{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"grid-expansion-plans","question":"Where can I get the planned new power lines and substations in Spain, with location, voltage, planned date and status?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"No structured national file of planned lines and substations was found. The official lists are PDF tables with voltage and planned year: the approved Plan 2021-2026 (consolidated July 2026) and the initial 2025-2030 proposal (Annex I). Coordinates and a 3-state status exist only in Red Eléctrica's project map (385 substations, 77 lines, updated September 2024). Distribution-grid plans were not obtained.","main_caveats":["Plan PDFs have no coordinates; match by substation name to the REE map points. The map lines are straight segments between two substations, not routes.","Planned years are best estimates; several are already past in a 2026 consolidation. The approved plan is 2021-2026; 2025-2030 is only a proposal under revision.","The revised 2030 proposal (September 2026: 193 substation parks, 6,706 km of lines) was announced but its documents were not found; Annex I here is the October 2025 version.","REE map status is dated September 2024; projects completed since may still show 'En proceso'.","Distribution-grid (below 220 kV, regional) planned assets were not obtained from any source."],"confidence":"medium","confidence_reason":"PDFs, JSON and API opened and tested; distribution and OSM left unchecked (portal 503, Overpass unreachable) and the 2030 XLSX could not be downloaded.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s003","s004"],"note":"Exact points only in REE map (lines as straight endpoint pairs) and TYNDP (12 features); plan PDFs give names only","gap":"not_published","gap_note":"No coordinates table in the plan PDFs or on planificacionelectrica.es, MITECO, datos.gob.es, REE pages opened"},{"attribute":"voltage","covered":"yes","source_ids":["s001","s002","s003"],"note":"kV in the name of each asset in plan tables and in map line titles","gap":null,"gap_note":null},{"attribute":"planned_date","covered":"yes","source_ids":["s001","s002","s004"],"note":"Prev. = best-estimate year in plan tables; TYNDP gives month-year for 12 projects; REE map has no date","gap":null,"gap_note":null},{"attribute":"status","covered":"partial","source_ids":["s003","s004","s005","s001"],"note":"REE map in process/partial/in service (2024-09); TYNDP status; plan only separates starting grid from new actions","gap":"not_checked","gap_note":"Per-project authorisation status sits in BOE notices; no consolidated list found; REE status page returned 404"},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"Plan de desarrollo de la red de transporte de energía eléctrica 2021-2026, documento completo consolidado (con las tres modificaciones de aspectos puntuales)","publisher":"Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO), documento elaborado por Red Eléctrica; publicado en planificacionelectrica.es","official":true,"landing_url":"https://www.planificacionelectrica.es/planificacion-vigente","data_url":"https://www.planificacionelectrica.es/sites/default/files/2026-08/planificacion-doc-completo-map26-jul26.pdf","access":"pdf","format":"PDF, 554 pages, A4 landscape, tables in the text layer (Annex I 'Red de partida', Annex II 'Nuevas actuaciones'); maps are vector drawings","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Approved, binding transmission plan: every planned new substation, line/cable, transformer and reactor of the transmission grid with voltage and best-estimate commissioning year (Prev.).","first_seen_pass":1,"rank":1,"summary":"Plan de desarrollo de la red de transporte de energía eléctrica 2021-2026, documento completo consolidado (con las tres modificaciones de aspectos puntuales)","coverage_note":"Spain: peninsula, Balearic Islands, Canary Islands (transmission network, 66 kV to 400 kV)","data_date":"Consolidated after the third modification approved by the Council of Ministers in July 2026 (PDF metadata creation date 2026-09-08)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain: peninsula, Balearic Islands, Canary Islands (transmission network, 66 kV to 400 kV)"},"fine_print":{"unit":{"value":"Voltage in kV (in the asset name); line length in km of route (+-10%); capacity in MVA winter/summer; substation extensions in positions (uds.); Prev. = year","quote":"Se computan kilómetros de circuito, mientras que en la tabla de detalle son kilómetros de traza.","url":"https://www.planificacionelectrica.es/sites/default/files/2026-08/planificacion-doc-completo-map26-jul26.pdf","attempts":[]},"inclusion_rule":{"value":"Plan includes new infrastructure, reinforcement of existing assets and other investments for safe operation","quote":"La Planificación incluye actuaciones que implican el desarrollo de nuevas infraestructuras, el refuerzo de las ya existentes y otras inversiones necesarias para la operación segura del sistema.","url":"https://www.planificacionelectrica.es/en-detalle","attempts":[]},"reference_date":{"value":"Consolidated after the third modification approved by the Council of Ministers in July 2026 (PDF metadata creation date 2026-09-08)","quote":"Tras las modificaciones aprobadas en abril de 2024 y julio de 2025, el Consejo de ministros ha aprobado las terceras MAPs en julio de 2026","url":"https://www.planificacionelectrica.es/planificacion-vigente","attempts":[]},"update_frequency":{"value":"A