{"schema_version":"1.0","country":"fr","country_name":"France","topic":"grid-hosting-capacity","question":"Where can I get the available grid connection capacity per substation or node in France, for generation and for demand, with the latest value and its history?","territory":"fr","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-25","access_checked_on":"2026-11-25","answer":{"official_data":"partial","non_official_data":"none_found","summary":"Caparéseau (RTE with Enedis and local distributors) publishes generation hosting capacity per substation: 3,116 mainland substations in a national CSV without login, with per-substation update dates up to 2026-11-10. It covers production only and is indicative; no per-node consumption capacity was found (RTE Cartostock covers batteries, viewer only). There is no history file: annual 31 December tables sit in RTE's regional reports. Corsica and overseas are on EDF's portal (101 rows, quarterly).","main_caveats":["Caparéseau shows capacity reserved under the S3REnR schemes, not physical grid headroom, and is indicative and non-binding.","INFO_NA, RTE_CDR and GRD1_CDR differ: a zero can be saturated or not reserved; installed transformer power is not available capacity.","No demand-side capacity per node was found; Caparéseau and the Enedis zone map are production-only.","History exists only as annual PDF tables in RTE reports (rounded to integers in 2024) and needs manual extraction.","Mainland Caparéseau excludes Corsica and overseas; data.gouv.fr links to the EDF dataset are dead redirects."],"confidence":"medium","confidence_reason":"National CSV, regional JSON and two RTE reports were downloaded and compared; consumption-side tools (Cartostock data, Enedis collectivités map) and other regions' reports were not read.","attributes":[{"attribute":"node","covered":"yes","source_ids":["capareseau","edf-sei-capacites","rte-etf-s3renr"],"note":"Caparéseau lists 3,116 mainland substations by code and name; EDF SEI lists Corsica and overseas; coordinates are valid for 3,076 of 3,116.","gap":null,"gap_note":null},{"attribute":"generation_capacity","covered":"yes","source_ids":["capareseau","edf-sei-capacites","rte-etf-s3renr"],"note":"INFO_NA, RTE_CDR and GRD1_CDR give S3REnR capacity left per substation; unit MW is stated by RTE/EDF files, not by Caparéseau labels; values are indicative.","gap":null,"gap_note":null},{"attribute":"demand_capacity","covered":"no","source_ids":[],"note":"Caparéseau and the Enedis zone map are production-only; no per-substation capacity for consumption sites was found.","gap":"not_checked","gap_note":"Cartostock (batteries) is viewer-only and the Enedis collectivités capacity tool sits behind an account; neither was read; RTE API catalogue needs an account."},{"attribute":"latest_data","covered":"yes","source_ids":["capareseau","edf-sei-capacites"],"note":"Caparéseau snapshot of 2026-11-10 with a per-substation update date (2026-02-04 to 2026-11-10); EDF SEI rows dated 2026-10-01.","gap":null,"gap_note":null},{"attribute":"historical_series","covered":"partial","source_ids":["rte-etf-s3renr"],"note":"Caparéseau and EDF keep only the current state; RTE annual reports give 31 December tables (Hauts-de-France 2024 and 2025 opened).","gap":"not_checked","gap_note":"Open the other regional reports and the 2020-2023 editions to measure the span; Caparéseau has no history."},{"attribute":"update_frequency","covered":"partial","source_ids":["capareseau","edf-sei-capacites","rte-etf-s3renr"],"note":"EDF SEI states quarterly and RTE reports are annual; Caparéseau only says 'régulièrement' and shows 32 distinct per-substation dates.","gap":"not_published","gap_note":"No stated schedule for Caparéseau; dates observed are irregular."