{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"network-tariffs","question":"Where can I get the current electricity network access tariffs and charges in Spain, by voltage level and period, with their history?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"structured","non_official_data":"none_found","summary":"Peajes (network access tariffs) are set yearly by CNMC resolution and cargos (system charges) by MITERD order, both in BOE, with 2.0TD to 6.4TD by period P1-P6. Current 2026 values: MITECO peajes page (both) and BOE-A-2025-26348 (peajes), BOE-A-2025-26705 (cargos). History since 2021-06 is the chain of BOE resolutions/orders; 2014-2021 frozen old-structure orders. No CSV/API of the series was found.","main_caveats":["Peajes (CNMC, networks) and cargos (Ministry, other system costs) are separate documents; a full regulated price needs both. Do not add transport and distribution parts on top of the T&D line.","No official CSV, API or time series exists in what was found: values sit in BOE text tables and an HTML page. History needs one BOE document per year; BOE legal status flags do not show supersession.","MITECO page shows 2,051434 for cargos segment 3 power P3-P5; the BOE order text says 2,054134. Take the BOE as the legal text.","Periods P1-P6 depend on season, day type and territory (Peninsula, Balearics, Canary Islands, Ceuta, Melilla); 2.0TD has 3 energy periods and 2 power periods. Hours are in Circular 3/2020 art. 7, not in the price resolutions.","2025 has two peajes documents: Res. 4-12-2024 (from 2025-01-01) and Res. 6-3-2025 replacing only Annex II (excess power) from 2025-04-01. Cargos 2024 order was published 2024-02-14."],"confidence":"high","confidence_reason":"Official BOE texts and CNMC files opened and values cross-checked (BOE, MITECO page, CNMC Excel and memoria agree except one cell); older years read from the BOE text.","attributes":[{"attribute":"network_tariffs","covered":"yes","source_ids":["s001","s003"],"note":"2.0TD (BT<=15kW), 3.0TD (BT>15kW), 6.1TD-6.4TD (1-30, 30-72.5, 72.5-145, >145 kV), TDVE for EV charging; 2026 values.","gap":null,"gap_note":null},{"attribute":"network_charges","covered":"yes","source_ids":["s002","s003"],"note":"Segments 1-6 plus 2VE/3VE, P1-P6, 2026 Orden TED/1524/2025. One cell differs between MITECO page and BOE (segment 3 power P3-P5).","gap":null,"gap_note":null},{"attribute":"voltage_level","covered":"yes","source_ids":["s001","s003"],"note":"2.0TD (BT<=15kW), 3.0TD (BT>15kW), 6.1TD-6.4TD (1-30, 30-72.5, 72.5-145, >145 kV), TDVE for EV charging; 2026 values.","gap":null,"gap_note":null},{"attribute":"time_band","covered":"yes","source_ids":["s001","s003","s005"],"note":"Power EUR/kW year, energy EUR/kWh, split transport/distribution in the BOE; hour definition of periods is in Circular 3/2020 art. 7.","gap":null,"gap_note":null},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"partial","source_ids":["s001","s002","s004","s006"],"note":"Coverage combines distinct components of the question; see the original detailed evidence and its geographic and technical limits.","gap":"not_checked","gap_note":"The original rows have different scopes. Their combination has not been established as complete; original rows are retained in internal curation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"CNMC annual resolutions setting the values of peajes de acceso a las redes de transporte y distribucion (BOE series 2021-2026)","publisher":"CNMC, published in Boletin Oficial del Estado","official":true,"landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348","access":"direct_download","format":"BOE XML (also HTML and PDF); prices are tables flattened into text","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"CNMC annual resolutions setting the values of peajes de acceso a las redes de transporte y distribucion (BOE series 2021-2026)","coverage_note":"Spain (all territories); period hours differ by territory in Circular 3/2020","data_date":"Prices apply from 2026-01-01; BOE publication 2025-12-22","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sL \"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348\" -o res2026.xml ; then strip tags, find ANEXO I, 1. Precios ... a) Términos de potencia contratada. For other years the same URL with the BOE id above; to find an id: curl -sL -H \"Accept: application/xml\" \"https://www.boe.es/datosabiertos/api/boe/sumario/20241216\" and look for the item title 'valores de los peajes de acceso'.","example_result":"Annex I, T&D block, EUR/kW year: 2.0 TD P1 23,324952 P2 0,443770; 6.1 TD P1 23,946498 P2 12,687713 P3 4,747747 P4 3,339695 P5 0,070979 P6 0,062703. Same series 2.0TD T&D power P1: 2021-06 23,469833; 2022 22,988256; 2023 22,393140; 2024 22,401746; 2025 22,958932; 2026 23,324952."