new plan every 4 years covering six years; punctual modifications at least every two years","quote":"Cada 4 años se elabora una nueva planificación de la red de transporte que abarca un periodo de seis años","url":"https://www.planificacionelectrica.es/en-detalle","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Searched the plan text (doc26.pdf) and the executive summary for an explicit exclusion list: none found; the tables only cover transmission-grid assets plus transport-distribution interface positions (motive ApD)","Opened the MITECO 2021-2026 plan page and the planificacionelectrica.es 'en detalle' page: no exclusion statement"]}},"key_fields":[{"field":"Actuación (code, e.g. AF_05, RdT_RENOVE, RdP_ApD_CONSUM-MUR)","meaning":"Project/action group; one fact sheet (ficha) of 1 to 3 pages per action"},{"field":"Nuevas subestaciones: name + voltage, Tipo, Prev.","meaning":"New substation (e.g. 'Torrejón de Velasco 400 kV'), Intemp.=outdoor / Edif.=building, planned year"},{"field":"Nuevas líneas/cables: name, MVA [inv.] [ver.], km (±10%), Tipo, Motiv., Prev.","meaning":"New line or cable between named substations with voltage in the name, route km, motive code and planned year"},{"field":"Motiv. (RdT, ApD, Gen./Alm., EjeFerr., SdS ...)","meaning":"Reason for the asset (consumers on transmission grid, support to distribution, generation/storage, rail axis, security of supply ...)"},{"field":"Anexo I 'Red de partida' vs Anexo II 'Nuevas actuaciones'","meaning":"Starting grid (in construction or with advanced progress) vs. new planned actions; this is the only status notion in the plan"}],"how_to_use":{"example_request":"curl -sL --max-time 300 --max-filesize 100000000 -o doc26.pdf \"https://www.planificacionelectrica.es/sites/default/files/2026-08/planificacion-doc-completo-map26-jul26.pdf\"; pdftotext -f 197 -l 197 -layout doc26.pdf -","example_result":"Page 197 (printed page 196), Anexo II, actuación AF_05 'Alimentación eje ferroviario Madrid-Albacete-Alicante-Valencia': 'Nuevas subestaciones | Tipo | Prev.: Torrejón de Velasco 400 kV | Intemp. | 2025'; 'Nuevas líneas/cables | MVA [inv.] | MVA [ver.] | km (±10%) | Tipo | Motiv. | Prev.: E/S en Torrejón de Velasco, de Morata - Villaviciosa 400 kV, cto 1 | 1.310 | 750 | 2 | Línea | EjeFerr. | 2025'","steps":["Download the PDF (98.6 MB, just under the 100 MB limit) and run pdftotext -layout; the file has a real text layer (no OCR needed).","Split the text on form feeds (one per page). Fact-sheet pages carry the heading 'Actuación <code>' and the sub-tables 'Nuevas subestaciones', 'Ampliación de subestaciones', 'Nuevas líneas/cables', 'Repotenciación de líneas', 'Cambios de conductor', 'Nuevos transformadores'. Annex II (new actions) starts around PDF page 187; Annex I (starting grid) around page 148.","Layout mode interleaves the side-menu words (Introducción, Metodología, Resultados...) and two-column tables; rebuild rows by splitting on runs of 3+ spaces and keep rows whose last cell is a 4-digit year.","The assets carry no coordinates: location is the substation name (and, for lines, the two substation names). Join to substation coordinates from the REE project map (rank 3) by name, or locate by hand.","Status: the plan gives only the section (Red de partida / Nuevas actuaciones / more than 2026) and the planned year; execution status must come from rank 3 or from BOE notices (if_unstructured)."],"reading_traps":["Prev. is 'Mejor estimación del año para la puesta en servicio' (best-estimate year), not a commitment; several years are already in the past (2021-2024) in a document consolidated in 2026.","Table headers in the unit table count km of circuit while the detail table counts km of route: they do not add up.","The same substation appears on several rows (one per motive, e.g. Almendrales 400 kV twice) and one project can span several fact sheets: sum with care.","pdftotext -layout puts navigation words of the side menu inside table lines; a plain-regex parse of Annex II in this test returned 41 new-substation rows and 196 line rows, which is a lossy lower bound, not an inventory.","Distribution-grid assets are not listed; only transport-distribution interface positions (motive ApD)."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":98578401,"records_total":null,"records_for_country":null,"problems":["HEAD requests return 403 (Incapsula) while GET works; the portal answers GET to the default curl client","No structured file (CSV/GIS) of the plan on the portal; planificacionelectrica.es 'Accede a la Planificación' links to a PDF only"]},"evidence":[{"claim":"Plan tables give 'Prev.' as best estimate of commissioning year","url":"https://www.planificacionelectrica.es/sites/default/files/2026-08/planificacion-doc-completo-map26-jul26.pdf","quote":"Prev.= Mejor estimación del año para la puesta en servicio."