{"schema_version":"1.0","country":"fr","country_name":"France","topic":"battery-storage","question":"Where can I get a list of battery storage (BESS) installations in operation in France, with location, power (MW), energy (MWh), operator and commissioning date?","territory":"fr","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-26","access_checked_on":"2026-11-26","answer":{"official_data":"structured","non_official_data":"partial","summary":"The official answer is the Registre national des installations de production et de stockage d'électricité on ODRÉ (RTE with Enedis, EDF SEI and local DSOs). Filtering codeFiliere STOCK gives 938 in-service storage rows (including 10 flywheel and 7 'Autre') at 30/09/2026 (2,453 MW, ≈3,347 MWh) with commune, charge/discharge kW, storable kWh, connection and commissioning dates. It does not publish the battery operator (only the grid operator), gives no coordinates, has no MWh for the 7 ZNI rows and no Mayotte row. Operators come from CRE ZNI deliberations, owner releases and OSM (23 large plants, joinable by EIC code).","main_caveats":["gestionnaire is the network operator (RTE, Enedis, EDF-SEI, ELD), not the battery operator; the exploitant is collected but not public.","dateMiseEnService is the grid operator's view: Cernay-lès-Reims shows 12/01/2026, the owner reports commercial operation since May 2026.","Hybrid batteries sit inside PV, wind, hydro or thermal rows (39 individual rows with typeStockage BATTE outside STOCK; small PV only as aggregates).","ZNI: only 7 EDF SEI rows without MWh or names; Mayotte absent (CRE deliberations fill part); EDF island batteries on Sein/Ouessant absent.","Row counts are not site or company counts: 706 rows are distributed 'NWJ' units of ≈1.25 MW; some sites have several rows.","Totals differ by source: register 31/12/2025 mainland 741 rows/1,531 MW/1,762 MWh vs CRE 758 projects/1,512 MW/1,720 MWh."],"confidence":"medium","confidence_reason":"Register downloaded and profiled, fine print quoted from glossary and arrêté; operator gap is legal. ZNI checked only through register copies and one CRE case; Corsica EDF document blocked.","attributes":[{"attribute":"location","covered":"yes","source_ids":["odre-registre-national","cre-zni-storage-deliberations","edf-sei-ponant-park","osm-openinframap"],"note":"Register: commune and INSEE code for all 938 rows (IRIS for 40), no coordinates; OSM gives exact geometry for 23 large plants; CRE names the commune for Mayotte.","gap":null,"gap_note":null},{"attribute":"power_mw","covered":"yes","source_ids":["odre-registre-national","cre-zni-storage-deliberations"],"note":"Register kW: puisMaxInstallee (max output), puisMaxCharge (charging), puisMaxInstalleeDisCharge and connection kW; charge empty in 89 rows, discharge in 104.","gap":null,"gap_note":null},{"attribute":"energy_mwh","covered":"partial","source_ids":["odre-registre-national","cre-zni-storage-deliberations","operator-publications","osm-openinframap"],"note":"energieStockable (kWh) >0 in 912 of 938 rows; CRE gives usable MWh for contracted ZNI sites; owner pages (Corse row: 10 MWh) and OSM (12 plants) fill some gaps.","gap":"not_published","gap_note":"No energy for the 7 EDF SEI rows (Corse, DOM), empty in 19 rows and 1-2 kWh placeholders in 14 rows of the register at 30/09/2026; not derivable from MW."},{"attribute":"operator","covered":"partial","source_ids":["cre-zni-storage-deliberations","operator-publications","osm-openinframap"],"note":"Register shows only the grid operator and an installation name (706 'NWJ…', 164 'Confidentiel'); operators from CRE ZNI deliberations, owner releases and OSM (17 plants).","gap":"restricted","gap_note":"The register collects 'nom de l'exploitant' (item 1A) but the arrêté du 7 juillet 2016, art. 4, leaves it out of the public data; no public operator list found at RTE, Enedis, CRE or NW."},{"attribute":"commissioning_date","covered":"yes","source_ids":["odre-registre-national","cre-zni-storage-deliberations","operator-publications"],"note":"dateMiseEnService (grid-side 'mise en service industrielle') in 933 rows, dateRaccordement in the rest; commercial operation can be months later.","gap":null,"gap_note":null}]},"sources":[{"source_id":"odre-registre-national","name":"Registre national des installations de production et de stockage d'électricité (au 30/09/2026)","publisher":"RTE (compiler, art. L142-9-1 Code de l'énergie) with data from Enedis, EDF SEI and local DSOs (ELD); published on Open Data Réseaux Énergies (ODRÉ)","official":true,"landing_url":"https://odre.opendatasoft.com/explore/dataset/registre-national-installation-production-stockage-electricite-agrege/information/","data_url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/exports/csv?where=codefiliere%3D%22STOCK%22&delimiter=%3B","access":"api","format":"CSV, JSON, XLSX exports and Opendatasoft Explore API v2.1 (JSON)","license":"Licence Ouverte v2.0 (Etalab)","language":"fr","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"The only official per-installation list: storage installations of 36 kW or more reported by the network operators of mainland France and most ZNI, with commune/INSEE code, charge/discharge kW, storable kWh, connection and commissioning dates, voltage and network operator.","first_seen_pass":1,"rank":1,"summary":"Official per-installation register (RTE/Enedis/EDF SEI/ELD) on ODRÉ; filter codeFiliere STOCK: 938 rows in service at 30/09/2026 (incl. 10 flywheel, 7 'Autre'), 2,453 MW puisMaxInstallee, ≈3,347 MWh.","coverage_note":"All networks of mainland France plus 7 EDF SEI rows (Corse 1, Guadeloupe 1, Martinique 1, Guyane 2, Réunion 2); Mayotte absent. Location = commune/INSEE, no coordinates. Operator not published.","data_date":"2026-09-30","caveats":["gestionnaire is the grid operator, not the battery operator; 164 names are 'Confidentiel'.","dateMiseEnService is grid-side commissioning, not commercial operation.","EDF SEI rows carry no MWh; 14 rows have 1-2 kWh placeholders.","Batteries in hybrid plants sit in PV/wind rows (typeStockage BATTE)."],"coverage":{"geographic":"Mainland France (RTE, Enedis, about 80 ELD) and ZNI served by EDF SEI (Corse, Guadeloupe, Martinique, Guyane, La Réunion); Mayotte (Électricité de Mayotte) has no storage row. Rows by network: RTE 24 (1,028 MW), Enedis 892 (1,354 MW), ELD 15, EDF-SEI 7 (42 MW); Saint-Pierre-et-Miquelon has no storage row."