{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"network-tariffs","question":"Where can I get the current electricity network access tariffs and charges in Spain, by voltage level and period, with their history?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-16","access_checked_on":null,"answer":{"official_data":"structured","non_official_data":"none_found","summary":"Peajes (network access tariffs) are set yearly by CNMC resolution and cargos (system charges) by MITERD order, both in BOE, with 2.0TD to 6.4TD by period P1-P6. Current 2026 values: MITECO peajes page (both) and BOE-A-2025-26348 (peajes), BOE-A-2025-26705 (cargos). History since 2021-06 is the chain of BOE resolutions/orders; 2014-2021 frozen old-structure orders. No CSV/API of the series was found.","main_caveats":["Peajes (CNMC, networks) and cargos (Ministry, other system costs) are separate documents; a full regulated price needs both. Do not add transport and distribution parts on top of the T&D line.","No official CSV, API or time series exists in what was found: values sit in BOE text tables and an HTML page. History needs one BOE document per year; BOE legal status flags do not show supersession.","MITECO page shows 2,051434 for cargos segment 3 power P3-P5; the BOE order text says 2,054134. Take the BOE as the legal text.","Periods P1-P6 depend on season, day type and territory (Peninsula, Balearics, Canary Islands, Ceuta, Melilla); 2.0TD has 3 energy periods and 2 power periods. Hours are in Circular 3/2020 art. 7, not in the price resolutions.","2025 has two peajes documents: Res. 4-12-2024 (from 2025-01-01) and Res. 6-3-2025 replacing only Annex II (excess power) from 2025-04-01. Cargos 2024 order was published 2024-02-14."],"confidence":"high","confidence_reason":"Official BOE texts and CNMC files opened and values cross-checked (BOE, MITECO page, CNMC Excel and memoria agree except one cell); older years read from the BOE text.","attributes":[{"attribute":"network_tariffs","covered":"yes","source_ids":["s001","s003"],"note":"2.0TD (BT<=15kW), 3.0TD (BT>15kW), 6.1TD-6.4TD (1-30, 30-72.5, 72.5-145, >145 kV), TDVE for EV charging; 2026 values.","gap":null,"gap_note":null},{"attribute":"network_charges","covered":"yes","source_ids":["s002","s003"],"note":"Segments 1-6 plus 2VE/3VE, P1-P6, 2026 Orden TED/1524/2025. One cell differs between MITECO page and BOE (segment 3 power P3-P5).","gap":null,"gap_note":null},{"attribute":"voltage_level","covered":"yes","source_ids":["s001","s003"],"note":"2.0TD (BT<=15kW), 3.0TD (BT>15kW), 6.1TD-6.4TD (1-30, 30-72.5, 72.5-145, >145 kV), TDVE for EV charging; 2026 values.","gap":null,"gap_note":null},{"attribute":"time_band","covered":"yes","source_ids":["s001","s003","s005"],"note":"Power EUR/kW year, energy EUR/kWh, split transport/distribution in the BOE; hour definition of periods is in Circular 3/2020 art. 7.","gap":null,"gap_note":null},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"partial","source_ids":["s001","s002","s004","s006"],"note":"Coverage combines distinct components of the question; see the original detailed evidence and its geographic and technical limits.","gap":"not_checked","gap_note":"The original rows have different scopes. Their combination has not been established as complete; original rows are retained in internal curation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"CNMC annual resolutions setting the values of peajes de acceso a las redes de transporte y distribucion (BOE series 2021-2026)","publisher":"CNMC, published in Boletin Oficial del Estado","official":true,"landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348","access":"direct_download","format":"BOE XML (also HTML and PDF); prices are tables flattened into text","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"Legal text of peajes with transport/distribution split, EV peajes (TDVE), excess power and reactive energy prices; one document per year gives the history.","first_seen_pass":1,"rank":1,"summary":"CNMC annual resolutions setting the values of peajes de acceso a las redes de transporte y distribucion (BOE series 2021-2026)","coverage_note":"Spain (all territories); period hours differ by territory in Circular 3/2020","data_date":"Prices apply from 2026-01-01; BOE publication 2025-12-22","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain (all territories); period hours differ by territory in Circular 3/2020"},"fine_print":{"unit":{"value":"Power EUR/kW year; energy EUR/kWh; excess power EUR/kW day; reactive EUR/kVArh","quote":"Término de potencia del peaje de transporte y distribución (€/kW año)","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":[]},"inclusion_rule":{"value":"Applies to consumers, to self-consumers for energy taken from the grid and to generators for own consumption","quote":"Precios de los términos de potencia contratada y energía activa de los peajes de transporte y distribución de aplicación a los consumidores, a los autoconsumidores por la energía demandada de la red y a los generadores por los consumos propios.","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","attempts":[]},"reference_date":{"value":"Prices apply from 2026-01-01; BOE publication 2025-12-22","quote":"por la que se establecen los valores de los peajes de acceso a las redes de transporte y distribución de electricidad de aplicación a partir del 1 de enero de 2026","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","attempts":[]},"update_frequency":{"value":"Annual, by CNMC resolution published in BOE","quote":"calculará anualmente y publicará en el «Boletín Oficial del Estado» mediante resolución los valores de los peajes de acceso a las redes de transporte y distribución","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","attempts":[]},"exclusions":{"value":"Cargos (other system costs) are not in these resolutions; they are set by the Ministry","quote":"correspondiendo al Ministerio para la Transición Ecológica y el Reto Demográfico la aprobación