},{"claim":"The law requires the transmission development plans to list planned lines and substations","url":"https://www.boe.es/buscar/act.php?id=BOE-A-2013-13645","quote":"Los planes de desarrollo de la red de transporte, que se deberán incluir en la planificación eléctrica, recogerán las líneas de transporte y subestaciones previstas"},{"claim":"Current plan is the 2021-2026 plan with three modifications; third one July 2026","url":"https://www.planificacionelectrica.es/planificacion-vigente","quote":"el Consejo de ministros ha aprobado las terceras MAPs en julio de 2026"},{"claim":"Third modification (51 actions) has its own 8-page annex table with year, voltage, region and substations","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/infraestructuras/MAPs_3_H2026_Web%20MITERD%20Vfinal.pdf","quote":"UN TOTAL DE 51 ACTUACIONES CENTRADAS EN LA PENÍNSULA"}],"members":[],"members_summary":null},{"source_id":"s002","name":"Propuesta inicial de desarrollo de la red de transporte de energía eléctrica 2025-2030, Anexo I 'Actuaciones propuestas' (audiencia pública)","publisher":"MITECO (proposal prepared by Red Eléctrica de España as system operator)","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/participacion/2025/detalle-participacion-publica-k-779.html","data_url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf","access":"pdf","format":"PDF, 380 pages (annex I fact sheets 'Red de partida' pages 3-197 and 'Nuevas actuaciones' H2030_* pages 198-380); companion PDFs: executive summary, plan, technical annexes, maps (vector), environmental study","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"The forward-looking list: new substations and lines proposed for 2025-2030 (not yet approved), same table layout as rank 1, with planned years up to 2030.","first_seen_pass":1,"rank":2,"summary":"Propuesta inicial de desarrollo de la red de transporte de energía eléctrica 2025-2030, Anexo I 'Actuaciones propuestas' (audiencia pública)","coverage_note":"Spain: peninsula, Balearic Islands, Canary Islands (transmission network)","data_date":"Initial proposal put to public hearing in October 2025; a revised proposal was announced on 2026-09-21 but its documents were not found published","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain: peninsula, Balearic Islands, Canary Islands (transmission network)"},"fine_print":{"unit":{"value":"Same as rank 1: kV in names, km of route (+-10% for long lines, +-2 km for short), MVA, positions, Prev. = year","quote":"Prev. = Mejor estimación del año para la puesta en servicio.","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf","attempts":[]},"inclusion_rule":{"value":"Actions proposed by the system operator after more than 5,000 proposals from 330 parties; about 25% of the demand proposals were included in the study scenario","quote":"En total, se han recibido más de 5.000 propuestas de 330 sujetos diferentes.","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/0_Planficacion_Sumario_ejecutivo.pdf","attempts":[]},"reference_date":{"value":"Initial proposal put to public hearing in October 2025; a revised proposal was announced on 2026-09-21 but its documents were not found published","quote":"tras analizar las 2.566 alegaciones recibidas durante la fase de audiencia","url":"https://www.miteco.gob.es/es/prensa/ultimas-noticias/2026/septiembre/joan-groizard-avanza-el-resultado-de-la-nueva-propuesta-de-plani.html","attempts":[]},"update_frequency":{"value":"One proposal per planning cycle (every 4 years); 6 phases from proposals to approval","quote":"El proceso completo consta de 6 fases: fase de propuestas (3 meses), fase de estudios (6 meses), fase de alegaciones (1 mes), segunda fase de estudios (2 meses), fase de consolidación y, finalmente, fase de aprobación.","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/0_Planficacion_Sumario_ejecutivo.pdf","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Read the executive summary and Annex I explanation pages: no explicit exclusion list","Opened the proceso-2025-30 page of planificacionelectrica.es: no exclusion statement"]}},"key_fields":[{"field":"Actuación H2030_* / RdP_*","meaning":"H2030_* = new actions proposed for 2030; RdP_* = starting grid (already planned in 2021-2026)"},{"field":"Nuevas subestaciones / Nuevas líneas/cables / Ampliación de subestaciones","meaning":"Name with voltage, type, motive and Prev. (year, 2024-2030)"}],"how_to_use":{"example_request":"curl -sL --max-time 400 --max-filesize 100000000 -o h2030_anexoI.pdf \"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf\"; pdftotext -f 205 -l 205 -layout h2030_anexoI.pdf -","example_result":"Page 205, actuación H2030_ApD_CONSUM-ARA (Aragón): 'Ampliación de subestaciones | uds. | Tipo | Motiv. | Prev.: Entrerríos 220 kV | 3 | Blind. | RdT | 2028'; 'Nuevas líneas/cables: Los Leones - Los Leones 220 kV, cto 1 | 1 | Cable | RdT | 2027'; unit table 220 kV: 11 positions; 400 kV: 3 positions","steps":["Download the Annex I PDF (99,319,747 bytes although the MITECO page says 90 MB; the limit of 100 MB is close) and run pdftotext -layout.","Pages 198-380 are the new actions (H2030_*); pages 3-197 are the starting grid (RdP_*) already in the 2021-2026 plan. Pick the section that matches the question.","Rows are 'name kV | uds | Tipo | Motiv. | Prev.'; the same regex approach as rank 1 applies. A crude regex over pages 198-380 found 93 new-substation rows and 313 new-line rows, a lossy count for orientation only.","Maps of each action are images or vector drawings inside the fact sheet; the separate Annex III map PDF (13 pages) is vector and gives no coordinates table.","The XLSX 'Nueva propuesta fase alegaciones' listed on the MITECO page could not be downloaded (503 from ssweb.seap.minhap.es on 5 attempts); its content is unknown."],"reading_traps":["It is an initial proposal, not the approved plan; the revised proposal of September 2026 (193 substation parks, 6,706 km of lines per the MITECO press release) is not in this PDF, so counts differ.","Mixes starting-grid actions (RdP, mostly 2024-2027) with new ones (H2030, 2027-2030): check the actuación prefix before saying 'new'.","Motive codes differ slightly from the 2021-2026 plan (CON, G_A appear next to RdT, ApD).","Same lossy layout caveats as rank 1 (navigation text inside table lines)."