{"schema_version":"1.0","country":"fr","country_name":"France","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in France, with project, technology, capacity (MW), connection node, status and date?","territory":"fr","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-25","access_checked_on":"2026-11-25","answer":{"official_data":"partial","non_official_data":"none_found","summary":"No public list of individual connection requests was found in the sources checked. Enedis publishes quarterly aggregates by department, technology and power band since 2020. Its queue field sums to 32,789 on 2026-09-30 (about 32.8 GW if the field is in MW; the schema does not state the unit). Caparéseau gives queue power per substation, ODRE regional totals and EDF SEI figures for Corsica and overseas territories. The CRE procedure describes how distributors send project and client names to RTE.","main_caveats":["The checked datasets give aggregates. None lists a project name, a node, a status or an event date per request.","Enedis counts only its own network; RTE, local distributors and storage or consumption queues need other sources.","'In development' differs by operator: RTE counts queue entry or accepted technical proposals, Enedis counts requests qualified complete.","The Enedis power unit is not declared in the schema (MW consistent); ODRE has one annual date.","Caparéseau queue power covers S3REnR generation only; summing substations was not reconciled across RTE and distributor views."],"confidence":"medium","confidence_reason":"Enedis, ODRE, Caparéseau and EDF datasets were queried and CRE's procedure read; the absence of a request list rests on these pages, not on a registry statement.","attributes":[{"attribute":"project","covered":"no","source_ids":[],"note":"No checked source lists individual connection requests. The documented datasets aggregate by department, region, substation or technology.","gap":"not_published","gap_note":"Enedis and EDF Data Fair sets, ODRE, Caparéseau and RTE pages were opened; CRE's procedure shows project and client names are only passed from distributors to RTE (from July 2027)."},{"attribute":"technology","covered":"partial","source_ids":["enedis-fa-historique","odre-projets-developpement","edf-sei-file-attente"],"note":"Technology exists only as an aggregate dimension (seven classes at Enedis; sectors at ODRE and EDF).","gap":"not_published","gap_note":"No technology per request."},{"attribute":"capacity_mw","covered":"partial","source_ids":["enedis-fa-historique","capareseau-queue","odre-projets-developpement","edf-sei-file-attente"],"note":"Enedis gives aggregates by department and power band (32,789 on 2026-09-30; MW inferred). Caparéseau gives totals per substation and ODRE by region.","gap":"not_published","gap_note":"No requested capacity per request; the Enedis unit is not declared."},{"attribute":"connection_node","covered":"partial","source_ids":["capareseau-queue"],"note":"Caparéseau gives queue power per substation (3,116 mainland; 2,279 above zero), not per request; requested and assigned node are not distinguished.","gap":"not_published","gap_note":"No mapping from individual requests to nodes was found in the checked datasets."},{"attribute":"status","covered":"partial","source_ids":["enedis-fa-historique","odre-projets-developpement"],"note":"Enedis separates in queue, entered and left per quarter; ODRE gives each operator's definition; no status per request.","gap":"not_published","gap_note":"No per-request status or queue position."},{"attribute":"event_date","covered":"partial","source_ids":["enedis-fa-historique","odre-projets-developpement"],"note":"Only quarter-end dates (Enedis) or 31/12/2024 (ODRE) for aggregates; no application, acceptance or decision date per request.","gap":"not_published","gap_note":"The checked datasets give no dates for individual events."},{"attribute":"latest_data","covered":"partial","source_ids":["enedis-fa-historique","capareseau-queue","odre-projets-developpement"],"note":"Latest aggregates: Enedis 2026-09-30 (updated 2026-10-20), Caparéseau 2026-11-10, ODRE 31/12/2024 (published 2025-06-25).","gap":"not_published","gap_note":"The latest checked data are aggregates. No current request-level dataset was found."