},"fine_print":{"unit":{"value":"Power fields in kW; energieStockable in kWh (divide by 1000 for MW/MWh).","quote":"puisMaxInstallee: Puissance active maximum installée, exprimée en kW; energieStockable: Energie stockable, exprimée en kWh","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege","attempts":[]},"inclusion_rule":{"value":"Installations connected directly or indirectly to public grids, with a valid EIC code, in service or in provisional withdrawal at the reference date; storage is codeFiliere STOCK ('Stockage non hydraulique'); installations under 36 kW only as aggregates of at least 10.","quote":"Le fichier contient les versions en exploitation actives à la date sélectionnée pour l'ensemble des installations valides, disposant de leur code EIC Resource Object.","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/attachments/11_glossaire_gpc_registre_des_installations_vrte_docx","attempts":[]},"reference_date":{"value":"Stock at 30 September 2026 (dataset modified 2026-10-13); annual year-end versions are separate datasets (e.g. au 31/12/2025).","quote":"raccordées directement ou indirectement aux réseaux publics d’électricité en France métropolitaine et dans les zones non interconnectées (ZNI) au 30 septembre 2026.","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege","attempts":[]},"update_frequency":{"value":"Monthly for the current year (month M shows capacity at M-1); the year-end register is frozen in February and republished in May-June.","quote":"Le registre de l’année en cours est publié chaque mois M pour la vision de la capacité installée M-1","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/attachments/11_glossaire_gpc_registre_des_installations_vrte_docx","attempts":[]},"exclusions":{"value":"Installations in permanent withdrawal; non-stationary storage (vehicles); installations without an EIC code; operator (exploitant) and owner names are collected but not public.","quote":"Les installation ayant un régime retrait définitif ne sont pas concernée par le registre","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/attachments/11_glossaire_gpc_registre_des_installations_vrte_docx","attempts":[]}},"key_fields":[{"field":"codeEICResourceObject","meaning":"Unique EIC code of the installation; join key to RTE/OSM records (OSM tag ref:EU:ENTSOE_EIC)."},{"field":"nomInstallation","meaning":"Name as supplied by the producer; 'Confidentiel' when anonymised (164 of 938 storage rows). Not the operator."},{"field":"codeFiliere / filiere / typeStockage","meaning":"STOCK = 'Stockage non hydraulique'; typeStockage BATTE (battery), V.INE (volant d'inertie) or empty."},{"field":"commune / codeINSEECommune / codeIRIS","meaning":"Commune and INSEE code of the delivery point (all rows); IRIS only for 40 storage rows. No coordinates."},{"field":"puisMaxInstallee","meaning":"Maximum active power the installation can produce/inject, kW (glossary 3F)."},{"field":"puisMaxCharge / puisMaxInstalleeDisCharge / puisMaxRac / puisMaxRacCharge","meaning":"Installed charging kW, installed discharge kW, connection (injection) kW and connection (withdrawal) kW."},{"field":"energieStockable","meaning":"Maximum storable energy in kWh for the calendar year."},{"field":"dateRaccordement / dateMiseEnService","meaning":"Grid connection date and 'mise en service industrielle' as seen by the network operator (dd/mm/yyyy)."},{"field":"regime","meaning":"'En service' or 'En retrait provisoire'; all 938 storage rows are 'En service'."},{"field":"gestionnaire","meaning":"Network operator (RTE, Enedis, EDF-SEI, ELD), not the battery operator."}],"how_to_use":{"example_request":"curl -sG 'https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/exports/csv' --data-urlencode 'where=codefiliere=\"STOCK\"' --data-urlencode 'delimiter=;'","example_result":"938 rows, e.g. SSLAIS01-STOCKAGE N0 01 DE SAINT-LAID;17W000002385265P;511050000;51105;Cernay-lès-Reims;…;12/01/2026;;12/01/2026;12/01/2026;SSLAI;225 kV;DIRECT;STOCK;Stockage non hydraulique;;;;;BATTE;Batterie;BATTE;240000.0;240000.0;;240000.0;;;1;En service;480000.0;;;;;10XFR-RTE------Q;RTE;…","steps":["Filter codefiliere=\"STOCK\" (938 rows at 30/09/2026); add typestockage=\"BATTE\" to drop flywheels (V.INE, 10 rows) and 'Autre' technology (7 rows); keep empty typeStockage rows with technologie 'Batterie' (90).","Divide puisMaxInstallee, puisMaxCharge, puisMaxInstalleeDisCharge and puisMaxRac by 1000 for MW and energieStockable by 1000 for MWh; keep charge and discharge power separate.","Use dateMiseEnService as the commissioning date; fall back to dateRaccordement when empty (5 rows).","For hybrids, also query codefiliere!=\"STOCK\" and typestockage=\"BATTE\": the battery sits inside a PV, wind, hydro or thermal row and only its charge kW and storable kWh are separable.","For a year-end snapshot use the dataset ...-agrege-311225 (31/12/2025) instead of the rolling one; rows and values change between versions.","Join to OSM or press material on codeEICResourceObject to get operator and exact position."],"reading_traps":["gestionnaire is the grid operator; the battery operator is not published (arrêté du 7 juillet 2016, art. 4 omits item 1A 'nom de l'exploitant').","706 of 938 storage rows are named 'NWJ ...' (≈1-1.25 MW units); counts of rows are not counts of companies or sites, and several rows can share a site (e.g. 2 DTPS rows in Saint-Avold).","dateMiseEnService is the network operator's view: Cernay-lès-Reims shows 12/01/2026 while the owner says commercial operation since May 2026.","energieStockable is empty in 19 rows, 0 in 7 (all 7 EDF-SEI ZNI rows have no energy), and 1-2 kWh placeholders in 14 rows; in 10 of 24 RTE rows it equals puisMaxInstallee numerically.","Field completeness varies by network: RTE 24 rows (energy 24, charge kW 11, discharge kW 0, dateMiseEnService 19); Enedis 892 (energy 885, charge 835); ELD 15 (energy 3); EDF-SEI 7 (no charge, discharge or energy).","Hybrids appear two ways: separate STOCK rows with modeRaccordement INDIRECT behind a private network (16 rows; some named after a plant, e.g. 'MEES S01-STOCKAGE … (SOLAIRE 1)'), or a battery inside a PV/wind/hydro/thermal row (39 individual rows with typeStockage BATTE).","typeStockage V.INE (flywheel) rows carry technologie 'Batterie'; 7 STOCK rows have technologie 'Autre'.","puisMaxInstallee differs from puisMaxInstalleeDisCharge in 185 rows (e.g. a Vert, Landes row: 16885 kW installed, 3100 kW charge and 3100 kW discharge, 12685 kWh).","The rolling dataset title changes monthly; data.gouv.fr titles may lag (page found titled 30/06/2026 while describing 30/09/2026).","EIC codes can change: the dataset carries a note on '79 codes EIC' modified; OSM keeps old_ref:EU:ENTSOE_EIC 17W000001600745Y for Claudia (now 17W000001637626Q).","Copies exist: data.gouv.fr mirrors, an Enedis-only copy ('Installations de production et de stockage d'électricité (2025)') and EDF SEI per-territory copies at 30/09/2025; use ODRÉ as the original."]