{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"hydrogen-plants-in-permitting","question":"Where can I get a list of hydrogen production projects currently in permitting in Spain, with location, capacity (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"Aragón publishes cases in current public participation, and Castilla y León published a project list in 2025. Sondeva reports a commercial national hydrogen permitting index, with limited free results. Current status, electrolyser technology, capacity and national completeness need further checking.","main_caveats":["An old administrative act does not establish current permitting status.","The national environmental search covers environmental procedures, not necessarily all permit types.","Hysencia capacity differs: 20 MW in the January 2026 Aragón act versus 35 MW on the developer page; verify the applicable configuration.","Castilla y León’s 2025 list includes projects later authorized; electrolysis is not specified for every entry.","Commercial project-level results were not checked; the stated national total is the provider’s count."],"confidence":"low","confidence_reason":"Research is in progress; current status and national coverage remain unverified.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s002"],"note":"Catalina example in the 2024 regional gazette; current status is unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s002"],"note":"Catalina example in the 2024 regional gazette; current status is unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"developer","covered":"partial","source_ids":["s002"],"note":"Catalina example in the 2024 regional gazette; current status is unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s002","s003"],"note":"Dated Aragón decision and Andalusian consultation; subsequent status unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"stage_date","covered":"partial","source_ids":["s002","s003"],"note":"Dated Aragón decision and Andalusian consultation; subsequent status unverified.","gap":"not_checked","gap_note":"The inherited row combines multiple concepts or coverage; this specific requirement requires separate review."}]},"sources":[{"source_id":"s001","name":"INAGA files in public participation","publisher":"Instituto Aragonés de Gestión Ambiental","official":true,"landing_url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","data_url":"https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240","access":"direct_download","format":"JSON","license":"CC BY 4.0","language":"Spanish","has_coordinates":false,"location_precision":"municipality","summary":"INAGA files in public participation","coverage_note":"Aragón","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sSL --max-time 60 --max-filesize 100000000 -o inaga.json 'https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240'","example_result":"30 public-display records; none contains HIDRÓGENO or HIDROGENO in asunto. One record has expediente 50030502202511104 and tipo_resolucion EN TRAMITACIÓN."},"members_summary":null},{"source_id":"s002","name":"Boletín Oficial de Aragón: Catalina regional interest decision","publisher":"Gobierno de Aragón","official":true,"landing_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101","data_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101","access":"pdf","format":"PDF","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"municipality","summary":"Boletín Oficial de Aragón: Catalina regional interest decision","coverage_note":"Aragón; one example decision","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101 pages 25540–25541, Annex I","example_result":"Catalina: Andorra (Teruel, Aragón); Copenhagen Infrastructure Energy Transition Fund I K/S; 500 MW; decision dated 23 August 2024."},"members_summary":null},{"source_id":"s003","name":"Andalucía public environmental consultation: La Joya H2","publisher":"Junta de Andalucía","official":true,"landing_url":"https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/637861.html","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"none","summary":"Andalucía public environmental consultation: La Joya H2","coverage_note":"Andalucía: one consultation record","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"problems":["The linked supporting-document address returned HTTP 404."]},"example":{"example_request":"https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/637861.html","example_result":"AAI/MA/05/25; SIROCCO HYDROGEN 2, S.L.; LA JOYA H2; 27/01/2026–09/03/2026."},"members_summary":null}],"other_sources_count":2,"if_unstructured":{"summary":null},"local_terms":[{"term":"información pública","language":"es","meaning":"public consultation"},{"term":"electrolizador","language":"es","meaning":"electrolyser"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":15,"pages_opened":46,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/hydrogen-plants-in-permitting.json","detail_url":"https://georutter.org/v1/es/hydrogen-plants-in-permitting/detail.json","html_url":"https://georutter.org/es/hydrogen-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}