}]},"sources":[{"source_id":"capareseau","name":"Caparéseau – Capacités d'accueil en production du réseau (national CSV and regional JSON)","publisher":"RTE with the distribution network operators (Enedis, local distribution companies)","official":true,"landing_url":"https://www.capareseau.fr/","data_url":"https://www.capareseau.fr/medias/27F7C201-1CD6-C0F6-8293-A6E5539F6A1E","access":"direct_download","format":"CSV (UTF-8 BOM, semicolon, two header rows) and per-region JSON read by the viewer","license":"unknown","language":"fr","has_coordinates":true,"location_precision":"exact","publisher_type":"operator","adds":"Only national, per-substation hosting capacity for generation across RTE and distribution networks, with queue power and planned works.","first_seen_pass":1,"rank":1,"summary":"Per-substation generation hosting capacity for mainland France: reserved capacity left, queue power, works; national CSV without login.","coverage_note":"3,116 substations in 12 regions; current snapshot of 2026-11-10; no history; generation only.","data_date":"2026-11-10","caveats":["Indicative and non-binding.","No consumption-side capacity."],"coverage":{"geographic":"Mainland France, 12 regions: 3,116 substations (postes); Corsica and overseas are on the EDF SEI portal."},"fine_print":{"unit":{"value":"MW (stated on RTE annex tables, not on Caparéseau column labels)","quote":"Capacité réservée sur le poste (MW)","url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","attempts":[]},"inclusion_rule":{"value":"Generation connection possibilities on transmission and distribution networks","quote":"Il affiche les possibilités de raccordement aux réseaux de transport et de distribution des installations de production d'électricité.","url":"https://www.capareseau.fr/mentions-legales","attempts":[]},"reference_date":{"value":"Per-substation update date shown as 'mis à jour le'; observed 2026-02-04 to 2026-11-10 in the region JSON","quote":"mis à jour le [[ poste.updated ]]","url":"https://www.capareseau.fr/region/27","attempts":[]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","note":"RTE report says the scheme capacities 'sont mises à jour régulièrement sur le site internet Caparéseau.fr'; no schedule."},{"url":"https://www.capareseau.fr/region/27","note":"Region JSON shows 32 distinct update dates (1,989 substations dated June 2026, 14 dated 2026-11-10); no fixed cycle."}]},"exclusions":{"value":"Indicative only; production only; storage and consumption not covered","quote":"Les capacités d'accueil publiées sont mises à disposition à titre indicatif par les gestionnaires de réseaux. Elles ne sont pas engageantes pour les gestionnaires et devront être confirmées lors du traitement de la demande de raccordement d'un producteur.","url":"https://www.capareseau.fr/mentions-legales","attempts":[]}},"key_fields":[{"field":"Code / Nom / S3REnR","meaning":"Substation code, name and regional scheme"},{"field":"INFO_CR","meaning":"Capacité réservée aux EnR au titre du S3REnR"},{"field":"INFO_NA","meaning":"Capacité d'accueil réservée au titre du S3REnR qui reste à affecter"},{"field":"RTE_CDR","meaning":"Capacité réservée disponible vue du réseau public de transport"},{"field":"GRD1_CDR","meaning":"Capacité restante sans travaux sur le poste source, vue du distributeur (GRD2_CDR and GRDHTB_CDR for other operators)"},{"field":"INFO_ESS3R / INFO_FAS3R","meaning":"Power of projects in service / in the S3REnR queue"},{"field":"TXA / INFO_TX","meaning":"Allocation rate and fill rate of the reserved capacity"},{"field":"INFO_QP","meaning":"Updated unit quote-part"},{"field":"GRD1_PTRE / GRD1_TRE","meaning":"Cumulated power and number of existing transformers (installed, not available, capacity)"},{"field":"RTE_TVX / GRD1_TVX","meaning":"Works planned to raise the reserved capacity"}],"how_to_use":{"example_request":"curl -sL \"https://www.capareseau.fr/medias/27F7C201-1CD6-C0F6-8293-A6E5539F6A1E\" -o capareseau_france.csv   # skip row 2 (column labels); region JSON: /medias/<posts_key> read from /region/<code>","example_result":"3,116 rows. Row: Code 936AA, Nom INDRE SUD, S3REnR CENTRE-VAL DE LOIRE, INFO_CR 57, INFO_NA 18.9, INFO_FAS3R 38.1, INFO_ESS3R 0, RTE_CDR 0, GRD1_CDR 0, TXA 0%, INFO_QP 70.49.","steps":["Download the national CSV linked as 'Télécharger les données sur la France entière' on any region page (no login; content-disposition backup_20261110_113147.csv).","Read with ';' separator; row 2 holds the French column labels, data start on row 3.","Use INFO_NA, RTE_CDR and GRD1_CDR for available generation capacity; INFO_FAS3R