},"test":{"tested_on":"2026-11-26","method":"download","http_status":200,"content_type":"text/csv; charset=utf-8","size_bytes":334026,"records_total":143712,"records_for_country":938,"problems":[]},"evidence":[{"claim":"Storage installations are part of the register for mainland France and ZNI.","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege","quote":"Ce registre présente les installations de production et de stockage d'électricité raccordées directement ou indirectement aux réseaux publics d’électricité en France métropolitaine et dans les zones non interconnectées (ZNI)"},{"claim":"Commissioning date definition.","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/attachments/11_glossaire_gpc_registre_des_installations_vrte_docx","quote":"Date de mise en service industrielle, vue du gestionnaire de réseau auquel est raccordée l’installation. L’installation est dans ce cas active."},{"claim":"Storage power must be published separately for charge and discharge, and storable energy is public.","url":"https://aida.ineris.fr/node/35852","quote":"en distinguant, pour les installations de stockage, la puissance active maximale installée en charge et en décharge"},{"claim":"Storable energy definition.","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege/attachments/11_glossaire_gpc_registre_des_installations_vrte_docx","quote":"Pour les installations de stockage, elle correspond à l’énergie maximale stockable pour chaque année civile (du 1er janvier au 31 décembre).(Unité : kWh)"}],"members":[],"members_summary":null},{"source_id":"cre-zni-storage-deliberations","name":"CRE deliberations on centralised storage in non-interconnected zones (compensation decisions, guichets, contract amendments)","publisher":"Commission de régulation de l'énergie (CRE)","official":true,"landing_url":"https://www.cre.fr/documents/deliberations.html","data_url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","access":"pdf","format":"PDF deliberations","license":"unknown","language":"fr","has_coordinates":false,"location_precision":"municipality","publisher_type":"regulator","adds":"Names the battery operator and gives power, usable MWh and actual commissioning date for contracted ZNI storage, including Mayotte, which the national register omits.","first_seen_pass":1,"rank":2,"summary":"CRE deliberations (PDF) on contracted ZNI storage give operator, commune, MW, usable MWh and real commissioning date; they fill the Mayotte gap of the register.","coverage_note":"Only storage contracted with ZNI system operators; tested on Mayotte (TotalEnergies Renewables ESS Mayotte, 4 MW/2 MWh, in service 24/01/2024).","data_date":"2025-07-24","caveats":["Documents, not a dataset: one PDF per decision.","Guichet decisions list projects, not operating sites."],"coverage":{"geographic":"ZNI: Corse, Guadeloupe, Martinique, Guyane, La Réunion, Mayotte (only storage contracted with the system operator and reviewed by CRE)."},"fine_print":{"unit":{"value":"MW for power and MWh 'capacité utile' (usable energy).","quote":"d’une puissance de 4 MW et d’une capacité utile de 2 MWh située sur la commune de Koungou (Longoni)","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","attempts":[]},"inclusion_rule":{"value":"Storage works piloted by the ZNI system operator whose compensation is evaluated by CRE (art. R.121-28 III Code de l'énergie).","quote":"le dossier des projets d'ouvrages de stockage d'électricité pilotés par le gestionnaire du système électrique est communiqué à la Commission de régulation de l'énergie","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","attempts":[]},"reference_date":{"value":"Each deliberation has its own date (example: 24 July 2025).","quote":"Délibération de la Commission de régulation de l’énergie du 24 juillet 2025","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.cre.fr/documents/deliberations.html","note":"Deliberations are published case by case; no periodic list of ZNI storage found."},{"url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","note":"Text refers to earlier guichet deliberations (2019) but announces no update cycle."}]},"exclusions":{"value":"Storage not contracted with the ZNI system operator (e.g. behind-the-meter or merchant) is outside these deliberations.","quote":"les charges imputables aux missions de service public compensées par l’Etat dans les zones non interconnectées","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","attempts":[]}},"key_fields":[{"field":"Exploitant (company)","meaning":"Operating company named in the deliberation, e.g. TotalEnergies Renewables ESS Mayotte."},{"field":"Puissance / capacité utile","meaning":"MW and usable MWh in §1.2 of revision deliberations."},{"field":"Commune","meaning":"Municipality (and locality) of the installation."},{"field":"Date de mise en service","meaning":"Actual commissioning date reported in post-commissioning revisions."}],"how_to_use":{"example_request":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf, pages 1-2, §1.2 'Objet du projet d’avenant au contrat d’achat'.","example_result":"TotalEnergies Renewables ESS Mayotte; Koungou (Longoni); 4 MW; capacité utile 2 MWh; batteries lithium-ion; mise en service le 24 janvier 2024; contrat EDM 15 ans.","steps":["Search the CRE deliberations page with keywords 'stockage' plus the territory (Mayotte, Corse, Guadeloupe, Martinique, Réunion, Guyane).","Keep post-commissioning revisions (avenant, révision de l’assiette, clause de sauvegarde): they state the actual mise en service; guichet decisions only list selected projects.","Extract operator, commune, MW and MWh from §1 of each PDF (pdftotext keeps the text)."],"reading_traps":["Guichet decisions (e.g. Corse 2026, Guadeloupe 2026) concern projects, not installations in service.","MWh is 'capacité utile', which may differ from the register's energieStockable.","Some deliberations are labelled 'Version confidentielle' and redact cost figures, not the technical data."]},"test":{"tested_on":"2026-11-26","method":"page_only","http_status":200,"content_type":"application/pdf","size_bytes":239963,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Mayotte battery in service with operator, size and date.","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","quote":"L’Installation a été mise en service le 24 janvier 2024, soit trois ans après la date prévisionnelle de mise en service."