{"schema_version":"1.0","country":"fr","country_name":"France","topic":"solar-pv-plants-in-permitting","question":"Where can I get a list of solar PV projects currently in permitting in France, with location, capacity (MW), developer, permitting stage and date?","territory":"fr","territory_level":"country","parent_url":null,"published_on":"2026-11-26","research_reviewed_on":"2026-11-25","access_checked_on":"2026-11-25","answer":{"official_data":"partial","non_official_data":"none_found","summary":"No national list gives location, MW, developer, stage and date together. The best official source is the State portal Projets-Environnement (open API, newest record 2026-11-24): about 1,182 PV-related file records, 826 with geometry, with procedure type and links to study PDFs, but the developer field is empty and capacity is only in text. Developer and stage dates must be read in the PDFs (study cover page, MRAe opinion, prefectoral decision). Departmental layers (Hautes-Pyrénées) and DGEC auction lists cover subsets.","main_caveats":["Projets-Environnement indexes documents, not permits: dc_date is the portal publication date and one project can be several records.","Maître d'ouvrage is empty for all 1,182 PV records; capacity is free text and may be MWc or connection MW.","Stage must be separated: impact-assessment opinion, permis de construire, works and auction award are different events in different documents.","Rooftop and carport PV and projects below the assessment threshold are not in the portal; no national list covers them."],"confidence":"medium","confidence_reason":"Portal fields and counts were tested on 2026-11-25 and one project was followed to its PDF; no national list exists as far as checked, but prefectures and MRAe sites were only sampled.","attributes":[{"attribute":"location","covered":"partial","source_ids":["pe-diffusion","ddt-pv-layers"],"note":"Point or polygon for 826 of 1,182 PV records on the national portal; a project may have several records; DDT layer gives surfaces for one department.","gap":"not_published","gap_note":"No geometry in 356 PV records; DGEC list only gives the department."},{"attribute":"capacity_mw","covered":"partial","source_ids":["pe-diffusion","ddt-pv-layers","dgec-ao-pv-sol-laureats"],"note":"MWc only in free text (about 455 PV records); numeric puissance only for Hautes-Pyrénées; MWc for auction winners.","gap":"not_published","gap_note":"No structured capacity field nationally; no source separates MWc from connection MW."},{"attribute":"developer","covered":"partial","source_ids":["pe-diffusion","dgec-ao-pv-sol-laureats"],"note":"Maître d'ouvrage field is empty in all PV records; names appear on study cover pages and in auction lists.","gap":"not_published","gap_note":"Developer is only in the PDFs (e.g. CAS Vallée de l'Énergie Sud Berry / VALECO) or as an SPV name in auction lists."},{"attribute":"permitting_stage","covered":"partial","source_ids":["pe-diffusion","ddt-pv-layers","dgec-ao-pv-sol-laureats"],"note":"Procedure type per record (870 permis de construire); decision link in 120; status only for 26 Hautes-Pyrénées projects.","gap":"not_published","gap_note":"No national current-stage field; refusal or withdrawal is visible only in some departments."},{"attribute":"stage_date","covered":"partial","source_ids":["pe-diffusion"],"note":"Prefecture decision date in 169 PV records; dc_date is only the portal date; MRAe opinion date is on each opinion's cover page.","gap":"not_published","gap_note":"Filing, opinion and permit dates are inside PDFs; the structured date is the portal publication date."}]},"sources":[{"source_id":"pe-diffusion","name":"Projets-Environnement – diffusion (portail de l'évaluation environnementale)","publisher":"Projets-environnement.gouv.fr (State portal for environmental assessment)","official":true,"landing_url":"https://www.projets-environnement.gouv.fr/pages/home/","data_url":"https://www.projets-environnement.gouv.fr/api/explore/v2.1/catalog/datasets/projets-environnement-diffusion/exports/json","access":"api","format":"JSON/CSV via Opendatasoft Explore API v2.1 (records and exports)","license":"Licence Ouverte (Etalab)","language":"fr","has_coordinates":true,"location_precision":"exact","summary":"State portal indexing project files with study PDFs: location and procedure type are structured; developer, capacity and stage dates are not and require the linked PDFs.","coverage_note":"National, State-authorised procedures only; about 1,182 PV-related records (826 with geometry); one project may appear in several records.","data_date":"2026-11-25","caveats":["Maître d'ouvrage field empty for all PV records.","Capacity only in free text; dc_date is the portal date."