{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"hydrogen-plants","question":"Where can I get a list of hydrogen production plants (electrolysers) in operation in Spain, with location, capacity (MW), operator and commissioning date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"The Spanish GdO register exposes participating renewable gas installations through a public API; registration status must be checked and its gas capacity is not necessarily electrical MW. The European Observatory provides operating electrolysers of at least 0.5 MWel as of December 2025, with start years. Neither covers every current plant; use operator reports to verify dates and status.","main_caveats":["The GdO API returned provisional and rejected records even with the COMPLETED filter; filter and verify status.","Barcelona coordinates differ between GdO and the European workbook; GdO Lloseta coordinates appear displaced.","Production-point capacity in kW and electrolyser input MWel are different quantities.","The 2025 European dataset excludes electrolysers below 0.5 MWel and omits operator names."],"confidence":"medium","confidence_reason":"API and European workbook were tested; current status, complete coverage and individual coordinates remain uncertain.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002"],"note":"Some coordinates disagree with the stated municipality.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s002","s003"],"note":"European dataset uses MWel; GdO production capacity is not necessarily electrical input.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."},{"attribute":"operator","covered":"partial","source_ids":["s003"],"note":"Operator reports identify a selection of their plants.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."},{"attribute":"commissioning_date","covered":"partial","source_ids":["s002","s003"],"note":"Start year available in the European workbook; operator reports confirm selected examples.","gap":"not_checked","gap_note":"National completeness and more recent plant-level verification remain to be checked."}]},"sources":[{"source_id":"s001","name":"Registro de instalaciones de producción de gases renovables","publisher":"Enagás GTS","official":true,"landing_url":"https://www.gdogas.es/","data_url":"https://www.gdogas.es/api/production-unit/search-consultation?page=0&size=200&isoLanguage=es&registrationTypeEnumRequest=COMPLETED","access":"api","format":"JSON","license":"unknown","language":"es","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"National register of participating renewable gas installations.","first_seen_pass":1,"rank":1,"summary":"Registro de instalaciones de producción de gases renovables","coverage_note":"Spain; installations registered in the guarantees-of-origin system","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain; installations registered in the guarantees-of-origin system"},"fine_print":{"unit":{"value":"Nominal capacity at the production point in kW; not necessarily electrolyser electrical input","quote":"Capacidad nominal del punto de producción en kW.","url":"https://www.enagas.es/content/dam/enagas/es/ficheros/gestion-tecnica-sistema/informacion-gestion-tecnica/garantias/documentos-informaci%C3%B3n-car%C3%A1cter-p%C3%BAblico/C2-Formulario-alta-instalaciones.pdf","attempts":[]},"inclusion_rule":{"value":"Facilities registered in the GdO system; participation voluntary according to 2022 FAQ","quote":"No existe base legal para que las instalaciones de producción de gases renovables en España tengan que estar incluidas obligatoriamente","url":"https://www.enagas.es/content/dam/enagas/en/files/gestion-tecnica-del-sistema/informacion-gestion-tecnica/garantias/preguntas-frecuentes-procedimiento-gestion-garantias-origen.pdf","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["API queried 2026-11-16; per-record registration dates returned.","2022 FAQ inspected; no global snapshot date stated."]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["API response lacks update-frequency metadata.","Enagás information page gives no update interval."]