de la estructura de los cargos, su metodología y sus valores.","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":[]}},"key_fields":[{"field":"Grupo tarifario","meaning":"Peaje group 2.0 TD, 3.0 TD, 6.1 TD, 6.2 TD, 6.3 TD, 6.4 TD (and 3.0/6.1/6.2 TDVE for public EV charging); each maps to a voltage and power range"},{"field":"Periodo 1 to Periodo 6","meaning":"Tariff periods; 2.0TD uses P1-P2 for power and P1-P3 for energy"},{"field":"Peaje de transporte / de distribucion / de transporte y distribucion","meaning":"Annex I gives three blocks per term; the third (T&D) is the sum and the price a customer pays"}],"how_to_use":{"example_request":"curl -sL \"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348\" -o res2026.xml ; then strip tags, find ANEXO I, 1. Precios ... a) Términos de potencia contratada. For other years the same URL with the BOE id above; to find an id: curl -sL -H \"Accept: application/xml\" \"https://www.boe.es/datosabiertos/api/boe/sumario/20241216\" and look for the item title 'valores de los peajes de acceso'.","example_result":"Annex I, T&D block, EUR/kW year: 2.0 TD P1 23,324952 P2 0,443770; 6.1 TD P1 23,946498 P2 12,687713 P3 4,747747 P4 3,339695 P5 0,070979 P6 0,062703. Same series 2.0TD T&D power P1: 2021-06 23,469833; 2022 22,988256; 2023 22,393140; 2024 22,401746; 2025 22,958932; 2026 23,324952.","steps":["Pick the year; the file is the resolution published in December of the previous year (see members). For 2021 take the 18-03-2021 resolution (applies from 2021-06-01).","Download the BOE XML, remove tags, and locate ANEXO I. Each of power and energy has three consecutive tables: transport, distribution, transport and distribution. Use the last for what a customer pays.","Rows are 2.0 TD, 3.0 TD, 6.1 TD, 6.2 TD, 6.3 TD, 6.4 TD; flattened text leaves blanks, so 2.0 TD has only 2 power values and 3 energy values, and others have 6.","For EV points use Annex I section 3 (3.0 TDVE, 6.1 TDVE, 6.2 TDVE). Annex II has excess-power prices and Annex III reactive-energy prices.","For 2025 take Annex I from the 2024-12-04 resolution and Annex II from the 2025-03-06 resolution.","Cargos are in source 2; add them by segment (2.0TD = segment 1, 3.0TD = 2, 6.1TD = 3, 6.2TD = 4, 6.3TD = 5, 6.4TD = 6)."],"reading_traps":["BOE metadata marks all old resolutions estatus_derogacion=N (not repealed); each is superseded by the next, so use the applicability date.","In the 2026 text the 6.1 TDVE and 6.2 TDVE power table header reads 'Periodo 1 Periodo 2 Periodo 1 Periodo 4 Periodo 1 Periodo 6' (typo); the six values are P1 to P6.","6.4 TD has no distribution part (all zeros in the CNMC Excel); its peaje is the transport part only.","Period hours are not in these resolutions; see source 5. A 2021 first-year price applies only 2021-06-01 to 2021-12-31.","Prices have six decimals; do not round before multiplying by contracted power."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/xml; charset=utf-8","size_bytes":78092,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"CNMC publishes the peajes values each year in BOE and the list of previous resolutions since 2021","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","quote":"la Resolución de 18 de marzo de 2021, de la Comisión Nacional de los Mercados y la Competencia, por la que se establecen los valores de los peajes de acceso a las redes de transporte y distribución de electricidad de aplicación a partir del 1 de junio de 2021"},{"claim":"Annex I contains power and energy prices by group and period","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","quote":"Precios de los términos de potencia contratada y de energía activa"},{"claim":"Annex I section 3 gives separate peajes for public EV charging","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","quote":"Precios de los términos de potencia contratada y de energía de los peajes de aplicación a los puntos de suministro de acceso público dedicados a la recarga de vehículos eléctricos."},{"claim":"March 2025 resolution replaces only Annex II of the 2025 resolution from April","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-5341","quote":"Segundo. Eficacia. La presente resolución surtirá efectos desde el 1 de abril de 2025."}],"members":[{"name":"Res. 18-03-2021 (from 2021-06-01), BOE 2021-03-23","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2021-4565","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2021-4565","access":"direct_download","tested":true,"data_found":null,"note":"First TD values. 2.0TD T&D power P1 23,469833 EUR/kW year."},{"name":"Res. 16-12-2021 (from 2022-01-01), BOE 2021-12-22","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2021-21208","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2021-21208","access":"direct_download","tested":true,"data_found":null,"note":"2.0TD T&D power P1 22,988256. Errata in BOE-A-2021-21647 (2021-12-28) not opened (title only, via BOE sumario)."},{"name":"Res. 15-12-2022 (from 2023-01-01), BOE 2022-12-22","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-21799","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2022-21799","access":"direct_download","tested":true,"data_found":null,"note":"2.0TD T&D power P1 22,393140."},{"name":"Res. 21-12-2023 (from 2024-01-01), BOE 2023-12-25","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-26251","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2023-26251","access":"direct_download","tested":true,"data_found":null,"note":"2.0TD T&D power P1 22,401746."},{"name":"Res. 04-12-2024 (from 2025-01-01), BOE 2024-12-16","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-26218","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2024-26218","access":"direct_download","tested":true,"data_found":null,"note":"2.0TD T&D power P1 22,958932. Annex II replaced from 2025-04-01 by the next row."