for queue power; INFO_ESS3R for connected power.","Get the per-substation update date from the region JSON (field 'updated', dd/mm/yyyy); the CSV has none.","Store the snapshot with its date yourself: the site keeps no history."],"reading_traps":["Capacity is S3REnR reserved capacity left, not the physical headroom of the grid.","INFO_NA, RTE_CDR and GRD1_CDR measure different things; a 0 can mean saturated, not reserved or not applicable.","GRD1_PTRE is installed transformer power, not available capacity.","580 of 3,116 substations have no distribution operator tagged in the JSON; 10 have empty values; 40 coordinate pairs fall outside Lambert-93 France.","Mainland only: Corsica and overseas are not in this file.","Values are indicative and non-binding for the operators."]},"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"content_type":"application/octet-stream","size_bytes":388512,"records_total":3116,"records_for_country":3116,"problems":["No documented API: the CSV and JSON links are generated by the pages.","Download id (/medias/27F7C201-…) is read from the page; its stability was not tested.","Legal notice states values are indicative and gives no open licence."]},"evidence":[{"claim":"Scope: generation connection possibilities","url":"https://www.capareseau.fr/mentions-legales","quote":"Il affiche les possibilités de raccordement aux réseaux de transport et de distribution des installations de production d'électricité."},{"claim":"Indicative and non-binding","url":"https://www.capareseau.fr/mentions-legales","quote":"Les capacités d'accueil publiées sont mises à disposition à titre indicatif par les gestionnaires de réseaux. Elles ne sont pas engageantes pour les gestionnaires et devront être confirmées lors du traitement de la demande de raccordement d'un producteur."},{"claim":"Publication duty on the common site","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf","quote":"Les GRD et RTE disposent d’un site internet commun (www.capareseau.fr) sur lequel les GRD publient les informations suivantes"}],"members":[],"members_summary":null},{"source_id":"edf-sei-capacites","name":"EDF SEI – Capacités d'accueil du réseau, Corse & Outre-Mer (open data portal)","publisher":"EDF Systèmes Énergétiques Insulaires","official":true,"landing_url":"https://www.data.gouv.fr/datasets/capacites-daccueil-du-reseau","data_url":"https://opendata.edf.fr/data-fair/api/v1/datasets/b93j4pbyzvjlyd7d85n1cmzp/lines","access":"api","format":"JSON/CSV via Data Fair API","license":"Licence Ouverte / Open Licence version 2.0","language":"fr","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Covers Corsica and the overseas departments, which Caparéseau does not.","first_seen_pass":1,"rank":2,"summary":"Corsica and overseas hosting capacity per substation, quarterly, open licence.","coverage_note":"101 rows; generation only.","data_date":"2026-11-10","caveats":["Dead export links on data.gouv.fr."],"coverage":{"geographic":"Corsica, Guadeloupe, Martinique, French Guiana, Réunion: 101 rows (one per substation)."},"fine_print":{"unit":{"value":"MW","quote":"Capacité d'accueil par poste source (en MW) pour le raccordement aux réseaux de transport (HTB) et de distribution (HTA) des installations de production d'électricité.","url":"https://www.data.gouv.fr/datasets/capacites-daccueil-du-reseau","attempts":[]},"inclusion_rule":{"value":"Generation connections on HTB and HTA/BT, per substation","quote":"Capacité d'accueil par poste pour le raccordement aux réseaux de transport (HTB) et de distribution (HTA/BT) des installations de production d'électricité.","url":"https://opendata.edf.fr/data-fair/api/v1/datasets/b93j4pbyzvjlyd7d85n1cmzp","attempts":[]},"reference_date":{"value":"date_de_la_mise_a_jour per row (example 2026-10-01); dataset updated 2026-11-10","quote":null,"url":"https://opendata.edf.fr/data-fair/api/v1/datasets/b93j4pbyzvjlyd7d85n1cmzp/lines?size=3","attempts":[]},"update_frequency":{"value":"quarterly","quote":null,"url":"https://opendata.edf.fr/data-fair/api/v1/datasets/b93j4pbyzvjlyd7d85n1cmzp","attempts":[]},"exclusions":{"value":"Connection offers suspended in saturated zones of the islands","quote":"Des offres de raccordement sont suspendues sur certaines zones, en raison de la saturation des capacités techniques du réseau.","url":"https://opendata.edf.fr/data-fair/api/v1/datasets/b93j4pbyzvjlyd7d85n1cmzp","attempts":[]}},"key_fields":[{"field":"poste / territoire","meaning":"Substation and territory"},{"field":"capacite_dinjection_sur_le_reseau_htb","meaning":"Availability text on the HTB network (e.g. 