},"exclusions":{"value":"Unregistered facilities excluded","quote":"El registro de instalaciones de producción de gases renovables incluirá todas las instalaciones de producción de gases renovables que han sido dadas de alta en el Sistema de GdO.","url":"https://www.enagas.es/content/dam/enagas/en/files/gestion-tecnica-del-sistema/informacion-gestion-tecnica/garantias/preguntas-frecuentes-procedimiento-gestion-garantias-origen.pdf","attempts":[]}},"key_fields":[{"field":"installationName","meaning":"Installation name"},{"field":"gasProducedType","meaning":"Gas type; code 3 is hydrogen"},{"field":"installationStatus","meaning":"Registration status"},{"field":"registrationDate","meaning":"Registration date, not commissioning"},{"field":"installationCapacity","meaning":"Capacity; unit unverified"},{"field":"postalData.municipality","meaning":"Municipality"},{"field":"productionPoints.injectionPointCoordinates","meaning":"x latitude, y longitude"},{"field":"entityCode","meaning":"Participant code"}],"how_to_use":{"example_request":"https://www.gdogas.es/api/production-unit/search-consultation?page=0&size=200&isoLanguage=es&registrationTypeEnumRequest=COMPLETED","example_result":"130 items; Planta Hidrógeno Verde Barcelona: hydrogen, Alta, installationCapacity 2500, Barcelona, x=41.3324128 y=2.1275612.","steps":["Read payload.items and payload.totalItems; paginate if necessary. Filter gasProducedType code 3 and check installationStatus.","Verify electrolyser technology, operator and commissioning date against the operator; registrationDate is not commissioning date."],"reading_traps":["The tested COMPLETED parameter returned provisional, rejected and withdrawn cases as well as Alta; filter statuses client side. Alta is registry status, not independently verified current production.","The manual describes production-point nominal capacity in kW, not necessarily electrical input. For example Mallorca is 1333 in the register vs 2.5 MW electrolyser on the operator site.","Lloseta coordinates 39.564202, 2.688521 appear far from its municipality; Barcelona GdO coordinates differ from the European compilation.","Individual production points can repeat the same capacity and must not be summed."]},"test":{"tested_on":"2026-11-16","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":130,"records_for_country":130,"problems":[]},"evidence":[{"claim":"Registered installations include operating and pending cases","url":"https://www.enagas.es/content/dam/enagas/en/files/gestion-tecnica-del-sistema/informacion-gestion-tecnica/garantias/preguntas-frecuentes-procedimiento-gestion-garantias-origen.pdf","quote":"El registro estará abierto a instalaciones de producción de gases renovables en operación, y también a aquellas en tramitación."}],"members":[],"members_summary":null},{"source_id":"s002","name":"Hydrogen production and consumption projects, December 2025","publisher":"European Hydrogen Observatory / Clean Hydrogen Partnership","official":false,"landing_url":"https://ipcei.observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","data_url":"https://ipcei.observatory.clean-hydrogen.europa.eu/sites/default/files/2026-02/Hydrogen%20production%20and%20consumption%20projects%20Dec2025.xlsx","access":"direct_download","format":"XLSX","license":"unknown","language":"en","has_coordinates":true,"location_precision":"exact","publisher_type":"supranational","adds":"Newer European plant-level compilation, including start year and project stage.","first_seen_pass":1,"rank":2,"summary":"Hydrogen production and consumption projects, December 2025","coverage_note":"Europe; Spain; 2024","data_date":"2025-12","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Europe; Spain; 2024"},"fine_print":{"unit":{"value":"MW/MWel","quote":"The data includes electrolysis facilities with a capacity of at least 0.5 MWel","url":"https://ipcei.observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","attempts":[]},"inclusion_rule":{"value":"Electrolysis at least 0.5 MWel; projects in operation or construction","quote":"The data includes electrolysis facilities with a capacity of at least 0.5 MWel","url":"https://ipcei.observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","attempts":[]},"reference_date":{"value":"2025-12","quote":"Data reflect the situation as of December 2025.","url":"https://ipcei.observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":["Inspected source landing page; no frequency stated.","Inspected workbook headings; no update schedule stated."]