{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"hydrogen-plants-in-permitting","question":"Where can I get a list of hydrogen production projects currently in permitting in Spain, with location, capacity (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"Aragón publishes cases in current public participation, and Castilla y León published a project list in 2025. Sondeva reports a commercial national hydrogen permitting index, with limited free results. Current status, electrolyser technology, capacity and national completeness need further checking.","main_caveats":["An old administrative act does not establish current permitting status.","The national environmental search covers environmental procedures, not necessarily all permit types.","Hysencia capacity differs: 20 MW in the January 2026 Aragón act versus 35 MW on the developer page; verify the applicable configuration.","Castilla y León’s 2025 list includes projects later authorized; electrolysis is not specified for every entry.","Commercial project-level results were not checked; the stated national total is the provider’s count."],"confidence":"low","confidence_reason":"Research is in progress; current status and national coverage remain unverified.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s002"],"note":"Catalina example in the 2024 regional gazette; current status is unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s002"],"note":"Catalina example in the 2024 regional gazette; current status is unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"developer","covered":"partial","source_ids":["s002"],"note":"Catalina example in the 2024 regional gazette; current status is unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s002","s003"],"note":"Dated Aragón decision and Andalusian consultation; subsequent status unverified.","gap":"not_checked","gap_note":"Current status and national and regional coverage remain to be checked."},{"attribute":"stage_date","covered":"partial","source_ids":["s002","s003"],"note":"Dated Aragón decision and Andalusian consultation; subsequent status unverified.","gap":"not_checked","gap_note":"The inherited row combines multiple concepts or coverage; this specific requirement requires separate review."}]},"sources":[{"source_id":"s001","name":"INAGA files in public participation","publisher":"Instituto Aragonés de Gestión Ambiental","official":true,"landing_url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","data_url":"https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240","access":"direct_download","format":"JSON","license":"CC BY 4.0","language":"Spanish","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"Structured current public consultation cases with case identifiers, applicant, dates and resolution status in Aragón.","first_seen_pass":1,"rank":1,"summary":"INAGA files in public participation","coverage_note":"Aragón","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Aragón"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"inclusion_rule":{"value":"Cases currently in public participation (public display or public announcement).","quote":"Expedientes INAGA que en la actualidad se encuentran en periodo de Participación Pública","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"update_frequency":{"value":"Instantaneous, according to catalogue","quote":"Instantánea","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","attempts":[]},"exclusions":{"value":"Only cases in public participation, not all stages.","quote":"trámites de exposición pública o de anuncio público","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","attempts":[]}},"key_fields":[{"field":"expediente","meaning":"case identifier"},{"field":"asunto","meaning":"case description, often generic"},{"field":"nombre_titular","meaning":"applicant"},{"field":"municipio_actuacion","meaning":"municipality code, sometimes empty"},{"field":"tipo_resolucion","meaning":"resolution status"},{"field":"fecha_inicio_exposicion","meaning":"public display start"},{"field":"fecha_fin_exposicion","meaning":"public display end"}],"how_to_use":{"example_request":"curl -sSL --max-time 60 --max-filesize 100000000 -o inaga.json 'https://opendata.aragon.es/GA_OD_Core/download?filters=%7B%22tipo_publicacion%22%3A%22Informacion+p%C3%BAblica%22%7D&formato=json&resource_id=240'","example_result":"30 public-display records; none contains HIDRÓGENO or HIDROGENO in asunto. One record has expediente 50030502202511104 and tipo_resolucion EN TRAMITACIÓN.","steps":["Download the public-display JSON and search asunto and applicant; inspect documents for technology where titles are generic.","Consult the separate Anuncio Público download and later resolutions; map municipality codes with official administrative codes."],"reading_traps":["No hydrogen keyword match does not prove there are no hydrogen cases: generic subjects and other permit stages are excluded.","A currently displayed notice may concern a case already resolved; inspect tipo_resolucion and dates.","Municipality code can be empty; this file contains no MW capacity."