},"members_summary":{"total":null,"listed":7,"tested":7,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s002","name":"MITERD orders setting the prices of the cargos del sistema electrico (BOE series 2021-2026)","publisher":"Ministerio para la Transicion Ecologica y el Reto Demografico, published in Boletin Oficial del Estado","official":true,"landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26705","access":"direct_download","format":"BOE XML (also HTML and PDF); tables flattened into text","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"MITERD orders setting the prices of the cargos del sistema electrico (BOE series 2021-2026)","coverage_note":"Spain (all territories)","data_date":"Prices apply from 2026-01-01; BOE publication 2025-12-27","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sL \"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26705\" -o cargos2026.xml ; strip tags and read Primero a) Precios de los términos de potencia and b) Precios de los términos de energía","example_result":"Segment 1: power P1 4,379461 P2 0,281653 EUR/kW year; energy P1 0,064292 P2 0,012858 P3 0,003215 EUR/kWh. Segment 3 power P1 5,648870 P2 2,826996 P3-P5 2,054134 P6 0,941478. 2024 order: segment 1 power P1 2,989915."},"members_summary":{"total":null,"listed":6,"tested":6,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"MITECO page: Peajes de acceso a las redes de transporte y distribucion y cargos asociados a los costes del sistema","publisher":"Ministerio para la Transicion Ecologica y el Reto Demografico","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","data_url":null,"access":"web_viewer_only","format":"HTML page with tables (also embedded as escaped HTML in the page source)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","summary":"MITECO page: Peajes de acceso a las redes de transporte y distribucion y cargos asociados a los costes del sistema","coverage_note":"Spain","data_date":"2026-01-01 values; page read 2026-11-16","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"problems":[]},"example":{"example_request":"curl -sL \"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html\" -o peajes.html ; the text is also in the page body table elements","example_result":"Peajes power EUR/kW year 2.0 TD: P1 23,324952, P2 0,443770; energy EUR/kWh 2.0 TD: P1 0,033261, P2 0,016409, P3 0,000077. Cargos segment 1 power P1 4,379461 P2 0,281653."},"members_summary":null}],"other_sources_count":3,"if_unstructured":{"summary":null},"local_terms":[{"term":"peajes de acceso (a las redes de transporte y distribucion)","language":"es","meaning":"Network access tariffs set by CNMC"},{"term":"cargos del sistema electrico","language":"es","meaning":"Charges for other system costs (renewable support, deficit, capacity) set by the Ministry"},{"term":"peajes T&D, TD","language":"es","meaning":"Transport and distribution tariff groups 2.0TD to 6.4TD"},{"term":"segmento tarifario de cargos","language":"es","meaning":"Cargo segments 1-6 matching the peaje groups"},{"term":"termino de potencia / termino de energia","language":"es","meaning":"Fixed power term (EUR/kW year) and energy term (EUR/kWh)"},{"term":"periodo P1-P6 (punta, llano, valle)","language":"es","meaning":"Tariff periods by season, day type and hour"},{"term":"TDVE","language":"es","meaning":"Peajes for public electric vehicle charging points"},{"term":"exceso de potencia","language":"es","meaning":"Excess over contracted power, billed with its own price"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5"],"minutes_estimate":13,"pages_opened":40,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/network-tariffs.json","detail_url":"https://georutter.org/v1/es/network-tariffs/detail.json","html_url":"https://georutter.org/es/network-tariffs/","country_url":"https://georutter.org/v1/countries/es.json"}