},{"attribute":"historical_series","covered":"partial","source_ids":["enedis-fa-historique"],"note":"Enedis gives 27 quarter-end values from 2020-03-31 (12,536 to 32,789 in queue); ODRE has one date and Caparéseau none.","gap":"not_published","gap_note":"No history of individual requests; RTE and ELD history was not found."},{"attribute":"update_frequency","covered":"partial","source_ids":["enedis-fa-historique","edf-sei-file-attente","odre-projets-developpement"],"note":"Enedis and EDF SEI state quarterly; ODRE is annual; Caparéseau has no stated schedule.","gap":"not_published","gap_note":"No schedule for Caparéseau or for RTE queue figures."}]},"sources":[{"source_id":"enedis-fa-historique","name":"Enedis – Projets en développement, maille régionale et départementale (historiques cumulés)","publisher":"Enedis","official":true,"landing_url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","data_url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz/lines","access":"api","format":"JSON/CSV/XLSX via Data Fair API (103,143 rows)","license":"Licence Ouverte / Open Licence version 2.0","language":"fr","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Only quarterly time series of the producer queue by département, technology, power band and injection mode, with entries and exits.","first_seen_pass":1,"rank":1,"summary":"Enedis queue aggregates by département, technology and power band, quarterly since 2020; no individual requests.","coverage_note":"94 départements, 27 quarters; latest 2026-09-30 (published 2026-10-20); Enedis network only.","data_date":"2026-09-30","caveats":["Unit not declared (MW consistent).","Aggregates, not a request list."],"coverage":{"geographic":"Enedis network, 94 départements, 12 regions; 27 quarter ends from 2020-03-31 to 2026-09-30."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","note":"Schema fields fa_en_cours_puiss, entree_fa_puiss, sortie_fa_puiss carry no description or unit; totals (32,789 at 2026-09-30) are consistent with MW."},{"url":"https://www.data.gouv.fr/datasets/projets-en-developpement-maille-regionale-departementale-historiques-cumules","note":"data.gouv.fr description speaks of 'volume' without unit."}]},"inclusion_rule":{"value":"Connection requests in treatment on the network operated by Enedis, by power band and injection mode","quote":"le volume des demandes de raccordement en cours de traitement au réseau de distribution géré par Enedis par tranche de puissance et modalité d'injection","url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","attempts":[]},"reference_date":{"value":"fin_de_trimestre: quarter-end date of each row","quote":null,"url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz/lines","attempts":[]},"update_frequency":{"value":"quarterly","quote":null,"url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","attempts":[]},"exclusions":{"value":"Only the Enedis network: RTE and local distribution companies are not included","quote":null,"url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","attempts":[]}},"key_fields":[{"field":"fin_de_trimestre","meaning":"Quarter-end date (27 values)"},{"field":"code_departement / nom_departement / region","meaning":"Location of the requests (94 départements)"},{"field":"type_production","meaning":"Photovoltaïque, Eolien, Stockage hors hydraulique, Hydraulique, Bio énergie, Cogénération, Autres"},{"field":"tranche","meaning":"Power band, e.g. a-]0;36] to e-]500;...["},{"field":"type_injection","meaning":"Injection totale, Injection du surplus, other"},{"field":"stockage_existence","meaning":"OUI/NON: project includes storage"},{"field":"fa_en_cours_nbr / fa_en_cours_puiss","meaning":"Requests in the queue at quarter end and their power"},{"field":"entree_fa_nbr / entree_fa_puiss","meaning":"Requests that entered the queue in the quarter"},{"field":"sortie_fa_nbr / sortie_fa_puiss","meaning":"Requests that left the queue in the quarter"}],"how_to_use":{"example_request":"curl -sG \"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz/values_agg\" --data-urlencode 'field=fin_de_trimestre' --data-urlencode 'agg_size=60' --data-urlencode 'metric=sum' --data-urlencode 'metric_field=fa_en_cours_puiss' --data-urlencode 'sort=key'","example_result":"27 quarters. Sum of fa_en_cours_puiss: 12,536 at 2020-03-31, 24,936 at 2024-12-31, 32,789 at 