{"schema_version":"1.0","country":"fr","country_name":"France","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in France, with project, technology, capacity (MW), connection node, status and date?","territory":"fr","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-25","access_checked_on":"2026-11-25","answer":{"official_data":"partial","non_official_data":"none_found","summary":"No public list of individual connection requests was found in the sources checked. Enedis publishes quarterly aggregates by department, technology and power band since 2020. Its queue field sums to 32,789 on 2026-09-30 (about 32.8 GW if the field is in MW; the schema does not state the unit). Caparéseau gives queue power per substation, ODRE regional totals and EDF SEI figures for Corsica and overseas territories. The CRE procedure describes how distributors send project and client names to RTE.","main_caveats":["The checked datasets give aggregates. None lists a project name, a node, a status or an event date per request.","Enedis counts only its own network; RTE, local distributors and storage or consumption queues need other sources.","'In development' differs by operator: RTE counts queue entry or accepted technical proposals, Enedis counts requests qualified complete.","The Enedis power unit is not declared in the schema (MW consistent); ODRE has one annual date.","Caparéseau queue power covers S3REnR generation only; summing substations was not reconciled across RTE and distributor views."],"confidence":"medium","confidence_reason":"Enedis, ODRE, Caparéseau and EDF datasets were queried and CRE's procedure read; the absence of a request list rests on these pages, not on a registry statement.","attributes":[{"attribute":"project","covered":"no","source_ids":[],"note":"No checked source lists individual connection requests. The documented datasets aggregate by department, region, substation or technology.","gap":"not_published","gap_note":"Enedis and EDF Data Fair sets, ODRE, Caparéseau and RTE pages were opened; CRE's procedure shows project and client names are only passed from distributors to RTE (from July 2027)."},{"attribute":"technology","covered":"partial","source_ids":["enedis-fa-historique","odre-projets-developpement","edf-sei-file-attente"],"note":"Technology exists only as an aggregate dimension (seven classes at Enedis; sectors at ODRE and EDF).","gap":"not_published","gap_note":"No technology per request."},{"attribute":"capacity_mw","covered":"partial","source_ids":["enedis-fa-historique","capareseau-queue","odre-projets-developpement","edf-sei-file-attente"],"note":"Enedis gives aggregates by department and power band (32,789 on 2026-09-30; MW inferred). Caparéseau gives totals per substation and ODRE by region.","gap":"not_published","gap_note":"No requested capacity per request; the Enedis unit is not declared."},{"attribute":"connection_node","covered":"partial","source_ids":["capareseau-queue"],"note":"Caparéseau gives queue power per substation (3,116 mainland; 2,279 above zero), not per request; requested and assigned node are not distinguished.","gap":"not_published","gap_note":"No mapping from individual requests to nodes was found in the checked datasets."},{"attribute":"status","covered":"partial","source_ids":["enedis-fa-historique","odre-projets-developpement"],"note":"Enedis separates in queue, entered and left per quarter; ODRE gives each operator's definition; no status per request.","gap":"not_published","gap_note":"No per-request status or queue position."},{"attribute":"event_date","covered":"partial","source_ids":["enedis-fa-historique","odre-projets-developpement"],"note":"Only quarter-end dates (Enedis) or 31/12/2024 (ODRE) for aggregates; no application, acceptance or decision date per request.","gap":"not_published","gap_note":"The checked datasets give no dates for individual events."},{"attribute":"latest_data","covered":"partial","source_ids":["enedis-fa-historique","capareseau-queue","odre-projets-developpement"],"note":"Latest aggregates: Enedis 2026-09-30 (updated 2026-10-20), Caparéseau 2026-11-10, ODRE 31/12/2024 (published 2025-06-25).","gap":"not_published","gap_note":"The latest checked data are aggregates. No current request-level dataset was found."},{"attribute":"historical_series","covered":"partial","source_ids":["enedis-fa-historique"],"note":"Enedis gives 27 quarter-end values from 2020-03-31 (12,536 to 32,789 in queue); ODRE has one date and Caparéseau none.","gap":"not_published","gap_note":"No history of individual requests; RTE and ELD history was not found."},{"attribute":"update_frequency","covered":"partial","source_ids":["enedis-fa-historique","edf-sei-file-attente","odre-projets-developpement"],"note":"Enedis and EDF SEI state quarterly; ODRE is annual; Caparéseau has no stated schedule.","gap":"not_published","gap_note":"No schedule for Caparéseau or for RTE queue figures."}]},"sources":[{"source_id":"enedis-fa-historique","name":"Enedis – Projets en développement, maille régionale et départementale (historiques cumulés)","publisher":"Enedis","official":true,"landing_url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","data_url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz/lines","access":"api","format":"JSON/CSV/XLSX via Data Fair API (103,143 rows)","license":"Licence Ouverte / Open Licence version 2.0","language":"fr","has_coordinates":false,"location_precision":"none","summary":"Enedis queue aggregates by département, technology and power band, quarterly since 2020; no individual requests.","coverage_note":"94 départements, 27 quarters; latest 2026-09-30 (published 2026-10-20); Enedis network only.","data_date":"2026-09-30","caveats":["Unit not declared (MW consistent).","Aggregates, not a request list."