'Disponible')"},{"field":"capacite_reservee_s2renrs3renr / capacite_restante_s2renrs3renr","meaning":"Reserved and remaining S2REnR/S3REnR capacity"},{"field":"puissance_totale_en_file_dattente_hta","meaning":"HTA queue power"},{"field":"date_de_la_mise_a_jour","meaning":"Row update date"}],"how_to_use":{"example_request":"curl -sG \"https://opendata.edf.fr/data-fair/api/v1/datasets/b93j4pbyzvjlyd7d85n1cmzp/lines\" --data-urlencode 'size=3'","example_result":"Row: territoire Corse, poste Bastia, capacite_dinjection_sur_le_reseau_htb 'Disponible', puissance_totale_en_file_dattente_hta 0.099, capacite_restante_s2renrs3renr 0, quote_part 54.1, date_de_la_mise_a_jour 2026-10-01.","steps":["Query the Data Fair /lines endpoint with size and qs parameters.","Use capacite_restante_* for available capacity and puissance_totale_en_file_dattente_hta for the queue."],"reading_traps":["The data.gouv.fr entry still links to old opendata-corse-outremer.edf.fr export URLs that now redirect to the portal home page.","Some fields are text ('Disponible'), not numbers."]},"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"content_type":"application/json","size_bytes":null,"records_total":101,"records_for_country":101,"problems":["Old export URLs listed on data.gouv.fr redirect to a HTML home page."]},"evidence":[{"claim":"Scope","url":"https://opendata.edf.fr/data-fair/api/v1/datasets/b93j4pbyzvjlyd7d85n1cmzp","quote":"Capacité d'accueil par poste pour le raccordement aux réseaux de transport (HTB) et de distribution (HTA/BT) des installations de production d'électricité."}],"members":[],"members_summary":null},{"source_id":"rte-etf-s3renr","name":"RTE – États techniques et financiers des S3REnR (annual regional reports)","publisher":"RTE","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF (annex tables per substation)","license":"unknown","language":"fr","has_coordinates":false,"location_precision":"none","publisher_type":"operator","adds":"Gives annual 31 December per-substation reserved, assigned and residual capacity, the only history found for the figures.","first_seen_pass":1,"rank":3,"summary":"Annual per-substation reserved and residual capacity tables, the only history found.","coverage_note":"Hauts-de-France 2024 and 2025 opened; other regions listed.","data_date":"2025-12-31","caveats":["Rounding differs between years."],"coverage":{"geographic":"One report per region; Hauts-de-France 2024 and 2025 opened."},"fine_print":{"unit":{"value":"MW","quote":"Capacité réservée sur le poste (MW)","url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","attempts":[]},"inclusion_rule":{"value":"Reserved capacity of the S3REnR, excluding diffuse generation below the threshold and offshore tender wind","quote":"hors installations de production diffuse de puissance inférieure au seuil en vigueur au moment de leur entrée en file d’attente (0 kVA, 36 kVA ou 100 kVA), et hors appel d’offres éolien posé en mer.","url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","attempts":[]},"reference_date":{"value":"31 December of the report year","quote":"Tableau des capacités réservées au 31 décembre 2025","url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","attempts":[]},"update_frequency":{"value":"Annual (editions of 2025-07-03 for 2024 and 2026-04-30 for 2025 opened)","quote":null,"url":"https://assets.rte-france.com/prod/public/2025-07/2025-07-03-etat-technique-financier-hdf-2024_0.pdf","attempts":[]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","note":"Mutualised capacity only: sites outside the S3REnR perimeter are absent."