},{"claim":"Operator named.","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","quote":"conclu entre EDM et la société TotalEnergies Renewables ESS Mayotte (ci-après l’« Exploitant ») relatif à l’installation de stockage d’électricité située sur la commune de Koungou (Longoni) à Mayotte"}],"members":[],"members_summary":null},{"source_id":"operator-publications","name":"Battery owners' and operators' press releases and site pages","publisher":"Battery owners/operators (TagEnergy with Banque des Territoires, Harmony Energy, NW Groupe, others)","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF press releases and HTML pages","license":"unknown","language":"fr, en","has_coordinates":false,"location_precision":"municipality","publisher_type":"operator","adds":"Operator/owner identity, ownership changes, commercial-operation dates and, for ZNI rows without energy, MWh for individual sites; the register publishes none of these.","first_seen_pass":1,"rank":3,"summary":"Owner/operator releases identify who runs large sites and when commercial operation began; tested for Cernay-lès-Reims, Cheviré, and ZNI sites in Corse (Corsica Sole, 10 MWh) and Martinique (Akuo); NW publishes only totals.","coverage_note":"Ad hoc, large sites only; no list.","data_date":"2026-10-01","caveats":["Commercial operation date ≠ register dateMiseEnService.","Owners change (Cheviré sold to Alpiq)."],"coverage":{"geographic":"Site by site; tested for Cernay-lès-Reims (Marne), Cheviré (Nantes), Prato-di-Giovellina (Corse) and Ducos (Martinique); NW publishes only totals."},"fine_print":{"unit":{"value":"MW and MWh as stated by the company.","quote":"D'une puissance de 240 MW pour une capacité de 480 MWh","url":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf","note":"Single-site press release; no inclusion rule."},{"url":"https://www.nw-groupe.com/fr/implantations/france/","note":"Company page gives a France total (1,2 GWh en exploitation) without a list."}]},"reference_date":{"value":"Date of each release (example 1 October 2026).","quote":"Cernay-lès-Reims, le 1er octobre 2026","url":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://harmonyenergy.co.uk/sale-of-landmark-chevire-battery-storage-project-to-alpiq/","note":"Undated news page."},{"url":"https://www.nw-groupe.com/fr","note":"No update cycle stated."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.nw-groupe.com/fr/implantations/france/","note":"No site list or map of JBox units."},{"url":"https://www.nw-groupe.com/fr","note":"Only a group-wide total ('NW opère à ce jour 2 GWh de batteries')."}]}},"key_fields":[{"field":"Owner/operator","meaning":"Company named in the release (e.g. TagEnergy and Banque des Territoires; Alpiq owner with Harmony Energy as asset manager)."},{"field":"Exploitation commerciale","meaning":"Commercial operation start, distinct from the register's dateMiseEnService."}],"how_to_use":{"example_request":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf, page 1.","example_result":"Cernay-lès-Reims; 240 MW / 480 MWh; 'en exploitation commerciale depuis mai 2026'; raccordé à 225 000 volts (RTE); détenue conjointement TagEnergy / Banque des Territoires.","steps":["Take the register row (commune, MW, kWh, EIC) and search the commune plus 'stockage batteries' with MW/MWh.","Accept a match only when commune, voltage/network, MW and date agree; record the EIC code."],"reading_traps":["Ownership changes: Cheviré was sold to Alpiq while Harmony Energy remains asset manager.","Company totals (NW: 1,2 GWh in France) cannot be split by site.","Register names follow RTE substation codes: the Cheviré plant is row DOPPLS01 (Nantes), a link made by the OSM tag ref:EU:ENTSOE_EIC 17W000002315528O, not by the register.","MWh bases differ: Akuo's Madinina has 19 MWh installed 'For a contractual effective volume of 12 MWh'; CRE uses 'capacité utile'."]},"test":{"tested_on":"2026-11-26","method":"page_only","http_status":200,"content_type":"application/pdf","size_bytes":235663,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Commercial operation date differs from register commissioning date.","url":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf","quote":"l'installation est en exploitation commerciale depuis mai 2026"},{"claim":"Cheviré owner change.","url":"https://harmonyenergy.co.uk/sale-of-landmark-chevire-battery-storage-project-to-alpiq/","quote":"Harmony Energy will continue to play a key role as asset manager"},{"claim":"MWh for the Corsican register row lacking energy.","url":"https://corsicasole.com/en/realisations/prato-energy-storage-facility/","quote":"a total storage capacity of 10 MWh"},{"claim":"Installed vs contractual MWh differ.","url":"https://www.akuoenergy.com/en/akuo-commissions-largest-storage-facility-martinique","quote":"For a contractual effective volume of 12 MWh"},{"claim":"Size of NW's distributed JBox units.","url":"https://atee.fr/system/files/2023-10/11%20NW%20Colloque%20Stockage%20ATEE%205%20oct2023.pdf","quote":"1,25 MW 1 MWh de puissance de capacité pour les modèles déployés"}],"members":[{"name":"TagEnergy / Banque des Territoires (Cernay-lès-Reims)","landing_url":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf","data_url":null,"access":"pdf","tested":true,"data_found":true,"note":"240 MW/480 MWh, commercial operation since May 2026; register EIC 17W000002385265P shows dateMiseEnService 12/01/2026."},{"name":"Harmony Energy (Cheviré, Nantes)","landing_url":"https://harmonyenergy.co.uk/sale-of-landmark-chevire-battery-storage-project-to-alpiq/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"100 MW/200 MWh, energised in August, inaugurated in December, sold to Alpiq; years not on the page."},{"name":"NW Groupe (JBox units)","landing_url":"https://www.nw-groupe.com/fr/implantations/france/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":false,"note":"Only '1,2 GWh en exploitation' in France, no site list; ATEE 2023 slides give the deployed JBox as 1,25 MW / 1 MWh, matching the 706 'NWJ' register rows of ≈1250 kW."},{"name":"Corsica Sole (Prato-di-Giovellina, Haute-Corse)","landing_url":"https://corsicasole.com/en/realisations/prato-energy-storage-facility/","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"10 MWh, 5 Li-ion batteries, commissioning Summer 2021, 'Fully dedicated to EDF SEI'; matches by commune/date the register row (4898 kW, 01/07/2021, no kWh)."},{"name":"Akuo (Madinina Storage, Martinique)","landing_url":"https://www.akuoenergy.com/en/akuo-commissions-largest-storage-facility-martinique","data_url":null,"access":"web_viewer_only","tested":true,"data_found":true,"note":"Ducos, up to 12 MW, 19 MWh (12 MWh contractual), put into service April 2022; the only Martinique register row is Rivière-Salée 12000 kW, 19/05/2021: match unresolved."}],"members_summary":{"total":null,"listed":5,"tested":5,"data_found":4,"scope_note":"Universe of battery operators unknown; the ATEE/CRE observatory identified 45 organisations for HTA/HTB storage in mainland France (31 responded). Tested: 2 mainland RTE sites, NW, and 2 of the 7 EDF SEI ZNI rows (Corse, Martinique).","pattern":"Search '<commune> stockage batteries MW MWh mise en service' or the operator named in OSM; owner press releases and the Banque des Territoires 'réalisations' pages carry dates."