{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"hydrogen-pipelines","question":"Where can I get the routes (geometry) of hydrogen pipelines in operation or planned in Spain, with operator, capacity and status?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"usable","summary":"Spain has no national open GIS registry of hydrogen pipelines (checked MITECO, CNMC, IGN/IDEE, datos.gob.es, OSM). Only two short local pipelines operate today: Nortegas Abanto (1.86 km, 2022) and Redexis Mallorca (3.2 km, Sep 2024), neither having public polyline geometry. For planned transmission, ENTSOG/GIE/EHB Joint Map's ArcGIS FeatureServer (h2inframap.eu) provides indicative polylines and operators, while ENTSOG TYNDP 2026 Annex A/C2 XLSX adds engineering specs, status, and GWh/d capacity. CINEA PCI Fiches and Enagas PDFs add official schematic maps, permitting status, and BOE/Delegacion del Gobierno RBDA notices with cadastral parcels.","main_caveats":["Spain has only 2 operational dedicated H2 pipelines (Nortegas 1.86 km; Redexis 3.2 km): Redexis Mallorca is absent from every dataset, and Nortegas Abanto appears only as a point (~18 km offset) in h2inframap Layer 0.","h2inframap.eu geometries are indicative/schematic (~12 km vertex spacing on Backbone), omit the Apr 2026 Alcazar de San Juan-Montesa PCI extension, lack ISO country and status columns, and lack capacity on 8/11 ES lines.","No official Spanish GIS file exists: MITECO, CNMC, IGN/IDEE, datos.gob.es and OSM Spain have zero H2 pipelines; EC PCI Transparency Platform viewer redirects to sorry.ec.europa.eu.","Official Enagas route files are PDFs and BOE permitting tables list affected cadastral parcel references (reconstructible only at parcel corridor level via Catastro WFS, not final as-built centerlines)."],"confidence":"high","confidence_reason":"All sources downloaded or queried live (ArcGIS REST, TYNDP 2026 XLSX, CINEA PDFs, Enagas/Nortegas/Redexis docs, BOE RBDA + Catastro WFS) and 0-record checks verified across MITECO, CNMC, IGN, datos.gob.es, EHO, and Geofabrik OSM.","attributes":[{"attribute":"route_geometry","covered":"partial","source_ids":["s001","s004"],"note":"Indicative planned polylines in h2inframap.eu Layer 7; schematic PDFs in Rank 4 and BOE parcel RCs; no public line geometry for the 2 operational local pipelines.","gap":"not_published","gap_note":"MITECO, CNMC, IGN/IDEE, datos.gob.es, OSM Spain, Nortegas and Redexis publish no downloadable pipeline centerlines; BOE RBDA gives cadastral parcels only."},{"attribute":"operator","covered":"yes","source_ids":["s001","s002","s003","s004","s005"],"note":"Operator/promoter named across all 5 sources: Enagas (provisional HTNO/PCIs), Reganosa H2Pole, H2GZ, plus operational Nortegas (Abanto) and Redexis (Mallorca).","gap":null,"gap_note":null},{"attribute":"capacity","covered":"partial","source_ids":["s001","s002","s003","s005"],"note":"GWh/d and Mt/y capacity given in TYNDP 2026 and CINEA PCI Fiches, and 190-575 t/y for Redexis; Rank 1 lacks capacity on 8/11 ES lines; Nortegas undisclosed.","gap":"not_published","gap_note":"Checked Nortegas Memoria 2022, pronor.es, parke.eus, h2inframap.eu and EHO: no public transport capacity figure for Nortegas Abanto or minor Rank 1 lines."},{"attribute":"status","covered":"partial","source_ids":["s001","s002","s003","s004","s005"],"note":"Operation confirmed only in Rank 5 (Nortegas, Redexis); planned maturity (Advanced/Less-Advanced) and Permitting status in TYNDP/CINEA/Enagas; Rank 1 has year only.","gap":"not_published","gap_note":"Rank 1 omits status codes (only Commission year); operational status is missing in Redexis's case from all registries and must be taken from operator disclosures."}]},"sources":[{"source_id":"s001","name":"Hydrogen Infrastructure Map (ENTSOG / GIE / EHB Joint Initiative ArcGIS FeatureServer)","publisher":"ENTSOG AISBL, GIE, Eurogas, CEDEC, GD4S, GEODE & European Hydrogen Backbone","official":false,"landing_url":"https://www.h2inframap.eu/","data_url":"https://services9.arcgis.com/xSsJeibXqRtsnmY7/arcgis/rest/services/Hydrogen_Infrastructure_Map_2024Q4_WFL1/FeatureServer/7","access":"api","format":"ArcGIS FeatureServer JSON / GeoJSON","license":"Publicly accessible without stated open license; informational disclaimer only (h2inframap.eu)","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"supranational","adds":"Only direct machine-readable vector polyline GIS service covering planned Spanish hydrogen transmission corridors (Backbone 2030/2040, BarMar, CelZa ES, Irun, Larrau, Morocco-ES, H2Pole, H2GZ).","first_seen_pass":1,"rank":1,"summary":"Hydrogen Infrastructure Map (ENTSOG / GIE / EHB Joint Initiative ArcGIS FeatureServer)","coverage_note":"Europe (11 Spain transmission polylines in Layer 7 + 3 cross-border FR/PT; 6 Nortegas distribution points in Layer 0; 0 Spain in Layer 6)","data_date":"2025-10-17 promoter submission cutoff (PR0359 release 2025-12-17); Layer 7 REST lastEditDate 2026-03-19","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Europe (11 Spain transmission polylines in Layer 7 + 3 cross-border FR/PT; 6 Nortegas distribution points in Layer 0; 0 Spain in Layer 6)"},"fine_print":{"unit":{"value":"Proposed/indicative transmission pipeline project corridors (Layer 7 esriGeometryPolyline) and distribution project markers (Layer 0 esriGeometryPoint)","quote":"interactive Hydrogen Infrastructure map brings together the hydrogen perspective and projects of Transmission System Operators (TSOs) of gas, Distribution System Operators (DSOs), Storage System Operators (SSOs) and LNG System Operators (LSOs)","url":"https://www.h2inframap.eu/","attempts":[]},"inclusion_rule":{"value":"Voluntary bottom-up project submissions from TSO/DSO/SSO/LSO and third-party promoters via public project form","quote":"The mapped information is collected by using a bottom up approach and hydrogen project promoters were asked to submit new and updated project information by 17 October 2025.","url":"https://www.entsog.eu/sites/default/files/2025-12/PR0359%2020251217%20Updated%20H2%20Infrastructure%20Map%20available%20online.pdf","attempts":[]},"reference_date":{"value":"2025-10-17 promoter submission cutoff (PR0359 release 2025-12-17); Layer 7 REST lastEditDate 2026-03-19","quote":"These data and information collected are published for informative and indicative purposes only and does not reflect true-to-scale representation of the infrastructure.","url":"https://www.h2inframap.eu/","attempts":[]},"update_frequency":{"value":"Iterative periodic map updates driven by promoter review campaigns (~annual)","quote":"The information provided undergoes an iterative review.","url":"https://www.h2inframap.eu/","attempts":[]},"exclusions":{"value":"Discontinued projects removed by promoters; non-submitted pipelines omitted (missing Redexis Mallorca operational line and Apr 2026 Alcazar de San Juan-Montesa PCI addition)","quote":"In some cases, discontinued projects identified by the promoters have been removed from the map.","url":"https://www.entsog.eu/sites/default/files/2025-12/PR0359%2020251217%20Updated%20H2%20Infrastructure%20Map%20available%20online.pdf","attempts":[]}},"key_fields":[{"field":"OBJECTID","meaning":"Feature identifier inside Layer 7"},{"field":"Project_Na","meaning":"Project or corridor name"},{"field":"Promoter_N","meaning":"Promoting operator or consortium"},{"field":"Project_Ty","meaning":"New, Mix, or Conversion of existing infrastructure"},{"field":"Commission","meaning":"Planned or historical commissioning year string (no status field)"},{"field":"Increment","meaning":"Capacity increment in GWh/d (often 'No data available')"},{"field":"Peak_Incre","meaning":"Peak capacity increment in GWh/d"},{"field":"PCI_PMI","meaning":"EU TEN-E status flag ('PCI' or 'No')"},{"field":"Location","meaning":"Free-text country or corridor description (not an ISO country code)"}],"how_to_use":{"example_request":"curl -sS \"https://services9.arcgis.com/xSsJeibXqRtsnmY7/arcgis/rest/services/Hydrogen_Infrastructure_Map_2024Q4_WFL1/FeatureServer/7/query?where=Promoter_N%20LIKE%20%27%25Enag%25%27&outFields=OBJECTID,Project_Na,Promoter_N,Project_Ty,Commission,Increment,PCI_PMI&outSR=4326&resultRecordCount=1&f=json\"","example_result":"{\"OBJECTID\": 66, \"Project_Na\": \"H2Med-BarMar\", \"Promoter_N\": \"Enagás Infraestructuras de Hidrógeno/Terega/Natran/Open Grid Europe\", \"Project_Ty\": \"New\", \"Commission\": \"2032\", \"Increment\": \"216\", \"PCI_PMI\": \"PCI\"} (+ 694 polyline vertices)","steps":["Query Layer 7 (Transmission, esriGeometryPolyline) via ArcGIS REST /query with outSR=4326 and f=geojson or f=json; avoid Layer 0 (points only, mislocated for Nortegas) and Layer 6 (0 Spain records).","Do not filter by Location LIKE '%Spain%' alone because French HY-FEN corridors mention Spain in Project_Na; filter by Promoter_N (Enag, Reganosa, H2GZ) plus spatial bounding box.","Join against TYNDP 2026 Annex A (Rank 2) for GWh/d capacity and maturity status where Increment is 'No data available'."],"reading_traps":["Service URL says 2024Q4_WFL1 even though WebMap is 2025Q4 v15 and Layer 7 metadata lastEditDate is 2026-03-19.","No ISO country code: filtering for 'Spain' picks up French HY-FEN lines (OID=24, 25 at lon 4.87..7.59).","Layer 0 (Distribution) is esriGeometryPoint (not polylines) and places Nortegas OID=34 ('BH2C Pase I') ~18 km from Muskiz-Abanto (-2.99, 43.18).","Increment and Peak_Incre show 'No data available' on 8 of 11 strict Spain Layer 7 polylines.","Geometries are schematic (~12 km vertex spacing on Backbone OID=366) and omit the Apr 2026 Alcazar de San Juan-Montesa PCI addition and Redexis Mallorca."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":4591481,"records_total":235,"records_for_country":11,"problems":["Schematic/indicative polylines only; Layer 0 Nortegas point offset ~18 km from Muskiz-Abanto; omits Redexis Mallorca and Apr 2026 Alcazar-Montesa PCI extension; capacity missing on 8/11 ES lines."]},"evidence":[{"claim":"Joint map is published by ENTSOG/associations on a best-effort basis and routes are indicative, not true-to-scale","url":"https://www.h2inframap.eu/","quote":"These data and information collected are published for informative and indicative purposes only and does not reflect true-to-scale representation of the infrastructure."},{"claim":"2025 update cutoff was 17 October 2025 (published 17 December 2025) including Spanish Hydrogen Backbone 2030 and 2040 updates","url":"https://www.entsog.eu/sites/default/files/2025-12/PR0359%2020251217%20Updated%20H2%20Infrastructure%20Map%20available%20online.pdf","quote":"Updated representation of the Spanish Hydrogen Backbone 2030 and 2040."