{"schema_version":"1.0","country":"gb","country_name":"United Kingdom","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in the United Kingdom, with location, power (MW), developer, permitting stage and date?","territory":"gb","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"The UK REPD publishes a quarterly list with battery and stand-alone storage filters, planning milestones and project details for all four nations. It is a snapshot above 150 kW, not a complete live register. Check each application with its planning authority; the Northern Ireland portal excludes some records online.","main_caveats":["REPD can lag: Belfast LA04/2020/1724/F is listed as submitted despite a 2023 council report marking it invalid.","The ECU screening outcome is not planning consent; the Netherton application dates require reconciliation.","The Northern Ireland register is not fully online, and Mid Ulster has a separate portal.","Connection and planning permission are separate milestones.","In October 2026, 32 of 271 rows tagged stand-alone and Application Submitted lacked MW. This is a snapshot count, and the stand-alone classification needs checking."],"confidence":"medium","confidence_reason":"The extract was downloaded and Scottish, Welsh and Northern Irish case documents checked; completeness and several sources remain unverified.","attributes":[{"attribute":"location","covered":"partial","source_ids":["repd"],"note":"REPD has address and coordinates; Netherton coordinate checked.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"power_mw","covered":"partial","source_ids":["repd"],"note":"REPD Installed Capacity (MWelec); Netherton is 400.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"developer","covered":"partial","source_ids":["repd"],"note":"REPD names operator or applicant; actual legal applicant can differ.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["repd"],"note":"REPD has Development Status and planning reference.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"stage_date","covered":"partial","source_ids":["repd"],"note":"Use the date for each milestone. The REPD date and the later Netherton letter do not establish the current consent stage.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."}]},"sources":[{"source_id":"repd","name":"Renewable Energy Planning Database quarterly extract","publisher":"Department for Energy Security and Net Zero","official":true,"landing_url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract","data_url":"https://assets.publishing.service.gov.uk/media/6af42ff0a4004bdbe54e54a5/REPD_Publication_Q3_2026.csv","access":"direct_download","format":"CSV","license":"UK Open Government Licence","language":"en","has_coordinates":true,"location_precision":"address","summary":"Quarterly downloadable project records, filterable by battery, storage type and planning status.","coverage_note":"UK records across all four nations; not a complete current register and subject to a 150 kW threshold.","data_date":"October 2026","caveats":["Check current status with the competent planning authority."],"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"problems":["UTF-8 decoding failed; Windows-1252 worked."]},"example":null,"members_summary":null},{"source_id":"authority_documents","name":"Planning authority case documents: sample","publisher":"Planning authorities","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF","license":"unknown","language":"en","has_coordinates":false,"location_precision":"address","summary":"Original planning case documents can confirm project details and expose stale snapshot statuses.","coverage_note":"Four case examples across the nations; find the relevant planning authority for other projects.","data_date":null,"caveats":["Examples are historical and do not establish current decisions."],"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"problems":[]},"example":null,"members_summary":{"total":null,"listed":4,"tested":4,"data_found":4,"scope_note":"Four documents chosen to compare one REPD case in each UK nation; the number of competent planning authorities is not established.","pattern":null}}],"other_sources_count":0,"if_unstructured":{"summary":"Planning case documents can resolve omissions and confirm a current decision; the sample below was read, but no systematic UK-wide compilation was tested."},"local_terms":[],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":7,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/gb/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/gb/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/gb/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/gb.json"}