{"schema_version":"1.0","country":"es","country_name":"Spain","topic":"solar-pv-plants-in-permitting","question":"Where can I get a list of solar PV projects currently in permitting in Spain, with location, capacity (MW), developer, permitting stage and date?","territory":"es","territory_level":"country","parent_url":null,"published_on":"2026-11-19","research_reviewed_on":"2026-11-15","access_checked_on":null,"answer":{"official_data":"partial","non_official_data":"partial","summary":"Spain publishes regional project information and official notices, but the sources checked do not establish a complete current national list. Catalonia, Aragon, Valencia and Navarre provide regional project data. The ministry describes a state map as under construction; BOE notices provide dated milestones. National coverage and current-stage dates remain unverified.","main_caveats":["State and autonomous authorities process different projects; the 50 MW threshold has territorial exceptions.","A public notice records an event, not necessarily the present status; check subsequent decisions.","Navarre includes projects with AAP and/or AAC; its BEGINLIFE field is a database insertion date.","Panel MWp and nominal installed MW are different; regional sources use different fields.","GEM has coarse project statuses, size thresholds and a download request form; individual Spanish records were not tested."],"confidence":"medium","confidence_reason":"Regional files and a BOE notice were tested; the state map service and national coverage remain unchecked.","attributes":[{"attribute":"location","covered":"partial","source_ids":["s001","s002"],"note":"Some polygons and municipalities are available; exact locations vary by member.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"capacity_mw","covered":"partial","source_ids":["s001","s002"],"note":"Nominal MW and panel MWp are separate measures.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"developer","covered":"partial","source_ids":["s001","s002"],"note":"Named applicants are available for tested regional and BOE examples.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"permitting_stage","covered":"partial","source_ids":["s001","s002"],"note":"Some regional layers report stages; a notice records a historic milestone.","gap":"not_checked","gap_note":"National completeness and current project-level coverage remain to be verified."},{"attribute":"stage_date","covered":"partial","source_ids":["s002"],"note":"BOE dates individual events; dates of current stage are not consistently established.","gap":"not_checked","gap_note":"The inherited row combines multiple concepts or coverage; this specific requirement requires separate review."}]},"sources":[{"source_id":"s001","name":"Autonomous community solar PV project datasets","publisher":"Generalitat de Catalunya; Gobierno de Aragón","official":true,"landing_url":"https://analisi.transparenciacatalunya.cat/Medi-Ambient/Plantes-solars-fotovoltaiques-a-Catalunya/ggx8-jkp4/about_data","data_url":"https://analisi.transparenciacatalunya.cat/resource/ggx8-jkp4.json?%24where=estat%3D%27En%20tramitaci%C3%B3%27&%24limit=2","access":"api","format":"JSON, CSV, GML, SHP","license":"Different by member; Navarre CC BY 4.0","language":"ca, es","has_coordinates":true,"location_precision":"exact","publisher_type":"regional_government","adds":"Official project-level records for Catalonia and Aragon with applicant, capacity and stage; geographic coverage is partial.","first_seen_pass":2,"rank":1,"summary":"Autonomous community solar PV project datasets","coverage_note":"Catalonia, Aragon, Valencia and Navarre","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Catalonia, Aragon, Valencia and Navarre"},"fine_print":{"unit":{"value":"Navarre: sum of panels in MW; Aragon: MWp for panels.","quote":"La potencia es la suma de las potencias de los paneles y se expresa en megavatios (MW).","url":"https://geoportal.navarra.es/es/idena/descargar","attempts":[]},"inclusion_rule":{"value":"Navarre: AAP and/or AAC, not yet in service; other regions use different categories.","quote":"Plantas solares fotovoltaicas que han obtenido autorización administrativa previa y/o autorización administrativa de construcción, pero no autorización de explotación o acta de puesta en servicio.","url":"https://geoportal.navarra.es/es/idena/descargar","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":["Navarre catalog creation/update metadata inspected; file has BEGINLIFE insertion date only.","Catalan sample and Valencian WFS features inspected; stage dates not established."]