{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"hydrogen-pipelines","question":"Where can I get the routes (geometry) of hydrogen pipelines in operation or planned in Spain, with operator, capacity and status?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"usable","summary":"Spain has no national open GIS registry of hydrogen pipelines (checked MITECO, CNMC, IGN/IDEE, datos.gob.es, OSM). Only two short local pipelines operate today: Nortegas Abanto (1.86 km, 2022) and Redexis Mallorca (3.2 km, Sep 2024), neither having public polyline geometry. For planned transmission, ENTSOG/GIE/EHB Joint Map's ArcGIS FeatureServer (h2inframap.eu) provides indicative polylines and operators, while ENTSOG TYNDP 2026 Annex A/C2 XLSX adds engineering specs, status, and GWh/d capacity. CINEA PCI Fiches and Enagas PDFs add official schematic maps, permitting status, and BOE/Delegacion del Gobierno RBDA notices with cadastral parcels.","main_caveats":["Spain has only 2 operational dedicated H2 pipelines (Nortegas 1.86 km; Redexis 3.2 km): Redexis Mallorca is absent from every dataset, and Nortegas Abanto appears only as a point (~18 km offset) in h2inframap Layer 0.","h2inframap.eu geometries are indicative/schematic (~12 km vertex spacing on Backbone), omit the Apr 2026 Alcazar de San Juan-Montesa PCI extension, lack ISO country and status columns, and lack capacity on 8/11 ES lines.","No official Spanish GIS file exists: MITECO, CNMC, IGN/IDEE, datos.gob.es and OSM Spain have zero H2 pipelines; EC PCI Transparency Platform viewer redirects to sorry.ec.europa.eu.","Official Enagas route files are PDFs and BOE permitting tables list affected cadastral parcel references (reconstructible only at parcel corridor level via Catastro WFS, not final as-built centerlines)."],"confidence":"high","confidence_reason":"All sources downloaded or queried live (ArcGIS REST, TYNDP 2026 XLSX, CINEA PDFs, Enagas/Nortegas/Redexis docs, BOE RBDA + Catastro WFS) and 0-record checks verified across MITECO, CNMC, IGN, datos.gob.es, EHO, and Geofabrik OSM.","attributes":[{"attribute":"route_geometry","covered":"partial","source_ids":["s001","s004"],"note":"Indicative planned polylines in h2inframap.eu Layer 7; schematic PDFs in Rank 4 and BOE parcel RCs; no public line geometry for the 2 operational local pipelines.","gap":"not_published","gap_note":"MITECO, CNMC, IGN/IDEE, datos.gob.es, OSM Spain, Nortegas and Redexis publish no downloadable pipeline centerlines; BOE RBDA gives cadastral parcels only."},{"attribute":"operator","covered":"yes","source_ids":["s001","s002","s003","s004","s005"],"note":"Operator/promoter named across all 5 sources: Enagas (provisional HTNO/PCIs), Reganosa H2Pole, H2GZ, plus operational Nortegas (Abanto) and Redexis (Mallorca).","gap":null,"gap_note":null},{"attribute":"capacity","covered":"partial","source_ids":["s001","s002","s003","s005"],"note":"GWh/d and Mt/y capacity given in TYNDP 2026 and CINEA PCI Fiches, and 190-575 t/y for Redexis; Rank 1 lacks capacity on 8/11 ES lines; Nortegas undisclosed.","gap":"not_published","gap_note":"Checked Nortegas Memoria 2022, pronor.es, parke.eus, h2inframap.eu and EHO: no public transport capacity figure for Nortegas Abanto or minor Rank 1 lines."},{"attribute":"status","covered":"partial","source_ids":["s001","s002","s003","s004","s005"],"note":"Operation confirmed only in Rank 5 (Nortegas, Redexis); planned maturity (Advanced/Less-Advanced) and Permitting status in TYNDP/CINEA/Enagas; Rank 1 has year only.","gap":"not_published","gap_note":"Rank 1 omits status codes (only Commission year); operational status is missing in Redexis's case from all registries and must be taken from operator disclosures."}]},"sources":[{"source_id":"s001","name":"Hydrogen Infrastructure Map (ENTSOG / GIE / EHB Joint Initiative ArcGIS FeatureServer)","publisher":"ENTSOG AISBL, GIE, Eurogas, CEDEC, GD4S, GEODE & European Hydrogen Backbone","official":false,"landing_url":"https://www.h2inframap.eu/","data_url":"https://services9.arcgis.com/xSsJeibXqRtsnmY7/arcgis/rest/services/Hydrogen_Infrastructure_Map_2024Q4_WFL1/FeatureServer/7","access":"api","format":"ArcGIS FeatureServer JSON / GeoJSON","license":"Publicly accessible without stated open license; informational disclaimer only (h2inframap.eu)","language":"en","has_coordinates":true,"location_precision":"exact","summary":"Hydrogen Infrastructure Map (ENTSOG / GIE / EHB Joint Initiative ArcGIS FeatureServer)","coverage_note":"Europe (11 Spain transmission polylines in Layer 7 + 3 cross-border FR/PT; 6 Nortegas distribution points in Layer 0; 0 Spain in Layer 6)","data_date":"2025-10-17 promoter submission cutoff (PR0359 release 2025-12-17); Layer 7 REST lastEditDate 2026-03-19","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"problems":["Schematic/indicative polylines only; Layer 0 Nortegas point offset ~18 km from Muskiz-Abanto; omits Redexis Mallorca and Apr 2026 Alcazar-Montesa PCI extension; capacity missing on 8/11 ES lines."]