2026-09-30 (4,745 rows; Photovoltaïque 19,356, Eolien 8,621, Stockage 4,472).","steps":["Query /lines (size up to 10,000, paged with after) or /values_agg for totals.","Filter qs=fin_de_trimestre:\"2026-09-30\" for the latest quarter.","Group by type_production, tranche or code_departement; flows are entree_* and sortie_*."],"reading_traps":["Aggregates only: no project, node or request date.","Unit is not declared in the schema (MW consistent).","The 'Répartition' dataset holds the latest quarter only; this one holds the history.","Enedis network only; add RTE and ELD figures from other sources.","Power bands are coded strings such as a-]0;36] and e-]500;...["]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":103143,"records_for_country":103143,"problems":["Unit of the power fields is not documented."]},"evidence":[{"claim":"Scope of the dataset","url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","quote":"le volume des demandes de raccordement en cours de traitement au réseau de distribution géré par Enedis par tranche de puissance et modalité d'injection"}],"members":[],"members_summary":null},{"source_id":"capareseau-queue","name":"Caparéseau – queue and in-service power per substation (S3REnR)","publisher":"RTE with the distribution network operators","official":true,"landing_url":"https://www.capareseau.fr/","data_url":"https://www.capareseau.fr/medias/27F7C201-1CD6-C0F6-8293-A6E5539F6A1E","access":"direct_download","format":"CSV (semicolon, two header rows) and region JSON","license":"unknown","language":"fr","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"Gives the node dimension: queue power per substation, which the Enedis aggregates lack.","first_seen_pass":1,"rank":2,"summary":"Queue power per substation (S3REnR generation), national CSV.","coverage_note":"3,116 mainland substations; snapshot 2026-11-10; aggregates.","data_date":"2026-11-10","caveats":["Not request-level.","Generation only."],"coverage":{"geographic":"Mainland France: 3,116 substations; generation projects under the S3REnR schemes."},"fine_print":{"unit":{"value":"MW (as in the RTE annexes)","quote":"Capacité réservée sur le poste (MW)","url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","attempts":[]},"inclusion_rule":{"value":"Projects in the S3REnR queue and in service per substation","quote":"La somme des puissances actives des projets en file d’attente et en service de son périmètre, au titre du schéma en vigueur ;","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf","attempts":[]},"reference_date":{"value":"Per-substation 'updated' date in the region JSON (2026-02-04 to 2026-11-10)","quote":null,"url":"https://www.capareseau.fr/region/27","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://www.capareseau.fr/region/27","note":"32 distinct update dates; no schedule stated."}]},"exclusions":{"value":"Consumption and storage requests are not part of the S3REnR generation queue","quote":null,"url":"https://www.services-rte.com/fr/decouvrez-nos-offres-de-services/consulter-les-capacites-d-accueil-du-reseau-capareseau.html","attempts":[]}},"key_fields":[{"field":"INFO_FAS3R","meaning":"Puissance des projets en file d’attente du S3REnR en cours"},{"field":"RTE_FAS3R","meaning":"Queue power on the transmission network"},{"field":"GRD1_FAS3R","meaning":"Queue power on the first distributor's network"},{"field":"INFO_ESS3R","meaning":"Power of projects in service under the scheme"},{"field":"Code / Nom","meaning":"Substation identifier and name"}],"how_to_use":{"example_request":"curl -sL \"https://www.capareseau.fr/medias/27F7C201-1CD6-C0F6-8293-A6E5539F6A1E\" -o capareseau_france.csv","example_result":"3,116 substations; 2,279 with INFO_FAS3R > 0; Σ INFO_FAS3R about 37,728 MW. Row INDRE SUD (936AA): INFO_FAS3R 38.1, INFO_ESS3R 0, INFO_NA 18.9.","steps":["Download the national CSV (no login).","Skip the label row.","Read INFO_FAS3R, RTE_FAS3R and GRD1_FAS3R per substation."],"reading_traps":["Aggregate per substation, not per request.","Σ over substations mixes RTE and distributor views and was not reconciled.","Generation under the S3REnR only; storage and consumption queues are absent."]},"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"content_type":"application/octet-stream","size_bytes":388512,"records_total":3116,"records_for_country":3116,"problems":["No documented API; link generated by the page."]