},"update_frequency":{"value":"Valencia catalog says weekly; its description says continuous.","quote":"Frecuencia de actualización","url":"https://dadesobertes.gva.es/dataset/er-fotovoltaicas-en-la-comunitat-valenciana-instalaciones-vallado-de-las-instalaciones-fotovolt","attempts":[]},"exclusions":{"value":"Navarre excludes self-consumption and state jurisdiction; other regions differ.","quote":"no se incluyen las instalaciones para autoconsumo ni aquellas de potencia superior a 50 MW o que excedan del ámbito territorial de Navarra","url":"https://geoportal.navarra.es/es/idena/descargar","attempts":[]}},"key_fields":[{"field":"nom","meaning":"Project name"},{"field":"estat","meaning":"Permitting status"},{"field":"pot_ncia_mw","meaning":"Capacity in MW"},{"field":"municipi","meaning":"Municipality"},{"field":"sol_licitant","meaning":"Applicant"},{"field":"estat_ambiental","meaning":"Environmental stage"}],"how_to_use":{"example_request":"curl -sSL --max-time 40 'https://analisi.transparenciacatalunya.cat/resource/ggx8-jkp4.json?%24where=estat%3D%27En%20tramitaci%C3%B3%27&%24limit=2'","example_result":"PSFV Galera Solar; 47.16 MW; Castelldans; Galera Solar, SL; En tramitació; Informació Pública (DOGC).","steps":["Filter estat for En tramitació; paginate to retrieve all records.","Check whether multiple rows refer to one project before counting.","Aragon: curl -sSL --max-time 40 'https://opendata.aragon.es/GA_OD_Core/download?resource_id=321&formato=csv'; the first project is CASTOR (Hibridación), HABIDITE ENERGY SL, 17 MWp.","Valencian WFS sample: https://terramapas.icv.gva.es/2601_Fotovoltaicas?service=WFS&version=2.0.0&request=GetFeature&typeNames=ms%3ATramitacion.Vallado.GVA&count=2&srsName=urn%3Aogc%3Adef%3Acrs%3AEPSG%3A%3A4326; first feature HISOPO NUCIA 1, 4.89 MW, HISOPO POWER SL, Admitida a trámite.","Navarre: download the ZIP and open ENERGI_Pol_PSolarTra.shp in EPSG:25830; first row LA PEDRERA, RIOS RENOVABLES, 1 MW, 5146-CE."],"reading_traps":["The administrative and environmental statuses are distinct. Date of status was not established in the sample.","Aragon has different files for admission, prior authorisation and construction authorisation; do not equate peak MWp with installed AC MW.","Navarre BEGINLIFE is the SITNA insertion date, not the permit-stage date.","Navarre publisher specifies AAP/AAC, unlike the broader description in datos.gob.es.","Aragon GeoJSON has projected coordinates but no declared CRS; conversion using EPSG:25830 was plausible for two named sites and all 88 first vertices in a broad bounding box.","Some members give polygons, while Catalonia sample only gives municipality; geometry does not establish current legal status."]},"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"The Generalitat links alphanumeric project data and GIS downloads.","url":"https://mediambient.gencat.cat/es/05_ambits_dactuacio/avaluacio_ambiental/energies_renovables/visor/index.html","quote":"la descarga de la tabla de datos con los datos alfanuméricos asociados"},{"claim":"The Navarre source is narrower than the national catalog description.","url":"https://geoportal.navarra.es/es/idena/descargar","quote":"Plantas solares fotovoltaicas que han obtenido autorización administrativa previa y/o autorización administrativa de construcción, pero no autorización de explotación o acta de puesta en servicio."}],"members":[{"name":"Catalonia","landing_url":"https://analisi.transparenciacatalunya.cat/Medi-Ambient/Plantes-solars-fotovoltaiques-a-Catalunya/ggx8-jkp4/about_data","data_url":"https://analisi.transparenciacatalunya.cat/resource/ggx8-jkp4.json?%24where=estat%3D%27En%20tramitaci%C3%B3%27&%24limit=2","access":"api","tested":true,"data_found":null,"note":"204 rows with En tramitació in this query; municipal granularity."},{"name":"Aragon","landing_url":"https://datos.gob.es/es/catalogo/a02002834-energias-renovables-en-aragon1","data_url":"https://opendata.aragon.es/GA_OD_Core/download?resource_id=321&formato=csv","access":"direct_download","tested":true,"data_found":null,"note":"88 rows admitted to processing; includes polygon geometry; CRS and dates need checking."