}]}},"key_fields":[{"field":"Poste","meaning":"Substation"},{"field":"Capacité réservée sur le poste (MW)","meaning":"Reserved capacity"},{"field":"Capacité réservée affectée (MW)","meaning":"Capacity assigned to projects"},{"field":"Capacité réservée résiduelle (MW)","meaning":"Capacity left"}],"how_to_use":{"example_request":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf  (annex 5, pdftotext -layout)","example_result":"AVESNES-LE-COMTE at 31/12/2025: réservée 45.3, affectée 3.5, résiduelle 41.8 MW; at 31/12/2024 (2024 report): 46, 2, 44.","steps":["Download the regional report for each year.","Find 'Tableau des capacités réservées au 31 décembre AAAA' and extract the three columns with pdftotext -layout.","Join years by substation name; check renamed or new substations."],"reading_traps":["2024 tables are rounded to integers, 2025 tables carry one decimal.","Substation names are not codes.","Excludes diffuse generation under the threshold."]},"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"content_type":"application/pdf","size_bytes":899081,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Annex gives reserved capacity per substation","url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","quote":"Les capacités réservées de chacun des postes du S3REnR sont disponibles en annexe 5."}],"members":[{"name":"RTE ETF 2025 – Hauts-de-France","landing_url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","data_url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","access":"pdf","tested":true,"data_found":true,"note":"73 pages; annex 5 per-substation table at 31/12/2025."},{"name":"RTE ETF 2024 – Hauts-de-France","landing_url":"https://assets.rte-france.com/prod/public/2025-07/2025-07-03-etat-technique-financier-hdf-2024_0.pdf","data_url":"https://assets.rte-france.com/prod/public/2025-07/2025-07-03-etat-technique-financier-hdf-2024_0.pdf","access":"pdf","tested":true,"data_found":true,"note":"Table at 31/12/2024 with integer MW."},{"name":"RTE ETF 2025 – Occitanie","landing_url":"https://assets.rte-france.com/prod/public/2026-05/2026-05-20-etats-techniques-financiers-2025-s3renr-occitanie.pdf","data_url":null,"access":"pdf","tested":false,"data_found":null,"note":"Listed by search; not opened."},{"name":"RTE ETF 2025 – Grand Est","landing_url":"https://assets.rte-france.com/prod/public/2026-05/2026-05-20-etat-technique-financier-grand-est.pdf","data_url":null,"access":"pdf","tested":false,"data_found":null,"note":"Listed by search; not opened."},{"name":"RTE ETF 2025 – Auvergne-Rhône-Alpes","landing_url":"https://assets.rte-france.com/prod/public/2026-06/2026-06-17-etat-technique-financier-aura-2025.pdf","data_url":null,"access":"pdf","tested":false,"data_found":null,"note":"Listed by search; not opened."}],"members_summary":{"total":null,"listed":5,"tested":2,"data_found":2,"scope_note":"One report per region and year expected (12 mainland regions); two Hauts-de-France reports were opened and three others only appeared in search results.","pattern":null},"member_scope":{"total":null,"note":"One report per region and year expected (12 mainland regions); two Hauts-de-France reports were opened and three others only appeared in search results."}},{"source_id":"cartostock-rte","name":"RTE Cartostock – Capacités de raccordement des batteries","publisher":"RTE (Analyses et données)","official":true,"landing_url":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","data_url":"https://cartostock.cloud-rte-france.com/","access":"web_viewer_only","format":"Interactive web map (iframe)","license":"unknown","language":"fr","has_coordinates":null,"location_precision":null,"publisher_type":"operator","adds":"RTE's only published connection-capacity map beyond generation; it covers batteries (storage), not consumption sites.","first_seen_pass":1,"rank":4,"summary":"RTE map of battery connection capacity; viewer only.","coverage_note":"Storage on the transmission network.","data_date":null,"caveats":["Not machine-readable."],"coverage":{"geographic":"Transmission network substations (storage connection)."},"fine_print":{"unit":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://cartostock.cloud-rte-france.com/","note":"Viewer is a script-driven app; no unit read."},{"url":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","note":"Page text lists 'Battery connection capacities' without unit."