},"member_scope":{"total":null,"note":"Universe of battery operators unknown; the ATEE/CRE observatory identified 45 organisations for HTA/HTB storage in mainland France (31 responded). Tested: 2 mainland RTE sites, NW, and 2 of the 7 EDF SEI ZNI rows (Corse, Martinique).","pattern":"Search '<commune> stockage batteries MW MWh mise en service' or the operator named in OSM; owner press releases and the Banque des Territoires 'réalisations' pages carry dates."}},{"source_id":"edf-sei-ponant-park","name":"Parc de production et de stockage - Sein Ouessant Molene","publisher":"EDF (Systèmes Énergétiques Insulaires) on the EDF open data portals (data-fair)","official":true,"landing_url":"https://opendata-corse.edf.fr/","data_url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2/lines","access":"api","format":"data-fair API (JSON, CSV export)","license":"Licence Ouverte / Open Licence version 2.0","language":"fr","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"EDF system batteries on the Breton islands (Sein 200 kW, Ouessant 1000 kW, 2017) with producer and coordinates; they have no storage row in the national register.","first_seen_pass":1,"rank":4,"summary":"EDF open data list of Sein/Ouessant/Molène plants: two EDF batteries (200 kW and 1 MW, 2017) with coordinates, absent from the national register.","coverage_note":"Three Breton islands only; end-2018 snapshot; no MWh.","data_date":"2018-12-31","caveats":["The same EDF portals also host copies of the national register per ZNI (Corse, DOM, SPM); those copies add nothing for storage."],"coverage":{"geographic":"Île-de-Sein, Ouessant and Île-Molène (Finistère) only."},"fine_print":{"unit":{"value":"kW (puissance de raccordement); no energy field.","quote":"puissance installée (en kW)","url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2","attempts":[]},"inclusion_rule":{"value":"Installations above 3 kWc connected at end 2018.","quote":"Parc des installations de production et de stockage d'électricité d'une puissance supérieure à 3 kWc raccordées à fin 2018","url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2","attempts":[]},"reference_date":{"value":"End 2018 (metadata updated 2026-04-30).","quote":"raccordées à fin 2018","url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2","note":"Description gives no update cycle."},{"url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets?q=stockage","note":"Catalogue entry shows only the last update date."}]},"exclusions":{"value":"Location is approximate by the publisher's own statement.","quote":"localisation approximative","url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2","attempts":[]}},"key_fields":[{"field":"producteur","meaning":"Owner/operator (EDF for the island batteries)."},{"field":"filiere","meaning":"'Stockage centralisé à base de batteries lithium-ion' for batteries."},{"field":"date_de_mise_en_service","meaning":"Commissioning year."},{"field":"puissance_de_raccordement_kw","meaning":"Connection power in kW."},{"field":"localisation / _geopoint","meaning":"Approximate lat, lon."}],"how_to_use":{"example_request":"curl -sG 'https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2/lines' --data-urlencode 'size=20'","example_result":"Ouessant | EDF | Centrale thermique de Ouessant | Stockage centralisé à base de batteries lithium-ion | 2017 | 1000 kW | 48.459791934476335, -5.099139511585236","steps":["Filter filiere containing 'Stockage'; 2 battery rows of 18."],"reading_traps":["'Energy Management System' rows are control systems, not batteries.","Snapshot at end 2018."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":18,"records_for_country":2,"problems":[]},"evidence":[{"claim":"Dataset content.","url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/fgg0oqqf65k32g7q3fu4l1q2","quote":"nom du producteur, nom du site et localisation approximative, date de mise en service, puissance installée (en kW)"}],"members":[],"members_summary":null},{"source_id":"osm-openinframap","name":"OpenStreetMap battery plants in France (Open Infrastructure Map statistics and OSM API)","publisher":"OpenStreetMap contributors; statistics page by Open Infrastructure Map","official":false,"landing_url":"https://openinframap.org/stats/area/France/plants","data_url":"https://api.openstreetmap.org/api/0.6/way/1375030122.json","access":"api","format":"HTML table (Open Infrastructure Map); OSM API 0.6 JSON per object","license":"ODbL (OpenStreetMap); Open Infrastructure Map analysis CC-BY","language":"fr, en","has_coordinates":true,"location_precision":"exact","publisher_type":"community","adds":"Exact geometry and, for large sites, operator, MWh and start date; 18 of 23 plants carry the register EIC code, which links them to official rows.","first_seen_pass":1,"rank":5,"summary":"OSM (via Open Infrastructure Map) maps 23 battery plants with exact geometry; 17 name an operator, 12 give MWh, 18 carry the register EIC code for joining.","coverage_note":"Large sites only; distributed 1 MW units are missing; includes some projects.","data_date":"2026-11-26","caveats":["Not official; values sometimes differ from the register.","Start dates often copied from the register."],"coverage":{"geographic":"France; 23 power=plant objects with plant:source=battery listed on 2026-11-26, mostly RTE-connected sites."},"fine_print":{"unit":{"value":"Free-text tags: plant:output:electricity in MW, plant:storage in MWh.","quote":"\"plant:output:electricity\":\"240 MW\",\"plant:source\":\"battery\",\"plant:storage\":\"480 MWh\"","url":"https://api.openstreetmap.org/api/0.6/way/1375030122.json","attempts":[]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://openinframap.org/stats/area/France/plants","note":"Page lists 'All 5834 power plants in France' without stating a tagging rule; battery rows identified by source 'battery'."},{"url":"https://openinframap.org/stats/area/France/plants/1565647801","note":"Plant page only states operator and output."}]},"reference_date":{"value":"Live data; each object has its last-edit timestamp (Cernay: 2026-10-06).","quote":"\"timestamp\":\"2026-10-06T20:55:33Z\"","url":"https://api.openstreetmap.org/api/0.6/way/1375030122.json","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://openinframap.org/stats/area/France/plants","note":"No refresh cycle stated."},{"url":"https://openinframap.org/stats/area/France/plants/1565647801","note":"No refresh cycle stated."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://openinframap.org/stats/area/France/plants","note":"Distributed units (NW JBox, ≈700 rows in the register) are almost all missing; only one unnamed NW plant mapped."},{"url":"https://overpass-api.de/api/interpreter","note":"Overpass API refused the default curl client (406), so generator-level objects were not counted."