{"schema_version":"1.0","country":"gb","country_name":"United Kingdom","topic":"battery-storage-in-permitting","question":"Where can I get a list of stand-alone battery storage (BESS) projects currently in permitting in the United Kingdom, with location, power (MW), developer, permitting stage and date?","territory":"gb","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"The UK REPD publishes a quarterly list with battery and stand-alone storage filters, planning milestones and project details for all four nations. It is a snapshot above 150 kW, not a complete live register. Check each application with its planning authority; the Northern Ireland portal excludes some records online.","main_caveats":["REPD can lag: Belfast LA04/2020/1724/F is listed as submitted despite a 2023 council report marking it invalid.","The ECU screening outcome is not planning consent; the Netherton application dates require reconciliation.","The Northern Ireland register is not fully online, and Mid Ulster has a separate portal.","Connection and planning permission are separate milestones.","In October 2026, 32 of 271 rows tagged stand-alone and Application Submitted lacked MW. This is a snapshot count, and the stand-alone classification needs checking."],"confidence":"medium","confidence_reason":"The extract was downloaded and Scottish, Welsh and Northern Irish case documents checked; completeness and several sources remain unverified.","attributes":[{"attribute":"location","covered":"partial","source_ids":["repd"],"note":"REPD has address and coordinates; Netherton coordinate checked.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"power_mw","covered":"partial","source_ids":["repd"],"note":"REPD Installed Capacity (MWelec); Netherton is 400.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"developer","covered":"partial","source_ids":["repd"],"note":"REPD names operator or applicant; actual legal applicant can differ.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"permitting_stage","covered":"partial","source_ids":["repd"],"note":"REPD has Development Status and planning reference.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."},{"attribute":"stage_date","covered":"partial","source_ids":["repd"],"note":"Use the date for each milestone. The REPD date and the later Netherton letter do not establish the current consent stage.","gap":"not_checked","gap_note":"Coverage, completeness and freshness across responsible authorities have not been fully checked."}]},"sources":[{"source_id":"repd","name":"Renewable Energy Planning Database quarterly extract","publisher":"Department for Energy Security and Net Zero","official":true,"landing_url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract","data_url":"https://assets.publishing.service.gov.uk/media/6af42ff0a4004bdbe54e54a5/REPD_Publication_Q3_2026.csv","access":"direct_download","format":"CSV","license":"UK Open Government Licence","language":"en","has_coordinates":true,"location_precision":"address","publisher_type":"national_government","adds":"UK-wide battery records and planning milestones in a downloadable file.","first_seen_pass":1,"rank":1,"summary":"Quarterly downloadable project records, filterable by battery, storage type and planning status.","coverage_note":"UK records across all four nations; not a complete current register and subject to a 150 kW threshold.","data_date":"October 2026","caveats":["Check current status with the competent planning authority."],"coverage":{"geographic":"United Kingdom: England, Scotland, Wales and Northern Ireland; omissions and size thresholds apply."},"fine_print":{"unit":{"value":"Installed capacity in MWelec","quote":null,"url":"https://assets.publishing.service.gov.uk/media/6af42ff0a4004bdbe54e54a5/REPD_Publication_Q3_2026.csv","attempts":[]},"inclusion_rule":{"value":"UK projects over 150 kW; before 2021 the threshold was 1 MW.","quote":"tracks the progress of UK renewable electricity projects over 150 kW","url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract","attempts":[]},"reference_date":{"value":"October 2026 quarterly publication; record-level dates differ.","quote":"Renewable Energy Planning Database (REPD): October 2026 (CSV)","url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract","attempts":[]},"update_frequency":{"value":"Quarterly","quote":"The database is updated during the month following the end of each quarter.","url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract","attempts":[]},"exclusions":{"value":"Projects below 150 kW and potentially incomplete or historic projects; omissions are possible.","quote":"projects below 1 MW (Megawatt) that were going through planning system before 2021 may not be represented","url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract","attempts":[]}},"key_fields":[{"meaning":"REPD record identifier"},{"meaning":"Battery is the technology filter"},{"meaning":"Stand-alone Storage excludes co-located storage"},{"meaning":"Electric power capacity"},{"meaning":"Operator or applicant, not necessarily the legal applicant"},{"meaning":"Current recorded stage"},{"meaning":"Submission date"},{"meaning":"Permission date"},{"meaning":"Construction date"},{"meaning":"Date the individual record was updated"},{"meaning":"Reference