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":30,"records_for_country":30,"problems":[]},"evidence":[{"claim":"Current public participation cases","url":"https://opendata.aragon.es/datos/catalogo/dataset/expedientes-inaga-en-periodo-de-informacion-publica","quote":"Expedientes INAGA que en la actualidad se encuentran en periodo de Participación Pública"}],"members":[],"members_summary":null},{"source_id":"s002","name":"Boletín Oficial de Aragón: Catalina regional interest decision","publisher":"Gobierno de Aragón","official":true,"landing_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101","data_url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101","access":"pdf","format":"PDF","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"A real administrative act with project developer, municipality, electrolyser MW and dated decision.","first_seen_pass":1,"rank":2,"summary":"Boletín Oficial de Aragón: Catalina regional interest decision","coverage_note":"Aragón; one example decision","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Aragón; one example decision"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]}},"key_fields":[{"field":"Promotor","meaning":"Developer"},{"field":"Potencia instalada del electrolizador","meaning":"Electrolyser installed capacity in MW"}],"how_to_use":{"example_request":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101 pages 25540–25541, Annex I","example_result":"Catalina: Andorra (Teruel, Aragón); Copenhagen Infrastructure Energy Transition Fund I K/S; 500 MW; decision dated 23 August 2024.","steps":["Read the decision and Annex I basic project data.","Extract promoter, municipality and electrolyser capacity; search subsequent acts to determine present status."],"reading_traps":["The dated regional-interest decision is not proof that permitting is still active.","Do not confuse generation assets capacity with electrolyser capacity."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"application/pdf","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Electrolyser capacity in annex","url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101","quote":"Potencia instalada del electrolizador | 500 MW"}],"members":[],"members_summary":null},{"source_id":"s003","name":"Andalucía public environmental consultation: La Joya H2","publisher":"Junta de Andalucía","official":true,"landing_url":"https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/637861.html","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"none","publisher_type":"regional_government","adds":"A separate regional public consultation with applicant, permit type and consultation dates.","first_seen_pass":1,"rank":3,"summary":"Andalucía public environmental consultation: La Joya H2","coverage_note":"Andalucía: one consultation record","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Andalucía: one consultation record"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]}},"key_fields":[{"field":"EXPTE.","meaning":"Environmental authorization case identifier"},{"field":"Plazo de alegaciones","meaning":"Public consultation period"}],"how_to_use":{"example_request":"https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/637861.html","example_result":"AAI/MA/05/25; SIROCCO HYDROGEN 2, S.L.; LA JOYA H2; 27/01/2026–09/03/2026.","steps":["Read the title, procedure and publication and consultation dates.","Check later decisions before assigning a current permitting stage."],"reading_traps":["The public consultation deadline has passed; it does not establish current status.","The linked supporting documents returned 404 when tested."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":["The linked supporting-document address returned HTTP 404."]},"evidence":[{"claim":"Public consultation dates","url":"https://www.juntadeandalucia.es/servicios/participacion/todos-documentos/detalle/637861.html","quote":"27/01/2026 - 09/03/2026"}],"members":[],"members_summary":null},{"source_id":"s004","name":"Castilla y León parliamentary answer on hydrogen projects","publisher":"Cortes de Castilla y León / Consejería de Medio Ambiente","official":true,"landing_url":"https://www.ccyl.es/Publicaciones/TextoEntradaBOCCL?Fichero=%5C%5CSIRDOCfiles%5Csirdoc%24%5CXML%5CEBOCCL%5C11L%5CBOCCL1100392%5CBOCCL-11-011913.xml","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"municipality","publisher_type":"regional_government","adds":"A dated list of 17 projects in permitting, with municipality and promoter, plus authorized and early-documentation lists.