}]}},"key_fields":[{"field":"operator","meaning":"Operator as mapped (17 of 23)."},{"field":"plant:output:electricity / plant:storage","meaning":"MW and MWh (MWh on 12 of 23)."},{"field":"start_date","meaning":"Start date (21 of 23); often copied from the register's dateMiseEnService."},{"field":"ref:EU:ENTSOE_EIC","meaning":"Register EIC code (18 of 23); join key."}],"how_to_use":{"example_request":"curl -s 'https://api.openstreetmap.org/api/0.6/way/1223498422.json'","example_result":"…\"name\":\"Claudia\",\"old_ref:EU:ENTSOE_EIC\":\"17W000001600745Y\",\"operator\":\"Amarenco\",\"plant:output:electricity\":\"105 MW\",\"plant:source\":\"battery\",\"plant:storage\":\"99.58 MWh\",\"power\":\"plant\",\"ref:EU:ENTSOE_EIC\":\"17W000001637626Q\",\"source\":\"Registre national des installations de production d'électricité et de stockage 2025\",\"start_date\":\"2023-04-10\"…","steps":["Read battery rows from the Open Infrastructure Map France plants table, then fetch each way/relation with the OSM API for all tags.","Join ref:EU:ENTSOE_EIC to codeEICResourceObject in the register."],"reading_traps":["Includes projects: Beaulieu (Acacia) has start_date 2027 and no EIC; Saleux, Foriaux and Sainte-Lizaigne lack EIC codes.","Values differ from the register: Claudia 99.58 MWh vs 105000 kWh; Breizh Big Battery 92 MW/183 MWh vs 82500 kW/160000 kWh; Bellac 36 MWh vs 24000 kWh.","Saleux: OSM 120 MW/240 MWh (no EIC) vs register row 17W000002431605X with 153650 kW installed, 120000 kW charge and 120000 kWh."]},"test":{"tested_on":"2026-11-26","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":5834,"records_for_country":23,"problems":["overpass-api.de answers 406 to the default curl client; two other Overpass instances did not answer within 110-180 s."]},"evidence":[{"claim":"OSM copies register identifiers and dates.","url":"https://api.openstreetmap.org/api/0.6/way/1375030122.json","quote":"\"ref:EU:ENTSOE_EIC\":\"17W000002385265P\",\"source\":\"Registre national des installations de production d'électricité et de stockage 2026\",\"start_date\":\"2026-01-12\""},{"claim":"OSM links Cheviré to register row DOPPLS01 and records the new owner.","url":"https://api.openstreetmap.org/api/0.6/way/1425094275.json","quote":"\"operator\":\"Harmony Energy\",\"owner\":\"Alpiq\",\"plant:output:electricity\":\"100 MW\",\"plant:source\":\"battery\",\"plant:storage\":\"200 MWh\",\"plant:type\":\"lithium_ion\",\"power\":\"plant\",\"ref:EU:ENTSOE_EIC\":\"17W000002315528O\""}],"members":[],"members_summary":null},{"source_id":"edf-sei-territorial-documents","name":"EDF SEI territorial documents (bilans prévisionnels, storage workshops) for Corse and the overseas departments","publisher":"EDF Systèmes Énergétiques Insulaires (EDF SEI), system operator in the ZNI","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF","license":"unknown","language":"fr","has_coordinates":null,"location_precision":null,"publisher_type":"operator","adds":"Possible per-territory description of the ZNI storage park (the register's EDF SEI rows have no names or MWh); content not verified because the sites refuse automated clients.","first_seen_pass":1,"rank":6,"summary":"","coverage_note":"","data_date":null,"caveats":[],"coverage":{"geographic":"Corse, Guadeloupe, La Réunion (tested URLs); Martinique and Guyane sites not tried."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.edf.gp/sites/sei_gp/files/2024-12/edf-sei-bilan-previsionnel-2024-guadeloupe.pdf","note":"HTTP 403 to curl and to the fetch tool."},{"url":"https://corse.edf.fr/sites/sei_corse/files/2025-03/2024-12-16-support-atelier-stockage.pdf","note":"HTTP 403 to curl and to the fetch tool."}]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.edf.gp/sites/sei_gp/files/2024-12/edf-sei-bilan-previsionnel-2024-guadeloupe.pdf","note":"HTTP 403 to curl and to the fetch tool."},{"url":"https://corse.edf.fr/sites/sei_corse/files/2025-03/2024-12-16-support-atelier-stockage.pdf","note":"HTTP 403 to curl and to the fetch tool."}]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.edf.gp/sites/sei_gp/files/2024-12/edf-sei-bilan-previsionnel-2024-guadeloupe.pdf","note":"HTTP 403 to curl and to the fetch tool."},{"url":"https://corse.edf.fr/sites/sei_corse/files/2025-03/2024-12-16-support-atelier-stockage.pdf","note":"HTTP 403 to curl and to the fetch tool."}]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.edf.gp/sites/sei_gp/files/2024-12/edf-sei-bilan-previsionnel-2024-guadeloupe.pdf","note":"HTTP 403 to curl and to the fetch tool."},{"url":"https://corse.edf.fr/sites/sei_corse/files/2025-03/2024-12-16-support-atelier-stockage.pdf","note":"HTTP 403 to curl and to the fetch tool."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.edf.gp/sites/sei_gp/files/2024-12/edf-sei-bilan-previsionnel-2024-guadeloupe.pdf","note":"HTTP 403 to curl and to the fetch tool."},{"url":"https://corse.edf.fr/sites/sei_corse/files/2025-03/2024-12-16-support-atelier-stockage.pdf","note":"HTTP 403 to curl and to the fetch tool."}]}},"key_fields":[],"how_to_use":{"example_request":"","example_result":"","steps":["Not readable with automated clients in this session."],"reading_traps":[]},"test":{"tested_on":"2026-11-26","method":"blocked","http_status":403,"content_type":"text/html","size_bytes":7577,"records_total":null,"records_for_country":null,"problems":["corse.edf.fr, edf.gp and reunion.edf.fr reject automated clients (HTTP 403)."]},"evidence":[],"members":[{"name":"EDF Corse – atelier stockage (16/12/2024)","landing_url":"https://corse.edf.fr/sites/sei_corse/files/2025-03/2024-12-16-support-atelier-stockage.pdf","data_url":null,"access":"pdf","tested":true,"data_found":null,"note":"HTTP 403 (curl and fetch tool)."},{"name":"EDF Guadeloupe – bilan prévisionnel 2024","landing_url":"https://www.edf.gp/sites/sei_gp/files/2024-12/edf-sei-bilan-previsionnel-2024-guadeloupe.pdf","data_url":null,"access":"pdf","tested":true,"data_found":null,"note":"HTTP 403 (curl and fetch tool)."},{"name":"EDF La Réunion – bilan prévisionnel 2024","landing_url":"https://reunion.edf.fr/sites/sei_reu/files/2025-04/2025-04-29-reunion-bp-2024.pdf","data_url":null,"access":"pdf","tested":true,"data_found":null,"note":"HTTP 403 (curl)."