},{"name":"Res. 06-03-2025 replacing Annex II (excess power) of the 2025 resolution, BOE 2025-03-17","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-5341","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-5341","access":"direct_download","tested":true,"data_found":null,"note":"Effects from 2025-04-01, after Circular 1/2025; only excess-power prices change."},{"name":"Res. 18-12-2025 (from 2026-01-01), BOE 2025-12-22","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348","access":"direct_download","tested":true,"data_found":null,"note":"Current. 2.0TD T&D power P1 23,324952, P2 0,443770 EUR/kW year."}],"members_summary":{"total":null,"listed":7,"tested":7,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s002","name":"MITERD orders setting the prices of the cargos del sistema electrico (BOE series 2021-2026)","publisher":"Ministerio para la Transicion Ecologica y el Reto Demografico, published in Boletin Oficial del Estado","official":true,"landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26705","access":"direct_download","format":"BOE XML (also HTML and PDF); tables flattened into text","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Cargos (charges for other system costs) by segment 1-6 and period, which are not part of the CNMC peajes; one order per year gives the history.","first_seen_pass":1,"rank":2,"summary":"MITERD orders setting the prices of the cargos del sistema electrico (BOE series 2021-2026)","coverage_note":"Spain (all territories)","data_date":"Prices apply from 2026-01-01; BOE publication 2025-12-27","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain (all territories)"},"fine_print":{"unit":{"value":"Power EUR/kW year; energy EUR/kWh","quote":"Término de potencia de los cargos (euros/kW año)","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705","attempts":[]},"inclusion_rule":{"value":"Segment 1-6 mirror the peaje groups 2.0TD to 6.4TD; segments 2 VE and 3 VE for public EV charging","quote":"La estructura de peajes se replica en los segmentos tarifarios de los cargos","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":[]},"reference_date":{"value":"Prices apply from 2026-01-01; BOE publication 2025-12-27","quote":"Los precios aplicables a los distintos segmentos tarifarios de los cargos del sistema eléctrico a partir del 1 de enero de 2026 son:","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705","attempts":[]},"update_frequency":{"value":"Annual, by ministerial order","quote":"los cargos previstos para cada ejercicio se establecerán mediante Orden de la Ministra para la Transición Ecológica y el Reto Demográfico","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2774","attempts":[]},"exclusions":{"value":"Peajes for networks are not included; the same orders also set other regulated costs (bono social share, capacity payments, etc.)","quote":"por la que se establecen los precios de los cargos del sistema eléctrico y se establecen diversos costes regulados del sistema eléctrico para el ejercicio 2026","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705","attempts":[]}},"key_fields":[{"field":"Segmento tarifario","meaning":"1 = 2.0TD, 2 = 3.0TD, 3 = 6.1TD, 4 = 6.2TD, 5 = 6.3TD, 6 = 6.4TD; 2 VE and 3 VE for EV charging"},{"field":"Periodo 1 to Periodo 6","meaning":"Same periods as the peajes; segment 1 has 2 power and 3 energy values"}],"how_to_use":{"example_request":"curl -sL \"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26705\" -o cargos2026.xml ; strip tags and read Primero a) Precios de los términos de potencia and b) Precios de los términos de energía","example_result":"Segment 1: power P1 4,379461 P2 0,281653 EUR/kW year; energy P1 0,064292 P2 0,012858 P3 0,003215 EUR/kWh. Segment 3 power P1 5,648870 P2 2,826996 P3-P5 2,054134 P6 0,941478. 2024 order: segment 1 power P1 2,989915.","steps":["Pick the order for the year (members). Titles are found with the BOE sumario API (same method as in source 1) searching 'cargos del sistema'.","In the XML, section Primero holds the segment 1-6 tables, section Segundo the 2 VE / 3 VE tables for EV charging.","Rows are segment number 1 to 6; flattened text leaves blanks for unused periods (segment 1 has only 2 power and 3 energy values).","Add to the matching peaje group (see source 1) to get regulated price per period."],"reading_traps":["MITECO page prints segment 3 power P3-P5 as 2,051434; the BOE order text says 2,054134 (checked in the downloaded XML and page source).","The 2024 order was published on 2024-02-14 and its text says the 2023 order prices applied while it was processed; check effect dates before using January-February 2024.","MITECO page labels cargos power unit as EUR/kW; the BOE text says EUR/kW year.","Cargos 2021: first TD order applies from 2021-06-01 only (Orden TED/371/2021), earlier months follow the old structure."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/xml; charset=utf-8","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Ministry order sets the cargos for 2026 by segment and period","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705","quote":"Orden TED/1524/2025, de 23 de diciembre, por la que se establecen los precios de los cargos del sistema eléctrico y se establecen diversos costes regulados del sistema eléctrico para el ejercicio 2026"},{"claim":"Cargos methodology is set by Real Decreto 148/2021 and values by yearly order","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2774","quote":"el artículo 7 del Real Decreto 148/2021, de 9 de marzo de 2021, establece que los cargos previstos para cada ejercicio se establecerán mediante Orden de la Ministra para la Transición Ecológica y el Reto Demográfico"}],"members":[{"name":"Orden TED/371/2021 (cargos from 2021-06-01), BOE 2021-04-22","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2021-6390","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2021-6390","access":"direct_download","tested":true,"data_found":null,"note":"Title and metadata read; values not extracted."