},{"name":"Comunitat Valenciana","landing_url":"https://dadesobertes.gva.es/dataset/er-fotovoltaicas-en-la-comunitat-valenciana-instalaciones-vallado-de-las-instalaciones-fotovolt","data_url":"https://terramapas.icv.gva.es/2601_Fotovoltaicas?request=GetCapabilities&service=WFS","access":"api","tested":true,"data_found":null,"note":"WFS layer ms:Tramitacion.Vallado.GVA: 301 geometries, stage, name, nominal MW and developer; exact currency not determined."},{"name":"Navarra","landing_url":"https://datos.gob.es/en/catalogo/a15002917-plantas-solares-fotovoltaicas-en-tramitacion1","data_url":"https://idena.navarra.es/descargas/ENERGI_Pol_PSolarTra.zip","access":"direct_download","tested":true,"data_found":null,"note":"55 geometries; excludes self-consumption and state jurisdiction. BEGINLIFE is insertion date, not stage date."}],"members_summary":{"total":null,"listed":4,"tested":4,"data_found":0,"scope_note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null},"member_scope":{"total":null,"note":"Inherited members; data findings were not reclassified during this structural migration. Consult each member note.","pattern":null}},{"source_id":"s002","name":"BOE daily summary API","publisher":"Agencia Estatal Boletín Oficial del Estado","official":true,"landing_url":"https://www.boe.es/datosabiertos/api/boe/sumario/20261113","data_url":"https://www.boe.es/datosabiertos/api/boe/sumario/20261113","access":"api","format":"JSON","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Dated official notices provide individual project milestones and can include autonomous authorities.","first_seen_pass":1,"rank":2,"summary":"BOE daily summary API","coverage_note":"Spain, partial","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain, partial"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[{"field":"identificador","meaning":"Official notice identifier"},{"field":"titulo","meaning":"Title and sometimes project and stage"},{"field":"url_html","meaning":"Full notice text"}],"how_to_use":{"example_request":"curl -sSL --max-time 30 -H 'Accept: application/json' 'https://www.boe.es/datosabiertos/api/boe/sumario/20261015'","example_result":"BOE-B-2026-33542: PSFV Solana, Constantí, 5.000 MW, public consultation on AAP/AAC and environmental assessment.","steps":["Read daily JSON items and filter titles for solar PV; retrieve url_html for each notice and extract promoter, MW and location.","Join later notices by expediente and project name to establish the latest known stage."],"reading_traps":["The summary is a stream of events, not a current project registry.","Autonomous-government notices can also appear in the BOE; many regional notices require regional gazettes.","The October example refers to the historical consultation date, not a verified current permit stage."]},"test":{"tested_on":"2026-11-15","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":247641,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Dated official notices provide individual project milestones and can include autonomous authorities.","url":"https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-33542","quote":"Persona peticionaria: OLMO DESARROLLOS FOTOVOLTAICOS ESPAÑA, SL"}],"members":[],"members_summary":null},{"source_id":"s003","name":"SABIA environmental assessment project search","publisher":"MITECO","official":true,"landing_url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","data_url":null,"access":"web_viewer_only","format":"HTML","license":"unknown","language":"es","has_coordinates":false,"location_precision":"municipality","publisher_type":"national_government","adds":"Public environmental-assessment search with project, promoter and status filters.","first_seen_pass":1,"rank":3,"summary":"SABIA environmental assessment project search","coverage_note":"Spain, partial","data_date":null,"caveats":["Consult the main caveats and the complete reading traps and access evidence in the detail."],"coverage":{"geographic":"Spain, partial"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[],"how_to_use":{"example_request":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","example_result":"Search fields include project title, status, project type and promoter.","steps":["Use the published project-search interface to filter by title, location and status."],"reading_traps":["Environmental stage alone is not the final construction authorisation.","A project result was not tested; the earlier navSabiaProyectos address returned a generic office home page."]