},"evidence":[{"claim":"Column label","url":"https://www.capareseau.fr/medias/27F7C201-1CD6-C0F6-8293-A6E5539F6A1E","quote":"Puissance des projets en file d’attente du S3REnR en cours"}],"members":[],"members_summary":null},{"source_id":"odre-projets-developpement","name":"ODRE – Projets en développement en électricité renouvelable","publisher":"Open Data Réseaux Énergies (RTE, Enedis, Agence ORÉ)","official":true,"landing_url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","data_url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/suivi-projet-raccordement-enr/exports/csv?use_labels=true","access":"api","format":"CSV/JSON/GeoJSON via Opendatasoft Explore API (193 rows)","license":"Licence Ouverte v2.0 (Etalab)","language":"fr","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Combines RTE, Enedis and local distributors in one regional table with the queue definition of each operator.","first_seen_pass":1,"rank":3,"summary":"Regional MW of renewable projects in development on RTE, Enedis and ELD networks at 31/12/2024.","coverage_note":"193 rows, annual, renewable sectors.","data_date":"2024-12-31","caveats":["One date; definitions differ by operator."],"coverage":{"geographic":"France by region (12 regions plus former regions), 7 sectors, transmission and distribution networks; reference 31/12/2024."},"fine_print":{"unit":{"value":"MW","quote":"Projets en développement au 31/12/2024 (MW)","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/suivi-projet-raccordement-enr","attempts":[]},"inclusion_rule":{"value":"RTE: proposal to enter the queue or accepted technical and financial proposal; Enedis and ELD: request qualified complete","quote":"Pour le réseau de RTE, il s’agit des projets ayant fait l’objet d’une « proposition d’entrée en file d’attente » ou d’une « proposition technique et financière » acceptée ainsi que des projets éoliens en mer prévus dans le cadre d’un appel d’offres.","url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","attempts":[]},"reference_date":{"value":"31 December 2024 (published 2025-06-25)","quote":"Ce jeu de données expose les projets (en MW) de raccordement en développement sur les réseaux de transport et de distribution en électricité au 31 décembre 2024.","url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","attempts":[]},"update_frequency":{"value":"annual (data.gouv.fr frequency field)","quote":null,"url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","attempts":[]},"exclusions":{"value":"Renewable sectors only; no storage or consumption","quote":null,"url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/suivi-projet-raccordement-enr","attempts":[]}},"key_fields":[{"field":"region / code_insee_region","meaning":"Region"},{"field":"filiere","meaning":"Sector (Solaire, Eolien terrestre, Eolien en mer, Hydraulique, Bioénergies…)"},{"field":"reseau","meaning":"Réseau public de transport or Réseaux publics de distribution"},{"field":"projets_en_developpement_au_31_12_2024_mw","meaning":"MW of projects in development"}],"how_to_use":{"example_request":"curl -sG \"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/suivi-projet-raccordement-enr/records\" --data-urlencode 'limit=20' --data-urlencode 'group_by=reseau,filiere' --data-urlencode 'select=reseau,filiere,sum(projets_en_developpement_au_31_12_2024_mw) as mw' --data-urlencode 'order_by=mw desc'","example_result":"193 rows. Top sums at 31/12/2024: distribution Solaire 15,836 MW; transport Solaire 15,093; transport Eolien en mer 9,278; distribution Eolien terrestre 8,874; transport Eolien terrestre 4,280.","steps":["Query the Explore API records endpoint or download the CSV.","Group by region, filiere and reseau."],"reading_traps":["One date only (31/12/2024); no 2025 edition was found in the catalogue on 2026-11-25.","The definition of 'in development' differs between RTE and the distributors.","Regional totals, not projects."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":193,"records_for_country":193,"problems":["Single annual date; no later edition found."]},"evidence":[{"claim":"Definition of Enedis and ELD projects","url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","quote":"Pour le réseau d’Enedis et des ELD, il s’agit de projets pour lesquels une demande de raccordement a été qualifiée complète par le gestionnaire de réseau de distribution."