for checking the authority record"},{"meaning":"Coordinates; Netherton sample consistent with British National Grid"}],"how_to_use":{"example_request":"https://assets.publishing.service.gov.uk/media/6af42ff0a4004bdbe54e54a5/REPD_Publication_Q3_2026.csv","example_result":"Ref ID 19029 | Netherton, Langside Road - Battery Energy Storage System | Field Energy | Battery | Stand-alone Storage | 400 MWelec | Planning Application Submitted | 21/08/2025 | ECU00006137","steps":["Download the CSV and parse using Windows-1252: UTF-8 decoding failed in this test.","Start with Technology Type = Battery and Storage Type = Stand-alone Storage. Check the case for co-located generation.","For pending cases start with Planning Application Submitted and review Appeal Lodged separately. For the wider pre-operation scope retain Planning Permission Granted, Appeal Granted and Under Construction as separate stages. Trim and match labels case-insensitively; verify Revised cases against their current references.","Use the date column for the chosen milestone (submission, grant, appeal or start of construction). Verify current status with the competent authority using the planning reference."],"reading_traps":["The file is a quarterly snapshot, not a real-time register or proof of completeness.","Permission, start of construction and connection are different milestones.","Netherton screening opinion dated 9 May 2025 was Non-EIA, not permission; application letter is dated 18 September 2025 while REPD gives 21 August 2025. Verify the date with the authority.","Northern Ireland coordinates need a separate grid check; the Netherton sample alone does not validate all coordinates.","Of the 271 stand-alone records with Planning Application Submitted, 32 have no Installed Capacity (MWelec).","The Storage Type filter is the publisher’s classification, not proof that the site has no other technology: REPD 15823 names wind turbines and battery but is classified Stand-alone Storage. Check application documents.","Belfast LA04/2020/1724/F remains Application Submitted in the extract, but a 2023 council report calls it Application Invalid; a later application has a separate reference.","For Abergelli the council weekly list gives map reference 265242 201648, while the REPD row has 265117 201649; do not treat these as surveyed boundaries.","Four sample coordinates transform plausibly to the named areas using EPSG:27700, including Belfast, but no full-coordinate audit was carried out."]},"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"content_type":"text/csv","size_bytes":5219160,"records_total":14968,"records_for_country":14968,"problems":["UTF-8 decoding failed; Windows-1252 worked."]},"evidence":[{"claim":"Quarterly UK-wide planning dataset","url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract","quote":"tracks the progress of UK renewable electricity projects over 150 kW"}],"members":[],"members_summary":null},{"source_id":"authority_documents","name":"Planning authority case documents: sample","publisher":"Planning authorities","official":true,"landing_url":null,"data_url":null,"access":"pdf","format":"PDF","license":"unknown","language":"en","has_coordinates":false,"location_precision":"address","publisher_type":"regional_government","adds":"Original case histories and application documents for checking the REPD snapshot.","first_seen_pass":1,"rank":2,"summary":"Original planning case documents can confirm project details and expose stale snapshot statuses.","coverage_note":"Four case examples across the nations; find the relevant planning authority for other projects.","data_date":null,"caveats":["Examples are historical and do not establish current decisions."],"coverage":{"geographic":"Selected authorities in England, Scotland, Wales and Northern Ireland; this is a small sample, not a national collection."},"fine_print":{"unit":null,"inclusion_rule":null,"reference_date":null,"update_frequency":null,"exclusions":null},"key_fields":[],"how_to_use":{"example_request":"https://minutes.belfastcity.gov.uk/%28S%281w3lda453fhw0f55xyxindbs%29%29/documents/b33085/Items%205d%20and%205e%2017th-Jan-2023%2017.00%20Planning%20Committee.pdf?T=9, printed page 42","example_result":"Belfast: LA04/2020/1724/F — Decision: Application Invalid.","steps":["For the Belfast member open the committee document and find the application reference in the planning history.","Distinguish an officer recommendation from a final decision; consult current authority records."],"reading_traps":["Four case documents are not a representative sample and their historical status is not necessarily current."]},"test":{"tested_on":"2026-11-27","method":"page_only","http_status":200,"content_type":"application/pdf","size_bytes":null,"records_total":null,"records_for_country":null,"problems":[]},"evidence":[{"claim":"Belfast historic invalid application","url":"https://minutes.belfastcity.gov.uk/%28S%281w3lda453fhw0f55xyxindbs%29%29/documents/b33085/Items%205d%20and%205e%2017th-Jan-2023%2017.00%20Planning%20Committee.pdf?T=9","quote":"Decision: Application Invalid"}],"members":[{"name":"Scotland: Netherton","landing_url":"https://docs.planning.org.uk/20250919/168/T2TTI4CA2SP00/ficfn4krecqtt7i5.pdf","data_url":null,"access":"pdf","tested":true,"data_found":true,"note":"Applicant letter, 18 September 2025, up to 400 MW and site near Peterhead; applicant copy hosted outside government."