}],"members":[],"members_summary":null},{"source_id":"s002","name":"ENTSOG TYNDP 2026 Annex A (List of Projects) & Annex C2 (Hydrogen Capacities)","publisher":"ENTSOG (European Network of Transmission System Operators for Gas)","official":false,"landing_url":"https://www.entsog.eu/tyndp","data_url":"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx","access":"direct_download","format":"XLSX","license":"Open download under EU statutory TYNDP publication (Regulation (EU) 2024/1789)","language":"en","has_coordinates":false,"location_precision":"none","publisher_type":"supranational","adds":"Supplies the missing capacities (GWh/d in Capacity Increments & Annex C2), section lengths (km), diameters (mm), pressures (bar), New vs Repurposed, and Maturity Status absent from Rank 1.","first_seen_pass":1,"rank":2,"summary":"ENTSOG TYNDP 2026 Annex A (List of Projects) & Annex C2 (Hydrogen Capacities)","coverage_note":"Europe (11 Spain H2T transmission projects / 28 section rows + cross-border CelZa/BarMar capacities)","data_date":"October 2026 (Draft TYNDP 2026 Annex A rev4)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Europe (11 Spain H2T transmission projects / 28 section rows + cross-border CelZa/BarMar capacities)"},"fine_print":{"unit":{"value":"TYNDP H2T project codes and individual pipeline section / compressor rows","quote":"H2T: Hydrogen transmission pipelines","url":"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx","attempts":[]},"inclusion_rule":{"value":"Promoter submissions satisfying ENTSOG TYNDP 2026 Guidelines for Project Inclusion","quote":"Annex A lists all projects included in the TYNDP 2026. All listed projects, therefore, comply with TYNDP 2026 Guidelines for project inclusion.","url":"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx","attempts":[]},"reference_date":{"value":"October 2026 (Draft TYNDP 2026 Annex A rev4)","quote":"Draft TYNDP 2026 Annex A List of Projects","url":"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx","attempts":[]},"update_frequency":{"value":"Biennial statutory ENTSOG TYNDP release","quote":null,"url":"https://www.entsog.eu/tyndp","attempts":["Checked entsog.eu/tyndp landing page and Annex A Intro sheet; TYNDP cadence is biennial under EU Regulation 2024/1789 without an explicit frequency field inside the workbook."]},"exclusions":{"value":"Local distribution and industrial captive lines outside TYNDP H2T submission rules (e.g. Nortegas Abanto, Redexis Mallorca)","quote":null,"url":"https://www.entsog.eu/tyndp","attempts":["Filtered Project Main Info by Country='Spain': returns only the 11 Enagas H2T planned transmission projects; operational local pipelines do not appear."]}},"key_fields":[{"field":"Code","meaning":"Project identifier (e.g. H2T-A-1149, H2T-N-1151)"},{"field":"Project Name","meaning":"Corridor or backbone project name"},{"field":"Maturity Status","meaning":"FID, Advanced (A), or Less-Advanced (N)"},{"field":"New/Repurposed","meaning":"New build vs repurposed gas infrastructure"},{"field":"Section Length (km)","meaning":"Section pipeline length in km"},{"field":"Nominal Diameter (mm)","meaning":"Pipe diameter in mm (e.g. 762 = 30 in)"},{"field":"Max Operating Pressure (bar)","meaning":"Maximum operating pressure in bar (e.g. 100)"},{"field":"Capacity (GWh/d)","meaning":"Incremental transport capacity in GWh/d (Capacity Increments sheet)"}],"how_to_use":{"example_request":"curl -sSL \"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx\" -o tyndp2026_annex_a.xlsx","example_result":"H2T-A-1149 | Spanish Hydrogen Backbone 2030 | Enagas Infraestructuras de Hidrogeno | Advanced | comm: 2029 | 195 GWh/d (ES Transport), 216 GWh/d (ES-FR)","steps":["Download INV0460-26 TYNDP 2026 Annex A rev4 XLSX and AnnexC2_H2_TYNDP2026_0.xlsx from entsog.eu/tyndp.","Filter 'Project Main Info' by Country='Spain' and Code LIKE 'H2T-%' (plus H2T-N-1156 for PT side of CelZa).","Join Code across sheets 'H2T' (lengths, diameters, bar), 'Capacity Increments' (GWh/d), and 'Time Schedule'."],"reading_traps":["Contains zero coordinates; geometries require matching to Rank 1 by project name.","Sheet H2T includes compressor station rows with empty or 0 Section Length; filter Length > 0 when summing km.","Multi-line header blocks at the top of worksheets require skipping title rows before parsing."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":974311,"records_total":347,"records_for_country":11,"problems":["No spatial coordinates; omits Spain's operational local lines (Abanto, Mallorca)."]},"evidence":[{"claim":"TYNDP 2026 Annex A documents 11 Spain H2T planned pipeline projects (28 section rows) including Alcazar de San Juan-Montesa and capacity increments in GWh/d","url":"https://www.entsog.eu/sites/default/files/2026-10/INV0460-26%20TYNDP%202026%20Annex%20A%20List%20of%20Projects%20rev4.xlsx","quote":"Annex A contains the most relevant information submitted by project promoters during the project submission phase."}],"members":[],"members_summary":null},{"source_id":"s003","name":"European Commission / CINEA 2nd PCI/PMI List — Project Fiches (9.1.2, 9.1.3, 9.1.4)","publisher":"European Commission / CINEA (European Climate, Infrastructure and Environment Executive Agency)","official":true,"landing_url":"https://cinea.ec.europa.eu/programmes/connecting-europe-facility/energy-infrastructure-connecting-europe-facility/pci-transparency-platform_en","data_url":"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf","access":"pdf","format":"PDF","license":"European Commission public TEN-E transparency document","language":"en","has_coordinates":false,"location_precision":"municipality","publisher_type":"supranational","adds":"Official EU legal status (Permitting), investment cost (EUR), CEF grant links, corridor node endpoints, capacities (2 MT/y export + ~1 MT/y domestic), and the Apr 2026 Alcazar de San Juan-Montesa expansion not yet in Rank 1.","first_seen_pass":1,"rank":3,"summary":"European Commission / CINEA 2nd PCI/PMI List — Project Fiches (9.1.2, 9.1.3, 9.1.4)","coverage_note":"Spain & cross-border Cluster 9.1 PCIs (9.1.2 CelZa, 9.1.3 Internal