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Castilla y León"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"reference_date":{"value":"2025-02-19","quote":"Valladolid, a 19 de febrero de 2025.","url":"https://www.ccyl.es/Publicaciones/TextoEntradaBOCCL?Fichero=%5C%5CSIRDOCfiles%5Csirdoc%24%5CXML%5CEBOCCL%5C11L%5CBOCCL1100392%5CBOCCL-11-011913.xml","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]}},"key_fields":[{"field":"MUNICIPIO","meaning":"municipality"},{"field":"PROMOTOR","meaning":"promoter"},{"field":"INSTALACIÓN","meaning":"hydrogen and associated product"}],"how_to_use":{"example_request":"https://www.ccyl.es/Publicaciones/TextoEntradaBOCCL?Fichero=%5C%5CSIRDOCfiles%5Csirdoc%24%5CXML%5CEBOCCL%5C11L%5CBOCCL1100392%5CBOCCL-11-011913.xml section “En tramitación están los proyectos siguientes”","example_result":"BU Lerma IBERHIDROGENO, S.L. H2; LE Bembibre GREEN CAPITAL DEVELPOMENT 53, S.L. H2+NH3.","steps":["Extract only the rows under En tramitación; separate the authorized and documentation-sufficiency sections.","Search later decisions for each project to verify current status and obtain electrolyser technology and MW."],"reading_traps":["The 2025 list is historical and lacks MW and individual stage; later authorizations are known.","Hydrogen and ammonia projects are mixed; electrolysis is not specified for every row."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":17,"records_for_country":17,"problems":[]},"evidence":[{"claim":"Separate list of projects in permitting","url":"https://www.ccyl.es/Publicaciones/TextoEntradaBOCCL?Fichero=%5C%5CSIRDOCfiles%5Csirdoc%24%5CXML%5CEBOCCL%5C11L%5CBOCCL1100392%5CBOCCL-11-011913.xml","quote":"En tramitación están los proyectos siguientes:"}],"members":[],"members_summary":null},{"source_id":"s005","name":"Sondeva Renovables hydrogen projects in permitting","publisher":"Sondeva","official":false,"landing_url":"https://sondeva.es/renovables/proyectos/tecnologia/hidrogeno/","data_url":null,"access":"paid","format":"web","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"none","publisher_type":"commercial","adds":"Reports a nationwide commercial index of hydrogen projects in permitting; free search results are limited.","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Spain"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"reference_date":{"value":"2026-11-14","quote":"A 14 de noviembre de 2026, Sondeva Renovables recoge 87 proyectos de hidrógeno en tramitación en España.","url":"https://sondeva.es/renovables/proyectos/tecnologia/hidrogeno/","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":["The decision was opened; this dataset-wide metadata is not established.","The annex was checked; no general dataset-wide rule was established."]}},"key_fields":[],"how_to_use":{"example_request":"https://sondeva.es/renovables/proyectos/tecnologia/hidrogeno/","example_result":"87 hydrogen projects in permitting in Spain as of 14 November 2026; stage and regional aggregate counts.","steps":["Open the hydrogen technology overview and inspect the published aggregate counts.","Project-level searches and individual records require further verification; the page describes five free results per search and paid plans for more."],"reading_traps":["The 87 total is the provider’s count, not an official complete census.","Individual projects, electrolyser technology and current permit status were not independently checked."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":["The full project list is behind a paid plan; limited results are available without an account."]},"evidence":[{"claim":"Reported count","url":"https://sondeva.es/renovables/proyectos/tecnologia/hidrogeno/","quote":"A 14 de noviembre de 2026, Sondeva Renovables recoge 87 proyectos de hidrógeno en tramitación en España."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Ministerio para la Transición Ecológica y el Reto Demográfico and regional environmental authorities","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido"},"operators":{"structure":"many","note":"Project developers include DH2 Energy and Copenhagen Infrastructure Energy Transition Fund I K/S.","census_url":null},"publication_obligation":{"exists":"yes","norm":"Real Decreto Legislativo 1/2016, artículo 16, as cited in the Madrid public notice","url":"https://www.bocm.es/boletin/CM_Orden_BOCM/2024/07/01/BOCM-20240701-51.PDF","what_must_be_published":"Public consultation of the integrated environmental authorization and environmental impact study for the specific project.","frequency":"At the relevant public consultation stage; not a periodic register."