}],"members":[],"members_summary":null},{"source_id":"edf-sei-file-attente","name":"EDF SEI – File d'attente producteur, Corse & Outre-Mer","publisher":"EDF Systèmes Énergétiques Insulaires","official":true,"landing_url":"https://www.data.gouv.fr/datasets/file-dattente-producteur-1","data_url":"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x/lines","access":"api","format":"JSON/CSV via Data Fair API","license":"Licence Ouverte (Etalab)","language":"fr","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Queue by technology and voltage level for Corsica and overseas, outside Enedis and mainland scope.","first_seen_pass":1,"rank":4,"summary":"Queue by technology for Corsica and overseas.","coverage_note":"75 rows, quarterly.","data_date":"2026-05-13","caveats":["Aggregates only."],"coverage":{"geographic":"Corsica and the overseas departments; 75 rows."},"fine_print":{"unit":{"value":"MW","quote":"Puissance totale (MW)","url":"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x","attempts":[]},"inclusion_rule":{"value":"Producer connection queue by technology with number of installations and power by voltage level","quote":"File d'attente de raccordement des producteurs par filière incluant le nombre d'installations et la puissance (en MW) avec le détail du niveau de tension concerné","url":"https://www.data.gouv.fr/datasets/file-dattente-producteur-1","attempts":[]},"reference_date":{"value":"Dataset updated 2026-05-13","quote":null,"url":"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x","attempts":[]},"update_frequency":{"value":"quarterly","quote":null,"url":"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x","note":"No exclusion statement."}]}},"key_fields":[{"field":"territoire / filiere","meaning":"Territory and technology"},{"field":"nombre_total_d_installations / puissance_totale_mw","meaning":"Count and MW of queued installations"},{"field":"puissance_bt_mw / hta / htb","meaning":"MW by voltage level"}],"how_to_use":{"example_request":"curl -sG \"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x/lines\" --data-urlencode 'size=3'","example_result":"Row: territoire CORSE, filiere Autre, nombre_total_d_installations 2, puissance_totale_mw 287.6, puissance_htb_mw 287.6.","steps":["Query /lines with size and qs filters.","Sum puissance_totale_mw by filiere or territoire."],"reading_traps":["Aggregates by technology only.","The data.gouv.fr resource links point to old export URLs that redirect to the portal home page."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":75,"records_for_country":75,"problems":["Old export URLs on data.gouv.fr redirect to HTML."]},"evidence":[{"claim":"Unit","url":"https://opendata.edf.fr/data-fair/api/v1/datasets/bb1cvjw7rb59zn44gqn9qf7x","quote":"Puissance totale (MW)"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Commission de régulation de l'énergie (CRE)","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf"},"operators":{"structure":"many","note":"RTE, Enedis and local distribution companies; EDF SEI for Corsica and overseas.","census_url":null},"publication_obligation":{"exists":"yes","norm":"CRE-approved procedure of 28/07/2026 (annex to deliberation 2026-173), 'Informations publiées sur Internet'","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf","what_must_be_published":"Sum of queue and in-service power per substation on the common site; project-level fields are only transmitted to RTE.","frequency":"Operators exchange queue data at least every three months (project-level exchange from July 2027)"},"consolidated_republication":{"found":"partial","note":"Caparéseau and ODRE republish aggregates from RTE and distributors; no request list.","checked_pages":[{"organization":"ODRE","url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","saw":"Regional MW of projects in development at 31/12/2024."},{"organization":"Enedis","url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","saw":"Quarterly queue by département, technology and power band."},{"organization":"RTE / distributors","url":"https://www.capareseau.fr/","saw":"Queue power per substation (S3REnR)."