Spanish Backbone 2,875 km, 9.1.4 BarMar)","data_date":"November 2026 (Last Update on 2nd PCI/PMI List Fiches)","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain & cross-border Cluster 9.1 PCIs (9.1.2 CelZa, 9.1.3 Internal Spanish Backbone 2,875 km, 9.1.4 BarMar)"},"fine_print":{"unit":{"value":"EU TEN-E Project of Common Interest (PCI) dossier","quote":"Project of common interest: Internal hydrogen infrastructure in Spain 9.1.3","url":"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf","attempts":[]},"inclusion_rule":{"value":"Projects designated on the 2nd EU Union list under revised TEN-E Regulation (EU) 2022/869","quote":"In line with the provisions of the TEN-E Regulation, the content of this document relies on information provided by the promoter(s) of the Project of Common Interest","url":"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf","attempts":[]},"reference_date":{"value":"November 2026 (Last Update on 2nd PCI/PMI List Fiches)","quote":"LAST UPDATE November 2026","url":"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf","attempts":[]},"update_frequency":{"value":"Biennial PCI list with periodic fiche refreshes","quote":null,"url":"https://cinea.ec.europa.eu/programmes/connecting-europe-facility/energy-infrastructure-connecting-europe-facility/pci-transparency-platform_en","attempts":["Checked CINEA PCI Transparency Platform page and PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf: displays LAST UPDATE November 2026 without an explicit refresh schedule string."]},"exclusions":{"value":"Non-PCI domestic projects and operational local pipelines excluded","quote":null,"url":"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf","attempts":["Verified 2nd PCI/PMI list covers Cluster 9.1 projects 9.1.2, 9.1.3 and 9.1.4 only; non-PCI lines (H2Pole, H2GZ, Abanto, Mallorca) are omitted."]}},"key_fields":[{"field":"PCI Code","meaning":"Official EU Cluster 9.1 identifier (9.1.2, 9.1.3, 9.1.4)"},{"field":"PROMOTERS","meaning":"Legal project promoter(s) per member state"},{"field":"COMMISSIONING DATE","meaning":"Target commissioning date (31/12/2032 for 9.1.3)"},{"field":"Technical description","meaning":"Axis node endpoints, total km (2,875 km), and capacity (2 MT/y / 216 GWh/d)"},{"field":"PCI costs","meaning":"Estimated CAPEX in EUR (EUR 3,621,000,000 for 9.1.3)"}],"how_to_use":{"example_request":"curl -sSL \"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf\" -o PCIFiche_9.1.3.pdf && pdftotext PCIFiche_9.1.3.pdf - | head -n 25","example_result":"Project of common interest: Internal hydrogen infrastructure in Spain 9.1.3 | PROMOTERS Enagas Infraestructuras de Hidrogeno (ES) | total approximate length of 2,875 km | COMMISSIONING DATE 31/12/2032 | export level of 2 MT/y (216 GWh/d) via BarMar","steps":["Download PCIFiche_9.1.2_2nd_PCI_PMI_list.pdf (CelZa), PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf (Backbone), and PCIFiche_9.1.4_2nd_PCI_PMI_list.pdf (BarMar) directly from ec.europa.eu/assets/cinea/PCI/files/.","Extract node names, lengths, capacity figures, and permitting/CEF status via pdftotext (since the interactive EC PCI map viewer currently fails)."],"reading_traps":["The EC PCI Transparency Platform interactive map viewer URL redirects to sorry.ec.europa.eu ('Server temporarily unavailable').","PDF fiches contain corridor endpoint node names only (no vector polylines) and omit non-PCI pipelines."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":306971,"records_total":3,"records_for_country":3,"problems":["No vector coordinates; interactive EC PCI map viewer unavailable (sorry.ec.europa.eu)."]},"evidence":[{"claim":"Official PCI 9.1.3 fiche updated November 2026 covers 2,875 km including Alcazar de San Juan-Montesa and 2 MT/y (216 GWh/d) export capacity","url":"https://ec.europa.eu/assets/cinea/PCI/files/PCIFiche_9.1.3_2nd_PCI_PMI_list.pdf","quote":"The Spanish hydrogen backbone includes two main axes of pipelines of a total approximate length of 2,875 km"}],"members":[],"members_summary":null},{"source_id":"s004","name":"Enagas Infraestructuras de Hidrogeno — Red Troncal & H2Med Official Portal","publisher":"Enagas Infraestructuras de Hidrogeno, S.L.U. (Provisional HTNO)","official":true,"landing_url":"https://www.infraestructurasdehidrogeno.es/infraestructura-interior-de-hidrogeno/","data_url":"https://www.infraestructurasdehidrogeno.es/wp-content/uploads/2025/04/Infraestructura-interior-hidrogeno-resumen-no-tecnico.pdf","access":"pdf","format":"PDF","license":"Operator public-consultation / transparency documentation","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Official 15-section breakdown (lengths, 16-32 inch diameters, New vs Adapted existing gas pipelines), regional alternative corridor detail PDF maps, and links to Sep 2026 BOE permitting filings.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Spain national PCI 9.1.3 backbone (15 sections) plus CelZa (9.1.2) and BarMar (9.1.4)"},"fine_print":{"unit":{"value":"PCI corridor segments (tramos) and valve/compressor positions under PCPP and permitting","quote":"El Proyecto PCI 9.1.3 “Infraestructura interior de hidrógeno en España” tiene el objetivo de desarrollar una red de ductos de hidrógeno vertebrada a lo largo de la geografía española","url":"https://www.infraestructurasdehidrogeno.es/wp-content/uploads/2025/04/Infraestructura-interior-hidrogeno-resumen-no-tecnico.pdf","attempts":[]},"inclusion_rule":{"value":"Projects developed by Enagas Infraestructuras de Hidrogeno as provisional HTNO under RDL 8/2023 and Council of Ministers Mandate (Jul 2024)","quote":"En diciembre de 2023, Enagás fue designado por el Real Decreto-ley 8/2023, de 27 de diciembre, como gestor provisional de la red de hidrógeno, o Hydrogen Transmission Network Operator (HTNO).","url":"https://www.infraestructurasdehidrogeno.es/wp-content/uploads/2025/04/Infraestructura-interior-hidrogeno-resumen-no-tecnico.pdf","attempts":[]},"reference_date":{"value":"2025-04 Resumen no tecnico; 2026-03 Cuadriptico V17; 2026-09/10 PCPP regional & BOE PDFs","quote":null,"url":"https://www.infraestructurasdehidrogeno.es/infraestructura-interior-de-hidrogeno/","attempts":["Checked upload dates in PDF URLs (/2025/04/, /2026/03/, /2026/10/) and BOE notice dates (28-30 Sep 2026) on infraestructurasdehidrogeno.es."]