},"example":{"example_request":"curl -sS \"https://services9.arcgis.com/xSsJeibXqRtsnmY7/arcgis/rest/services/Hydrogen_Infrastructure_Map_2024Q4_WFL1/FeatureServer/7/query?where=Promoter_N%20LIKE%20%27%25Enag%25%27&outFields=OBJECTID,Project_Na,Promoter_N,Project_Ty,Commission,Increment,PCI_PMI&outSR=4326&resultRecordCount=1&f=json\"","example_result":"{\"OBJECTID\": 66, \"Project_Na\": \"H2Med-BarMar\", \"Promoter_N\": \"Enagás Infraestructuras de Hidrógeno/Terega/Natran/Open Grid Europe\", \"Project_Ty\": \"New\", \"Commission\": \"2032\", \"Increment\": \"216\", \"PCI_PMI\": \"PCI\"} (+ 694 polyline vertices)"},"members_summary":null},{"source_id":"s002","name":"ENTSOG TYNDP 2026 Annex A (List of Projects) & Annex C2 (Hydrogen Capacities)","publisher":"ENTSOG (European Network of Transmission System Operators for Gas)","official":false,"landing_url":"https://www.entsog.eu/tyndp","data_url":"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx","access":"direct_download","format":"XLSX","license":"Open download under EU statutory TYNDP publication (Regulation (EU) 2024/1789)","language":"en","has_coordinates":false,"location_precision":"none","summary":"ENTSOG TYNDP 2026 Annex A (List of Projects) & Annex C2 (Hydrogen Capacities)","coverage_note":"Europe (11 Spain H2T transmission projects / 28 section rows + cross-border CelZa/BarMar capacities)","data_date":"October 2026 (Draft TYNDP 2026 Annex A rev4)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["No spatial coordinates; omits Spain's operational local lines (Abanto, Mallorca)."]},"example":{"example_request":"curl -sSL \"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx\" -o tyndp2026_annex_a.xlsx","example_result":"H2T-A-1149 | Spanish Hydrogen Backbone 2030 | Enagas Infraestructuras de Hidrogeno | Advanced | comm: 2029 | 195 GWh/d (ES Transport), 216 GWh/d (ES-FR)"},"members_summary":null},{"source_id":"s003","name":"European Commission / CINEA 2nd PCI/PMI List — Project Fiches (9.1.2, 9.1.3, 9.1.4)","publisher":"European Commission / CINEA (European Climate, Infrastructure and Environment Executive Agency)","official":true,"landing_url":"https://cinea.ec.europa.eu/programmes/connecting-europe-facility/energy-infrastructure-connecting-europe-facility/pci-transparency-platform_en","data_url":"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf","access":"pdf","format":"PDF","license":"European Commission public TEN-E transparency document","language":"en","has_coordinates":false,"location_precision":"municipality","summary":"European Commission / CINEA 2nd PCI/PMI List — Project Fiches (9.1.2, 9.1.3, 9.1.4)","coverage_note":"Spain & cross-border Cluster 9.1 PCIs (9.1.2 CelZa, 9.1.3 Internal Spanish Backbone 2,875 km, 9.1.4 BarMar)","data_date":"November 2026 (Last Update on 2nd PCI/PMI List Fiches)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":["No vector coordinates; interactive EC PCI map viewer unavailable (sorry.ec.europa.eu)."]},"example":{"example_request":"curl -sSL \"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf\" -o PCIFiche_9.1.3.pdf && pdftotext PCIFiche_9.1.3.pdf - | head -n 25","example_result":"Project of common interest: Internal hydrogen infrastructure in Spain 9.1.3 | PROMOTERS Enagas Infraestructuras de Hidrogeno (ES) | total approximate length of 2,875 km | COMMISSIONING DATE 31/12/2032 | export level of 2 MT/y (216 GWh/d) via BarMar"},"members_summary":null}],"other_sources_count":2,"if_unstructured":{"summary":null},"local_terms":[{"term":"hidroducto / hidrogenoducto","language":"es","meaning":"Dedicated hydrogen pipeline (used interchangeably in Nortegas/Redexis announcements alongside 'ducto de hidrogeno' in Enagas permitting docs)"},{"term":"gestor provisional de la red troncal de hidrogeno (HTNO)","language":"es","meaning":"Provisional Hydrogen Transmission Network Operator role granted to Enagas Infraestructuras de Hidrogeno S.L.U. under RDL 8/2023 DA 9a and Council of Ministers Agreement (30 Jul 2024)"},{"term":"RBDA (Relacion de Bienes y Derechos Afectados)","language":"es","meaning":"Schedule of affected cadastral parcels and linear easement meters ('SP (LM)') published in BOE Sec. V-B permitting notices"},{"term":"PCI / PMI (Proyecto de Interes Comun / Mutuo)","language":"es","meaning":"EU TEN-E Project of Common Interest / Mutual Interest (9.1.2 CelZa, 9.1.3 Internal Spanish Backbone, 9.1.4 BarMar)"},{"term":"PCPP (Plan de Participacion Publica)","language":"es","meaning":"Regional public-consultation process generating corridor alternative PDF maps prior to formal BOE/EIA authorization filings"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":35,"pages_opened":82,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/hydrogen-pipelines.json","detail_url":"https://georutter.org/v1/es/hydrogen-pipelines/detail.json","html_url":"https://georutter.org/es/hydrogen-pipelines/","country_url":"https://georutter.org/v1/countries/es.json"}