},"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Public environmental-assessment search with project, promoter and status filters.","url":"https://sede.miteco.gob.es/portal/site/seMITECO/navServicioContenido","quote":"Este buscador permite consultar el estado de tramitación de proyectos en procedimiento de evaluación ambiental"}],"members":[],"members_summary":null},{"source_id":"s004","name":"Global Solar Power Tracker","publisher":"Global Energy Monitor","official":false,"landing_url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","data_url":null,"access":"request_form","format":"XLSX","license":"CC BY 4.0; some component records CC BY-NC 4.0","language":"en","has_coordinates":false,"location_precision":null,"publisher_type":"community","adds":"Global prospective-project tracker; broad status categories and limited threshold.","first_seen_pass":1,"rank":4,"coverage":{"geographic":"Spain, partial"},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[]}},"key_fields":[],"how_to_use":{"example_request":"https://globalenergymonitor.org/projects/global-solar-power-tracker","example_result":"The page describes the tracker, its project status definitions and a download request form.","steps":["The download form was not submitted. Consult the methodology and permitted download route."],"reading_traps":["Announced status can precede permit applications; construction is not necessarily current permitting.","The provider states that location may be approximate; do not assume exact coordinates.","The file and project-level Spain records were not tested."]},"test":{"tested_on":"2026-11-15","method":"page_only","http_status":200,"content_type":"text/html","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Global prospective-project tracker; broad status categories and limited threshold.","url":"https://globalenergymonitor.org/projects/global-solar-power-tracker","quote":"all announced, pre-construction, construction, and shelved projects with capacities greater than 20 MW."}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Comisión Nacional de los Mercados y la Competencia (CNMC)","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-electrico"},"operators":{"structure":"many","note":"Many project promoters; authorisation is divided among the ministry and autonomous communities. Red Eléctrica handles transmission access.","census_url":null},"publication_obligation":{"exists":"yes","norm":"Real Decreto 1955/2000, article 125","url":"https://www.boe.es/buscar/act.php?id=BOE-A-2000-24019&p=20251106&tn=1","what_must_be_published":"Public-information notice of the application in the indicated gazettes; this is an event publication, not a duty to publish a consolidated live registry.","frequency":"On the public-information procedure, not a periodic project dataset."},"consolidated_republication":{"found":"unknown","note":"A ministry map is described but labelled under construction; its underlying service was not verified.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/infraestructuras-integracion/division-de-proyectos.html","saw":"Describes state-permitting map by technology and municipality, limited to ministry projects."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-electrico","saw":"Electricity regulator sector page, no project-level permitting list identified in this page."},{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Aggregated grid-access data by stage, not a tested complete national permitting list."}]}},"national_registry":{"exists":"unknown","note":"The ministry describes a project map but labels it under construction; no functioning registry was verified.","checked_pages":[{"organization":"MITECO","url":"https://www.miteco.gob.es/es/energia/infraestructuras-integracion/division-de-proyectos.html","saw":"Describes state-permitting map by technology and municipality, limited to ministry projects."},{"organization":"CNMC","url":"https://www.cnmc.es/ambitos-de-actuacion/energia/mercado-electrico","saw":"Electricity regulator sector page, no project-level permitting list identified in this page."