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":99319747,"records_total":null,"records_for_country":null,"problems":["Companion XLSX on a different host (ssweb.seap.minhap.es) returned 503 Service Unavailable on every attempt"]},"evidence":[{"claim":"Document is the initial proposal, Annex I with proposed actions","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/es-ES/Participacion/Documents/anexos/aeip-planificacion-h2030/2_Planficacion_ANEXO_I_-_ACTUACIONES_PROPUESTAS.pdf","quote":"PROPUESTA INICIAL DE DESARROLLO DE LA RED DE TRANSPORTE DE ENERGÍA ELÉCTRICA. PERÍODO 2025-2030. ANEXO I – ACTUACIONES PROPUESTAS"},{"claim":"Public hearing documents list, including Annex I (90 MB) and an XLSX 'Nueva propuesta fase alegaciones'","url":"https://www.miteco.gob.es/es/energia/participacion/2025/detalle-participacion-publica-k-779.html","quote":"2. Planficación ANEXO I - ACTUACIONES PROPUESTAS [PDF][90 MB]"},{"claim":"Revised national figures announced 2026-09-21","url":"https://www.miteco.gob.es/es/prensa/ultimas-noticias/2026/septiembre/joan-groizard-avanza-el-resultado-de-la-nueva-propuesta-de-plani.html","quote":"También ha aumentado el número de parques de subestaciones un 17%, hasta las 193, así como la longitud de las líneas eléctricas previstas, que se eleva un 11% hasta los 6.706 kilómetros"},{"claim":"Process page says the plan is in phase 4 (studies) at the time of testing","url":"https://www.planificacionelectrica.es/proceso-2025-30","quote":"Estado de fase: actual 4. Estudios"}],"members":[],"members_summary":null},{"source_id":"s003","name":"Mapa de proyectos de la red de transporte (Red Eléctrica), datos embebidos en la página","publisher":"Red Eléctrica de España (transmission system operator and sole transmitter)","official":true,"landing_url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","data_url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","access":"web_viewer_only","format":"HTML page carrying a JSON object (drupalSettings.projects_map: lines, substations, projects, filters)","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"Only source with coordinates and an execution status: 385 substations as points, 77 new lines as endpoint pairs, 385 project cards with voltage, province and motivation, and a 3-state status.","first_seen_pass":1,"rank":3,"summary":"Mapa de proyectos de la red de transporte (Red Eléctrica), datos embebidos en la página","coverage_note":"Spain: peninsula, Balearic Islands, Canary Islands (Canarias have their own inset)","data_date":"Data updated to September 2024 (older than the plans by two years)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain: peninsula, Balearic Islands, Canary Islands (Canarias have their own inset)"},"fine_print":{"unit":{"value":"Voltage in kV (66, 132, 220, 400) in line titles and project voltages; no length, capacity or year fields","quote":"Tensión · 400 kV","url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","attempts":[]},"inclusion_rule":{"value":"All projects of the transmission network 'en curso' shown on the map","quote":"Descubre todos los proyectos en curso de la red de transporte a través de este mapa interactivo.","url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","attempts":[]},"reference_date":{"value":"Data updated to September 2024 (older than the plans by two years)","quote":"Información actualizada a septiembre de 2024","url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Page states only the date of the last update; no update schedule found on the map page or on the 'cómo gestionamos proyectos' page"," Compared with the plan pages (updated 2026): the map still says September 2024"]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Map legend and filters opened: only line, substation and storage types; no exclusion text","'Cómo gestionamos los proyectos' page opened: no mention of exclusions"]}},"key_fields":[{"field":"substations[name].lat / lon / community / province / status / projects_card","meaning":"Point of the substation (WGS84); status 0 gray 'En proceso', 1 blue 'En servicio', 2 presumably orange 'Parcialmente en servicio'"},{"field":"lines[].title / status / new_line / coords / project_card","meaning":"Line title with voltage ('L/Abona - Las Rosas 220 kV'), two [lon,lat] endpoints (straight segment, not the route), status 1 = solid (in service) else dashed"},{"field":"projects[id].title / types / voltages / locations / motivations / actions[].status","meaning":"Project card: name, asset types, kV list, community/province, motivation codes, per-action status 0/1"}],"how_to_use":{"example_request":"curl -sL --max-time 60 -o mapa.html \"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos\"; python3 -I -c \"import re,json;t=open('mapa.html',encoding='utf-8').read();m=re.search(r'<script type=\\\"application/json\\\" data-drupal-selector=\\\"drupal-settings-json\\\">(.*?)</script>',t,re.S);d=json.loads(m.group(1))['projects_map'];print(len(d['lines']),len(d['substations']),len(d['projects']));print(d['lines'][0]);print({k:v for k,v in d['substations']['Abades'].items() if k!