},{"name":"Orden TED/1484/2021 (cargos 2022), BOE 2021-12-30","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2021-21794","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2021-21794","access":"direct_download","tested":true,"data_found":null,"note":"Title and metadata read; values not extracted."},{"name":"Orden TED/1312/2022 (cargos 2023), BOE 2022-12-29","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2022-23737","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2022-23737","access":"direct_download","tested":true,"data_found":null,"note":"Title and metadata read; values not extracted."},{"name":"Orden TED/113/2024 (cargos 2024), BOE 2024-02-14","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-2774","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2024-2774","access":"direct_download","tested":true,"data_found":null,"note":"Published mid-February; segment 1 power P1 2,989915 EUR/kW year."},{"name":"Orden TED/1487/2024 (cargos 2025), BOE 2024-12-28","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2024-27289","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2024-27289","access":"direct_download","tested":true,"data_found":null,"note":"Title and metadata read; values not extracted."},{"name":"Orden TED/1524/2025 (cargos 2026), BOE 2025-12-27","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26705","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26705","access":"direct_download","tested":true,"data_found":null,"note":"Current. Segment 1 power P1 4,379461 EUR/kW year; energy P1 0,064292 EUR/kWh."}],"members_summary":{"total":null,"listed":6,"tested":6,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s003","name":"MITECO page: Peajes de acceso a las redes de transporte y distribucion y cargos asociados a los costes del sistema","publisher":"Ministerio para la Transicion Ecologica y el Reto Demografico","official":true,"landing_url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","data_url":null,"access":"web_viewer_only","format":"HTML page with tables (also embedded as escaped HTML in the page source)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"Current peajes and cargos side by side with the peaje-to-segment mapping and voltage ranges, in HTML tables; fastest way to get 2026 values. No history.","first_seen_pass":1,"rank":3,"summary":"MITECO page: Peajes de acceso a las redes de transporte y distribucion y cargos asociados a los costes del sistema","coverage_note":"Spain","data_date":"2026-01-01 values; page read 2026-11-16","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain"},"fine_print":{"unit":{"value":"Peajes power EUR/kW year, energy EUR/kWh; cargos power labelled EUR/kW (BOE says EUR/kW year)","quote":"Término de potencia del peaje de transporte y distribución (€/kW año)","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":[]},"inclusion_rule":{"value":"Groups 2.0TD to 6.4TD mapped to voltage ranges and cargo segments 1-6; TDVE peajes named but without prices","quote":"La estructura de peajes se replica en los segmentos tarifarios de los cargos, tal y como se muestra a continuación:","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":[]},"reference_date":{"value":"2026-01-01 values; page read 2026-11-16","quote":"Los precios de los peajes se han aprobado por la Resolución de 18 de diciembre de 2025, de la Comisión Nacional de los Mercados y la Competencia","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":[]},"update_frequency":{"value":"Page is replaced each year with the new values (no archive)","quote":null,"url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":["Read the page: it states only the 2026 resolution and order, no earlier years.","Searched for an archive of past years on the page and its links: none found."]},"exclusions":{"value":"No TDVE prices, no excess-power or reactive prices, no history","quote":"Existen además unos peajes y cargos específicos para puntos de recarga de vehículos eléctricos de acceso público con potencia contratada superior a 15 kW:","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","attempts":[]}},"key_fields":[{"field":"Peaje T&D / Segmentos tarifarios de cargos","meaning":"Mapping table from supply characteristics (BT<=15kW, BT>15kW, 1-30, 30-72,5, 72,5-145, >145 kV) to peaje and cargo segment"}],"how_to_use":{"example_request":"curl -sL \"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html\" -o peajes.html ; the text is also in the page body table elements","example_result":"Peajes power EUR/kW year 2.0 TD: P1 23,324952, P2 0,443770; energy EUR/kWh 2.0 TD: P1 0,033261, P2 0,016409, P3 0,000077. Cargos segment 1 power P1 4,379461 P2 0,281653.","steps":["Download the page; the price tables appear as plain HTML tables with rows per group and columns Periodo 1 to Periodo 6.","Read peajes power, peajes energy, cargos power and cargos energy tables in that order; empty cells mean the period does not exist for that group.","Link the groups to cargos segments with the table 'Características del suministro'.","Check against BOE (sources 1 and 2) when a precise legal value is needed."],"reading_traps":["The page source also holds the same tables as one escaped HTML string (with \\n and \\\" characters) inside a component attribute; parse the rendered tables, not that string.","Cargos segment 3 power P3-P5 is 2,051434 on the page but 2,054134 in BOE Orden TED/1524/2025.","Page shows only the current year; old values disappear when it is updated."