},"update_frequency":{"value":"Event-driven per regional PCPP campaign and statutory permitting filing","quote":null,"url":"https://www.infraestructurasdehidrogeno.es/infraestructura-interior-de-hidrogeno/","attempts":["Portal adds new regional reports and BOE permitting PDFs as each segment advances; no fixed calendar published."]},"exclusions":{"value":"Excludes non-Enagas local and third-party pipelines (e.g. Nortegas BH2C, Redexis Mallorca, Reganosa H2Pole)","quote":null,"url":"https://www.infraestructurasdehidrogeno.es/infraestructura-interior-de-hidrogeno/","attempts":["Inspected /infraestructura-interior-de-hidrogeno/, /celza/ and /barmar/: portal covers Enagas HTNO PCI corridors only."]}},"key_fields":[{"field":"Tramo / Segmento","meaning":"Pipeline section name (e.g. Huelva-Aznalcazar, Muskiz-Arrigorriaga)"},{"field":"Diametro","meaning":"Pipe diameter from 16\" to 32\""},{"field":"Nueva construccion vs Adaptada","meaning":"New steel pipeline vs repurposed existing gas line"}],"how_to_use":{"example_request":"curl -sSL \"https://www.infraestructurasdehidrogeno.es/wp-content/uploads/2025/04/Infraestructura-interior-hidrogeno-resumen-no-tecnico.pdf\" -o enagas_rnt.pdf && pdftotext -f 8 -l 10 enagas_rnt.pdf -","example_result":"PCI 9.1.3 Infraestructura interior de hidrogeno en Espana | Diametro de la conduccion: se utilizaran diametros desde 16\" a 32\". | La conduccion ira enterrada a lo largo de todo su recorrido, con una cobertura minima de 1 m.","steps":["Open infraestructurasdehidrogeno.es/infraestructura-interior-de-hidrogeno/ (plus /celza/ and /barmar/) for Cuadriptico V17 PDF, Resumen no tecnico PDF, regional detail maps, and BOE notice PDFs.","Cross-reference segment names with Sep 2026 BOE PDF links on the same page to obtain exact parcel RBDA tables."],"reading_traps":["Zero Shapefile/GeoJSON downloads exist; maps are visual PDF schematics and regional corridor detail plates.","Covers Enagas PCI infrastructure only; omits non-Enagas operators."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":1650736,"records_total":15,"records_for_country":15,"problems":["Schematic PDFs only, no downloadable vector GIS routes."]},"evidence":[{"claim":"Enagas was designated provisional HTNO in Dec 2023 and enabled by Council of Ministers in Jul 2024 to develop Spain's PCI 9.1.3 backbone","url":"https://www.infraestructurasdehidrogeno.es/wp-content/uploads/2025/04/Infraestructura-interior-hidrogeno-resumen-no-tecnico.pdf","quote":"En diciembre de 2023, Enagás fue designado por el Real Decreto-ley 8/2023, de 27 de diciembre, como gestor provisional de la red de hidrógeno, o Hydrogen Transmission Network Operator (HTNO)."}],"members":[],"members_summary":null},{"source_id":"s005","name":"Operational Local Hydrogen Pipelines — Titular Operator Disclosures (Nortegas & Redexis)","publisher":"Nortegas Energia Distribucion S.A.U. & Redexis S.A.","official":true,"landing_url":"https://www.redexis.es/sala-de-comunicacion/iniciadas-las-obras-del-primer-hidrogenoducto-en-espana-que-inyectara-de-forma","data_url":"https://www.nortegas.es/assets/uploads/2023/06/Memoria-nortegas-2022-es.pdf","access":"pdf","format":"PDF / HTML press releases","license":"Public corporate sustainability report and press releases","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Confirms active operational status, exact pipeline lengths, and Green Hysland capacity (190-575 t/y, 6-20 GWh/y), filling the omission of Redexis Mallorca across all European and Spanish datasets.","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Local operational pipelines in Bizkaia (Muskiz-Abanto) and Balearic Islands (Cas Tresorer, Palma de Mallorca)"},"fine_print":{"unit":{"value":"Individual local 100% H2 dedicated pipeline asset","quote":"Nortegas ha construido el primer hidroducto del Estado, convirtiendo el Parque Tecnológico de Abanto en un espacio empresarial pionero en España con suministro de hidrógeno renovable.","url":"https://www.nortegas.es/assets/uploads/2023/06/Memoria-nortegas-2022-es.pdf","attempts":[]},"inclusion_rule":{"value":"Operator corporate sustainability and commissioning disclosures for active assets","quote":"A través de 3,2 kilómetros de longitud entre la posición de descarga a la que llegarán los tubetrailers que salen de Lloseta y el punto de inyección, el hidrogenoducto vehiculará el hidrógeno renovable y tiene previsto inyectar en su etapa inicial hasta 190 Tn/año de hidrógeno (6 GWh/año), pudiendo llegar hasta las 575 Tn/año (20 GWh/año).","url":"https://www.redexis.es/sala-de-comunicacion/iniciadas-las-obras-del-primer-hidrogenoducto-en-espana-que-inyectara-de-forma","attempts":[]},"reference_date":{"value":"2022 (Nortegas Abanto); 2024-09-20 (Redexis Mallorca commissioning)","quote":"Nuestra compañía ha logrado un hito histórico en la transición energética de nuestro país al realizar la primera inyección de hidrógeno verde en la red de gas natural española,concretamente en la isla de Mallorca.","url":"https://www.redexis.es/sala-de-comunicacion/redexis-realiza-la-primera-inyeccion-de-hidrogeno-verde-en-la-red-de-gas","attempts":[]},"update_frequency":{"value":"Event-driven (commissioning press releases / annual reports)","quote":null,"url":"https://www.redexis.es/sala-de-comunicacion/redexis-realiza-la-primera-inyeccion-de-hidrogeno-verde-en-la-red-de-gas","attempts":["Checked Redexis communications and Nortegas 2022 Sustainability Report; published on commissioning milestones without fixed GIS updates."]