{"schema_version":"1.0","country":"gb","country_name":"United Kingdom","topic":"grid-connection-queue","question":"Where can I get the list of grid connection requests in the United Kingdom, with project, technology, capacity (MW), connection node, status and date?","territory":"gb","territory_level":"country","parent_url":null,"published_on":"2026-11-27","research_reviewed_on":"2026-11-27","access_checked_on":"2026-11-27","answer":{"official_data":"partial","non_official_data":"not_tested","summary":"NESO publishes GB TEC contracts and a separate Scottish embedded register; SONI publishes Northern Ireland connection agreements and effective applications. Distribution operators publish their own registers. These datasets mix connected and future projects and do not provide a complete list of all UK applications.","main_caveats":["TEC is a contract register, not all requests; NESO reports no public demand connection register.","An empty Gate field is not Gate 1 or Gate 2: NESO populates it after an agreement is countersigned.","Effective capacity dates are not application dates; connected MW and cumulative stage MW are different.","NESO warns repeated capacity across stages or technologies can cause duplicates.","Distribution coverage varies: Northern Powergrid ECR omits unaccepted enquiries; SONI omits cluster agreements."],"confidence":"medium","confidence_reason":"Both NESO CSVs and SONI workbook were downloaded; a distribution CSV is blocked and full UK coverage remains unchecked.","attributes":[{"attribute":"project","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"Names and project IDs are available in tested NESO and SONI records.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"technology","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO has Plant Type; SONI groups rows in technology sections.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"capacity_mw","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO connected and cumulative TEC; SONI export/import differ.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"connection_node","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO connection site and SONI point coordinates are available.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"status","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"Status and agreement stage exist; Gate blank is unspecified.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"event_date","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO MW Effective From is not the request date; SONI has connection dates.","gap":"not_checked","gap_note":"The tested NESO files give capacity-effective dates, SONI reports connection dates or status, and Northern Powergrid reports offer acceptance. Application submission dates were not established across these registers."},{"attribute":"latest_data","covered":"partial","source_ids":["tec","embedded","soni"],"note":"NESO files dated 26 November 2026; SONI latest linked 17 August 2026.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"historical_series","covered":"partial","source_ids":["tec","embedded","soni"],"note":"NESO cites FOI archives for 2014–2025; SONI links previous editions.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."},{"attribute":"update_frequency","covered":"partial","source_ids":["tec","embedded","soni","distribution"],"note":"NESO states twice weekly, SSEN monthly; SONI schedule not established.","gap":"not_checked","gap_note":"UK-wide coverage and missing distribution, request-date or history details remain to be checked."}]},"sources":[{"source_id":"tec","name":"NESO Transmission Entry Capacity register","publisher":"National Energy System Operator","official":true,"landing_url":"https://www.neso.energy/data-portal/transmission-entry-capacity-tec-register","data_url":"https://api.neso.energy/dataset/cbd45e54-e6e2-4a38-99f1-8de6fd96d7c1/resource/17becbab-e3e8-473f-b303-3806f43a6a10/download/tec-register-26-november-2026.csv","access":"direct_download","format":"CSV","license":"NESO Open Data Licence","language":"en","has_coordinates":false,"location_precision":"none","summary":"TEC agreements, including existing and future projects.","coverage_note":"Great Britain; projects holding TEC agreements for existing or future connections, including embedded projects.","data_date":"26 November 2026","caveats":["Not a complete UK-wide list of all applications."],"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"embedded","name":"NESO Embedded Register","publisher":"National Energy System Operator","official":true,"landing_url":"https://www.neso.energy/data-portal/embedded-register","data_url":"https://api.neso.energy/dataset/4b0e109c-aa23-45ac-86c1-0bda557d1aab/resource/68b6f3a1-e1bf-403b-9062-0269fc758d77/download/embedded-register-26-november-2026.csv","access":"direct_download","format":"CSV","license":"NESO Open Data Licence","language":"en","has_coordinates":false,"location_precision":"none","summary":"NESO Scottish embedded generation.","coverage_note":"Scotland: embedded generation connected or contracted to connect.","data_date":"26 November 2026","caveats":["Not a complete UK-wide list of all applications."],"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"soni","name":"Connections Register","publisher":"SONI","official":true,"landing_url":"https://www.soni.ltd.uk/industry/connections-and-applications","data_url":"https://cms.soni.ltd.uk//sites/default/files/2026-08/20260817%20Connections%20Register%2017%20Aug%202026%20%28Excel%29.xlsx","access":"direct_download","format":"XLSX","license":"unknown","language":"en","has_coordinates":true,"location_precision":"exact","summary":"Northern Ireland applications and agreements.","coverage_note":"Northern Ireland transmission and selected distribution TUoS cases. SONI excludes connections below 5 MW and cluster substation agreements.","data_date":"17 August 2026","caveats":["Not a complete UK-wide list of all applications."],"test":{"tested_on":"2026-11-27","method":"download","http_status":200,"problems":[]},"example":null,"members_summary":null},{"source_id":"distribution","name":"Distribution operators’ embedded capacity registers: sample","publisher":"Distribution network operators","official":true,"landing_url":null,"data_url":null,"access":"api","format":"JSON, CSV or web","license":"varies by operator","language":"en","has_coordinates":true,"location_precision":"exact","summary":"Operator registers cover distribution-connected and accepted projects; Northern Powergrid data are queryable.","coverage_note":"Northern Powergrid tested in northeast England and Yorkshire; SSEN and NGED data downloads were blocked.","data_date":"13 November 2026 for Northern Powergrid","caveats":["Coverage and access differ by operator; ECRs omit many unaccepted enquiries."],"test":{"tested_on":"2026-11-27","method":"api_query","http_status":200,"problems":[]},"example":null,"members_summary":{"total":null,"listed":4,"tested":4,"data_found":2,"scope_note":"Three DNO group examples reviewed, chosen for accessible dataset leads; not all GB operators are covered.","pattern":null}}],"other_sources_count":0,"if_unstructured":{"summary":"Where published information is in workbooks or case documents, extract only their stated status; the example does not fill all missing requests."},"local_terms":[{"term":"Transmission Entry Capacity","language":"en","meaning":"Contracted TEC, not all applications."},{"term":"Gate 2","language":"en","meaning":"Prioritised connection agreement after applicable assessment and countersignature."},{"term":"Embedded Capacity Register","language":"en","meaning":"Distribution operator register; distinct from NESO Scottish Embedded register."}],"provenance":{"pass_count":1,"models":["GPT-6"],"minutes_estimate":12,"pages_opened":null,"passes":[{"pass":1,"date":"2026-11-27","model":"GPT-6"}],"note":"Minutes are researcher estimates. Counts describe documented passes, not publication approval. Missing history or effort is not reconstructed."},"card_url":"https://georutter.org/v1/gb/grid-connection-queue.json","detail_url":"https://georutter.org/v1/gb/grid-connection-queue/detail.json","html_url":"https://georutter.org/gb/grid-connection-queue/","country_url":"https://georutter.org/v1/countries/gb.json"}