='popup'})\"","example_result":"77 385 385 | line: {'title': 'L/Abona - Las Rosas 220 kV', 'status': 0, 'new_line': 1, 'project_card': '540', 'substations': {'Abona': 'Abona', 'Las Rosas': 'Las Rosas'}, 'coords': [[-16.5766728, 28.1221408], [-16.4099501, 28.3150189]]} | substation Abades: {'lat': 40.914854, 'lon': -4.2690384, 'community': 'Castilla y León', 'province': 'Segovia', 'storage': 0, 'projects_card': {'212': '212'}, 'status': 0}","steps":["GET the map page (about 1.1 MB) with the default client; HEAD is not needed.","Extract the <script type=application/json data-drupal-selector=drupal-settings-json> block and read the key projects_map.","lines and substations give geometry; projects give the cards. Join substation.projects_card and line.project_card to projects[id].","Status meaning comes from the page script legend: blue 'En servicio', orange 'Parcialmente en servicio', gray 'En proceso'. Project status counts in this test: 153 in process (0), 153 in service (1), 65 partial (2), 14 without status.","Voltage of a line: parse the 'NNN kV' at the end of the title; of a substation: the name does not carry it, use the voltages of its project cards."],"reading_traps":["Lines are straight segments between two substation points, not the physical route; 77 lines for 385 substation points: many project lines are missing.","Planned date is absent: no year field in any object; dates must come from ranks 1 or 2.","Page states 'Información actualizada a septiembre de 2024'; projects commissioned since then may still show 'En proceso'.","Substation 'status' 0/1/2 comes from its projects; a substation can be in service while a new extension is still pending.","All 77 lines have new_line = 1, including 26 already in service: the flag means 'new line' project, not 'planned'.","The page lists all 'projects en curso' including already commissioned ones (153 cards in service); filter status before calling them planned."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"text/html","size_bytes":1108331,"records_total":385,"records_for_country":385,"problems":["No documented API or file; data exist only as page-embedded JSON consumed by the Leaflet map","HEAD not tested; GET with default client works","All 385 substation points and 77 line endpoint pairs fall inside Spain bounding box (lat 27-44, lon -19 to 5)"]},"evidence":[{"claim":"Map is a project map with update date September 2024","url":"https://www.ree.es/es/transporte-electricidad/proyectos-transporte/mapa-proyectos","quote":"Información actualizada a septiembre de 2024"},{"claim":"Map legend states: in service / partially in service / in process (from the map script served with the page)","url":"https://www.ree.es/sites/default/files/js/js_AXUYkkDVgfSppN7h4mPPN1LW-bQWT3J5Qulv98KtFkI.js","quote":"<span>En servicio</span></li><li><span class=\"circle orange\"></span><span>Parcialmente en servicio</span></li><li><span class=\"circle gray\"></span><span>En proceso</span>"},{"claim":"REE presents the map as its projects under development","url":"https://www.ree.es/es/operacion/desarrollo-sistema/planificacion-nacional","quote":"Mapa de proyectos"}],"members":[],"members_summary":null},{"source_id":"s004","name":"ENTSO-E TYNDP 2024 project map data (transmission and storage projects, GeoJSON behind the project sheets)","publisher":"ENTSO-E (European Network of Transmission System Operators for Electricity)","official":true,"landing_url":"https://tyndp2024.entsoe.eu/projects-map/transmission","data_url":"https://tyndp2024.entsoe.eu/api/maps/all","access":"api","format":"GeoJSON FeatureCollection (LineString, Point, MultiPolygon)","license":"unknown","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"supranational","adds":"EU-level view of the Spanish interconnection and major-reinforcement projects with geometry, ENTSO-E status and commissioning month-year, comparable across countries.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Europe; 12 features with countryCode ES (Red Eléctrica) covering Portugal and France interconnections and Gatica (Basque Country) reinforcements"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["Properties observed in the API response (commissioningYear as 'MM-YYYY', status text and statusId); no documentation page for the endpoint found","Opened the TYNDP 2024 project-sheet page (Angular app) and its bundle: no field dictionary"]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["TYNDP 2024 candidate projects submitted by promoters; the app page opens as a project collection","No inclusion rule text found on the project page or the ENTSO-E outlook page"]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["Response carries no date field; the ENTSO-E outlook page lists 'TYNDP 2024 Reports and Data'","Compared with the REE PCI page (older dates)"]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["TYNDP is biennial; the app gives no refresh schedule","No schedule found on the opened ENTSO-E page"]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Storage features carry 'promoters' instead of countryCode and were not filtered by country","Only projects submitted to TYNDP are present, so most domestic Spanish substations are absent"]}},"key_fields":[{"field":"properties.investmentName / name","meaning":"Investment (e.g. 'Uprate Gatica-Azpeitia') and project (e.g. 