{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"solar-pv-plants-in-permitting","question":"Where can I get a list of solar PV projects currently in permitting in Spain, with location, capacity (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"Spain publishes regional project information and official notices, but the sources checked do not establish a complete current national list. Catalonia, Aragon, Valencia and Navarre provide regional project data. The ministry describes a state map as under construction; BOE notices provide dated milestones. National coverage and current-stage dates remain unverified.","main_caveats":["State and autonomous authorities process different projects; the 50 MW threshold has territorial exceptions.","A public notice records an event, not necessarily the present status; check subsequent decisions.","Navarre includes projects with AAP and/or AAC; its BEGINLIFE field is a database insertion date.","Panel MWp and nominal installed MW are different; regional sources use different fields.","GEM has coarse project statuses, size thresholds and a download request form; individual Spanish records were not tested."],"confidence":"medium","confidence_reason":"Regional files and a BOE notice were tested; the state map service and national coverage remain unchecked.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002"],"note":"Some polygons and municipalities are available; exact locations vary by member.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s001","s002"],"note":"Nominal MW and panel MWp are separate measures.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"developer","covered":"partial","source_ids":["s001","s002"],"note":"Named applicants are available for tested regional and BOE examples.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s002"],"note":"Some regional layers report stages; a notice records a historic milestone.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"stage_date","covered":"partial","source_ids":["s002"],"note":"BOE dates individual events; dates of current stage are not consistently established.","gap":"not_checked","gap_note":"The inherited row combines multiple concepts or coverage; this specific requirement requires separate review."}]},"sources":[{"source_id":"s001","name":"Autonomous community solar PV project datasets","publisher":"Generalitat de Catalunya; Gobierno de Aragón","official":true,"landing_url":"https://analisi.transparenciacatalunya.cat/Medi-Ambient/Plantes-solars-fotovoltaiques-a-Catalunya/ggx8-jkp4/about_data","data_url":"https://analisi.transparenciacatalunya.cat/resource/ggx8-jkp4.json?%24where=estat%3D%27En%20tramitaci%C3%B3%27&%24limit=2","access":"api","format":"JSON, CSV, GML, SHP","license":"Different by member; Navarre CC BY 4.0","language":"ca, es","has_coordinates":true,"location_precision":"exact","summary":"Autonomous community solar PV project datasets","coverage_note":"Catalonia, Aragon, Valencia and Navarre","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"problems":[]},"example":{"example_request":"curl -sSL --max-time 40 'https://analisi.transparenciacatalunya.cat/resource/ggx8-jkp4.json?%24where=estat%3D%27En%20tramitaci%C3%B3%27&%24limit=2'","example_result":"PSFV Galera Solar; 47.16 MW; Castelldans; Galera Solar, SL; En tramitació; Informació Pública (DOGC)."},"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s002","name":"BOE daily summary API","publisher":"Agencia Estatal Boletín Oficial del Estado","official":true,"landing_url":"https://www.boe.es/datosabiertos/api/boe/sumario/20261113","data_url":"https://www.boe.es/datosabiertos/api/boe/sumario/20261113","access":"api","format":"JSON","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","summary":"BOE daily summary API","coverage_note":"Spain, partial","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"problems":[]},"example":{"example_request":"curl -sSL --max-time 30 -H 'Accept: application/json' 'https://www.boe.es/datosabiertos/api/boe/sumario/20261015'","example_result":"BOE-B-2026-33542: PSFV Solana, Constantí, 5.000 MW, public consultation on AAP/AAC and environmental assessment."},"members_summary":null},{"source_id":"s003","name":"SABIA environmental assessment project search","publisher":"MITECO","official":true,"landing_url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","summary":"SABIA environmental assessment project search","coverage_note":"Spain, partial","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"problems":[]},"example":{"example_request":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","example_result":"Search fields include project title, status, project type and promoter."},"members_summary":null}],"other_sources_count":1,"if_unstructured":{"summary":null},"local_terms":[{"term":"planta solar fotovoltaica","language":"es","meaning":"solar PV plant"},{"term":"información pública","language":"es","meaning":"public consultation"},{"term":"autorización administrativa previa","language":"es","meaning":"prior administrative authorisation"},{"term":"autorización administrativa de construcción","language":"es","meaning":"construction authorisation"},{"term":"declaración de impacto ambiental","language":"es","meaning":"environmental impact statement"}],"provenance":{"pass_count":2,"models":["Gemini 4 Hydrogen (Low)","Terra 6.1 (High)"],"minutes_estimate":34,"pages_opened":48,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen (Low)"},{"pass":2,"date":"2026-11-15","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/solar-pv-plants-in-permitting.json","detail_url":"https://georutter.org/v1/es/solar-pv-plants-in-permitting/detail.json","html_url":"https://georutter.org/es/solar-pv-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}