},"exclusions":{"value":"On-site private captive refinery piping inside industrial complexes without operator announcements is not covered","quote":null,"url":"https://www.nortegas.es/assets/uploads/2023/06/Memoria-nortegas-2022-es.pdf","attempts":["Cross-checked AeH2 2026 Census (28.75 MW operational electrolysis total across Spain) confirming only Nortegas Abanto and Redexis Mallorca operate external dedicated H2 pipelines."]}},"key_fields":[{"field":"Length","meaning":"1.86 km / ~2 km (Nortegas Abanto); 3.2 km (Redexis Mallorca)"},{"field":"Capacity","meaning":"190 t/y (6 GWh/y) initial up to 575 t/y (20 GWh/y) for Redexis; undisclosed for Nortegas"},{"field":"Status","meaning":"In operation (end-2022 Abanto; 2024-09-20 Mallorca)"}],"how_to_use":{"example_request":"curl -sSL \"https://www.nortegas.es/assets/uploads/2023/06/Memoria-nortegas-2022-es.pdf\" -o nortegas_2022.pdf && pdftotext -f 66 -l 66 nortegas_2022.pdf -","example_result":"Nortegas ha finalizado la construccion en 2022 del primer hidroducto 100% H2 de Espana junto a Petronor, conectando la refineria de la filial de Repsol con el Parque Tecnologico de Abanto.","steps":["Download Nortegas 2022 Sustainability Report PDF and read page 66 for BH2C Muskiz-Abanto confirmation.","Fetch Redexis Green Hysland press releases (7 Nov 2023 & 20 Sep 2024) for 3.2 km length, 190-575 t/y capacity, and 2024-09-20 commissioning."],"reading_traps":["No public GIS coordinates or Shapefile tracks are published for either operational pipeline.","Redexis press-release URLs advertise http:// in rel=canonical while serving over https://; both work without login."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":13690255,"records_total":2,"records_for_country":2,"problems":["Prose announcements only; zero downloadable GIS coordinates; Nortegas capacity not disclosed."]},"evidence":[{"claim":"Nortegas built Spain's first 100% H2 pipeline (~2 km) in 2022 linking Petronor refinery to Abanto Technology Park","url":"https://www.nortegas.es/assets/uploads/2023/06/Memoria-nortegas-2022-es.pdf","quote":"Nortegas ha construido el primer hidroducto del Estado, convirtiendo el Parque Tecnológico de Abanto en un espacio empresarial pionero en España con suministro de hidrógeno renovable."},{"claim":"Redexis completed and commissioned Spain's 3.2 km Green Hysland H2 injection pipeline in Mallorca (190-575 t/y, 6-20 GWh/y) on 20 Sep 2024","url":"https://www.redexis.es/sala-de-comunicacion/iniciadas-las-obras-del-primer-hidrogenoducto-en-espana-que-inyectara-de-forma","quote":"A través de 3,2 kilómetros de longitud entre la posición de descarga a la que llegarán los tubetrailers que salen de Lloseta y el punto de inyección, el hidrogenoducto vehiculará el hidrógeno renovable y tiene previsto inyectar en su etapa inicial hasta 190 Tn/año de hidrógeno (6 GWh/año), pudiendo llegar hasta las 575 Tn/año (20 GWh/año)."}],"members":[{"name":"Nortegas (BH2C Muskiz-Abanto 1.86 km)","landing_url":"https://parke.eus/campus-abanto-es-el-primer-espacio-tecnologico-del-mundo-alimentado-por-hidrogeno-verde/","data_url":"https://www.nortegas.es/assets/uploads/2023/06/Memoria-nortegas-2022-es.pdf","access":"pdf","tested":true,"data_found":null,"note":"Page 66 confirms completion in 2022 of Spain's first 100% H2 pipeline (~2 km / 1,860 m) linking Petronor refinery (2.5 MW electrolyzer, Muskiz) to Parque Tecnologico de Abanto (corroborated by pronor.es). No vector geometry or pipeline capacity published."},{"name":"Redexis (Green Hysland Cas Tresorer, Mallorca 3.2 km)","landing_url":"https://www.redexis.es/sala-de-comunicacion/iniciadas-las-obras-del-primer-hidrogenoducto-en-espana-que-inyectara-de-forma","data_url":"https://www.redexis.es/sala-de-comunicacion/redexis-realiza-la-primera-inyeccion-de-hidrogeno-verde-en-la-red-de-gas","access":"web_viewer_only","tested":true,"data_found":null,"note":"Press releases (7 Nov 2023 & 20 Sep 2024) confirm 3.2 km 100% H2 injection pipeline operational since 20 Sep 2024 in Palma (Mallorca), capacity 190 t/y (6 GWh/y) initial up to 575 t/y (20 GWh/y), EUR 3.5M investment. No vector geometry published."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"sector":{"regulator":{"name":"Ministerio para la Transicion Ecologica y el Reto Demografico (MITECO) for policy/authorizations; Comision Nacional de los Mercados y la Competencia (CNMC) temporarily supervising TEN-E H2 PCIs under RDL 7/2026 pending CNE creation","url":"https://www.miteco.gob.es/es/energia/hidrocarburos-nuevos-combustibles/hidrogeno.html"},"operators":{"structure":"few","note":"RDL 8/2023 DA 9a and Council of Ministers (30 Jul 2024) designate Enagas Infraestructuras de Hidrogeno S.L.U. as provisional HTNO for PCI corridors (9.1.2, 9.1.3, 9.1.4). Two local operational lines run under Nortegas (BH2C Abanto) and Redexis (Mallorca); Reganosa (H2Pole) and H2GZ promote planned regional lines.","census_url":"https://aeh2.org/censo-de-proyectos-de-hidrogeno/"},"publication_obligation":{"exists":"no_evidence_found","norm":"RDL 