'Uprate Gatica lines')"},{"field":"properties.status / statusId","meaning":"Under Consideration, Planned But Not Yet Permitting, In Permitting, Under Construction"},{"field":"properties.commissioningYear","meaning":"Planned commissioning, 'MM-YYYY'"},{"field":"properties.countryCode / promoter","meaning":"ES / Red Eléctrica"}],"how_to_use":{"example_request":"curl -sL --max-time 40 -o tyndp_maps_all.json https://tyndp2024.entsoe.eu/api/maps/all; python3 -I -c \"import json;d=json.load(open('tyndp_maps_all.json'));es=[f for f in d['features'] if f['properties'].get('countryCode')=='ES'];print(len(d['features']),len(es));print(es[1]['properties'])\"","example_result":"363 12 | {'promoter': 'Red Eléctrica', 'countryCode': 'ES', 'status': 'Under Construction', 'statusId': 4, 'investmentName': 'HVDC Gatica-Cubnezais', 'type': 'Transmission', 'name': 'Biscay Gulf', 'commissioningYear': '12-2028', 'onshoreOffShore': 'Offshore interconnector'}","steps":["GET /api/maps/all (184 KB, no key).","Filter features by properties.countryCode == 'ES' (12 of 363); storage features have no countryCode.","Voltage is not a property: read it from investmentName (e.g. '400kV') or from the project sheet in the app."],"reading_traps":["Endpoint is the one used by the ENTSO-E web app, not a documented download; it can change without notice.","Only 12 Spanish features (interconnections and Gatica-Basque Country works): it is a small subset of the national plan.","Corridor projects with status 'Under Consideration' are MultiPolygon areas with horizon 2037 and 2041, not lines.","Geometries of lines are two to four points (schematic)."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json; charset=utf-8","size_bytes":183868,"records_total":363,"records_for_country":12,"problems":["The documented downloads on the ENTSO-E outlook page (investment candidates, starting grid 2030 XLSX) are border-level capacities, not projects with location"]},"evidence":[{"claim":"ENTSO-E offers online TYNDP 2024 project sheets and a projects map","url":"https://www.entsoe.eu/outlooks/tyndp/2024/","quote":"Access online project sheets"},{"claim":"Spanish PCIs and their status as stated by Red Eléctrica (older, 2024 horizon)","url":"https://www.ree.es/en/operation/system-development/european-planning/project-common-interest","quote":"Interconnection between Aragon (ES) and Western Pyrenees (Pyrénées-Atlantiques) (FR)."}],"members":[],"members_summary":null},{"source_id":"s005","name":"Regional and provincial public-information lists of electrical infrastructure (authorisation phase)","publisher":"Autonomous communities and Subdelegaciones del Gobierno (via regional portals and BOE section V-B)","official":true,"landing_url":"https://www.aragon.es/proyectos-en-informacion-publica/energia/infraestructuras-electricas","data_url":null,"access":"web_viewer_only","format":"HTML list with search form","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Administrative status (public information, authorisation) with municipality, voltage and promoter for individual lines and substations, including 132 kV and distribution assets authorised by the regions.","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Aragón only was opened; other regions publish in their own gazettes and portals (pattern in if_unstructured)"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["Voltage appears inside each title, e.g. 'Ampliación de la Subestación eléctrica Gurrea 220 kV'","No unit field"]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["The page title says projects in public information","No wider rule text read"]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["No date shown per entry on the page","Opened once on 2026-11-16"]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["No update schedule on the page","Not stated"]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["Only procedures in the public-information period are listed, not those already authorised","Inferred from page title only"]}},"key_fields":[{"field":"title","meaning":"Project name with voltage and municipality (province)"}],"how_to_use":{"example_request":"https://www.aragon.es/proyectos-en-informacion-publica/energia/infraestructuras-electricas (open in a client that runs scripts, filter province)","example_result":"'Ampliación de la Subestación eléctrica Gurrea 220 kV en el término municipal de Gurrea de Gállego (Huesca)'; 'Centro de seccionamiento \"Puerto Venecia\" a 132 kV en el término municipal de Zaragoza'","steps":["Open the list, filter by province or municipality, read voltage and municipality from the title.","Open each entry for the notice (not done in this test)."],"reading_traps":["Only projects currently in public information; no planned date and no status beyond that.","Municipality precision only: do not geocode as the line route."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":92,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Aragón lists electrical infrastructure projects in public information","url":"https://www.aragon.es/proyectos-en-informacion-publica/energia/infraestructuras-electricas","quote":"Ampliación de la Subestación eléctrica Gurrea 220 kV en el término municipal de Gurrea de Gállego (Huesca)"}],"members":[{"name":"Aragón: Proyectos en información pública, infraestructuras eléctricas","landing_url":"https://www.aragon.es/proyectos-en-informacion-publica/energia/infraestructuras-electricas","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"92 results at test time, filter by province, municipality and keyword; voltage in the title, no dates, no promoter field, no download"}],"members_summary":{"total":null,"listed":1,"tested":1,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"sector":{"regulator":{"name":"MITECO