{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"hydrogen-plants","question":"Where can I get a list of hydrogen production plants (electrolysers) in operation in Spain, with location, capacity (MW), operator and commissioning date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"The Spanish GdO register exposes participating renewable gas installations through a public API; registration status must be checked and its gas capacity is not necessarily electrical MW. The European Observatory provides operating electrolysers of at least 0.5 MWel as of December 2025, with start years. Neither covers every current plant; use operator reports to verify dates and status.","main_caveats":["The GdO API returned provisional and rejected records even with the COMPLETED filter; filter and verify status.","Barcelona coordinates differ between GdO and the European workbook; GdO Lloseta coordinates appear displaced.","Production-point capacity in kW and electrolyser input MWel are different quantities.","The 2025 European dataset excludes electrolysers below 0.5 MWel and omits operator names."],"confidence":"medium","confidence_reason":"API and European workbook were tested; current status, complete coverage and individual coordinates remain uncertain.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002"],"note":"Some coordinates disagree with the stated municipality.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s002","s003"],"note":"European dataset uses MWel; GdO production capacity is not necessarily electrical input.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."},{"attribute":"operator","covered":"partial","source_ids":["s003"],"note":"Operator reports identify a selection of their plants.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."},{"attribute":"commissioning_date","covered":"partial","source_ids":["s002","s003"],"note":"Start year available in the European workbook; operator reports confirm selected examples.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."}]},"sources":[{"source_id":"s001","name":"Registro de instalaciones de producción de gases renovables","publisher":"Enagás GTS","official":true,"landing_url":"https://www.gdogas.es/","data_url":"https://www.gdogas.es/api/production-unit/search-consultation?page=0&size=200&isoLanguage=es&registrationTypeEnumRequest=COMPLETED","access":"api","format":"JSON","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","summary":"Registro de instalaciones de producción de gases renovables","coverage_note":"Spain; installations registered in the guarantees-of-origin system","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"problems":[]},"example":{"example_request":"https://www.gdogas.es/api/production-unit/search-consultation?page=0&size=200&isoLanguage=es&registrationTypeEnumRequest=COMPLETED","example_result":"130 items; Planta Hidrógeno Verde Barcelona: hydrogen, Alta, installationCapacity 2500, Barcelona, x=41.3324128 y=2.1275612."},"members_summary":null},{"source_id":"s002","name":"Hydrogen production and consumption projects, December 2025","publisher":"European Hydrogen Observatory / Clean Hydrogen Partnership","official":false,"landing_url":"https://ipcei.observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","data_url":"https://ipcei.observatory.clean-hydrogen.europa.eu/sites/default/files/2026-02/Hydrogen%20production%20and%20consumption%20projects%20Dec2025.xlsx","access":"direct_download","format":"XLSX","license":"unknown","language":"en","has_coordinates":true,"location_precision":"exact","summary":"Hydrogen production and consumption projects, December 2025","coverage_note":"Europe; Spain; 2024","data_date":"2025-12","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"https://ipcei.observatory.clean-hydrogen.europa.eu/sites/default/files/2026-02/Hydrogen%20production%20and%20consumption%20projects%20Dec2025.xlsx; sheet Clean H2 projects, headings row 7, records from row 8","example_result":"H2F (Phase 1); Puertollano; Spain; 2022; 20 MW; Water electrolysis; Operation."},"members_summary":null},{"source_id":"s003","name":"Operator project descriptions and reports","publisher":"Iberdrola and Enagás Renovable","official":true,"landing_url":"https://www.iberdrolaespana.com/conocenos/lineas-negocios/hidrogeno-verde","data_url":null,"access":"web_viewer_only","format":"HTML and PDF","license":"unknown","language":"es, en","has_coordinates":false,"location_precision":"municipality","summary":"Operator project descriptions and reports","coverage_note":"Selected operator projects in Spain","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://www.iberdrola.com/documents/20125/42166/Informe_retornos_financiacion_verde_2022.pdf; tables in pages 36 and 43","example_result":"Hidrogenera Verde Barcelona: 2022, 2.5 MW; Planta de Hidrógeno Verde de Puertollano: 2022, 20 MW."},"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"other_sources_count":0,"if_unstructured":{"summary":null},"local_terms":[{"term":"electrolizador","language":"es","meaning":"electrolyser"},{"term":"hidrógeno renovable","language":"es","meaning":"renewable hydrogen"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":20,"pages_opened":25,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/hydrogen-plants.json","detail_url":"https://georutter.org/v1/es/hydrogen-plants/detail.json","html_url":"https://georutter.org/es/hydrogen-plants/","country_url":"https://georutter.org/v1/countries/es.json"}