},"exclusions":{"value":"Below 0.5 MWel excluded; announced projects without construction excluded","quote":"projects already in operation or currently under construction","url":"https://ipcei.observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","attempts":[]}},"key_fields":[{"field":"Name","meaning":"Project name"},{"field":"City","meaning":"City"},{"field":"Country","meaning":"Country"},{"field":"Start year","meaning":"Start year"},{"field":"Production capacity MW/MWel","meaning":"Electrolyser electrical capacity"},{"field":"Production process","meaning":"Production technology"},{"field":"Latitude","meaning":"Latitude"},{"field":"Longitude","meaning":"Longitude"},{"field":"Project stage","meaning":"Operation or Construction"}],"how_to_use":{"example_request":"https://ipcei.observatory.clean-hydrogen.europa.eu/sites/default/files/2026-02/Hydrogen%20production%20and%20consumption%20projects%20Dec2025.xlsx; sheet Clean H2 projects, headings row 7, records from row 8","example_result":"H2F (Phase 1); Puertollano; Spain; 2022; 20 MW; Water electrolysis; Operation.","steps":["Filter Country = Spain, Production process = Water electrolysis and Project stage = Operation; use Start year as reported, not a full calendar date.","Check current status with operators and cross-reference individual project reports for operator names."],"reading_traps":["As of December 2025, not current; construction entries are not operating. The sheet uses Operation, not Operational.","The Barcelona Zona Franca row has longitude +1.946659641, apparently displaced from its stated location.","The file has no operator column and excludes electrolysers under 0.5 MWel."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":218785,"records_total":1220,"records_for_country":15,"problems":[]},"evidence":[{"claim":"Project stage coverage and threshold","url":"https://ipcei.observatory.clean-hydrogen.europa.eu/hydrogen-landscape/projects-and-valleys/hydrogen-production-and-consumption-projects","quote":"The data includes electrolysis facilities with a capacity of at least 0.5 MWel"}],"members":[],"members_summary":null},{"source_id":"s003","name":"Operator project descriptions and reports","publisher":"Iberdrola and Enagás Renovable","official":true,"landing_url":"https://www.iberdrolaespana.com/conocenos/lineas-negocios/hidrogeno-verde","data_url":null,"access":"web_viewer_only","format":"HTML and PDF","license":"unknown","language":"es, en","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Operator descriptions and commissioning years for some installations.","first_seen_pass":1,"rank":3,"summary":"Operator project descriptions and reports","coverage_note":"Selected operator projects in Spain","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Selected operator projects in Spain"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"Año puesta en marcha","meaning":"Year of commissioning in finance report"},{"field":"MW H2","meaning":"Electrolyser power in report"}],"how_to_use":{"example_request":"https://www.iberdrola.com/documents/20125/42166/Informe_retornos_financiacion_verde_2022.pdf; tables in pages 36 and 43","example_result":"Hidrogenera Verde Barcelona: 2022, 2.5 MW; Planta de Hidrógeno Verde de Puertollano: 2022, 20 MW.","steps":["Read project tables in operator report, then check current operator site for later status and capacity."],"reading_traps":["A commissioning year is not proof of continuous operation today; projects may have several owners or phases."]},"test":{"tested_on":"2026-11-16","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Operator identifies Puertollano electrolyser capacity","url":"https://www.iberdrolaespana.com/conocenos/lineas-negocios/hidrogeno-verde","quote":"una capacidad de 20 MW de electrolizador, situada en Puertollano (Ciudad Real)."}],"members":[{"name":"Iberdrola","landing_url":"https://www.iberdrolaespana.com/conocenos/lineas-negocios/hidrogeno-verde","data_url":"https://www.iberdrola.com/documents/20125/42166/Informe_retornos_financiacion_verde_2022.pdf","access":"pdf","tested":true,"data_found":null,"note":"2022 finance report gives Barcelona and Puertollano commissioning year."},{"name":"Enagás Renovable","landing_url":"https://enagasrenovable.es/en/green-hydrogen/?id=greenhysland","data_url":null,"access":"web_viewer_only","tested":true,"data_found":null,"note":"Lloseta project and operation; Enagás 2022 announcement distinguishes initial tests from gradual production."