on the REE page)."},{"name":"Renovables CyL: parques eolicos y fotovoltaicos (IDECyL)","url":"https://idecyl.jcyl.es:443/geonetwork/srv/api/records/spagobcyltemenerenipepol","why":"Plants already operating in Castilla y Leon, not requests."},{"name":"Delfos blog: 462 storage projects, 7.6 GW in permitting","url":"https://www.delfos.energy/blog-posts/spain-energy-storage-permitting-pipeline-7614mw","why":"Commercial blog with aggregate permitting figures from official bulletins; no dataset is offered."},{"name":"CEER paper on grid connection challenges (June 2026)","url":"https://www.ceer.eu/wp-content/uploads/2026/06/GridConnectionChallanges_CEER-paper-combined-1.pdf","why":"Regulators' policy paper; no per-country queue dataset found when searching its text for Spain and data."},{"name":"MITECO division de proyectos: renewable permitting map","url":"https://www.miteco.gob.es/es/energia/infraestructuras-integracion/division-de-proyectos.html","why":"Describes a viewer of projects under state permitting (>50 MW) but the page shows 'MAPA (En construccion)' with no link; permitting is not the access queue."}],"open_questions":["Whether the REE interactive access map (Leaflet, by node and technology) loads from a downloadable endpoint: page source and access_grid.js show no data URL; needs asking REE.","Meaning of 'Capacidad de acceso otorgada' columns in REE per-node CSV (whether it includes plants already in service): only the per-position PDF separates in-service/pending/in-progress."],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Claude Sonnet 5.5 (High)","rules_version":"6.12","note":"REE publishes an individual-request list only for demand/storage-consumption at >=220 kV nodes; generation and distribution queues are only aggregated per node (REE, CNMC, e-distribucion).","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"partial"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":40,"minutes":10}}],"local_terms":[{"term":"solicitud de acceso y conexion","language":"es","meaning":"formal request to the grid manager for access capacity and a connection point"},{"term":"capacidad de acceso","language":"es","meaning":"maximum active power that can be injected or consumed at a node"},{"term":"nudo de la red de transporte (RdT)","language":"es","meaning":"transmission-grid node, named with voltage, e.g. ALVARADO 220"},{"term":"red de distribucion (RdD)","language":"es","meaning":"distribution grid managed by distribuidoras"},{"term":"permiso de acceso / permiso de conexion","language":"es","meaning":"permits issued by the grid manager; 'con permisos' means pending commissioning"},{"term":"concurso de capacidad de acceso","language":"es","meaning":"tender when requests compete for scarce node capacity (art. 20 quater for demand)"},{"term":"informe de aceptabilidad","language":"es","meaning":"REE report on a request to a distribution grid (above 5 MW peninsular / 500 kW non-peninsular)"},{"term":"MGES / MPE","language":"es","meaning":"synchronous generation module / power park module (types of generation capacity)"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (High)"],"minutes_estimate":10,"pages_opened":40,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/grid-connection-queue.json","detail_url":"https://georutter.org/v1/es/grid-connection-queue/detail.json","html_url":"https://georutter.org/es/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/es.json"}