{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"permitting-rules","question":"Where can I find, in consolidated form, the current legal texts that set the permitting procedure for energy projects in Spain, by technology and size?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-17","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"none_found","summary":"BOE publishes consolidated individual laws and energy codes, including electricity authorization, environmental assessment, gas, water, offshore and nuclear rules. Technology, installed capacity, location and regional competence determine which texts apply; there is no tested complete nationwide matrix covering every technology and size. Regional regulations and authentic publications require separate checks.","main_caveats":["BOE consolidation is informative; check original official publications and pending or implicit amendments.","Installed electrical MW, thermal MW, surface and other thresholds measure different things; do not interchange them.","Regional, local, environmental, water and grid-connection procedures can apply alongside the energy authorization.","More than 50 MW is not the only state competence criterion; offshore and cross-regional projects and network classifications also matter."],"confidence":"medium","confidence_reason":"Principal sources and examples were opened, but regional coverage and all technology-specific thresholds remain incomplete.","attributes":[{"attribute":"consolidated_legal_text","covered":"partial","source_ids":["s001"],"note":"BOE offers consolidated laws; selection and latest effects must be checked.","gap":"not_checked","gap_note":"All sector-specific and transitional texts have not been exhaustively checked."},{"attribute":"permitting_procedure","covered":"partial","source_ids":["s001","s002"],"note":"Article 53 and RD 1955/2000 contain relevant rules; competence and exemptions vary.","gap":"not_checked","gap_note":"No complete checked matrix of all thresholds and regions."},{"attribute":"technology","covered":"partial","source_ids":["s001","s002"],"note":"Examples include electrical generation, self-consumption, offshore, gas, hydro, nuclear and geothermal.","gap":"not_checked","gap_note":"Not all technologies and associated authorizations have been checked."},{"attribute":"size_threshold","covered":"partial","source_ids":["s001","s002"],"note":"Article 53 and RD 1955/2000 contain relevant rules; competence and exemptions vary.","gap":"not_checked","gap_note":"No complete checked matrix of all thresholds and regions."},{"attribute":"latest_data","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"historical_series","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."},{"attribute":"update_frequency","covered":"no","source_ids":[],"note":"This specific requirement was not separately established in the inherited research.","gap":"not_checked","gap_note":"Review the original answer and source evidence; no new research was performed during this adaptation."}]},"sources":[{"source_id":"s001","name":"BOE consolidated legislation and legal codes","publisher":"Agencia Estatal Boletín Oficial del Estado","official":true,"landing_url":"https://boe.es/biblioteca_juridica/codigos/codigo.php?id=14&lang=es&modo=2&tipo=L","data_url":null,"access":"web_viewer_only","format":"HTML, PDF","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"none","summary":"BOE consolidated legislation and legal codes","coverage_note":"Spain; state legislation and selected regional laws","data_date":"Example RD 1955/2000: 2026-02-12","caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://boe.es/buscar/act.php?id=BOE-A-2000-24019&p=20260212&tn=0; article 115","example_result":"Article 115 lists autorización administrativa previa, autorización administrativa de construcción and autorización de explotación."},"members_summary":{"total":null,"listed":12,"tested":12,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s002","name":"Catalan renewable deployment and environmental legislation index","publisher":"Generalitat de Catalunya","official":true,"landing_url":"https://mediambient.gencat.cat/ca/05_ambits_dactuacio/avaluacio_ambiental/energies_renovables/normativa/","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"Spanish","has_coordinates":false,"location_precision":"none","summary":"Catalan renewable deployment and environmental legislation index","coverage_note":"Catalonia","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-17","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://mediambient.gencat.cat/ca/05_ambits_dactuacio/avaluacio_ambiental/energies_renovables/normativa/","example_result":"The index lists Decret llei 16/2019 and later amendments including Llei 5/2020."},"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":null},"local_terms":[{"term":"autorización administrativa previa","language":"Spanish","meaning":"preliminary administrative authorization"},{"term":"autorización de construcción","language":"Spanish","meaning":"construction authorization"},{"term":"autorización de explotación","language":"Spanish","meaning":"operating authorization"},{"term":"acceso y conexión","language":"Spanish","meaning":"grid access and connection"},{"term":"evaluación de impacto ambiental","language":"Spanish","meaning":"environmental impact assessment"},{"term":"legislación consolidada","language":"Spanish","meaning":"consolidated legislation"},{"term":"potencia eléctrica instalada","language":"Spanish","meaning":"installed electrical capacity"},{"term":"autoconsumo","language":"Spanish","meaning":"self-consumption"}],"provenance":{"pass_count":1,"models":["Terra 6.1 (High)"],"minutes_estimate":10,"pages_opened":39,"passes":[{"pass":1,"date":"2026-11-17","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/permitting-rules.json","detail_url":"https://georutter.org/v1/es/permitting-rules/detail.json","html_url":"https://georutter.org/es/permitting-rules/","country_url":"https://georutter.org/v1/countries/es.json"}