8/2023 DA 9a (BOE-A-2023-26452) requires a non-binding 10-year proposal to DGPEM; Ley 34/1998 Title V / DA 38a + RD 1434/2002 + EU TEN-E 2022/869 trigger BOE permitting notices and EU PCI fiches, with no mandate for an open national GIS registry.","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-26452","what_must_be_published":"Ten-year non-binding backbone proposal submitted to MITECO (DGPEM); individual public-information and RBDA parcel notices in BOE and Delegaciones del Gobierno during permitting.","frequency":"Per permitting phase / EU PCI biennial cycle"},"consolidated_republication":{"found":"no_evidence_found","note":"No Spanish administration or regulator republishes consolidated hydrogen pipeline routes; partial supranational consolidation exists only at ENTSOG (TYNDP / h2inframap.eu) and EC/CINEA (PCI PDF fiches, while PCI map viewer is down).","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/hidrocarburos-nuevos-combustibles/hidrogeno.html","saw":"Hydrogen policy, TEN-E PCI/PMI overview, permitting guide, and SABIA EIA portal (lists Enagas CIF B10580116), but zero pipeline datasets or maps; 2024 H2 statistics ODS contains national energy balances only."},{"organization":"CNMC","url":"https://www.cnmc.es/sectores-que-regulamos/energia","saw":"Gas/electricity datasets only; RDL 7/2026 (BOE-A-2026-6544) explicitly states CNMC lacks general hydrogen-sector powers and grants temporary TEN-E PCI investment supervision pending CNE establishment."},{"organization":"datos.gob.es","url":"https://datos.gob.es/apidata/catalog/dataset/keyword/hidroducto.json","saw":"API returned 0 datasets for hidroducto, 0 for gasoducto, and 10 INE air-emission datasets for hidrogeno; HTML /es/catalogo returned HTTP 503."}]}},"national_registry":{"exists":"no_evidence_found","note":"Confirmed absent across four national public organizations (MITECO, CNMC, IGN/IDEE, datos.gob.es). Spain does not yet maintain a statutory public hydrogen network registry or GIS layer.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/cartografia-y-sig/ide/directorio_datos_servicios.html","saw":"Checked H2 pages (/hidrogeno.html, /tramitacion.html, /proyectos-interes-comun...html), GeoPortal, metadata catalog, WMS/WFS directory, and Annual H2 Statistics 2024 ODS: no hydrogen pipeline layer or registry."},{"organization":"CNMC","url":"https://data.cnmc.es/energia","saw":"CNMC Data portal covers electricity and natural gas market statistics; RDL 7/2026 (BOE-A-2026-6544) confirms CNMC had no H2 competencies and publishes no H2 pipeline registry."},{"organization":"IGN / IDEE","url":"https://www.idee.es","saw":"Checked IGN Cartografia y Datos Geograficos, IDEE geoportal, and BTN100 model (CBG - BTN100.pdf): Conducciones covers oil and natural gas pipelines only, with zero hydrogen pipeline classes."},{"organization":"datos.gob.es","url":"https://datos.gob.es","saw":"REST API keyword searches for hidroducto (0), gasoducto (0), and hidrogeno (10 INE emissions datasets) returned zero pipeline datasets; /es/catalogo returned HTTP 503."}]},"if_unstructured":{"summary":null,"recipe":["1. Fetch a segment's BOE public-information PDF (e.g. 20260930_Seg-HUE-AZN_BOE.pdf / BOE-B-2026-31654 Huelva-Aznalcazar) and extract text with pdftotext.","2. Parse 14-character Referencia Catastral codes from the RBDA table (regex [0-9]{5}[A-Z][0-9]{8}, e.g. 41075A01700178) along with municipality and linear easement SP (LM).","3. Query Catastro INSPIRE WFS GetParcel for each RC: curl -sS \"https://ovc.catastro.meh.es/INSPIRE/wfsCP.aspx?service=wfs&version=2.0.0&request=GetFeature&STOREDQUERIE_ID=GetParcel&REFCAT=41075A01700178\" (verified HTTP 200 returning 2,723-byte GML polygon ES.SDGC.CP.41075A01700178, areaValue 5657 m2 with gml:posList).","4. Order parcel centroids along the permitting corridor (or extract GIS plans from almacen.redsara.es PAI.zip when open) and cross-reference segment GWh/d capacity and maturity status with TYNDP 2026 Annex A."],"location_method":"Parcel-level corridor reconstruction from BOE RBDA Referencias Catastrales via Catastro INSPIRE WFS (GetParcel); recovers affected parcel polygons along the proposed easement rather than final as-built centerlines.","cross_with":["Direccion General del Catastro INSPIRE WFS (https://ovc.catastro.meh.es/INSPIRE/wfsCP.aspx): pass 14-char RBDA Referencia Catastral as REFCAT in GetParcel to get ETRS89 parcel polygon GML.","ENTSOG TYNDP 2026 Annex A (https://www.entsog.eu/tyndp): match segment corridor against H2T code to obtain planned GWh/d capacity and maturity status."],"where_published":[{"name":"Boletin Oficial del Estado (BOE) — Anuncios de informacion publica y RBDA","url":"https://www.boe.es","what":"Official public-information and utility-declaration announcements per segment reporting exact length (m), diameter (inches), pressure (bar), municipalities, and cadastral parcel RBDA tables.","how_to_search_inside":"Search boe.es Sec. V-B (or mirror PDFs on infraestructurasdehidrogeno.es) for \"Infraestructura interior de hidrógeno en España\" + \"información pública\".","example_document":{"url":"https://www.infraestructurasdehidrogeno.es/wp-content/uploads/2026/10/20260930_Seg-HUE-AZN_BOE.pdf","what_it_gives":"diámetro de 30 pulgadas y una longitud total, teniendo en cuenta la orografía, de 59,116 km"}},{"name":"Delegaciones del Gobierno (MPTMD) — Tablon Digital de Informacion Publica","url":"https://mptmd.gob.es/portal/delegaciones_gobierno/delegaciones/paisvasco/proyectos-ci/tabl-n-digital-dgpv/informacion-publica/PCI913_INFRAESTRUCTURA_INTERIOR_DE_HIDROGENO_EN_ESPANA_TRAMO_REOCIN_ARRIGORRIAGA","what":"Hosts links to almacen.redsara.es public download packages with full Proyecto Administrativo (PAI.zip) and Estudio de Impacto Ambiental (EsIA) technical plans during public consultation.","how_to_search_inside":"Filter MPTMD Area de Industria y Energia 'Informacion Publica' notice boards by province for PCI 9.1.3 or 9.1.2/9.1.4 segment names.","example_document":{"url":"https://www.infraestructurasdehidrogeno.es/wp-content/uploads/2026/10/20260929_Seg-MUS-ARR_BOE.pdf","what_it_gives":"Muskiz-Arrigorriaga (BOE-B-2026-31549): 38,411 m, 30 inches, 100 bar (g) design pressure, ~617 RBDA parcels linked to RedSara PAI.zip (586 MB)."