},{"organization":"Red Eléctrica","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","saw":"Aggregated grid-access data by stage, not a tested complete national permitting list."}]},"if_unstructured":{"summary":null,"recipe":["Retrieve the daily summary and filter titles for fotovoltaica, then open the HTML notice.","For BOE-B-2026-33542 read Persona peticionaria, Nombre instalación and the project description; retain the expediente and publication date.","Search subsequent notices for that expediente and regional gazettes before treating a milestone as current."],"location_method":"Use the municipality or project plans and parcels given in the notice; exact plant position is not implied by the municipality.","cross_with":["Regional datasets and gazettes by competent authority.","SABIA environmental-assessment results, where applicable."],"where_published":[{"name":"Boletín Oficial del Estado","url":"https://www.boe.es/","what":"Dated public consultation and authorisation notices; regional authorities can also publish here.","how_to_search_inside":"Search full text for fotovoltaica and expediente; inspect later notices for the same project.","example_document":{"url":"https://www.boe.es/diario_boe/txt.php?id=BOE-B-2026-33542","what_it_gives":"PSFV Solana; OLMO DESARROLLOS FOTOVOLTAICOS ESPAÑA, SL; Constantí; 5,000 MW nominal and 6,6447 MWp; public consultation, BOE 2026-10-15."}}]},"related_not_answering":[{"name":"Red Eléctrica grid-access statistics","url":"https://www.ree.es/es/clientes/titular-de-almacenamiento/acceso-conexion/conoce-el-estado-de-las-solicitudes","why":"Aggregated access-connection capacity is not a complete project-level permitting list."},{"name":"Castilla y León photovoltaic exclusion areas","url":"https://datos.gob.es/es/catalogo/a07002862-renovables-cyl-excluido-fotovoltaico","why":"Maps restricted land, not projects in permitting."},{"name":"CINEA cross-border renewable transparency platform","url":"https://cinea.ec.europa.eu/transparency-platform-cross-border-renewable-energy-projects_en","why":"Limited to eligible cross-border renewable projects, not the national permitting universe."}],"open_questions":[],"history":[{"pass":1,"date":"2026-11-15","role":"research","model":"Gemini 4 Hydrogen (Low)","rules_version":"6.11","note":"First pass: no single national structured registry for permitting; >50 MW projects are tracked via MITECO SABIA (EIA) and BOE Open Data API, <=50 MW across 17 CCAA, and utility-scale pipeline in Global Energy Monitor.","headline":{"official_data":"partial","non_official_data":"usable","national_registry":"no_evidence_found"},"sources":{"total":3,"new":3,"dropped":0},"negatives":{"overturned":0,"confirmed":1},"effort":{"pages":8,"minutes":5}},{"pass":2,"date":"2026-11-15","role":"revision","model":"Terra 6.1 (High)","rules_version":"6.11","note":"Tested four regional sources, corrected BOE and GEM claims, and identified ministry map; national completeness remains unverified.","headline":{"official_data":"partial","non_official_data":"partial","national_registry":"unknown"},"sources":{"total":4,"new":1,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":40,"minutes":29}}],"local_terms":[{"term":"planta solar fotovoltaica","language":"es","meaning":"solar PV plant"},{"term":"información pública","language":"es","meaning":"public consultation"},{"term":"autorización administrativa previa","language":"es","meaning":"prior administrative authorisation"},{"term":"autorización administrativa de construcción","language":"es","meaning":"construction authorisation"},{"term":"declaración de impacto ambiental","language":"es","meaning":"environmental impact statement"}],"provenance":{"pass_count":2,"models":["Gemini 4 Hydrogen (Low)","Terra 6.1 (High)"],"minutes_estimate":34,"pages_opened":48,"passes":[{"pass":1,"date":"2026-11-15","model":"Gemini 4 Hydrogen (Low)"},{"pass":2,"date":"2026-11-15","model":"Terra 6.1 (High)"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/es/solar-pv-plants-in-permitting.json","detail_url":"https://georutter.org/v1/es/solar-pv-plants-in-permitting/detail.json","html_url":"https://georutter.org/es/solar-pv-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/es.json"}