plans the network; CNMC reports on the plan (informa la propuesta)","url":"https://cnmc.es/prensa/modificacion-plan-transporte-electricidad-20240222"},"operators":{"structure":"single","note":"Red Eléctrica is the single transmitter and drafts the proposal as system operator; distribution is run by many companies (e.g. i-DE, e-distribución) with their own investment plans.","census_url":null},"publication_obligation":{"exists":"yes","norm":"Ley 24/2013 del Sector Eléctrico, art. 4","url":"https://www.boe.es/buscar/act.php?id=BOE-A-2013-13645","what_must_be_published":"Transmission development plans must list the planned transmission lines and substations; the plan goes through hearing, CNMC report and Congress before approval","frequency":"Six-year periods; a modification of punctual aspects at least every two years"},"consolidated_republication":{"found":"partial","note":"Transmission plans are republished in one place (planificacionelectrica.es and MITECO) but as PDFs; no consolidated source found for distribution plans.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/estrategia-normativa/planificacion/planificacion-electricidad-gas/plan-desarrollo-red-transporte-energia-electrica-2021-2026.html","saw":"Links to the plan PDF, to planificacionelectrica.es and to the 2024 modification; no GIS or fichas"},{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/participacion/2025/detalle-participacion-publica-k-779.html","saw":"Public-hearing page of the 2025-2030 proposal with 7 downloads (PDFs and one XLSX)"},{"organization":"Red Eléctrica / MITECO portal","url":"https://www.planificacionelectrica.es/planificacion-vigente","saw":"Plan 2021-2026 documents, three modifications and a list of NextGenerationEU-financed projects by code"},{"organization":"CNMC","url":"https://cnmc.es/prensa/modificacion-plan-transporte-electricidad-20240222","saw":"Press page on its report on the plan modification; links to a case file, no project list"}]}},"national_registry":{"exists":"partial","note":"The approved plan is the official national list of planned transmission assets, but only as PDF, only for the transmission network, and without coordinates.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/estrategia-normativa/planificacion/planificacion-electricidad-gas.html","saw":"Only links the 2021-2026 plan page; nothing on 2025-2030"},{"organization":"Red Eléctrica","url":"https://www.ree.es/es/operacion/desarrollo-sistema/planificacion-nacional","saw":"Links to planificacionelectrica.es and to the project map; no GIS or shapefile"},{"organization":"CNMC","url":"https://cnmc.es/prensa/modificacion-plan-transporte-electricidad-20240222","saw":"Report on the plan, no data listing"},{"organization":"datos.gob.es","url":"https://datos.gob.es/es/","saw":"Catalogue API title searches for red eléctrica, líneas eléctricas, subestaciones, planificación returned no national planning dataset"}]},"if_unstructured":{"summary":null,"recipe":["1. Take the transmission list from ranks 1 and 2: extract the sub-tables 'Nuevas subestaciones' and 'Nuevas líneas/cables' (and extensions) per actuación with pdftotext -layout; keep name, kV, Tipo, Motiv., Prev. (tested on PDF pages 197 and 205).","2. Add location by joining substation names to the points of the REE project map (rank 3); lines are drawn between their two substation names. Names differ in spelling (e.g. 'Almodovar Del Rio' vs 'Almodóvar del Río'), so match after normalising case and accents; unmatched substations need manual location.","3. Add status per project: map status (rank 3, dated 2024-09) and, for assets in permitting, the BOE notices (search the substation or line name; the notice gives the stage: información pública, AAP, AAC, DIA/IIA).","4. For assets below 220 kV or distribution, search regional lists (rank 5 pattern) and distributor investment plans; none was obtained in this pass."],"location_method":"Plan PDFs carry no coordinates. Use REE map points by substation name; for lines, the two end substations; BOE environmental and authorisation documents describe municipalities and sometimes include coordinates in annexes (not tested).","cross_with":["REE project map points (rank 3)","BOE notices per project","MITECO SABIA environmental files","TYNDP 2024 sheets for interconnections"],"where_published":[{"name":"BOE section V-B and III (announcements, authorisations and environmental resolutions)","url":"https://www.boe.es/boe/dias/2026/10/01/pdfs/BOE-B-2026-31759.pdf","what":"Public-information notices and resolutions for individual substations and lines: promoter, municipality, voltage, technology, file number and whether the action belongs to the plan","how_to_search_inside":"BOE text search or daily summary; search for 'subestación', 'línea eléctrica', 'Red Eléctrica de España' and 'autorización administrativa previa'; regional gazettes carry the same for regionally authorised assets. Search is by words only; no structured fields.","example_document":{"url":"https://www.boe.es/boe/dias/2026/10/01/pdfs/BOE-B-2026-31759.pdf","what_it_gives":"Anuncio 31759, 2026-10-01, Huelva: 'ampliación de la subestación Puebla de Guzmán en el parque de 400 kV con una nueva posición de interruptor y la máquina asociada (reactancia REA-1)', titular Red Eléctrica de España, expediente 151/2026; says it is included in the 'Tercera modificación ... Plan de desarrollo ... 