}]},"inclusion_rule":{"value":"Battery connection capacities on the transmission network","quote":"Battery connection capacities","url":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","attempts":[]},"reference_date":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","note":"No date on the page."},{"url":"https://cartostock.cloud-rte-france.com/","note":"Landing page has no date."}]},"update_frequency":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","note":"No schedule stated."}]},"exclusions":{"value":null,"quote":null,"url":null,"attempts":[{"url":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","note":"Storage only according to the page title."}]}},"key_fields":[],"how_to_use":{"example_request":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","example_result":"Not read: the map is rendered by a script and no data endpoint was found in the bundle.","steps":["Open the viewer in a browser."],"reading_traps":["Storage connection, not generation or demand capacity."]},"test":{"tested_on":"2026-11-25","method":"page_only","http_status":200,"content_type":"text/html; charset=utf-8","size_bytes":806,"records_total":null,"records_for_country":null,"problems":["No data file or API found; viewer only."]},"evidence":[{"claim":"Page lists the map","url":"https://analysesetdonnees.rte-france.com/en/grid/cartostock","quote":"Battery connection capacities"}],"members":[],"members_summary":null}],"sector":{"regulator":{"name":"Commission de régulation de l'énergie (CRE)","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf"},"operators":{"structure":"many","note":"RTE, Enedis and several local distribution companies (Strasbourg Électricité Réseaux, GEREDIS, SRD, SICAE-Oise, réséda, Synelva) appear in Caparéseau.","census_url":null},"publication_obligation":{"exists":"yes","norm":"CRE-approved procedure of 28/07/2026 (annex to deliberation 2026-173), section 'Informations publiées sur Internet'","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf","what_must_be_published":"Per substation: reserved capacity, queue and in-service power, residual capacity without works, non-assigned reserved capacity.","frequency":"Operators exchange queue data at least every three months; no public update schedule"},"consolidated_republication":{"found":"yes","note":"Caparéseau is the common site of RTE and the distributors for generation capacity.","checked_pages":[{"organization":"RTE / distributors","url":"https://www.capareseau.fr/","saw":"Viewer with region pages and a national CSV download."},{"organization":"RTE","url":"https://www.services-rte.com/fr/decouvrez-nos-offres-de-services/consulter-les-capacites-d-accueil-du-reseau-capareseau.html","saw":"Service page describing Caparéseau and the Enedis saturated-zones map (production only, data of April 2026)."}]}},"national_registry":{"exists":"partial","note":"Caparéseau is the common national publication but covers generation only and mainland France; no demand-side equivalent was found.","checked_pages":[{"organization":"RTE / distributors","url":"https://www.capareseau.fr/","saw":"Generation hosting capacity per substation."},{"organization":"CRE","url":"https://www.cre.fr/fileadmin/Documents/Deliberations/2026/260728_2026-173_Procedure_de_raccordement_RTE_annexe.pdf","saw":"Procedure obliging publication on the common site."},{"organization":"RTE services","url":"https://www.services-rte.com/fr/decouvrez-nos-offres-de-services/consulter-les-capacites-d-accueil-du-reseau-capareseau.html","saw":"Enedis zone map 'exclusivement les raccordements de projets de production HTA/BT'."},{"organization":"EDF SEI","url":"https://www.data.gouv.fr/datasets/capacites-daccueil-du-reseau","saw":"Corsica and overseas capacity dataset."},{"organization":"RTE data API","url":"https://data.rte-france.com/catalog","saw":"Catalogue behind an account; categories Production, Consommation, Marché, Echanges; no capacity API visible."