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":85223,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"CNMC sets peajes, Ministry sets cargos","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","quote":"compete a la autoridad nacional regulatoria, la Comisión Nacional de los Mercados y la Competencia, la aprobación de la metodología de peajes de acceso a las redes de transporte y distribución, la estructura y los valores concretos de los mismos"},{"claim":"Current cargos prices come from Orden TED/1524/2025","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","quote":"Los precios de los cargos que resultan de aplicación desde el 1 de enero de 2026 se han establecido en la Orden TED/1524/2025, de 23 de diciembre"}],"members":[],"members_summary":null},{"source_id":"s004","name":"CNMC expediente RAP/DE/009/25 (peajes T&D 2026): resolution, memoria and Excel allocation model","publisher":"Comision Nacional de los Mercados y la Competencia","official":true,"landing_url":"https://www.cnmc.es/expedientes/rapde00925","data_url":"https://www.cnmc.es/sites/default/files/6331871.xlsx","access":"direct_download","format":"XLSX (model), PDF (resolution 417 KB, memoria 3.2 MB, 175 pages)","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"Machine-readable Excel with unrounded transport and distribution prices, EV peajes and price ratios between periods; memoria with comparison to 2025 and reasons for the change.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Spain"},"fine_print":{"unit":{"value":"Power EUR/kW year, energy EUR/kWh (sheet VII headings)","quote":"Término de potencia de los peajes (€/kW","url":"https://www.cnmc.es/sites/default/files/6331871.xlsx","attempts":[]},"inclusion_rule":{"value":"Groups 2.0TD to 6.4TD plus TDVE variants (sheet IX); excludes cargos","quote":null,"url":"https://www.cnmc.es/sites/default/files/6331871.xlsx","attempts":["Opened the xlsx sheet list: 'VII. Peajes T&D' and 'IX. Peajes VE' only cover peajes.","Memoria Cuadro 29-30 (pages 62-63) list the same groups with TDVE."]},"reference_date":{"value":"Year 2026 (resolution dated 2025-12-18; memoria PDF created 2025-12-18)","quote":"Cuadro 29. Términos de potencia de los peajes de transporte y distribución que resultan de la metodología de la Circular 3/2020. Año 2026","url":"https://www.cnmc.es/sites/default/files/6331870.pdf","attempts":[]},"update_frequency":{"value":"One expediente per year (RAP/DE/xxx/yy)","quote":null,"url":"https://www.cnmc.es/expedientes/rapde00925","attempts":["Opened the CNMC retribucion-peajes-y-liquidaciones page: it lists only recent expedientes, no per-year archive.","Web search for 2021-2025 CNMC peajes files: results gave the CNMC press notes and BOE, not a list of expedientes."]},"exclusions":{"value":"Only the 2026 expediente was opened; past years' Excel models were not located","quote":null,"url":"https://www.cnmc.es/expedientes/rapde00925","attempts":["Opened the expediente page: five documents, all 2026.","Searched the CNMC site through web search for earlier years (searches 2 and 3): only 2025 press note and PDFs without a list."]}},"key_fields":[{"field":"Sheet 'VII. Peajes T&D'","meaning":"Rows 11-16 transport, 21-26 distribution, 33-38 transport and distribution; columns B-G power P1-P6, I-N energy P1-P6"},{"field":"Sheet 'IX. Peajes VE'","meaning":"Peajes for public EV charging (TDVE)"}],"how_to_use":{"example_request":"curl -sL -o modelo2026.xlsx \"https://www.cnmc.es/sites/default/files/6331871.xlsx\" ; read sheet 'VII. Peajes T&D' (sheet10.xml in the zip), row 33","example_result":"Row 33 (2.0 TD, T&D): B33 23.324952, C33 0.44377, I33 0.033261, J33 0.016409, K33 0.000077; row 38 (6.4 TD): B38 6.606205.","steps":["Download the xlsx (298 KB); sheet names: I. Datos de entrada ... VII. Peajes T&D, VIII. Pagos autoconsumo proximo, IX. Peajes VE.","Use sheet 'VII. Peajes T&D' block 3 (rows 33-38) for the final T&D prices; blocks 1-2 are the transport and distribution parts.","Use the memoria PDF Cuadro 29 and 30 (pages 62-63 of 175) for a printed version including TDVE rows."],"reading_traps":["Sheet VII.2 (row 44 onwards) holds price ratios between periods, not prices.","6.4 TD distribution rows are zero by design.","The memoria is a 175-page PDF; text extraction works with pdftotext."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","size_bytes":298772,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Expediente lists resolution, memoria and Excel files for peajes 2026","url":"https://www.cnmc.es/expedientes/rapde00925","quote":"03_Modelo_de_Asignacion_TD_2026.xlsx"},{"claim":"CNMC press note: 2026 peajes rise on average 0.5 percent","url":"https://cnmc.es/prensa/peajes-electricidad-2026-20251222","quote":"Los peajes aumentan, en términos medios, el 0,5% con respecto de los a los del ejercicio 2025."}],"members":[],"members_summary":null},{"source_id":"s005","name":"Circular 3/2020 CNMC (peajes methodology) and Circular 1/2025 modification","publisher":"CNMC, published in Boletin Oficial del Estado","official":true,"landing_url":"https://www.boe.es/buscar/act.php?id=BOE-A-2020-1066","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066","access":"direct_download","format":"BOE XML/HTML/PDF","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"regulator","adds":"Definition of the tariff periods (seasons, day types, hours by territory) needed to apply the P1-P6 prices, and the methodology and structure of the peajes.","first_seen_pass":1,"rank":5,"coverage":{"geographic":"Spain, with separate season and hour tables for Peninsula, Balearics, Canary Islands, Ceuta and Melilla"},"fine_print":{"unit":{"value":"Hours of day and months by season","quote":"Periodo horario Tipo de día Tipo A Tipo B Tipo B1 Tipo C Tipo D","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066","attempts":[]},"inclusion_rule":{"value":"Six periods for all peajes except 2.0TD (three-period energy, two-period power)","quote":"La discriminación horaria de seis periodos será de aplicación a los términos de potencia y energía de todos los peajes, con la excepción del peaje 2.0 TD.","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066","attempts":[]},"reference_date":{"value":"In force since 2020-01-25; modified 2025","quote":null,"url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066","attempts":["BOE metadata fecha_vigencia 20200125 in the XML.","Circular 1/2025 opened (BOE-A-2025-2044): entry into force next day after publication, billing changes from 2025-04-01."]