},{"name":"Wales: Swansea","landing_url":"https://www.swansea.gov.uk/media/23633/Applications-for-week-ending-25-July-2025/pdf/hjApplications_for_week_ending_25_July_2025.pdf?m=1753872544877","data_url":null,"access":"pdf","tested":true,"data_found":true,"note":"Weekly planning list: 2025/1580/FUL, EDF Energy Renewables Limited, Being Considered as at the list date."},{"name":"Northern Ireland: Belfast","landing_url":"https://minutes.belfastcity.gov.uk/%28S%281w3lda453fhw0f55xyxindbs%29%29/documents/b33085/Items%205d%20and%205e%2017th-Jan-2023%2017.00%20Planning%20Committee.pdf?T=9","data_url":null,"access":"pdf","tested":true,"data_found":true,"note":"2023 report marks LA04/2020/1724/F invalid and discusses LA04/2021/2862/F separately."},{"name":"England: Basingstoke and Deane","landing_url":"https://democracy.basingstoke.gov.uk/documents/s27216/Applications.pdf","data_url":null,"access":"pdf","tested":true,"data_found":true,"note":"2022 report 21/02412/FUL describes site, applicant and registration; minutes defer the case."}],"members_summary":{"total":null,"listed":4,"tested":4,"data_found":4,"scope_note":"Four documents chosen to compare one REPD case in each UK nation; the number of competent planning authorities is not established.","pattern":null},"member_scope":{"total":null,"note":"Four documents chosen to compare one REPD case in each UK nation; the number of competent planning authorities is not established."}}],"sector":{"regulator":{"name":"Planning authorities and devolved administrations","url":"https://www.gov.uk/guidance/renewable-and-low-carbon-energy"},"operators":{"structure":"many","note":"Multiple local planning authorities and devolved administrations determine cases; Scottish Energy Consents handles qualifying Section 36 cases.","census_url":null},"publication_obligation":{"exists":"unknown"},"consolidated_republication":{"found":"partial","note":"DESNZ REPD compiles UK planning data above 150 kW, subject to gaps.","checked_pages":[{"url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract"}]}},"national_registry":{"exists":"partial","note":"REPD gathers a UK-wide snapshot, but has threshold and completeness limits.","checked_pages":[{"url":"https://www.gov.uk/government/publications/renewable-energy-planning-database-quarterly-extract"},{"url":"https://www.gov.scot/policies/energy-infrastructure/energy-consents/"},{"url":"https://www.nidirect.gov.uk/services/planning-portal"}]},"if_unstructured":{"summary":"Planning case documents can resolve omissions and confirm a current decision; the sample below was read, but no systematic UK-wide compilation was tested.","recipe":["Filter REPD to the relevant project and copy its planning reference.","For Netherton the application letter is text on page 1, stating the applicant, capacity, location and requested section 36 consent.","Check the case’s current decision and dates separately; the application letter is not an approval.","For the Belfast example search the council committee PDF for LA04/2020/1724/F and read its planning history on printed page 42; do not infer the decision of the separate later application from its recommendation."],"location_method":"Netherton letter states National Grid Reference NK059448; its plan supplies the boundary. This example does not establish position methods for every authority.","cross_with":["REPD reference and Scottish Government case record."],"where_published":[{"name":"Scottish Energy Consents Unit and application documents","url":"https://www.energyconsents.scot/ApplicationDetails.aspx?cr=ECU00006137","example_document":{}},{"name":"Belfast City Council planning committee documents","url":"https://minutes.belfastcity.gov.uk/%28S%281w3lda453fhw0f55xyxindbs%29%29/documents/b33085/Items%205d%20and%205e%2017th-Jan-2023%2017.00%20Planning%20Committee.pdf?T=9","example_document":{}}]},"related_not_answering":[{"name":"RenewableNI storage totals by planning authority and status","url":"https://www.uregni.gov.uk/files/uregni/documents/2025-01/RNI%20response%20to%20SONI%20TDPNI%202023-2032%20final.pdf","why":"Aggregate capacities and project counts, not the requested project-level list."}],"open_questions":["Why does the REPD list 21 August 2025 for Netherton’s application while the section 36 application letter is dated 18 September 2025? Confirmation requires the determining authority."],"history":[{"pass":1,"date":"2026-11-27","role":"research","model":"GPT-6","rules_version":"6.15","note":"Initial REPD test; jurisdictional checks and other requirements remain incomplete.","headline":{"official_data":"partial","non_official_data":"not_tested","national_registry":"partial"},"sources":{"total":2,"new":2,"dropped":0},"negatives":{},"effort":{"pages":null,"minutes":7}}],"local_terms":[],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":7,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/gb/battery-storage-in-permitting.json","detail_url":"https://georutter.org/v1/gb/battery-storage-in-permitting/detail.json","html_url":"https://georutter.org/gb/battery-storage-in-permitting/","country_url":"https://georutter.org/v1/countries/gb.json"}