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":["Developer (maîtrise d'ouvrage) field empty for every PV record; capacity only in free text.","Catalogue 'modified' date (2018-03-22) does not reflect the daily content."]},"example":{"example_request":"curl -sG \"https://www.projets-environnement.gouv.fr/api/explore/v2.1/catalog/datasets/projets-environnement-diffusion/records\" --data-urlencode 'limit=3' --data-urlencode 'where=search(dc_title,\"photovoltaïque\")' --data-urlencode 'order_by=dc_date desc'","example_result":"total_count 729 (title search). First record: recordsid 2026N29105, dc_type [\"Permis de construire\"], dc_date 2026-11-24T10:52:14+00:00, title \"…centrale photovoltaïque d'une puissance de 139 MWc…\", geo_point_2d lon 1.602022 lat 46.597321."},"members_summary":null},{"source_id":"ddt-pv-layers","name":"Departmental PV project layers (sample: DDT Hautes-Pyrénées, 'Assiette')","publisher":"DDT Hautes-Pyrénées via Géo-IDE / data.gouv.fr","official":true,"landing_url":"https://www.data.gouv.fr/datasets/projets-dinstallations-photovoltaiques-dans-les-hautes-pyrenees-assiette-1","data_url":"https://ogc.geo-ide.developpement-durable.gouv.fr/wxs?map=/opt/data/stack/mapfiles/1.4/org_38072/17f8f8d7-eb56-43e0-bc87-01efea9f313c.internet.map&SERVICE=WFS&REQUEST=GetCapabilities","access":"api","format":"WFS (GML), Shapefile","license":"Licence Ouverte v2.0","language":"fr","has_coordinates":true,"location_precision":"exact","summary":"Department layer with a status per PV project above 1 MW.","coverage_note":"Hautes-Pyrénées only.","data_date":"2026-03","caveats":["No developer or date field."],"test":{"tested_on":"2026-11-25","method":"api_query","http_status":200,"problems":["WFS 2.0.0 with GeoJSON output returns HTTP 500 (the backend answers 400); GML 1.1.0 works."]},"example":null,"members_summary":{"total":null,"listed":1,"tested":1,"data_found":1,"scope_note":"Only one departmental PV layer turned up in two data.gouv.fr searches; other DDT/DREAL layers on Géo-IDE were not enumerated.","pattern":null}},{"source_id":"dgec-ao-pv-sol-laureats","name":"DGEC list of laureates – PPE2 'Centrales au sol' tender, round 5","publisher":"Direction générale de l'énergie et du climat (published on ecologie.gouv.fr)","official":true,"landing_url":"https://www.ecologie.gouv.fr/sites/default/files/documents/DGEC%20laur%C3%A9ats%20AO%20PPE2%20PV%20sol%205P.pdf","data_url":"https://www.ecologie.gouv.fr/sites/default/files/documents/DGEC%20laur%C3%A9ats%20AO%20PPE2%20PV%20sol%205P.pdf","access":"pdf","format":"PDF table (5 pages)","license":"unknown","language":"fr","has_coordinates":false,"location_precision":"none","summary":"Awarded projects of one tender round with candidate, MWc and department.","coverage_note":"Round 5 only; department-level location.","data_date":"2024-02","caveats":[],"test":{"tested_on":"2026-11-25","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":null}],"other_sources_count":0,"if_unstructured":{"summary":"Developer, capacity and stage dates are in documents: the study cover page, the MRAe opinion and the prefectoral decision, all linked from Projets-Environnement."},"local_terms":[{"term":"centrale photovoltaïque au sol","language":"fr","meaning":"Ground-mounted PV plant; the usual title wording in permit files."},{"term":"permis de construire","language":"fr","meaning":"Building permit; the procedure under which most PV files appear in Projets-Environnement."},{"term":"étude d'impact / résumé non technique","language":"fr","meaning":"Impact study and its summary; the PDFs whose cover page names the maître d'ouvrage."},{"term":"avis de la MRAe","language":"fr","meaning":"Regional environmental authority opinion; its cover page gives applicant, date and procedure."},{"term":"participation du public par voie électronique (PPVE)","language":"fr","meaning":"Online public consultation run by the prefecture before the permit."},{"term":"MWc / puissance crête","language":"fr","meaning":"Peak DC capacity, different from the MW grid-connection capacity."},{"term":"lauréats appel d'offres PPE2 PV sol","language":"fr","meaning":"Winners of the multi-annual energy programme tender for ground PV."}],"provenance":{"pass_count":1,"models":["claude-sonnet-5-5"],"minutes_estimate":32,"pages_opened":50,"passes":[{"pass":1,"date":"2026-11-25","model":"claude-sonnet-5-5"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/fr/solar-pv-plants-in-permitting.json","detail_url":"https://georutter.org/v1/fr/solar-pv-plants-in-permitting/detail.json","html_url":"https://georutter.org/fr/solar-pv-plants-in-permitting/","country_url":"https://georutter.org/v1/countries/fr.json"}