},"update_frequency":{"value":"Methodology, regulatory period six years; modified by circular when needed","quote":null,"url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","attempts":["BOE 2026 resolution text says the 6-year regulatory period (art. 14.4 Ley 24/2013) and that the methodology review is in its final phase.","Circular 1/2025 (BOE 2025-02-05) is the only modification cited in the BOE 2026 resolution (December 2025) antecedentes."]},"exclusions":{"value":"Prices are not in the circular; they are in the annual resolutions","quote":null,"url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066","attempts":["Searched the circular text for price tables: none, only methodology and period tables.","Checked that prices come from article 13 annual resolution (source 1)."]}},"key_fields":[{"field":"Artículo 7","meaning":"Seasons, day types (A, B, B1, C, D) and hours for P1-P6; 2.0TD three-period energy: punta 10-14 and 18-22, llano 8-10, 14-18, 22-24, valle 0-8 and weekends/holidays (Peninsula, Balearics, Canary Islands)"}],"how_to_use":{"example_request":"curl -sL \"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066\" -o circular3-2020.xml ; strip tags and read Artículo 7","example_result":"Peninsula seasons: alta enero, febrero, julio, diciembre; media alta marzo, noviembre; media junio, agosto, septiembre; baja abril, mayo, octubre. 2.0TD energy: P1 10h-14h and 18h-22h, P2 8h-10h, 14h-18h, 22h-24h, P3 0h-8h (Ceuta/Melilla 11-15 and 19-23).","steps":["Find the territory and month to get the season, then the day type (A, B, B1, C, D).","Look up the hour in the table for that day type to get P1-P6; for 2.0TD use the three-period table for energy.","For 2.0TD power use P1 (punta-llano) and P2 (valle); P1+P2 of the three-period table form the punta-llano period.","Use the national holidays in the official calendar, excluding substitutable ones and those without fixed date."],"reading_traps":["The XML is the text as published in 2020; apply Circular 1/2025 changes (art. 7.4 renamed punta-llano; billing of power and excess).","Canary Islands, Balearics, Ceuta and Melilla have different season months and, for Ceuta and Melilla, different hours.","Tables are flattened in the XML and need care when parsing."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/xml; charset=utf-8","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Article 7 defines the tariff periods","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066","quote":"Artículo 7. Periodos horarios de los peajes de transporte y distribución."},{"claim":"Circular 1/2025 renames the two-period power discrimination","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-2044","quote":"La discriminación horaria de dos periodos diferencia las horas del año en dos periodos horarios: punta-llano y valle."}],"members":[{"name":"Circular 3/2020, BOE 2020-01-24","landing_url":"https://www.boe.es/buscar/act.php?id=BOE-A-2020-1066","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-1066","access":"direct_download","tested":true,"data_found":null,"note":"Article 7 defines periods; text read from XML."},{"name":"Circular 1/2025 modifying Circular 3/2020, BOE 2025-02-05","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-2044","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-2044","access":"direct_download","tested":true,"data_found":null,"note":"Renames the 2-period power discrimination punta-llano / valle; changes billing of excess power from 2025-04-01."}],"members_summary":{"total":null,"listed":2,"tested":2,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s006","name":"Old peajes de acceso (2.0A-6.xB) set by orders 2014-2020 and prorogued to 2021-05","publisher":"Ministerio de Industria / Ministerio para la Transicion Ecologica, published in Boletin Oficial del Estado","official":true,"landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2014-1052","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2014-1052","access":"direct_download","format":"BOE XML/HTML/PDF; prices written as lines of text in the annexes","license":"unknown","language":"es","has_coordinates":false,"location_precision":"none","publisher_type":"national_government","adds":"History before 2021-06: the old tariff structure, where peajes already included the cargos, with values fixed in 2014/2015 and prorogued year by year.","first_seen_pass":1,"rank":6,"coverage":{"geographic":"Spain"},"fine_print":{"unit":{"value":"Power EUR/kW year; energy EUR/kWh","quote":"Término de facturación de potencia: TPA: 38,043426 €/kW y año.","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2014-1052","attempts":[]},"inclusion_rule":{"value":"Peajes 2.0A, 2.0DHA, 2.0DHS, 2.1A, 2.1DHA, 2.1DHS, 3.0A, 3.1A, 6.1A-6.5 by voltage and power","quote":"Peajes de alta tensión de 6 periodos tarifarios (6.)","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2014-1052","attempts":[]},"reference_date":{"value":"Values of 2014 (6.1A: 2015) kept until 2021-05-31","quote":"Para las restantes categorías de peajes de acceso serán los previstos en el artículo 10 y el anexo I de la Orden IET/107/2014, de 31 de enero","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2018-17606","attempts":[]},"update_frequency":{"value":"Prorogued annually by order until replaced by the TD structure on 2021-06-01","quote":"se ha optado por prorrogar los peajes establecidos en la Orden TEC/1258/2019, de 20 de diciembre","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-17206","attempts":[]},"exclusions":{"value":"In this regime peajes included the cargos","quote":"los peajes incorporan tanto peajes como cargos","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-17206","attempts":[]}},"key_fields":[{"field":"Peaje 2.0A ... 6.5","meaning":"Old tariff names; 2.0A/2.0DHA up to 10 kW BT, 2.1A 10-15 kW, 3.0A BT above 15 kW, 3.1A, 6.1-6.5 HV"}],"how_to_use":{"example_request":"curl -sL \"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2014-1052\" -o iet107-2014.xml ; strip tags and read ANEXO I, 1.º and 2.º","example_result":"2.0A: TPA 38,043426 EUR/kW year, TEA 0,044027 EUR/kWh. 3.0A power P1-P3 40,728885 24,437330 16,291555. 