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":["Unit of the power fields is not documented."]},"example":{"example_request":"curl -sG \"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz/values_agg\" --data-urlencode 'field=fin_de_trimestre' --data-urlencode 'agg_size=60' --data-urlencode 'metric=sum' --data-urlencode 'metric_field=fa_en_cours_puiss' --data-urlencode 'sort=key'","example_result":"27 quarters. Sum of fa_en_cours_puiss: 12,536 at 2020-03-31, 24,936 at 2024-12-31, 32,789 at 2026-09-30 (4,745 rows; Photovoltaïque 19,356, Eolien 8,621, Stockage 4,472)."},"members_summary":null},{"source_id":"capareseau-queue","name":"Caparéseau – queue and in-service power per substation (S3REnR)","publisher":"RTE with the distribution network operators","official":true,"landing_url":"https://www.capareseau.fr/","data_url":"https://www.capareseau.fr/medias/27F7C201-1CD6-C0F6-8293-A6E5539F6A1E","access":"direct_download","format":"CSV (semicolon, two header rows) and region JSON","license":"unknown","language":"fr","has_coordinates":true,"location_precision":"exact","summary":"Queue power per substation (S3REnR generation), national CSV.","coverage_note":"3,116 mainland substations; snapshot 2026-11-10; aggregates.","data_date":"2026-11-10","caveats":["Not request-level.","Generation only."],"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"problems":["No documented API; link generated by the page."]},"example":{"example_request":"curl -sL \"https://www.capareseau.fr/medias/27F7C201-1CD6-C0F6-8293-A6E5539F6A1E\" -o capareseau_france.csv","example_result":"3,116 substations; 2,279 with INFO_FAS3R > 0; Σ INFO_FAS3R about 37,728 MW. Row INDRE SUD (936AA): INFO_FAS3R 38.1, INFO_ESS3R 0, INFO_NA 18.9."},"members_summary":null},{"source_id":"odre-projets-developpement","name":"ODRE – Projets en développement en électricité renouvelable","publisher":"Open Data Réseaux Énergies (RTE, Enedis, Agence ORÉ)","official":true,"landing_url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","data_url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/suivi-projet-raccordement-enr/exports/csv?use_labels=true","access":"api","format":"CSV/JSON/GeoJSON via Opendatasoft Explore API (193 rows)","license":"Licence Ouverte v2.0 (Etalab)","language":"fr","has_coordinates":false,"location_precision":"none","summary":"Regional MW of renewable projects in development on RTE, Enedis and ELD networks at 31/12/2024.","coverage_note":"193 rows, annual, renewable sectors.","data_date":"2024-12-31","caveats":["One date; definitions differ by operator."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":["Single annual date; no later edition found."]},"example":{"example_request":"curl -sG \"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/suivi-projet-raccordement-enr/records\" --data-urlencode 'limit=20' --data-urlencode 'group_by=reseau,filiere' --data-urlencode 'select=reseau,filiere,sum(projets_en_developpement_au_31_12_2024_mw) as mw' --data-urlencode 'order_by=mw desc'","example_result":"193 rows. Top sums at 31/12/2024: distribution Solaire 15,836 MW; transport Solaire 15,093; transport Eolien en mer 9,278; distribution Eolien terrestre 8,874; transport Eolien terrestre 4,280."},"members_summary":null},{"source_id":"edf-sei-file-attente","name":"EDF SEI – File d'attente producteur, Corse & Outre-Mer","publisher":"EDF Systèmes Énergétiques Insulaires","official":true,"landing_url":"https://www.data.gouv.fr/datasets/file-dattente-producteur-1","data_url":"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x/lines","access":"api","format":"JSON/CSV via Data Fair API","license":"Licence Ouverte (Etalab)","language":"fr","has_coordinates":false,"location_precision":"none","summary":"Queue by technology for Corsica and overseas.","coverage_note":"75 rows, quarterly.","data_date":"2026-05-13","caveats":["Aggregates only."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":["Old export URLs on data.gouv.fr redirect to HTML."]},"example":{"example_request":"curl -sG \"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x/lines\" --data-urlencode 'size=3'","example_result":"Row: territoire CORSE, filiere Autre, nombre_total_d_installations 2, puissance_totale_mw 287.6, puissance_htb_mw 287.6."},"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":"The CRE procedure describes a project- and client-name exchange between distributors and RTE. The checked public datasets give aggregates only."},"local_terms":[{"term":"file d'attente (FA)","language":"fr","meaning":"Connection queue of requests that reserve capacity."},{"term":"proposition technique et financière (PTF)","language":"fr","meaning":"Operator's connection offer; when accepted, the project holds a place in the queue."},{"term":"projets en développement","language":"fr","meaning":"Name of the Enedis and ODRE queue datasets."},{"term":"demande de raccordement complète","language":"fr","meaning":"Distribution-network request qualified complete; counted by Enedis and ELDs."},{"term":"tranche de puissance / modalité d'injection","language":"fr","meaning":"Power band and injection mode (total or surplus) used by Enedis."},{"term":"poste source","language":"fr","meaning":"Substation to which queue power is attributed in Caparéseau."},{"term":"S3REnR","language":"fr","meaning":"Regional scheme whose reserved capacity the queue consumes."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":32,"pages_opened":50,"passes":[{"pass":1,"date":"2026-11-25","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/fr/grid-connection-queue.json","detail_url":"https://georutter.org/v1/fr/grid-connection-queue/detail.json","html_url":"https://georutter.org/fr/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/fr.json"}