},"consolidated_republication":{"found":"unknown","note":"National completeness remains unchecked.","checked_pages":[{"organization":"MITECO","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","saw":"Searches environmental procedures by title, stage and promoter."},{"organization":"Enagás Infraestructuras de Hidrógeno","url":"https://www.infraestructurasdehidrogeno.es/infraestructura-interior-de-hidrogeno/","saw":"Public consultation concerns hydrogen transport network segments, not a production-project register."}]}},"national_registry":{"exists":"unknown","note":"Research in progress; no conclusion about a national register.","checked_pages":[{"organization":"MITECO","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","saw":"Environmental assessment search with stage and promoter filters."},{"organization":"CNMC","url":"https://www.cnmc.es/sites/default/files/5782331.pdf","saw":"An individual electricity access dispute; no register evaluated."},{"organization":"Gobierno de Aragón","url":"https://idearagon.aragon.es/geonetwork/RCA/search","saw":"Regional public participation case layers."},{"organization":"Enagás Infraestructuras de Hidrógeno","url":"https://www.infraestructurasdehidrogeno.es/infraestructura-interior-de-hidrogeno/","saw":"Public consultation concerns hydrogen transport network segments, not a production-project register."}]},"if_unstructured":{"summary":null,"recipe":["In the opened decision, read Annex I on printed page 25541 and copy the promoter, municipality and electrolyser capacity.","Read the decision and its publication date; check subsequent acts before assigning current status.","For the Madrid example, read the notice on page 188 and the environmental study title; the latter gives 10 MW. Cross-check later decisions because the notice dates from 2024."],"location_method":"The example gives municipality only; exact siting requires checking project plans.","cross_with":["Later administrative notices for the same project and promoter.","Environmental study for Inspira Madrid: https://www.comunidad.madrid/transparencia/sites/default/files/regulation/documents/estudio_de_impacto_ambiental_inspira_madrid_hidrogeno_verde_censurado.pdf"],"where_published":[{"name":"Boletín Oficial de Aragón","url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101","what":"Regional administrative project decisions.","how_to_search_inside":"Search the gazette for the project name or promoter; verify later notices.","example_document":{"url":"https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1348260490101","what_it_gives":"Annex I p. 25541: “Promotor | Copenhagen Infrastructure Energy Transition Fund I K/S.”; “Término Municipal de la Planta de Hidrógeno | Andorra (Teruel, Aragón)”; “Potencia instalada del electrolizador | 500 MW”."}},{"name":"Boletín Oficial de la Comunidad de Madrid","url":"https://www.bocm.es/boletin/CM_Orden_BOCM/2024/07/01/BOCM-20240701-51.PDF","what":"Dated public notices for environmental authorization and environmental impact assessment.","how_to_search_inside":"Search BOCM by project name, promoter or case number; inspect later notices.","example_document":{"url":"https://www.bocm.es/boletin/CM_Orden_BOCM/2024/07/01/BOCM-20240701-51.PDF","what_it_gives":"Page 188: “Avda. Mercurio, número 23”; “Villanueva del Pardillo”; “Inspira Madrid Hidrógeno Verde, S. L.”; case 26-IPPC-00039.0/2024. Its environmental study states 10 MW."}}]},"related_not_answering":[{"name":"European Hydrogen Observatory production and consumption projects","url":"https://observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","why":"Only operating or under-construction projects as of December 2025, not the full current permitting pipeline."}],"open_questions":["Hysencia: whether 20 MW in the 2026 Aragón decision and 35 MW on the developer page describe different configurations or subsequent changes."],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Terra 6.1 (High)","rules_version":"6.12","note":"Regional current-case dataset and historical project list checked; 60-search limit reached with national coverage and statuses incomplete.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"unknown"},"sources":{"total":5,"new":5,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":46,"minutes":15}}],"local_terms":[{"term":"información pública","language":"es","meaning":"public consultation"},{"term":"electrolizador","language":"es","meaning":"electrolyser"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":15,"pages_opened":46,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/hydrogen-plants-in-permitting.json","detail_url":"https://georutter.org/v1/es/hydrogen-plants-in-permitting/detail.json","html_url":"https://georutter.org/es/hydrogen-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}