6.1A (IET/2444/2014): P1 39,139427 P2 19,586654 P3 14,334178.","steps":["Use IET/107/2014 Annex I for every peaje except 6.1A and 6.1B; use IET/2444/2014 Annex I for 6.1A and 6.1B.","For 2019 follow Orden TEC/1366/2018 article 2, for 2020 Orden TEC/1258/2019, for 2021-01 to 2021-05 Orden TED/1271/2020: all keep those prices.","From 2021-06-01 use sources 1 and 2."],"reading_traps":["The old peajes contain what are now cargos; do not compare directly with TD peajes.","6.1A is set by the 2015 order, the other peajes by the 2014 order.","Orden TEC/1258/2019 text was not opened; only its title was seen."]},"test":{"tested_on":"2026-11-16","method":"download","http_status":200,"content_type":"application/xml; charset=utf-8","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Orden TEC/1366/2018 points to IET/107/2014 and IET/2444/2014 for the prices","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2018-17606","quote":"Para el peaje de acceso 6.1A de alta tensión serán los previstos en el artículo 9 y el anexo I de la Orden IET/2444/2014, de 19 de diciembre, por la que se determinan los peajes de acceso de energía eléctrica para 2015."},{"claim":"Peajes prorogued from 2021-01-01 and replaced by the new structure","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-17206","quote":"se prorrogan los peajes de acceso de energía eléctrica a partir del 1 de enero de 2021"}],"members":[{"name":"Orden IET/107/2014 (peajes 2014; all but 6.1A/6.1B)","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2014-1052","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2014-1052","access":"direct_download","tested":true,"data_found":null,"note":"Annex I read: 2.0A power 38,043426 EUR/kW year, energy 0,044027 EUR/kWh."},{"name":"Orden IET/2444/2014 (peajes 2015; 6.1A and 6.1B)","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2014-13475","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2014-13475","access":"direct_download","tested":true,"data_found":null,"note":"6.1A power P1 39,139427 EUR/kW year."},{"name":"Orden TEC/1366/2018 (peajes 2019, points to the two orders above)","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2018-17606","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2018-17606","access":"direct_download","tested":true,"data_found":null,"note":"Article 2 refers to IET/2444/2014 for 6.1A and IET/107/2014 for the rest."},{"name":"Orden TEC/1258/2019 (prorogues peajes for 2020)","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2019-18618","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2019-18618","access":"direct_download","tested":false,"data_found":null,"note":"Title seen in BOE sumario scan; text not opened (its content is described in the next order)."},{"name":"Orden TED/1271/2020 (prorogues peajes for 2021 until the new structure)","landing_url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2020-17206","data_url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2020-17206","access":"direct_download","tested":true,"data_found":null,"note":"Text read: prorogues the TEC/1258/2019 peajes from 2021-01-01."}],"members_summary":{"total":null,"listed":5,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}}],"sector":{"regulator":{"name":"Comision Nacional de los Mercados y la Competencia (CNMC) sets peajes; Ministerio para la Transicion Ecologica y el Reto Demografico (MITERD) sets cargos","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html"},"operators":{"structure":"many","note":"Red Electrica (transport) plus many distributors (i-DE, e-distribucion, UFD, etc. and small ones); they apply the same national prices, they do not set them. Iberdrola document on peajes returned 403 to automated clients.","census_url":null},"publication_obligation":{"exists":"yes","norm":"Circular 3/2020 art. 13 and Ley 3/2013 art. 7.1 bis (CNMC publishes values in BOE each year); Real Decreto 148/2021 art. 7 (cargos by ministerial order)","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-A-2025-26348","what_must_be_published":"Annual resolution with peajes prices by group and period; annual order with cargos prices by segment and period","frequency":"Annual (December), with mid-year changes possible"},"consolidated_republication":{"found":"yes","note":"MITECO republishes only the current year; CNMC keeps an expediente per year but no consolidated series. BOE is the only place with every year.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","saw":"Current 2026 peajes (CNMC resolution) and cargos (Orden TED/1524/2025) tables by period, plus segment-to-peaje mapping; no history."},{"organization":"CNMC","url":"https://www.cnmc.es/expedientes/rapde00925","saw":"Expediente with resolution, memoria, Excel allocation model and BOE copy for peajes 2026."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/retribucion-peajes-y-liquidaciones","saw":"Page lists only recent expedientes; no historical archive of peajes resolutions."},{"organization":"Red Electrica de Espana","url":"https://www.ree.es/en/operation/electricity-system/pvpc","saw":"PVPC page lists regulations for peajes and cargos but no amounts."}]}},"national_registry":{"exists":"yes","note":"The BOE is the official single register of the prices (annual CNMC resolution and MITERD order). It is not a dataset: each year is a separate document.","checked_pages":[{"organization":"BOE","url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348","saw":"Resolution CNMC 18-12-2025 with Annex I prices and list of previous annual resolutions since 2021."},{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes.html","saw":"Current peajes and cargos tables."},{"organization":"CNMC","url":"https://www.cnmc.es/expedientes/rapde00925","saw":"Expediente RAP/DE/009/25 with Excel model."