2021-2026' (BOE 8 August 2026)"}},{"name":"MITECO SABIA environmental assessment consultation","url":"https://www.miteco.gob.es/es/calidad-y-evaluacion-ambiental/temas/evaluacion-ambiental.html","what":"Environmental assessment files for state projects with their processing status","how_to_search_inside":"Choose activity from a provincial or autonomous-community map and combine with dropdown filters (page description); the SABIA application itself was not opened.","example_document":{"url":null,"what_it_gives":null}},{"name":"Regional public-information lists (example Aragón)","url":"https://www.aragon.es/proyectos-en-informacion-publica/energia/infraestructuras-electricas","what":"Lines and substations in public information with voltage and municipality in the title","how_to_search_inside":"Search box and province/municipality filters","example_document":{"url":"https://www.aragon.es/proyectos-en-informacion-publica/energia/infraestructuras-electricas","what_it_gives":"'Centro de seccionamiento \"Puerto Venecia\" a 132 kV en el término municipal de Zaragoza'"}},{"name":"Third modification annex (51 actions), MITECO","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/infraestructuras/MAPs_3_H2026_Web%20MITERD%20Vfinal.pdf","what":"8-page PDF with an annex table: asset, year, voltage, community or island, origin and destination substation, subtype, value, unit","how_to_search_inside":"Read the annex table with pdftotext -layout; only the 51 actions of the July 2026 modification","example_document":{"url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/infraestructuras/MAPs_3_H2026_Web%20MITERD%20Vfinal.pdf","what_it_gives":"'Reactancia San Jorge 132 kV REA1, 20 MVAr | 2026 | SEB | Ibiza | SAN JORGE | 132 ... Nuevo cable | Subterraneo | 0,5 | km'"}}]},"related_not_answering":[{"name":"TYNDP 2024 investment candidates and Starting grid 2030 (XLSX)","url":"https://www.entsoe.eu/outlooks/tyndp/2024/","why":"Border-level transfer capacities and costs between market areas (ES-FR, ES-PT, ES-MA), no substations or lines with location"},{"name":"Red Eléctrica list of NextGenerationEU-financed projects","url":"https://www.planificacionelectrica.es/planificacion-vigente","why":"Project codes and names (e.g. 'J-00A6-S1450 - SE/Sagunto GIS 220 kV (Ampl.)') for a subset financed by EU funds; no voltage, date or location fields"},{"name":"REE press and PCI page (Spanish PCIs)","url":"https://www.ree.es/en/operation/system-development/european-planning/project-common-interest","why":"Short narrative list of interconnection projects with 2023-2027 horizons that are dated; not a list of planned lines and substations"},{"name":"MITECO press releases on the 2030 proposal","url":"https://www.miteco.gob.es/es/prensa/ultimas-noticias/2026/septiembre/joan-groizard-avanza-el-resultado-de-la-nueva-propuesta-de-plani.html","why":"National and regional totals (substation parks, km, investment) without asset-level rows"},{"name":"e-distribución Planes de Inversión 2028-2030 page","url":"https://www.edistribucion.com/es/red-electrica/planesinversion.html","why":"Consultation form for the 2028-2030 plans open 15 October to 5 December 2026; it does not publish assets"}],"open_questions":["What does the XLSX 'Nueva propuesta fase alegaciones' (MITECO 2030 hearing page, host ssweb.seap.minhap.es) contain? It returned 503 on 5 attempts; only the organisation can say whether it is a structured action list.","Is the revised 2025-2030 proposal of September 2026 published as documents? The press release says it will go to Congress and the Council of Ministers; no document was found on the pages opened."],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Claude Sonnet 5.5 (High)","rules_version":"6.12","note":"First pass: planned assets exist as official PDF tables (plan 2021-2026, proposal 2025-2030) with voltage and year but no coordinates; REE map gives points and status, last updated 2024-09.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"partial"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":41,"minutes":18}}],"local_terms":[{"term":"planificación de la red de transporte de energía eléctrica","language":"es","meaning":"Binding national plan of transmission assets"},{"term":"Modificación de aspectos puntuales (MAP)","language":"es","meaning":"Interim modification of the plan approved by the Council of Ministers"},{"term":"actuación / ficha de actuación","language":"es","meaning":"A project group and its fact sheet in the plan annexes"},{"term":"red de partida","language":"es","meaning":"Starting grid: already in construction or advanced when the plan was drawn"},{"term":"Prev.","language":"es","meaning":"Mejor estimación del año para la puesta en servicio"},{"term":"autorización administrativa previa (AAP) / de construcción (AAC) / DUP","language":"es","meaning":"Permit steps for a line or substation; announced in BOE section V-B"},{"term":"E/S (entrada/salida)","language":"es","meaning":"Loop-in of an existing line into a new substation"},{"term":"parque / posición","language":"es","meaning":"Substation yard / bay of equipment inside it"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5 (High)"],"minutes_estimate":18,"pages_opened":41,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/grid-expansion-plans.json","detail_url":"https://georutter.org/v1/es/grid-expansion-plans/detail.json","html_url":"https://georutter.org/es/grid-expansion-plans/","country_url":"https://georutter.org/v1/countries/es.json"}