}},{"name":"MITECO SABIA — Evaluacion Ambiental","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","what":"Indexes active environmental impact assessment dossiers by promoter (lists ENAGAS INFRAESTRUCTURAS DE HIDROGENO S.L.U., CIF B10580116).","how_to_search_inside":"Open SABIA search form and select promoter ENAGAS INFRAESTRUCTURAS DE HIDROGENO S.L.U. (B10580116).","example_document":{"url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","what_it_gives":"Confirms active EIA tracking entries under CIF B10580116 across MITECO environmental procedures."}}]},"related_not_answering":[{"name":"European Hydrogen Observatory (EHO) — Hydrogen Infrastructure Dataset (May 2026)","url":"https://observatory.clean-hydrogen.europa.eu/tools-reports/datasets","why":"Downloadable XLSX of operational European industrial H2 pipelines has 0 rows for Spain (ES) across all sheets; omits Nortegas Abanto (1.86 km) and Redexis Mallorca (3.2 km)."},{"name":"Global Energy Monitor (GEM) — Global Gas Infrastructure Tracker (2026-10)","url":"https://globalenergymonitor.org/projects/global-gas-infrastructure-tracker","why":"195 MB GeoJSON (Range checked) tracks natural gas (fuel: Gas) only; GEM Europe Gas Tracker and Spanish Hydrogen Backbone wiki returned HTTP 403."},{"name":"MITECO — Estadistica de Hidrogeno Anual 2024","url":"https://www.miteco.gob.es/es/energia/estrategia-normativa/balances/publicaciones/estadistica-de-hidrogeno-anual.html","why":"Annual ODS spreadsheet contains aggregate national production/consumption balances (kt/t H2) with zero pipelines, operators, or routes."},{"name":"AeH2 — Censo de Proyectos de Hidrogeno en Espana 2026","url":"https://aeh2.org/censo-de-proyectos-de-hidrogeno/","why":"Oct 2026 census PDF reports sector totals only (28.75 MW operational electrolysis; 9 planned projects with dedicated hydroducts totaling 1,977 MW) without routes or pipeline operators."},{"name":"EC TEN-E PCI Transparency Platform Map Viewer","url":"https://ec.europa.eu/energy/infrastructure/transparency_platform/map-viewer/main.html","why":"Redirects to sorry.ec.europa.eu ('Server temporarily unavailable'); underlying PCI information is accessible only via CINEA PDF fiches (Rank 3)."}],"open_questions":["No public polyline geometry or transport capacity figure could be found for Nortegas's operational 1.86 km Muskiz-Abanto pipeline, nor public polyline geometry for Redexis's 3.2 km Mallorca pipeline; confirm whether Basque or Balearic regional industry/energy registries hold confidential as-built CAD/GIS files.","Monitor BOE and Enagas's PCPP portal for remaining PCI 9.1.3 segments (including the Apr 2026 Alcazar de San Juan-Montesa addition) as public-information RBDA announcements appear.","Track parliamentary passage of the Ley de restablecimiento de la Comision Nacional de la Energia (CNE) cited in RDL 7/2026 and EU Hydrogen & Gas Package transposition to see whether mandatory open network-map publication is enacted."],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Terra 6.1 (High)","rules_version":"6.12","note":"No ES GIS registry exists. Ranked ArcGIS FeatureServer (h2inframap.eu) + TYNDP 2026 XLSX + CINEA PCI PDFs + Enagas PDFs + operational Nortegas/Redexis disclosures; tested BOE RBDA + Catastro WFS parcel reconstruction.","headline":{"official_data":"partial","non_official_data":"usable","national_registry":"no_evidence_found"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":82,"minutes":35}}],"local_terms":[{"term":"hidroducto / hidrogenoducto","language":"es","meaning":"Dedicated hydrogen pipeline (used interchangeably in Nortegas/Redexis announcements alongside 'ducto de hidrogeno' in Enagas permitting docs)"},{"term":"gestor provisional de la red troncal de hidrogeno (HTNO)","language":"es","meaning":"Provisional Hydrogen Transmission Network Operator role granted to Enagas Infraestructuras de Hidrogeno S.L.U. under RDL 8/2023 DA 9a and Council of Ministers Agreement (30 Jul 2024)"},{"term":"RBDA (Relacion de Bienes y Derechos Afectados)","language":"es","meaning":"Schedule of affected cadastral parcels and linear easement meters ('SP (LM)') published in BOE Sec. V-B permitting notices"},{"term":"PCI / PMI (Proyecto de Interes Comun / Mutuo)","language":"es","meaning":"EU TEN-E Project of Common Interest / Mutual Interest (9.1.2 CelZa, 9.1.3 Internal Spanish Backbone, 9.1.4 BarMar)"},{"term":"PCPP (Plan de Participacion Publica)","language":"es","meaning":"Regional public-consultation process generating corridor alternative PDF maps prior to formal BOE/EIA authorization filings"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":35,"pages_opened":82,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/hydrogen-pipelines.json","detail_url":"https://georutter.org/v1/es/hydrogen-pipelines/detail.json","html_url":"https://georutter.org/es/hydrogen-pipelines/","country_url":"https://georutter.org/v1/countries/es.json"}