}]},"if_unstructured":{"summary":null,"recipe":["List the BOE ids by year with the sumario API (examples: peajes BOE-A-2021-4565, BOE-A-2021-21208, BOE-A-2022-21799, BOE-A-2023-26251, BOE-A-2024-26218, BOE-A-2025-5341, BOE-A-2025-26348; cargos BOE-A-2021-6390, BOE-A-2021-21794, BOE-A-2022-23737, BOE-A-2024-2774, BOE-A-2024-27289, BOE-A-2025-26705).","Download xml.php?id=<id> for each, strip tags and cut text from 'ANEXO I' (peajes) or from 'Primero' (cargos) to the next annex.","In peajes Annex I take the third table of each term (T&D) and read rows by group: tested on BOE-A-2025-26348 (2.0 TD 23,324952 0,443770 EUR/kW year).","Build one table per year with group, period, term, unit and the applicability date; keep the March 2025 Annex II replacement as a separate row set from 2025-04-01.","For years before 2021-06 use source 6 Annex I tables (tested on IET/107/2014: 2.0A 38,043426 EUR/kW year)."],"location_method":"Not applicable: prices are national, by tariff group and period; territory only affects the period hours (Circular 3/2020 art. 7).","cross_with":["Circular 3/2020 art. 7 for hours of each period","Contracted power and voltage level on the supply contract (CUPS) to pick the tariff group"],"where_published":[{"name":"Boletin Oficial del Estado (annual CNMC resolution and MITERD order)","url":"https://www.boe.es/buscar/","what":"Official text with price tables for each year","how_to_search_inside":"BOE search by title 'valores de los peajes de acceso a las redes de transporte y distribucion' (CNMC) or 'precios de los cargos del sistema electrico' (Ministry); or use the BOE sumario API by date: curl -sL -H \"Accept: application/xml\" https://www.boe.es/datosabiertos/api/boe/sumario/AAAAMMDD and filter item titles. Dates return 404 on days without a BOE.","example_document":{"url":"https://www.boe.es/diario_boe/xml.php?id=BOE-A-2025-26348","what_it_gives":"Annex I, 1.a) 'Grupo tarifario ... Periodo 1 Periodo 2 ... 2.0 TD 3,233054 0,003283' (transport) and the T&D block '2.0 TD 23,324952 0,443770' in EUR/kW year; Annex III reactive price '0,80 <= cos phi < 0,95 0,0415540 EUR/kVArh'."}},{"name":"CNMC expedientes of the annual peajes resolution","url":"https://www.cnmc.es/expedientes/rapde00925","what":"Resolution, memoria and Excel model per year (only 2026 opened)","how_to_search_inside":"Expediente number RAP/DE/nnn/yy; the CNMC retribucion-peajes page lists only recent items; no search by year was found.","example_document":{"url":"https://www.cnmc.es/sites/default/files/6331871.xlsx","what_it_gives":"Sheet 'VII. Peajes T&D' row 33: 2.0 TD 23.324952 EUR/kW year P1; I33 0.033261 EUR/kWh."}}]},"related_not_answering":[{"name":"ENTSO-E Overview of Transmission Tariffs in Europe, Synthesis 2025","url":"https://eepublicdownloads.blob.core.windows.net/public-cdn-container/clean-documents/mc-documents/transmission-tariffs/l_260405_entso-e_TTO_2025_03.pdf","why":"Compares an artificial Unit Transmission Tariff of a base case across 36 countries (Spain included); not the Spanish prices by voltage level and period."},{"name":"ESIOS PVPC (Red Electrica)","url":"https://www.esios.ree.es/en/pvpc","why":"Hourly PVPC price for 2.0TD customers; the page and the REE page showed no peajes or cargos amounts and the ESIOS API returns 403 without a token."},{"name":"MITECO Tarifa de Acceso Unica","url":"https://www.miteco.gob.es/es/energia/energia-electrica/electricidad/peajes/tarifa-acceso-unica.html","why":"Procedure for billing several connection points under one access tariff; contains no prices."},{"name":"datos.gob.es dataset 'Evolucion mensual del consumo y numero de clientes por grupos de peajes'","url":"https://datos.gob.es/catalogo/ea0042931-tabla-9-y-11-evolucion-mensual-del-consumo-y-numero-de-clientes-por-grupos-de-peajes-por-ano","why":"Consumption and customers by peaje group, not tariff prices."},{"name":"Endesa page on 2021 tariff changes","url":"https://www.endesa.com/es/te-ayudamos/peajes-de-acceso/nuevas-tarifas-de-luz-2021","why":"Commercial explanation of the 2021 periods; no price values."}],"open_questions":["MITECO page prints 2,051434 and BOE Orden TED/1524/2025 prints 2,054134 for cargos segment 3 power P3-P5; only the organisation can say which is a typo (the BOE is the legal text).","ESIOS may hold peajes or cargos time series behind its API token; not checkable without registration."],"history":[{"pass":1,"date":"2026-11-16","role":"research","model":"Claude Sonnet 5.5","rules_version":"6.12","note":"First pass: peajes (CNMC resolutions) and cargos (MITERD orders) found as BOE documents from 2014 to 2026; one 2026 cell differs between MITECO page and BOE.","headline":{"official_data":"structured","non_official_data":"none_found","national_registry":"yes"},"sources":{"total":6,"new":6,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":40,"minutes":13}}],"local_terms":[{"term":"peajes de acceso (a las redes de transporte y distribucion)","language":"es","meaning":"Network access tariffs set by CNMC"},{"term":"cargos del sistema electrico","language":"es","meaning":"Charges for other system costs (renewable support, deficit, capacity) set by the Ministry"},{"term":"peajes T&D, TD","language":"es","meaning":"Transport and distribution tariff groups 2.0TD to 6.4TD"},{"term":"segmento tarifario de cargos","language":"es","meaning":"Cargo segments 1-6 matching the peaje groups"},{"term":"termino de potencia / termino de energia","language":"es","meaning":"Fixed power term (EUR/kW year) and energy term (EUR/kWh)"},{"term":"periodo P1-P6 (punta, llano, valle)","language":"es","meaning":"Tariff periods by season, day type and hour"},{"term":"TDVE","language":"es","meaning":"Peajes for public electric vehicle charging points"},{"term":"exceso de potencia","language":"es","meaning":"Excess over contracted power, billed with its own price"}],"provenance":{"pass_count":1,"models":["Claude Sonnet 5.5"],"minutes_estimate":13,"pages_opened":40,"passes":[{"pass":1,"date":"2026-11-16","model":"Claude Sonnet 5.5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/network-tariffs.json","detail_url":"https://georutter.org/v1/es/network-tariffs/detail.json","html_url":"https://georutter.org/es/network-tariffs/","country_url":"https://georutter.org/v1/countries/es.json"}