}]},"if_unstructured":{"summary":"History must be rebuilt from annual RTE reports; demand-side capacity was not found in any file.","recipe":["Open the regional report of each year and run pdftotext -layout.","Locate the annex table 'Tableau des capacités réservées au 31 décembre AAAA'.","Extract Poste and the three MW columns; join years by substation name.","Note that 2024 values are integers and 2025 values have one decimal."],"location_method":"Use Caparéseau coordinates (Lambert-93, 3,076 valid) joined by substation code or name.","cross_with":"Enedis and RTE queue aggregates (see the connection-queue case) and S3REnR scheme documents.","where_published":[{"name":"RTE états techniques et financiers (assets.rte-france.com)","url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","what":"Annual regional report with per-substation reserved, assigned and residual capacity at 31 December.","how_to_search_inside":"Find 'Tableau des capacités réservées au 31 décembre' in the annexes and extract the table.","example_document":{"url":"https://assets.rte-france.com/prod/public/2026-04/2026-04-30-etat-technique-financier-hdf-2025.pdf","what_it_gives":"Annex 5, 'Tableau des capacités réservées au 31 décembre 2025': 'AVESNES-LE-COMTE 45.3 3.5 41.8' (réservée, affectée, résiduelle in MW)."}}]},"related_not_answering":[{"name":"Enedis/RTE map of saturated zones (HTA/BT)","url":"https://www.services-rte.com/fr/decouvrez-nos-offres-de-services/consulter-les-capacites-d-accueil-du-reseau-capareseau.html","why":"Classifies supply zones as saturated or not; it gives no MW per substation and is production-only."},{"name":"Loiret DDT extract of RTE capacity (2023)","url":"https://www.data.gouv.fr/datasets/capacite-dacceuil-du-reseau-electrique","why":"One-off cartographic extract of April 2023 that points to Caparéseau for current data."},{"name":"ODRE – Contraintes résiduelles prospectives sur le RPT","url":"https://odre.opendatasoft.com/api/explore/v2.1/catalog/datasets/contraintes-region","why":"Forecast transit constraints per region, not connection capacity per substation."}],"open_questions":["Whether RTE publishes per-substation capacity for consumption sites other than the battery map cannot be answered from the pages read; RTE would have to confirm.","Which date applies to the CSV rows (the file name carries 20261110, the region JSON carries per-substation dates) needs operator confirmation."],"history":[{"pass":1,"date":"2026-11-25","role":"research","model":"claude-sonnet-5-5","rules_version":"2026-11-25-fr-red-y-tramitacion","note":"First pass: Caparéseau CSV and JSON downloaded and compared with RTE and EDF files; demand side and history only partly covered.","headline":{"official_data":"partial","non_official_data":"none_found","national_registry":"partial"},"sources":{"total":4,"new":4,"dropped":0},"negatives":{},"effort":{"pages":50,"minutes":32}}],"local_terms":[{"term":"capacité d'accueil","language":"fr","meaning":"Hosting capacity; the term used by Caparéseau and RTE for connection capacity."},{"term":"poste source / poste de transformation","language":"fr","meaning":"Substation HTB/HTA that connects the distribution network to transmission."},{"term":"S3REnR","language":"fr","meaning":"Regional scheme for connecting renewable energy; defines the reserved capacity per substation."},{"term":"capacité réservée / capacité restante","language":"fr","meaning":"Capacity reserved by the scheme and the part still unassigned."},{"term":"file d'attente (FA)","language":"fr","meaning":"Queue of connection requests counted against the reserved capacity."},{"term":"quote-part","language":"fr","meaning":"Unit contribution (k€/MW) paid by generators to the scheme."},{"term":"état technique et financier (ETF)","language":"fr","meaning":"Annual report per S3REnR with per-substation tables."},{"term":"soutirage","language":"fr","meaning":"Withdrawal from the grid, the demand-side counterpart of injection."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":32,"pages_opened":50,"passes":[{"pass":1,"date":"2026-11-25","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/fr/grid-hosting-capacity.json","detail_url":"https://georutter.org/v1/fr/grid-hosting-capacity/detail.json","html_url":"https://georutter.org/fr/grid-hosting-capacity/","country_url":"https://georutter.org/v1/countries/fr.json"}