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"sector":{"regulator":{"name":"Ministry for the Ecological Transition and the Demographic Challenge (MITECO); autonomous environmental authorities","url":"https://www.juntadeandalucia.es/sites/default/files/2024-02/guia_tramitacion_hidrogeno.pdf"},"operators":{"structure":"many","note":"Various developers and operators; no complete operator census confirmed.","census_url":"https://aeh2.org/censo-de-proyectos-de-hidrogeno/"},"publication_obligation":{"exists":"unknown","norm":null,"url":null,"what_must_be_published":null,"frequency":null},"consolidated_republication":{"found":"partial","note":"GdO register and IDAE sources need further access checks.","checked_pages":[{"organization":"CNMC","url":"https://www.cnmc.es/sites/default/files/5904506.pdf","saw":"Describes renewable gas guarantees register operated by Enagás GTS; only registered facilities."},{"organization":"MITECO","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/balances/Estadisticas/ims-2026/IMS%2023104%20Hidr%C3%B3geno.pdf","saw":"Statistical method identifies IDAE information on operational green hydrogen facilities, without publishing individual records here."}]}},"national_registry":{"exists":"partial","note":"National public GdO registration covers participating renewable gas plants; it does not include every electrolyser.","checked_pages":[{"organization":"CNMC","url":"https://www.cnmc.es/sites/default/files/5904506.pdf","saw":"Describes renewable gas guarantees register operated by Enagás GTS; only registered facilities."},{"organization":"MITECO","url":"https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/balances/Estadisticas/ims-2026/IMS%2023104%20Hidr%C3%B3geno.pdf","saw":"Statistical method identifies IDAE information on operational green hydrogen facilities, without publishing individual records here."},{"organization":"IDAE","url":"https://www.idae.es/noticias/el-idae-destina-274-millones-cuatro-nuevos-proyectos-para-producir-h2-renovable-en","saw":"Funding award notice for projects, not a list of all operating plants."},{"organization":"Enagás Renovable","url":"https://enagasrenovable.es/en/projects/","saw":"Operator publishes selected projects with current stage and capacity."}]},"if_unstructured":{"summary":null,"recipe":["Open the 2022 CNMC resolution, locate the project discussion and extract the project name and reported operating status; cross-check its operator and 2.5 MW with the Enagás Renovable project page. The resolution does not give a full commissioning date."],"location_method":"Use coordinates in project data or official plans; check for discrepancies against municipality and operator descriptions.","cross_with":["Operator project reports and current GdO records; distinguish registration date from commissioning."],"where_published":[{"name":"BOE official gazette","url":"https://www.boe.es/buscar/boe.php","what":"Regulatory resolutions and notices; includes documents about individual hydrogen projects.","how_to_search_inside":"Search title or full text for project and developer; date and section filters are available.","example_document":{"url":"https://www.boe.es/buscar/doc.php?id=BOE-A-2022-19607","what_it_gives":"CNMC resolution 2022: Power to Green Hydrogen Mallorca; Enagás reported commissioning, and gradual industrial production."}}]},"related_not_answering":[{"name":"RAIPEE electricity production register","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/energias-renovables/registro-administrativo.html","why":"Registers electricity producers, not all electrolytic hydrogen production."},{"name":"IDAE funding notice","url":"https://www.idae.es/noticias/el-idae-destina-274-millones-cuatro-nuevos-proyectos-para-producir-h2-renovable-en","why":"Funding award does not establish operation."}],"open_questions":["Why does the GdO API COMPLETED parameter return provisional entries?","What explains the Mallorca capacity and coordinate discrepancies between GdO and operator project descriptions?"],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Terra 6.1 (High)","rules_version":"6.12","note":"GdO API and European 2025 workbook tested; coverage, current status and some coordinates remain incomplete.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"partial"},"sources":{"total":3,"new":3,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":25,"minutes":20}}],"local_terms":[{"term":"electrolizador","language":"es","meaning":"electrolyser"},{"term":"hidrógeno renovable","language":"es","meaning":"renewable hydrogen"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":20,"pages_opened":25,"passes":[{"pass":1,"date":"2026-11-16","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/hydrogen-plants.json","detail_url":"https://georutter.org/v1/es/hydrogen-plants/detail.json","html_url":"https://georutter.org/es/hydrogen-plants/","country_url":"https://georutter.org/v1/countries/es.json"}
