{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"grid-expansion-plans","question":"Where can I get the planned new power lines and substations in Spain, with location, voltage, planned date and status?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"No structured national file of planned lines and substations was found. The official lists are PDF tables with voltage and planned year: the approved Plan 2021-2026 (consolidated July 2026) and the initial 2025-2030 proposal (Annex I). Coordinates and a 3-state status exist only in Red Eléctrica's project map (385 substations, 77 lines, updated September 2024). Distribution-grid plans were not obtained.","main_caveats":["Plan PDFs have no coordinates; match by substation name to the REE map points. The map lines are straight segments between two substations, not routes.","Planned years are best estimates; several are already past in a 2026 consolidation. The approved plan is 2021-2026; 2025-2030 is only a proposal under revision.","The revised 2030 proposal (September 2026: 193 substation parks, 6,706 km of lines) was announced but its documents were not found; Annex I here is the October 2025 version.","REE map status is dated September 2024; projects completed since may still show 'En proceso'.","Distribution-grid (below 220 kV, regional) planned assets were not obtained from any source."],"confidence":"medium","confidence_reason":"PDFs, JSON and API opened and tested; distribution and OSM left unchecked (portal 503, Overpass unreachable) and the 2030 XLSX could not be downloaded.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s003","s004"],"note":"Exact points only in REE map (lines as straight endpoint pairs) and TYNDP (12 features); plan PDFs give names only","gap":"not_published","gap_note":"No coordinates table in the plan PDFs or on planificacionelectrica.es, MITECO, datos.gob.es, REE pages opened"},{"attribute":"voltage","covered":"yes","source_ids":["s001","s002","s003"],"note":"kV in the name of each asset in plan tables and in map line titles","gap":null,"gap_note":null},{"attribute":"planned_date","covered":"yes","source_ids":["s001","s002","s004"],"note":"Prev. = best-estimate year in plan tables; TYNDP gives month-year for 12 projects; REE map has no date","gap":null,"gap_note":null},{"attribute":"status","covered":"partial","source_ids":["s003","s004","s005","s001"],"note":"REE map in process/partial/in service (2024-09); TYNDP status; plan only separates starting grid from new actions","gap":"not_checked","gap_note":"Per-project authorisation status sits in BOE notices; no consolidated list found; REE status page returned 404"},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"Plan de desarrollo de la red de transporte de energía eléctrica 2021-2026, documento completo consolidado (con las tres modificaciones de aspectos puntuales)","publisher":"Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO), documento elaborado por Red Eléctrica; publicado en planificacionelectrica.es","official":true,"landing_url":"https://www.planificacionelectrica.es/planificacion-vigente","data_url":"https://www.planificacionelectrica.es/sites/default/files/2026-08/planificacion-doc-completo-map26-jul26.pdf","access":"pdf","format":"PDF, 554 pages, A4 landscape, tables in the text layer (Annex I 'Red de partida', Annex II 'Nuevas actuaciones'); maps are vector drawings","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"Plan de desarrollo de la red de transporte de energía eléctrica 2021-2026, documento completo consolidado (con las tres modificaciones de aspectos puntuales)","coverage_note":"Spain: peninsula, Balearic Islands, Canary Islands (transmission network, 66 kV to 400 kV)","data_date":"Consolidated after the third modification approved by the Council of Ministers in July 2026 (PDF metadata creation date 2026-09-08)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["HEAD requests return 403 (Incapsula) while GET works; the portal answers GET to the default curl client","No structured file (CSV/GIS) of the plan on the portal; planificacionelectrica.es 'Accede a la Planificación' links to a PDF only"]},"example":null,"members_summary":null},{"source_id":"s002","name":"Propuesta inicial de desarrollo de la red de transporte de energía eléctrica 2025-2030, Anexo I 'Actuaciones propuestas' (audiencia pública)","publisher":"MITECO (proposal prepared by Red Eléctrica de España as system operator)","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/participacion/2025/detalle-participacion-publica-k-779.html","data_url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf","access":"pdf","format":"PDF, 380 pages (annex I fact sheets 'Red de partida' pages 3-197 and 'Nuevas actuaciones' H2030_* pages 198-380); companion PDFs: executive summary, plan, technical annexes, maps (vector), environmental study","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"Propuesta inicial de desarrollo de la red de transporte de energía eléctrica 2025-2030, Anexo I 'Actuaciones propuestas' (audiencia pública)","coverage_note":"Spain: peninsula, Balearic Islands, Canary Islands (transmission network)","data_date":"Initial proposal put to public hearing in October 2025; a revised proposal was announced on 2026-09-21 but its documents were not found published","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["Companion XLSX on a different host (ssweb.seap.minhap.es) returned 503 Service Unavailable on every attempt"]},"example":{"example_request":"curl -sL --max-time 400 --max-filesize 100000000 -o h2030_anexoI.pdf \"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf\"; pdftotext -f 205 -l 205 -layout h2030_anexoI.pdf -","example_result":"Page 205, actuación H2030_ApD_CONSUM-ARA (Aragón): 'Ampliación de subestaciones | uds. | Tipo | Motiv. | Prev.: Entrerríos 220 kV | 3 | Blind. | RdT | 2028'; 'Nuevas líneas/cables: Los Leones - Los Leones 220 kV, cto 1 | 1 | Cable | RdT | 2027'; unit table 220 kV: 11 positions; 400 kV: 3 positions"},"members_summary":null},{"source_id":"s003","name":"Mapa de proyectos de la red de transporte (Red Eléctrica), datos embebidos en la página","publisher":"Red Eléctrica de España (transmission system operator and sole transmitter)","official":true,"landing_url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","data_url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","access":"web_viewer_only","format":"HTML page carrying a JSON object (drupalSettings.projects_map: lines, substations, projects, filters)","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","summary":"Mapa de proyectos de la red de transporte (Red Eléctrica), datos embebidos en la página","coverage_note":"Spain: peninsula, Balearic Islands, Canary Islands (Canarias have their own inset)","data_date":"Data updated to September 2024 (older than the plans by two years)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["No documented API or file; data exist only as page-embedded JSON consumed by the Leaflet map","HEAD not tested; GET with default client works","All 385 substation points and 77 line endpoint pairs fall inside Spain bounding box (lat 27-44, lon -19 to 5)"]},"example":null,"members_summary":null}],"other_sources_count":2,"if_unstructured":{"summary":null},"local_terms":[{"term":"planificación de la red de transporte de energía eléctrica","language":"es","meaning":"Binding national plan of transmission assets"},{"term":"Modificación de aspectos puntuales (MAP)","language":"es","meaning":"Interim modification of the plan approved by the Council of Ministers"},{"term":"actuación / ficha de actuación","language":"es","meaning":"A project group and its fact sheet in the plan annexes"},{"term":"red de partida","language":"es","meaning":"Starting grid: already in construction or advanced when the plan was drawn"},{"term":"Prev.","language":"es","meaning":"Mejor estimación del año para la puesta en servicio"},{"term":"autorización administrativa previa (AAP) / de construcción (AAC) / DUP","language":"es","meaning":"Permit steps for a line or substation; announced in BOE section V-B"},{"term":"E/S (entrada/salida)","language":"es","meaning":"Loop-in of an existing line into a new substation"},{"term":"parque / posición","language":"es","meaning":"Substation yard / bay of equipment inside it"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (High)"],"minutes_estimate":18,"pages_opened":41,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/grid-expansion-plans.json","detail_url":"https://georutter.org/v1/es/grid-expansion-plans/detail.json","html_url":"https://georutter.org/es/grid-expansion-plans/","country_url":"https://georutter.org/v1/countries/es.json"}