}],"members_summary":{"total":null,"listed":3,"tested":3,"data_found":0,"scope_note":"One set of documents per EDF SEI territory (regional sites seen: corse.edf.fr, edf.gp, edf.mq, reunion.edf.fr); 3 documents tried, all blocked.","pattern":"<territory site>/sites/sei_<code>/files/<yyyy-mm>/edf-sei-bilan-previsionnel-<year>-<territory>.pdf"},"member_scope":{"total":null,"note":"One set of documents per EDF SEI territory (regional sites seen: corse.edf.fr, edf.gp, edf.mq, reunion.edf.fr); 3 documents tried, all blocked.","pattern":"<territory site>/sites/sei_<code>/files/<yyyy-mm>/edf-sei-bilan-previsionnel-<year>-<territory>.pdf"}},{"source_id":"doe-gesdb","name":"DOE Global Energy Storage Database (GESDB)","publisher":"Sandia National Laboratories for the US Department of Energy","official":false,"landing_url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","data_url":null,"access":"direct_download","format":"Web table with JSON/CSV export","license":"unknown","language":"en","has_coordinates":true,"location_precision":null,"publisher_type":"academic","adds":"Worldwide project database (location, operator-type fields per its page) that may hold older French projects; France content not verified.","first_seen_pass":1,"rank":7,"summary":"","coverage_note":"","data_date":null,"caveats":[],"coverage":{"geographic":"Worldwide; France coverage not checked."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","note":"Export not opened (download agreement not accepted)."},{"url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","note":"Page shows field names only."}]},"inclusion_rule":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","note":"No inclusion rule on the projects page."},{"url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","note":"Download Agreement text covers reuse terms only."}]},"reference_date":{"value":"Under validation per the page.","quote":"The data in this database is still being validated, and will be updated in the next release.","url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","note":"Not stated."},{"url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","note":"Not stated in the agreement modal."}]},"exclusions":{"value":"Locations may be approximate.","quote":"Note that project locations might be only an approximation of their actual location.","url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","attempts":[]}},"key_fields":[],"how_to_use":{"example_request":"","example_result":"","steps":["Not tested: exporting requires accepting a Download Agreement."],"reading_traps":[]},"test":{"tested_on":"2026-11-26","method":"page_only","http_status":200,"content_type":"text/html; charset=UTF-8","size_bytes":64884,"records_total":null,"records_for_country":null,"problems":["Export behind a 'Download Agreement' (terms acceptance); not accepted in this session."]},"evidence":[{"claim":"Download conditional on agreement.","url":"https://sandia.gov/ess-ssl/gesdb/public/projects.html","quote":"In order to download project data from the Global Energy Storage Database, you must agree to the following"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Commission de régulation de l'énergie (CRE)","url":"https://www.cre.fr/documents/deliberations.html"},"operators":{"structure":"many","note":"Batteries are owned by many private companies (NW, TagEnergy, Harmony/Alpiq, Amarenco, TotalEnergies, Neoen, Kallista…); grids: RTE (transmission), Enedis and ≈80 ELD (distribution), EDF SEI (Corse, DOM, SPM, Ponant), EDM (Mayotte). QE 864 recalls that EU rules bar network operators from owning storage; the register still lists three RTE 'RINGO' rows.","census_url":null},"publication_obligation":{"exists":"yes","norm":"Code de l'énergie art. L142-9-1; arrêté du 7 juillet 2016 (art. 2-4)","url":"https://aida.ineris.fr/node/35852","what_must_be_published":"Per installation ≥36 kW: name, IRIS/INSEE location, connection and commissioning dates, voltage, filière/technology, charge and discharge power, storable energy, annual energies; operator and owner names excluded; <36 kW aggregated by ≥10.","frequency":"Network operators transmit monthly (>100,000 customers) or half-yearly; RTE publishes continuously or at least monthly."},"consolidated_republication":{"found":"yes","note":"RTE republishes all network operators' data in one register; ODRÉ is the original, data.gouv.fr, Enedis and EDF portals hold copies or extracts.","checked_pages":[{"organization":"RTE / ODRÉ","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege","saw":"Register at 30/09/2026 compiled by RTE from RTE, Enedis, EDF SEI and ≈80 ELD; 938 storage rows."},{"organization":"data.gouv.fr (Etalab)","url":"https://www.data.gouv.fr/datasets/5bfcc5a006e3e744e304ccf0","saw":"Mirror of the ODRÉ register with RTE, Enedis, EDF SEI and ELD as producers."},{"organization":"EDF SEI open data","url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets?q=stockage","saw":"Per-territory copies of the register (Corse, Réunion, Guadeloupe, Guyane, Martinique, SPM at 30/09/2025) and the Ponant plant list."},{"organization":"Enedis open data","url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/e57veou6k31lnhys5216b8yo","saw":"Only aggregates by department and power band; storage as 'Stockage hors hydraulique'."}]}},"national_registry":{"exists":"yes","note":"The ODRÉ register (art. L142-9-1) lists storage installations ≥36 kW in service reported by the network operators, but omits operator names by rule, has no Mayotte rows and no MWh for EDF SEI rows.","checked_pages":[{"organization":"RTE / ODRÉ","url":"https://odre.opendatasoft.com/explore/dataset/registre-national-installation-production-stockage-electricite-agrege/information/","saw":"Dataset page 'Registre national … (au 30/09/2026)'."},{"organization":"INERIS AIDA (arrêté du 7 juillet 2016)","url":"https://aida.ineris.fr/node/35852","saw":"Art. 4 list of public items excludes exploitant (1A) and owner (1B)."},{"organization":"data.gouv.fr","url":"https://www.data.gouv.fr/datasets/5bfcc5a006e3e744e304ccf0","saw":"Mirror with LO 2.0 licence and the <36 kW aggregation rule."},{"organization":"EDF SEI","url":"https://opendata-corse.edf.fr/data-fair/api/v1/datasets/eydtgekr285ytj5qxuu-972d","saw":"Corse copy of the register: one storage row (Prato-di-Giovellina, 4898 kW, no energy)."},{"organization":"CRE","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","saw":"Mayotte battery (4 MW/2 MWh, 2024) that has no row in the register."