}]}},"national_registry":{"exists":"no_evidence_found","note":"No national register of individual connection requests was found; only aggregates are published.","checked_pages":[{"organization":"CRE","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf","saw":"Procedure: project and client names go from distributors to RTE; 'RTE s’engage à préserver les informations commercialement sensibles.'"},{"organization":"Enedis","url":"https://opendata.enedis.fr/data-fair/api/v1/datasets/rf7c--nnyt6y4ca3tey-oxwz","saw":"Aggregated queue dataset; seven related 'Projets en développement' sets, all aggregates."},{"organization":"ODRE (RTE)","url":"https://www.data.gouv.fr/datasets/projets-en-developpement-en-electricite-renouvelable","saw":"Regional aggregates."},{"organization":"EDF SEI","url":"https://www.data.gouv.fr/datasets/file-dattente-producteur-1","saw":"Queue by technology for the islands."},{"organization":"RTE services","url":"https://www.services-rte.com/fr/decouvrez-nos-offres-de-services/consulter-les-capacites-d-accueil-du-reseau-capareseau.html","saw":"Caparéseau description; Enedis zone map excludes storage and consumption."}]},"if_unstructured":{"summary":"The CRE procedure describes a project- and client-name exchange between distributors and RTE. The checked public datasets give aggregates only.","recipe":[],"location_method":null,"cross_with":"Caparéseau substation data and the OREOL wind table for projects in permitting (different subject).","where_published":[]},"related_not_answering":[{"name":"CRE procedure for connecting a distribution network to RTE (28/07/2026)","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf","why":"Describes the project-level fields distributors send to RTE. The procedure itself contains no list of requests."},{"name":"ODRE national register of production and storage installations","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/registre-national-installation-production-stockage-electricite-agrege","why":"Lists installations already connected, not requests; seen in the catalogue listing (143,712 rows at 30/09/2026)."},{"name":"Géorisques OREOL wind table","url":"https://www.georisques.gouv.fr/donnees/bases-de-donnees/eolien-terrestre","why":"Wind parks in permitting; it carries no connection node, request date or queue status."}],"open_questions":["Whether RTE or the distributors will publish project-level queue data from July 2027 when the exchange duty starts cannot be learned from the pages read.","Can Caparéseau’s queue sum (about 37.7 GW) be compared with Enedis’s total (32,789, with MW inferred)? The network perimeters and the Enedis unit need confirmation."],"history":[{"pass":1,"date":"2026-11-25","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-25-fr-red-y-tramitacion","note":"First pass: four aggregate sources queried; no request-level list found; CRE procedure explains why.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"no_evidence_found"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{},"effort":{"pages":50,"minutes":32}}],"local_terms":[{"term":"file d'attente (FA)","language":"fr","meaning":"Connection queue of requests that reserve capacity."},{"term":"proposition technique et financière (PTF)","language":"fr","meaning":"Operator's connection offer; when accepted, the project holds a place in the queue."},{"term":"projets en développement","language":"fr","meaning":"Name of the Enedis and ODRE queue datasets."},{"term":"demande de raccordement complète","language":"fr","meaning":"Distribution-network request qualified complete; counted by Enedis and ELDs."},{"term":"tranche de puissance / modalité d'injection","language":"fr","meaning":"Power band and injection mode (total or surplus) used by Enedis."},{"term":"poste source","language":"fr","meaning":"Substation to which queue power is attributed in Caparéseau."},{"term":"S3REnR","language":"fr","meaning":"Regional scheme whose reserved capacity the queue consumes."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":32,"pages_opened":50,"passes":[{"pass":1,"date":"2026-11-25","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/fr/grid-connection-queue.json","detail_url":"https://georutter.org/v1/fr/grid-connection-queue/detail.json","html_url":"https://georutter.org/fr/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/fr.json"}