}]},"if_unstructured":{"summary":"The register lacks the operator, ZNI energy and Mayotte; CRE deliberations on ZNI storage and owner press releases give these site by site, and OSM links large sites to register EIC codes.","recipe":["Download register rows with codefiliere=\"STOCK\" (and hybrids with typestockage=\"BATTE\" outside STOCK).","For each row with a missing operator, look up the EIC code in OSM (ref:EU:ENTSOE_EIC) to get operator and geometry; tested on 17W000002385265P (Cernay, TagEnergy) and 17W000001637626Q (Claudia, Amarenco).","Confirm the operator and commercial date in the owner's release (tested: Banque des Territoires CP of 01/10/2026 for Cernay-lès-Reims).","For ZNI, search CRE deliberations by territory and read §1 of post-commissioning revisions (tested: n°2025-203, Mayotte); add Mayotte sites missing from the register.","Keep register kW/kWh as the official values and record conflicting figures from other documents."],"location_method":"Register gives commune/INSEE (and IRIS for 40 rows) of the delivery point plus posteSource code; exact position only where OSM maps the plant with the same EIC code, or from coordinates in EDF's Ponant list.","cross_with":["OSM via Open Infrastructure Map (EIC join, operator, geometry).","Enedis aggregated park by department (Stockage hors hydraulique: 855 installations, 1,167 MW at 2026-09-30) to check Enedis totals.","CRE/ATEE year-end totals (758 projects, 1,512 MW/1,720 MWh at 31/12/2025, mainland)."],"where_published":[{"name":"CRE deliberations (ZNI storage compensation and contract amendments)","url":"https://www.cre.fr/documents/deliberations.html","what":"Decisions on storage contracted by ZNI system operators: operator, commune, MW, usable MWh, commissioning date in revision decisions.","how_to_search_inside":"Keyword box 'Rechercher des délibérations' with 'stockage' plus territory; filters Énergies, Type de délibération, Date du document; no ZNI filter; 25 results per page.","example_document":{"url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2025/250724_2025-203_CDS_Batterie_TE_Mayotte.pdf","what_it_gives":"p.1: 'la société TotalEnergies Renewables ESS Mayotte'; p.2 §1.2: 'd’une puissance de 4 MW et d’une capacité utile de 2 MWh située sur la commune de Koungou (Longoni)'; 'mise en service le 24 janvier 2024'."}},{"name":"Owner/operator press releases","url":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf","what":"Single-site announcements with owner, MW/MWh, voltage and commercial-operation date.","how_to_search_inside":"Web search on the register commune with 'stockage batteries MW MWh'; Banque des Territoires and operator newsrooms.","example_document":{"url":"https://www.banquedesterritoires.fr/sites/default/files/2026-10/01-10-2026%20CP%20Inauguration%20TagEnergy%20x%20Banque%20des%20Territoires.pdf","what_it_gives":"p.1: 'D'une puissance de 240 MW pour une capacité de 480 MWh, l'installation est en exploitation commerciale depuis mai 2026'; 'Raccordé au réseau de transport d'électricité de RTE à une tension de 225 000 volts'."}}]},"related_not_answering":[{"name":"Enedis – Parc de production – Maille régionale & départementale – Répartition","url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/e57veou6k31lnhys5216b8yo","why":"Counts and MW by department and power band (Stockage hors hydraulique 855 / 1,167 MW at 2026-09-30); not a list of installations."},{"name":"Nombre d'installations de production et de stockage de moins de 36kW par IRIS (au 31/12/2025)","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/nombre-installation-production-stockage-electricite-3112025","why":"Counts of all small installations per IRIS with no filière; cannot isolate batteries."},{"name":"Données éCO2mix nationales temps réel","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/eco2mix-national-tr","why":"National battery charging/discharging flows in MW; aggregated, no installations."},{"name":"ATEE storage colloquium slides (CRE totals and Observatoire des batteries stationnaires)","url":"https://atee.fr/system/files/2026-06/Pr%C3%A9sentation%20Colloque%20Stockage%20%C3%A9lectrique%202%20JUIN%202026%20ATEE.pdf","why":"Year-end totals (758 projects, 1,512 MW/1,720 MWh) and survey aggregates of 114 installations; no list."},{"name":"Réponse ministérielle QE n°864 (JO 30/06/2026)","url":"https://questions.assemblee-nationale.fr/dyn/17/questions/QANR5L17QE864.pdf","why":"States about 2 GW of batteries in mainland France at 1 April 2026; aggregate only."},{"name":"CRE note on PV + storage (05/03/2026)","url":"https://www.cre.fr/fileadmin/Documents/Rapports_et_etudes/2026/260305_Note_PV_Stockage.pdf","why":"About 1.5 GW installed and a 14.9 GW queue; defines stand-alone vs hybrid; no list."}],"open_questions":["Why EDF SEI storage rows carry no energieStockable and whether ZNI PV+storage plants record their batteries; needs EDF SEI or RTE.","Why Mayotte (EDM) has no rows although CRE reports a battery in service since 24/01/2024; needs RTE/EDM.","Register 31/12/2025 (741 rows, 1,531 MW, 1,762 MWh mainland) and CRE totals (758 projects, 1,512 MW, 1,720 MWh) differ; definitions not published.","Whether typeStockage V.INE rows labelled 'Batterie' are flywheels or miscoded batteries; needs the reporting DSO.","Whether Akuo's Madinina Storage (Ducos, 12 MW, in service April 2022) is the register's Martinique row (Rivière-Salée, 12000 kW, 19/05/2021); needs EDF SEI."],"history":[{"pass":1,"date":"2026-11-26","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-26-de-fr-baterias","note":"First pass: ODRÉ register profiled (938 STOCK rows); operator gap traced to arrêté 2016 art. 4; ZNI, hybrids, OSM EIC join and CRE ZNI deliberations documented.","headline":{"official_data":"structured","non_official_data":"partial","national_registry":"yes"},"sources":{"total":7,"new":7,"dropped":0},"negatives":{"overturned":0,"confirmed":0},"effort":{"pages":44,"minutes":32}}],"local_terms":[{"term":"Registre national des installations de production et de stockage d'électricité","language":"fr","meaning":"Official national register on ODRÉ, compiled by RTE; the per-installation list of storage."},{"term":"Stockage non hydraulique (codeFiliere STOCK)","language":"fr","meaning":"Register filière for batteries, flywheels and hydrogen storage; filter value."},{"term":"typeStockage BATTE / V.INE","language":"fr","meaning":"Storage type codes: battery / volant d'inertie (flywheel)."},{"term":"énergie stockable","language":"fr","meaning":"Storable energy field (kWh) in the register."},{"term":"date de mise en service","language":"fr","meaning":"Commissioning date as seen by the network operator; not commercial operation."},{"term":"gestionnaire de réseau","language":"fr","meaning":"Grid operator (RTE, Enedis, EDF SEI, ELD) shown in the register; not the battery operator."},{"term":"exploitant","language":"fr","meaning":"Installation operator; collected in the register but not published."},{"term":"zones non interconnectées (ZNI)","language":"fr","meaning":"Corsica, overseas departments and islands not connected to the mainland grid; storage contracts reviewed by CRE."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":32,"pages_opened":44,"passes":[{"pass":1,"date":"2026-11-26","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/fr/battery-storage.json","detail_url":"https://georutter.org/v1/fr/battery-storage/detail.json","html_url":"https://georutter.org/fr/battery-storage/","country_url":"https://georutter.org/v1/countries/fr.json"}